RIVER KANHAN At

Total Page:16

File Type:pdf, Size:1020Kb

RIVER KANHAN At 1 PROPOSED ACTION PLAN FOR REJUVENATION OF RIVER KANHAN at BOREGAON TAH : SAUSAR DISTT : CHHINDWARA PREPARED BY :- M. P. POLLUTION CONTROL BOARD, Chhindwara 2 CONTENTS SR. NO. CONTENTS PAGE NO. 1 Executive summary 3 2 Back Ground /NGT Case No. 673/2018 4 3 Components of Action Plan 5 4 Basic information of Kanhan River 6-10 5 Water Quality of Kanhan river 11-12 6 Industrial Area Status of Borgaon 13 7 Short / long term Action Plan 14-19 3 EXECUTIVE SUMMARY ON PROPOSED ACTION PLANS FOR REJUVENATION OF RIVER FOR IDENTIFIED POLLUTED RIVER STRETCH S. No. DESCRIPTION OF ITEM Details 1 Name of the identified polluted river and its tributaries : Kanhan River 2 Is river is perineal and total length of the polluted river : Yes 3 No of drains contributing to pollution and names of major : 1 ( Barsati River/ Nall) drains 4 Whether ‘River Rejuvenation Committee (RRC) constituted by : the State Govt./UT Administration and If so, Date of constitution of ‘RRC’ 5 Major Towns on the banks of the river with population : Nil a. Total water consumption and sewage generation in MLD : N.A. b. Total no. of existing STPs and the total capacities in MLD : Nil c. Gaps in sewage treatment in MLD and no. of towns not : N.A having STPs d. Total MSW generation in TPA : No city near bank e. Existing treatment and disposal facilities and total : N.A capacity 6 Major industrial estates located with total no. of : 1 No. of ind. 70 industries a. Total water consumption and total industrial effluent : Water Consumption. -- 8520 KLD generation in MLD Discharge & Re use -- 8400 KLD b. No. of industries having captive ETPs and their : 14 treatment capacity in MLD c. No of CETP’s and their treatment capacity : Nil d. Gaps in treatment of industrial effluent : Nil e. Total HW generation in TPA in the catchment area : f. Existing HW Treatment and Disposal Facilities and total : Dispose through recyclers and TSDF capacity with life span 7 Action plan includes mainly covering aspect such as (Proposal : No waste discharge in river. for utilization of sewage, ground water recharging or rain water harvesting, measures for regulating ground water use, protection and management of flood plain zone, maintaining minimum E-flows and water shed management, plantation on both sides of the river, setting up of bio-diversity parks etc., as per Hon’ble NGT Orders dated 20.09.2018 and 19.12.2018) 8 Min. and Max. required time period for implementation of 3 - months 6 - years action plans 9 Total estimated budget in crores towards implementation of : preparation of DPR in one year proposed action plans with break-up ( e.g. No. of STPs, capacity, total cost; No of CETPs, total capacity, Cost towards interception and diversion of sewage/effluent to STPs/CETPs etc.,) 10 Responsible Organization (s) for implementation : Shown in plan of proposed action plans (Please enclose details as annexure ) 11 Proposed Mechanism for execution of action plans : 12 Expected deliverables w r to achieving Goals (Please enclose as : annexure ) 4 NGT Case No. 673/2018 • Hon’ble National Green Tribunal, Central Zonal Bench, New Delhi, in the matter of original application no. 673/2018 (News Item Published in the “Hindu” authored by Shri Jacob Koshy titled” More river stretches are now critically polluted: CPCB”) passed an order on 20/09/2018. • The para 48 states that “it is absolutely necessary that Action Plans are prepared to restore the polluted river stretches to the prescribed standards.” Para 49 states that “Model Action Plan for Hindon River” already provided by CPCB may also be taken into account.” • All states and Union Territories are directed to prepare action plans within two months for bringing all the polluted river stretches to be fit at least for bathing purposes (i.e. BOD < 3 mg/L and FC < 500 MPN/100 ml) within six months from the date of finalization of the action plans. 5 • Components like identification of polluting sources including functioning/ status of STPs/ETPs/CETP. • Solid waste management and processing facilities, quantification and characterization of solid waste, trade and sewage generated in the catchment area of polluted river stretch. • The action plan will address issues relation to; ground water extraction, adopting good irrigation practices, • Protection and management of Flood Plain Zones (FPZ), • Rain water harvesting, ground water charging maintaining minimum environmental flow of river. • Plantation on both sides of the river. • Setting up of biodiversity parks on flood plains by removing encroachment. • The action plan should focus on proper interception and diversion of sewage carrying drains to the Sewage Treatment Plant (STP) • Utilization of treated sewage so as to minimize extraction of ground or surface water. • The action plan should have speedy, definite or specific timelines for execution of steps. • Provision may be made to pool the resources, utilizing funds from State budgets, local bodies, State Pollution Control Board/ Committee and out of Central Schemes. 6 Basic Information of Kanhan river Stretch • Kanhan River is non perennial and intermittent. • River Kanhan originates from village Bhaleaam , flows through the Damua Town To village Borgaon & finally River cross to interstate boundary near village Khapa padriwar after travelling approx. 200. Kms. • Among full length of Kanhan river only Borgaon catchment area is been mark under the action plan. • River “Jam” flows near by the small town Lodikheda and joins to Kanhan River near at village sangam, before Intec Well Point Sangam. No sewage waste discharge in this river from lodikheda town. This river being dry in all season's rest of monsoon. • Around Borgaon area there are three or four small villeges/towns situated in catchment area. From each town and Borgaon industrial area one or two seasonal nallas are flow to words the Kanhan river. (detail map enclosed.) • Population/ water supply of marked towns are:- • Lodikheda - 9950 1000 Kl/day • Borgaon - 7497 700 Kl/Day • Satnoor - 1784 150 kl/Day • Kheritaygaon - 3721 300 Kl/Day 7 Status of Pollution sources Nallas before Mixing in to Kanhan ( Dry ) • Only one industrial area “ AKVN Industrial Growth centre” Borgaon is situated Approx. 9-10 KM. away from Kanhan River . • Three small drains generate from industrial area region and combine after travelling of about 2 km. This combined nalla travel 7.0 Km and mix in lodikheda nalla. It is dry at kabar pipla village before mix in lendi river. Again, this nalla trevel 1.5 Km and mixed in Lendi river . At last this mix in Kanhan river after travel of 1.5 km. It is also dry. 8 These all are seasonal nallas. Water flow found only in monsoon season. Recent position shows in photo graph , showing total dry position at mixing point of lodikheda nalla and confluence point of Kanhan river. Nalla from Satnoor is also found dry in present status. Nalla from Khairitaygaon dry in present status. Status of River kanhan at borgaon area stretch STATE RIVER RIVER BOD RANGE/ PRIORITY NAME STRETCH MAX VALUE (mg/L) Madhya KANHAN KANHAN IN 3.2 V Pradesh CHHINDWARA DISTRICT BOUNDRY 9 Kanhan River , Borgaon catchment , Chhindwara lodhikheda Jam River Kanhan River Barsati Nalla Borgaon Borgoan 1 Photograph enclosed of markesd site Borgaon Industrial 2 Area 3 Barsati Nalla Kheritaigaon Borgaon Ind. area Nall Barsati Nalla Satnoor 1,2,3 Barsati Nalla Satnoor 10 11 Water quality of Kanhan river Industrial. Only from June to December water flows in river and there is no flow from January to May. So sampling and monitoring done only from June to Dec. Data sheet enclosed. Only once BOD was 3.2 in December 2018 in monitoring results. It was slightly high then limit. After comparing results of two years the BOD value was slightly exceed from 3.0. It could be happened due to human error. All the possible drains shown in Google image became dry after travelling of some KM. From source and all sources became dry before mixing in to Kanhan River. So throughout the year there is no source available to pollute Kanhan River. Domestic. All Nallas near the towns in catchment area became dry after travelling of some distance. So there are no possibilities of contributing of pollution in river due to urban discharge or City Sewage. 12 Water Quality During Year- 2017-18 Nature Water Resource :- KANAHN RIVER AT Sausar, CHHINDWARA Description of Sapmling Station :- RIVER WATER AFTER MIXING BORGAON GROWTH CENTER NALLA AT BORGAON, CHHINDWARA S.No. Characteristic Unit Sept. Mar Av. Maxi. Mini. Date of Sampling 04/09/2017 23.03.2018 1 pH pH Units 8.34 8.19 8.27 8.34 8.19 2 Total Dissolved mg/l 518.00 595 556.50 595.00 518.00 solids 3 Total Coliform MPN/100 ml 39.00 - 39.00 39.00 39.00 4 Chemical Oxygen mg/l 20.00 20 20.00 20.00 20.00 Demand 5 B.O.D. mg/l 3.20 2.8 3.00 3.20 2.80 Water Quality During Year- 2018-19 Nature Water Resource :- KANAHN RIVER AT Sausar, CHHINDWARA Description of Sapmling Station :- RIVER WATER AFTER MIXING BORGAON GROWTH CENTER NALLA AT BORGAON, CHHINDWARA S.No Sept. Dec Mar . Characteristic Unit Av. Maxi. Mini. Date of Sampling 06.03.20 13/09/2018 13.12.2018 19 1 pH pH Units 7.83 8.31 7.34 7.83 8.31 7.34 2 Total Dissolved mg/l 587.00 608.00 575.6 608.00 532.00 532.00 solids 7 3 Total Coliform MPN/100 ml 15.00 15.00 15.00 15.00 4 Chemical Oxygen mg/l 16.00 16.00 14.67 16.00 12.00 12.00 Demand 5 B.O.D.
Recommended publications
  • (EC) (14.03.2018) Accorded for Expansion of Gondegaon Extension OC, Nagpur Area, Dt
    Compliance Report for Amendment in Environmental Clearance (EC) (14.03.2018) Accorded for Expansion of Gondegaon Extension OC, Nagpur Area, Dt. Nagpur Maharashtra. June 2018 Western Coalfields Limited Nagpur 1 Expansion of Gondegaon Extension OC Sub:- Extension in validity of EC accorded for Expansion of Gondegaon Extension OC Coal mine Project from 2.5 MTPA to 3.5 MTPA of Western Coalfields Limited within existing ML area of 917 Ha located in Gondegaon Village, Parseoni Tehsil, Nagpur District, Maharashtra under Clause 7(ii) of the EIA Notification, 2006 – Amendment reg. Ref:- 1. EC letter accorded by MoEF & CC vide letter no. J-11015/106/2009 - IA.II(M) dated 14-03-2018. 1.0 Background: The proposal for Expansion of Gondegaon Extension OC Coal mine Project from 2.5 MTPA to 3.5 MTPA by M/s. Western Coalfields Limited in an area of 917 ha located in village Gondegaon, Tehsil Parseoni, District Nagpur was submitted through online portal of MoEF & CC vide no. IA/MH/CMIN/71601/2017 dated 14-12-2017. Subsequently, the proposal was considered by the EAC (TP & C) in its 24th meeting held on 11-01-2018. Based on the recommendation of the EAC, MoEF & CC accorded EC for the subject project vide letter J-11015/106/2009-IA.II(M) dated 14-03-2018 for enhancement in production capacity from 2.5 MTPA to 3.5 MTPA in a total area of 917 ha (mine lease area 845.74 ha) for a period of one year subject to compliance of terms and conditions and environmental safeguards mentioned below: i.
    [Show full text]
  • Government of India Ministry of Road Transport and Highways
    GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 3971 ANSWERED ON 12TH DECEMBER, 2019 NH PROJECTS IN MAHARASHTRA 3971. DR. SUJAY RADHAKRISHNA VIKHE PATIL: SHRI DHAIRYASHEEL SAMBHAJIRAO MANE: Will the Minister of ROAD TRANSPORT AND HIGHWAYS औ be pleased to state: (a) the details and the present status of the National Highway (NH) projects pending in Maharashtra, district-wise; (b) the details of the NH projects where construction has been delayed due to presence of defence land and dispute over approvals from defence forces; and (c) the steps taken/being taken by the Government to ensure quality of construction of NHs? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) The details and present status of National Highway projects pending (under construction/to be awarded) in the State of Maharashtra,district wise,is at Annexure-I. (b) There are 5 National Highway projects where construction have been delayed due to presence of defence land and delay in approvals from Ministry of Defence (MOD). Deliberations with MODare made for speedy transfer of defence land to this Ministry. The details of these projects are at Annexure-II. (c) To ensure quality construction, the NH projects are executed conforming toMoRT&H specifications, norms laid down in the relevant Manuals / IRC codes duly supervised by Authority’s Engineer / Independent Engineers andofficers of State PWD / MSRDC. ANNEXURE-I ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 3971 FOR ANSWER ON 12.12.2019 ASKED BY DR. SUJAY RADHAKRISHNA VIKHE PATIL & SHRI DHAIRYASHEEL SAMBHAJIRAO MANE REGARDING NH PROJECTS IN MAHARASHTRA.
    [Show full text]
  • Moef's Expert Appraial Committee on River Valley Projects
    MoEF’s Expert Appraial Committee on River Valley Projects: Stage 1 and 2 Environment Clearance status From the minutes of EAC meetings Project wise details: April 2007 to Dec 2012 South Asia Network on Dams, Rivers & People www.sandrp.in February 2013 2 TOR & Environment Clearance status of River Valley Projects: Project wise details: April 2007 to Dec 2012 TOR & Environment Clearance status of River Valley Projects Project wise details: April 2007 to Dec 2012 In this document we have given decision of meetings of Expert Appraisal Committee (EAC) for River Valley and Hydroelectric Projects constituted under the provisions of EIA notification 2006 during the period from Apr 2007 to Dec 2012. The document is organized region wise, comprising of North, North East, East, West and South Regions of India. Within each region, state wise information is given and within each state projects are listed river basin wise. For each project besides state, district and river basin, some basic features of the projects are given. After this, the dates of the EAC meetings where these projects were considered and main decisions taken in the EAC meetings are given. This document from the South Asia Network on Dams, RIvers & People1 (www.sandrp.in) provides further background and detailed information about the functioning of the EAC for the above mentioned period, compared to the overview information given in the accompanying SANDRP document2 titled “Analysis of MOEF’s EAC on RVP: The Expert Approval Committee has zero rejection in six years”, that is being simultaneously published. We are hopeful that these two documents will be helpful in giving clear picture about functioning of the EAC to all concerned.
    [Show full text]
  • Nag River Confluence with River Kanhan to NIT Colony, Nagpur (58.7Km) SURVEY PERIOD: 31 JUL 2016 to 30 SEP 2016
    Final Feasibility Report National Waterways-72, Region V - Nag River Confluence with River Kanhan to NIT Colony, Nagpur (58.7km) SURVEY PERIOD: 31 JUL 2016 to 30 SEP 2016 Volume - I Prepared for: Inland Waterways Authority of India (Ministry of Shipping, Govt. of India) A-13, Sector – 1, NOIDA Distt. Gautam Budh Nagar, Uttar Pradesh – 201 301 Document Distribution Date Revision Distribution Hard Copy Soft Copy INLAND WATERWAYS 05 Dec 2016 Rev – 0 01 01 AUTHORITY OF INDIA INLAND WATERWAYS 13 Jan 2017 Rev – 1.0 01 01 AUTHORITY OF INDIA INLAND WATERWAYS 17 Oct 2017 Rev – 1.1 04 04 AUTHORITY OF INDIA INLAND WATERWAYS 23 Nov 2017 Rev – 1.2 01 01 AUTHORITY OF INDIA INLAND WATERWAYS 22 Oct 2018 Rev – 1.3 04 04 AUTHORITY OF INDIA ACKNOWLEDGEMENT IIC Technologies Ltd. expresses its sincere gratitude to IWAI for awarding the work of carrying out detailed hydrographic surveys in the New National Waterways in NW-72 in Region V – Nag River from confluence with river Kanhan near Sawangi village to Bridge near NIT Colony, Nagpur. We would like to use this opportunity to pen down our profound gratitude and appreciations to Shri Pravir Pandey, IA&AS, Chairman IWAI for spending his valuable time and guidance for completing this Project. IIC Technologies Ltd., would also like to thank, Shri Alok Ranjan, ICAS, Member (Finance), Shri Shashi Bhushan Shukla, Member (Traffic), Shri S.K. Gangwar, Member (Technical) for their valuable support during the execution of project. IIC Technologies Ltd, wishes to express their gratitude to Capt. Ashish Arya, Hydrographic Chief IWAI, Cdr.
    [Show full text]
  • Ministry of Road Transport & Highways (2020-21)
    7 MINISTRY OF ROAD TRANSPORT & HIGHWAYS ESTIMATES AND FUNCTIONING OF NATIONAL HIGHWAY PROJECTS INCLUDING BHARATMALA PROJECTS COMMITTEE ON ESTIMATES (2020-21) SEVENTH REPORT ___________________________________________ (SEVENTEENTH LOK SABHA) LOK SABHA SECRETARIAT NEW DELHI SEVENTH REPORT COMMITTEE ON ESTIMATES (2020-21) (SEVENTEENTH LOK SABHA) MINISTRY OF ROAD TRANSPORT & HIGHWAYS ESTIMATES AND FUNCTIONING OF NATIONAL HIGHWAY PROJECTS INCLUDING BHARATMALA PROJECTS Presented to Lok Sabha on 09 February, 2021 _______ LOK SABHA SECRETARIAT NEW DELHI February, 2021/ Magha, 1942(S) ________________________________________________________ CONTENTS PAGE COMPOSITION OF THE COMMITTEE ON ESTIMATES (2019-20) (iii) COMPOSITION OF THE COMMITTEE ON ESTIMATES (2020-21) (iv) INTRODUCTION (v) PART - I CHAPTER I Introductory 1 Associated Offices of MoRTH 1 Plan-wise increase in National Highway (NH) length 3 CHAPTER II Financial Performance 5 Financial Plan indicating the source of funds upto 2020-21 5 for Phase-I of Bharatmala Pariyojana and other schemes for development of roads/NHs Central Road and Infrastructure Fund (CRIF) 7 CHAPTER III Physical Performance 9 Details of physical performance of construction of NHs 9 Details of progress of other ongoing schemes apart from 10 Bharatmala Pariyojana/NHDP Reasons for delays NH projects and steps taken to expedite 10 the process Details of NHs included under Bharatmala Pariyojana 13 Consideration for approving State roads as new NHs 15 State-wise details of DPR works awarded for State roads 17 approved in-principle
    [Show full text]
  • Maharashtra 211Th Meeting of SEIAA (VC2
    State Environment Impact Assessment Authority (SEIAA) Maharashtra 211th Meeting of SEIAA (VC2)(PART-4) AGENDA Venue: Meeting Through Video Conferencing Please Check MoEF&CC Website at www.parivesh.nic.in for details and updates Date : 08 Dec 2020 Time : 12.00 PM Onwards CONSIDERATION/RECONSIDERATION OF ENVIRONMENTAL CLEARANCE S.No Proposal Environmental Clearance for proposed river bed Sand mining having area 3.20 Ha of Garanda sand ghat on Pench River. S. State District Tehsil Village (1) No. (1.) Maharashtra Nagpur Parseoni Garanda [SIA/MH/MIN/160896/2020 , SIA/MH/MIN/160896/2020 ] Environmental Clearance for proposed river bed Sand mining having area 3.00 Ha of Ghatrohna sand ghat on Pench River. S. State District Tehsil Village (2) No. (1.) Maharashtra Nagpur Parseoni Ghatrohna [SIA/MH/MIN/161028/2020 , SIA/MH/MIN/161028/2020 ] Environmental Clearance for proposed river bed Sand mining having area 2.00 Ha of Palora sand ghat on Pench River. S. State District Tehsil Village (3) No. (1.) Maharashtra Nagpur Parseoni Palora [SIA/MH/MIN/161155/2020 , SIA/MH/MIN/161155/2020 ] Environmental Clearance for proposed river bed Sand mining having area 1.93 Ha of Pipla sand ghat on Pench River. S. State District Tehsil Village (4) No. (1.) Maharashtra Nagpur Parseoni Pipla [SIA/MH/MIN/161233/2020 , SIA/MH/MIN/161233/2020 ] Environmental Clearance for proposed river bed Sand mining having area 4.50 Ha of Sihora sand ghat on Kanhan River. (5) S. State District Tehsil Village No. (1.) Maharashtra Nagpur Parseoni Sihora [SIA/MH/MIN/161345/2020 , SIA/MH/MIN/161345/2020 ] Environmental Clearance for proposed river bed Sand mining having area 4.40 Ha of Singardip sand ghat on Kanhan River S.
    [Show full text]
  • GRMB Annual Report 2018-19 | 59
    Government of India Ministry of Jal Shakti Department of Water Resources, River Development & Ganga Rejuvenation Godavari River Management Board GODAVARI RIVER Origin Brahmagiri near Trimbakeshwar, Nashik Dist., Maharashtra Geographical Area 9.50 % of Total Geographical Area of India Location Latitude – 16°19’ to 22°34’ North Longitude – 73°24’ to 83° 40’ East Boundaries West: Western Ghats North: Satmala hills, Ajanta range and the Mahadeo hills East: Eastern Ghats & Bay of Bengal South: Balaghat & Mahadeo ranges, stretching from eastern flank of Western Ghats & Anantgiri and other ranges of the hills. Ridges separate the Godavari basin from Krishna basin. Catchment Area 3,12,812 Sq.km. Length of the River 1465 km States Maharashtra, Madhya Pradesh, Chhattisgarh, Odisha, Karnataka, Telangana, Andhra Pradesh and Puducherry (Yanam). Length in AP & TS 772 km Major Tributaries Pravara, Manjira, Manair – Right side of River Purna, Pranhita, Indravati, Sabari – Left side of River Sub- basins Twelve (G1- G12) Select Dams/ Head works Gangapur Dam, Jayakwadi Dam, Srirama Sagar, Sripada across Main Godavari Yellampally, Kaleshwaram Projects (Medigadda, Annaram & Sundilla barrages), Dummugudem Anicut, Polavaram Dam (under construction), Dowleswaram Barrage. Hydro power stations Upper Indravati 600 MW Machkund 120 MW Balimela 510 MW Upper Sileru 240 MW Lower Sileru 460 MW Upper Kolab 320 MW Pench 160 MW Ghatghar pumped storage 250 MW Polavaram (under 960 MW construction) ANNUAL REPORT 2018-19 GODAVARI RIVER MANAGEMENT BOARD 5th Floor, Jalasoudha,
    [Show full text]
  • (River/Creek) Station Name Water Body Latitude Longitude NWMP
    NWMP STATION DETAILS ( GEMS / MINARS ) SURFACE WATER Station Type Monitoring Sr No Station name Water Body Latitude Longitude NWMP Project code (River/Creek) Frequency Wainganga river at Ashti, Village- Ashti, Taluka- 1 11 River Wainganga River 19°10.643’ 79°47.140 ’ GEMS M Gondpipri, District-Chandrapur. Godavari river at Dhalegaon, Village- Dhalegaon, Taluka- 2 12 River Godavari River 19°13.524’ 76°21.854’ GEMS M Pathari, District- Parbhani. Bhima river at Takli near Karnataka border, Village- 3 28 River Bhima River 17°24.910’ 75°50.766 ’ GEMS M Takali, Taluka- South Solapur, District- Solapur. Krishna river at Krishna bridge, ( Krishna river at NH-4 4 36 River Krishna River 17°17.690’ 74°11.321’ GEMS M bridge ) Village- Karad, Taluka- Karad, District- Satara. Krishna river at Maighat, Village- Gawali gally, Taluka- 5 37 River Krishna River 16°51.710’ 74°33.459 ’ GEMS M Miraj, District- Sangli. Purna river at Dhupeshwar at U/s of Malkapur water 6 1913 River Purna River 21° 00' 77° 13' MINARS M works,Village- Malkapur,Taluka- Akola,District- Akola. Purna river at D/s of confluence of Morna and Purna, at 7 2155 River Andura Village, Village- Andura, Taluka- Balapur, District- Purna river 20°53.200’ 76°51.364’ MINARS M Akola. Pedhi river near road bridge at Dadhi- Pedhi village, 8 2695 River Village- Dadhi- Pedhi, Taluka- Bhatkuli, District- Pedhi river 20° 49.532’ 77° 33.783’ MINARS M Amravati. Morna river at D/s of Railway bridge, Village- Akola, 9 2675 River Morna river 20° 09.016’ 77° 33.622’ MINARS M Taluka- Akola, District- Akola.
    [Show full text]
  • District Survey Report for Sand Mining Or River Bed Mining
    Draft DSR Report for Gondia DISTRICT SURVEY REPORT FOR SAND MINING OR RIVER BED MINING Prepared by District Mining Officer Collector Office, Gondia Prepared Under A] Appendix –X Of MoEFCC, GoI. Notification S.O. 141(E) Dated 15.1.2016 B] Sustainable Sand Mining Guidelines C] MoEFCC, GoI. Notification S.O. 3611(E) Dated 25.07.2018 DISTRICT-GONDIA MAHARASHTRA PREFACE With reference to the gazette notification dated 15th January 2016, ministry of Environment, Forest and Climate Change, the State environment Impact Assessment Authority (SEIAA) and State Environment Assessment Committee (SEAC) are to be constituted by the divisional commissioner for prior environmental clearance of quarry for minor minerals. The SEIAA and SEAC will scrutinize and recommend the prior environmental clearance of ministry of minor minerals on the basis of district survey report. The main purpose of preparation of District Survey Report is to identify the mineral resources and mining activities along with other relevant data of district. This report contains details of Lease, Sand mining and Revenue which comes from minerals in the district. This report is prepared on the basis of data collected from different concern departments. A survey is carried out by the members of DEIAA with the assistance of Geology Department or Irrigation Department or Forest Department or Public Works Department or Ground Water Boards or Remote Sensing Department or Mining Department etc. in the district. Minerals are classified into two groups, namely (i) Major minerals and (ii) Minor minerals. Amongst these two groups minor mineral have been defined under section 3(e) of Mines and Minerals (Regulation and development) Act, 1957.
    [Show full text]
  • 7437-A-2017.Pdf
    Available Online at http://www.recentscientific.com International Journal of CODEN: IJRSFP (USA) Recent Scientific International Journal of Recent Scientific Research Research Vol. 8, Issue, 5, pp. 16953-16959, May, 2017 ISSN: 0976-3031 DOI: 10.24327/IJRSR Research Article GIS-BASED MORPHOMETRIC ANALYSIS OF PENCH RIVER BASIN Lokesh Shrivastava1., *Shashikant Nag1 and Ritu Rani2 1Department of Post Graduate Studies and Research in Geography, Rani Durgavati University, Jabalpur, Madhya Pradesh, India 2Department of Geography, Govt. Mahakoshal Arts and Commerce College, Jabalpur, Madhya Pradesh, India DOI: http://dx.doi.org/10.24327/ijrsr.2017.0805.0252 ARTICLE INFO ABSTRACT Article History: Morphometric analysis is important in any hydrological investigation and it is inevitable in development and management of drainage basin. The development of morphometric techniques was Received 20th February, 2017 a major advance in the quantitative description of the geometry of the drainage basins and its Received in revised form 29th network which helps in characterizing the drainage network. The geomorphological properties March, 2017 which are important from the hydrological studies point of view include the linear, aerial and relief Accepted 30th April, 2017 aspect of the watersheds. The study indicates that analysis of morphometric parameters with the help Published online 28th May, 2017 of geographic information system (GIS) would prove a viable method of characterizing the Key Words: hydrological response behaviour of the watershed. In the present study a morphometric analysis of Pench river basin area has been carried out using geoprocessing techniques in GIS. In this study, Pench River Basin, Morphometric analysis, Pench River basin a tributaries of Kanhan River has been selected for detailed morphometric drainage morphology, drainage area, GIS analysis.
    [Show full text]
  • Model Simulation Study of Coal Mining Under River Beds in India T
    International Journal of Mine Water, VoZ.4, (3), (1985), 1-10, Mnted in Madrid, Spain. MODEL SIMULATION STUDY OF COAL MINING UNDER RIVER BEDS IN INDIA T. N. Singh*, B. Singh**, *Deputy Director, **Director, Central Mining Research Station, Dhanbad 826001, India. ABSTRACT Over 80% coal reserve of Bihar coalfield and substantial portion of Ranigunj coalfield of India is within Damodar river basin. Mahanadi - brahmani basin is the coal resource of Orissa region. Total coal of Nagpur area is under the HFL of Kanhan river. The methods of mining thick seams under these water bodies and depth cover of 50 m to 500 m required planning such that thick strata band in between the subsiding mass and the floor of the water body remained free from tensile strain, cracks, bed separation or open joints. For these studies, the high flood level of rivers was taken as catastrophic danger in view of their perennial water resource. With a view to evolving suitable mining geometry under Indian geo- mining conditions, an indirect technique - Equivalent Material Mine Modelling was used. The studies conducted under idealised laboratory condition covered the scope of mining 7 m thick seam under river Damodar at Sudamdih Incline mine, 2-4 m thick seam under Damodar at Chinakuri and Seetalpur mines, 3 m thick seam under HFL of river Brahmani at Deulbera, and 5 seams of 40 m total thickness under Kanhan river High Flood Level (HFL) at Kamptee colliery. The problem of mining different seams of Sudamdih, Chasnalla and Chapui Khas underneath subsurface water was also studied in models.
    [Show full text]
  • 2020031344.Pdf
    DISTRICT SURVEY REPORT (For Sand Mining) (As per Ministry of Environment, Forest and Climate Change, G.O.I, New Delhi; Notification No. S. O. 3611 (E), Dated - 25th July, 2018.) 2020 CHAPTER 1 INTRODUCTION Nagpur is the winter capital of the state of Maharashtra, a fast growing metropolis and third largest city in Maharashtra after Mumbai and Pune. With a population of 2,405,421 (2011) Nagpur Metropolitan Area is the 13th largest urban conglomeration in India. It has also recently been ranked as the cleanest city and the second greenest city of India. In addition to being the seat of annual winter session of Maharashtra state assembly “Vidhan Sabha”, Nagpur is also a major commercial and political center of the Vidharbha region of Maharashtra, and is also famous throughout the country as “Orange City” for being a major trade center of oranges that are cultivated in the region. In addition, the city also derives political importance from being the headquarters for the RSS and an important location for the Buddhistmovement. The city was founded by the Gonds but later became part of the Maratha Empire under the Bhonsles. The British East India Company took over Nagpur in the 19th century and made it the capital of the Central Provinces and Berar. After the first reorganization of states, the city lost its capital status but according to the “Nagpur Pact” between political leaders it was made the second capital of Maharashtra. Pic 1: Central Provinces and Berar, 1903. Nagpur is also called, “Tiger Capital of India” as it connects many Tiger Reserves in India to the world.
    [Show full text]