1 Verve Energy Annual Report 2006 Table of Contents
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
ROAM Consulting Report on Security of Supply and Tranmission Impacts Of
ROAM Consulting Pty Ltd A.B.N. 54 091 533 621 Report (EMC00017) to Impact of the LRET on the costs of FCAS, NCAS and Transmission augmentation 13 September 2011 Report to: Impact of the LRET on the costs of FCAS, NCAS and Transmission augmentation EMC00017 13 September 2011 VERSION HISTORY Version History Revision Date Issued Prepared By Approved By Revision Type Jenny Riesz Joel Gilmore Sam Shiao 0.9 2011-07-04 Ian Rose Preliminary Draft David Yeowart Richard Bean Matthew Holmes Jenny Riesz 1 2011-07-07 Ian Rose Complete Matthew Holmes 1.1 2011-07-07 Jenny Riesz Ian Rose Minor text edits Minor text edits - Appendix B 1.2 2011-09-01 Jenny Riesz - and explanation of Badgingarra Minor text edits – further 1.3 2011-09-13 Jenny Riesz - explanation of Badgingarra ROAM Consulting Pty Ltd VERSION HISTORY www.roamconsulting.com.au Report to: Impact of the LRET on the costs of FCAS, NCAS and Transmission augmentation EMC00017 13 September 2011 EXECUTIVE SUMMARY At the request of the Ministerial Council on Energy, the Australian Energy Market Commission (AEMC) is conducting an assessment of the impact of the Large-scale Renewable Energy Target (LRET) on security of energy supply, the price of electricity and emissions levels from the energy sector. The AEMC appointed consultants to develop a long-term generation expansion plan for meeting the LRET. Consequently, the ‘core’ scenarios for the portfolio and geographic distribution of technologies have been determined. ROAM Consulting was subsequently appointed to utilise these scenarios to forecast the cost of Frequency Control Ancillary Services (FCAS), Network Support and Control Ancillary Services (NSCAS) and transmission augmentation associated with the LRET for the National Electricity Market (NEM) and the South West Interconnected System (SWIS). -
ERM Power's Neerabup
PROSPECTUS for the offer of 57,142,858 Shares at $1.75 per Share in ERM Power For personal use only Global Co-ordinator Joint Lead Managers ERMERR M POWERPOWEPOWP OWE R PROSPECTUSPROSPEOSP CTUCTUSTU 1 Important Information Offer Information. Proportionate consolidation is not consistent with Australian The Offer contained in this Prospectus is an invitation to acquire fully Accounting Standards as set out in Sections 1.2 and 8.2. paid ordinary shares in ERM Power Limited (‘ERM Power’ or the All fi nancial amounts contained in this Prospectus are expressed in ‘Company’) (‘Shares’). Australian currency unless otherwise stated. Any discrepancies between Lodgement and listing totals and sums and components in tables and fi gures contained in this This Prospectus is dated 17 November 2010 and a copy was lodged with Prospectus are due to rounding. ASIC on that date. No Shares will be issued on the basis of this Prospectus Disclaimer after the date that is 13 months after 17 November 2010. No person is authorised to give any information or to make any ERM Power will, within seven days after the date of this Prospectus, apply representation in connection with the Offer which is not contained in this to ASX for admission to the offi cial list of ASX and quotation of Shares on Prospectus. Any information not so contained may not be relied upon ASX. Neither ASIC nor ASX takes any responsibility for the contents of this as having been authorised by ERM Power, the Joint Lead Managers or Prospectus or the merits of the investment to which this Prospectus relates. -
Western Power Corporation Standard Form Contract 2
Decision on: 1. Western Power Corporation Standard Form Contract 2. Synergy Standard Form Contract 3. Horizon Power Standard Form Contract 30 March 2006 A full copy of this document is available from the Economic Regulation Authority website at www.era.wa.gov.au. For further information, contact: Mr Paul Kelly Economic Regulation Authority Perth, Western Australia Phone: (08) 9213 1900 © Economic Regulation Authority 2006 The copying of this document in whole or part for non-commercial purposes is permitted provided that appropriate acknowledgment is made of the Economic Regulation Authority and the State of Western Australia. Any other copying of this document is not permitted without the express written consent of the Authority. Economic Regulation Authority DECISION 1. On 20 December 2005, Western Power Corporation submitted an application to the Economic Regulation Authority (Authority) for the approval of draft standard form contracts (Application). The draft standard form contracts were submitted as part of Western Power Corporation’s application for a Retail Licence and Integrated Regional Licence. 2. Disaggregation of Western Power Corporation is expected to take place on 1 April 2006. At this time, a statutory Transfer Order made in accordance with section 147 of the Electricity Corporations Act 2005 will reform Western Power Corporation into four separate business units being: • Generation: Electricity Generation Corporation (Verve Energy), • Networks: Electricity Networks Corporation (Western Power); • Retail: Electricity Retail -
Pdf (935.83Kb)
Market Participant Comments / IMO Responses - 8 August 2011 Market Participant who Issue/comment IMO Response provided response Alinta Alinta – Corey Dykstra Why is “Electricity Generation Corporation” changed to “Verve The similarities between the different state owned entities and the 1. Energy”. Is it intended that this term be amended throughout the increased references to the Electricity Generation Corporation and Market Rules? If so, will references to “Electricity Networks Electricity Generation Corporation Facilities in the new balancing rules, Corporation” be changed to “Western Power”; and combined to make the use of “Electricity Generation Corporation” a “Electricity Retail Corporation” be similarly changed to cumbersome and potentially confusing moniker. The IMO considers “Synergy”? that the new drafting using Verve Energy creates an easier to read set of Market Rules. (Verve – Andrew/Wendy also make this point). The IMO agrees with Alinta that to ensure consistency the other state owned entities should also be renamed. 2. 2.16.2 - It would appear that Verve Energy’s Portfolio Supply The intention is to include the Verve Energy Portfolio Supply Curve. Curve is not included in the “Market Surveillance Data The definition of “Balancing Submission” includes the Verve Energy Catalogue” set out in clause 2.16.2 – this appears inconsistent Balancing Portfolio Supply Curve, hence the reference to Balancing with the inclusion of Balancing Submissions in respect of other Submissions in clause 2.16.2 results in the Verve Energy Balancing Balancing Facilities, including Verve Energy’s Stand Alone Portfolio Supply Curve being included in the Market Surveillance Data Facilities. What is the rationale for this? Catalogue. -
Peak Demand Forecasts
2014 Electricity Statement of Opportunities (ESOO) Stakeholder Workshop Neetika Kapani A/Manager, System Capacity 1 July 2015 1 Agenda Background Purpose Key Findings o Peak Demand Forecasts o Energy Forecasts Interesting Analysis o Capacity Credits by Market Participant o Individual Reserve Capacity Requirement (IRCR) o Solar PV o Battery Questions 2 2014 and 2015 ESOO deferrals Minister for Energy directed IMO on 29 April 2014 to defer certain aspects of the 2014 Reserve Capacity Cycle, by a year. 13 March 2015 to defer certain aspects of the 2015 Reserve Capacity Cycle, by a year. On 17 June 2015, the IMO published 2014 ESOO and sets the Reserve Capacity Target for the 2016-17 Capacity Year Reserve Capacity Information Pack 3 RCM Process http://www.imowa.com.au/home/electricity/reserve-capacity 4 Purpose of the 2014 ESOO Provides market data and information of interest to current and potential WEM participants and stakeholders Sets the Reserve Capacity Target (RCT) for the 2016-17 Capacity Year o RCT for 2016-17 is 4,557 MW o Based on the 10 per cent probability of exceedance (PoE) forecast plus a reserve margin 5 Key Findings • Unusual Early Peak 5 January 2015 15:30- 16:00 TI Demand of 3744 MW • SWIS demand growth flattening • IRCR mechanism continues to be effective • Customer behaviour changing rapidly • Healthy mix and diversity of generation capacity and DSM continues • No new generation or Demand Side Management (DSM) capacity will be required for the 2015 to 2025 forecast period 6 Forecasting presents Challenges -
Inquiry Into the Funding Arrangements of Horizon Power
Economic Regulation Authority Inquiry into the Funding Arrangements of Horizon Power Issues Paper 3 June 2010 A full copy of this document is available from the Economic Regulation Authority website at www.erawa.com.au. For further information, contact Economic Regulation Authority Perth, Western Australia Phone: (08) 9213 1900 The copying of this document in whole or in part for non-commercial purposes is permitted provided that appropriate acknowledgement is made of the Economic Regulation Authority and the State of Western Australia. Any other copying of this document is not permitted without the express written consent of the Authority. Disclaimer This document has been compiled in good faith by the Economic Regulation Authority (the Authority). This document is not a substitute for legal or technical advice. No person or organisation should act on the basis of any matter contained in this document without obtaining appropriate professional advice. The Authority and its staff members make no representation or warranty, expressed or implied, as to the accuracy, completeness, reasonableness or reliability of the information contained in this document, and accept no liability, jointly or severally, for any loss or expense of any nature whatsoever (including consequential loss) (“Loss”) arising directly or indirectly from any making available of this document, or the inclusion in it or omission from it of any material, or anything done or not done in reliance on it, including in all cases, without limitation, Loss due in whole or part to the negligence of the Authority and its employees. This notice has effect subject to the Trade Practices Act 1974 (Cth) and the Fair Trading Act 1987 (WA), if applicable, and to the fullest extent permitted by law. -
2014-11-25 QWON Power Stations
LEGISLATIVE COUNCIL C1379 QUESTION WITHOUT NOTICE (Of which some notice has been given) Tuesday, 25 November 2014 Hon Robin Chapple to the Leader ofthe House representing the Minister for Energy. Please provide a summary of all active power stations in Western Australia, including: age; capacity profile; fuel and/or mine type; number of employees; whether it is on or off the grid; and the closure schedule. I thankthe Hon. Member for some notice of this question. I table the attached document. The Public Utilities Office has relied on the Independent Market Operator for data concerning generators on the SWIS and has reported the maximum sent out capacity offered by these facilities into the Balancing Market, as of 25 November 2014. These figures may differ slightly from the number of capacity credits awarded and from facility nameplate capacity owing to factors including parasitic load and ambient temperature. For NWIS and NIS facilities, various sources have been used as there is no single definitive list of facilities. The nature of mining operations has not been investigated. The Public Utilities Office does not have access to data on the number of employees or on the closure schedule of power stations. The expected plant life of power stations is variable, a function of maintenance regimes and commercial considerations. ATTACHMENT TO QWN C1379 . 'I . " ~ -1J&1t~-n i ~,'l;(, : 'C' 4\", lTt ~A','~:'l';"(~.i~ffil!. " l]f,:,gl '~. l) , '. lifP'\1 ~, , •. 'fg~~t:t.: :' (~~.~:~n.', . ~ j - llll' ~!l!i:jliiW~tlilit~r~QJ\l1~~t~ii~Sys:t~m;(~~),~'•. -
Answers to Questions Prior to Hearing
Hon Mike Nahan MLA Treasurer; Minister for Energy; Citizenship and Multicultural Interests Ourref: 48-13528; 48-13527 Hon Ken Travers MLC Chairman Estimates and Financial Operations Committee Parliament House PERTH WA 6000 Attn: Mr Mark Warner Committee Clerk Dear Mr Travers QUESTIONS PRIOR TO 2014-15 ANNUAL REPORT HEARINGS - SYNERGY AND HORIZON POWER In response to the Committee's letter of 20 October 2015, please find attached responses to the questions prior to hearing, in respect of Synergy and Horizon Power's 2014-15 annual report. Yours sincerely DR MIKE NAHAN MLA TREASURER Att. CC: Hon Peter Collier MLC Minister representing the Minister for Energy in the Legislative Council 1 9 NOV 2015 Level 13, Dumas House, 2 Havelock Street, West Perth, Western Australia 6005 Telephone: +61 8 6552 5700 Facsimile: +61 8 6552 5701 Email: [email protected] ESTIMATES AND FINANCIAL OPERATIONS COMMITTEE 2014/15 ANNUAL REPORT HEARINGS QUESTIONS PRIOR TO HEARING Synergy Annual Report 2014/15 Hon Robin Chappie asked: 1) Page 5 under "Our Business," I ask: a) How many people are employed at each of your nine power stations? Answer: Employees (2014-15) Cockbum Power Station 19 Kalgoorlie Gas Turbine Mungarra Gas Turbine 5 Pinjar Power Station Kwinana Power Station (includes Kwinana Gas Turbines) 11 Geraldton Gas Turbine 0 Worsley (South West Co-Generation Joint Venture) 0 (operated by Worsley Alumina) Muja Power Station 337 Collie Power Station 1 FTE + contractors as required. How many people are employed at each of your nine wind farms? Answer: Employees (2014-15) Albany Wind Farm Bremer Bay Wind-Diesel System 4 Esperance Wind Farms Hopetoun Wind-Diesel System Coral Bay Wind-Diesel System 2 Denham Wind-Diesel System 2 Kalbarri Wind Farm 1 Mumbida Wind Farm 6 How many people are employed at your one solar farm? Answer: Employees (2014-15) Greenough River Solar Farm 1.5 2) Page 21 under "Delivering energy" you describe two station transformers failing and a partial cooling tower collapse at Muja Power Station, I ask: a) Have these issues been rectified? Answer: Yes. -
Kemerton Power Station Referral Supporting Documentation Volume I
U. Environmental ern.'iroi:,,:enta! scientists TRANSFIELD SERVICES TRANSFIELD SERVICES KEMERTON TRUST .. -. .. -- - * :*-. • KEMERTON POWER STATION REFERRAL SUPPORTING DOCUMENTATION VOLUME I 1)oF Information Centre VERSION 3 \\l\\ll\\\ll\\ll\\l\l\\\\\ll\l\l\\\ll\ 006579 DECEMBER 2003 REPORT NO: 2003/179 621.311.2(941.21) SIN ATA Environmental DISCLAIMER This document is published in accordance with and subject to an agreement between ATA Environmental ("ATA") and the client for whom it has been prepared Transfield Services Kemerton Trust ("Client") and is restricted to those issues that have been raised by the client in its engagement of ATA and prepared using the standard of skill and care ordinarily exercised by Environmental Scientists in the preparation of such Documents. Any person or organisation that relies on or uses the document for purposes or reasons other than those agreed by ATA and the Client without first obtaining the prior written consent of ATA, does so entirely at their own risk and ATA denies all liability in tort, contract or otherwise for any loss, damage or injury of any kind whatsoever (whether in negligence or otherwise) that may be suffered as a consequence of relying on this Document for any purpose other than that agreed with the Client. QUALITY ASSURANCE ATA Environmental has implemented a comprehensive range of quality control measures on all aspects of the company's operation and has Quality Assurance certification to 150 9001. An internal quality review process has been applied to each project task undertaken by us. Each document is carefully reviewed by core members of the consultancy team and signed off at Director level prior to issue to the client. -
Carbon Emissions Inventory Major Resource Projects – AGEIS 2012
FACILITIES CURRENTLY OPERATING Name/Location; Facility name, Operator Scope 1 (Direct) Source of data General activity GHG emissions Point source CO2e TPA emissions total, where stationary energy is accounted for elsewhere (eg Power derived from SWIS) Alkimos Wastewater Treatment Water Corporation Plant Sourced from SWIS 16,000 EPA Bulletins 1238, 1239 Argyle, diamonds Rio Tinto Argyle Diamonds sustainable development 49,000 report 2009 and 2010 Armadale Brick Austral Bricks Data provided by Company giving their (Brickworks Ltd) 42,968 state total emissions Cardup Brick Austral Bricks (Brickworks Ltd) see Armadale Brick Caversham Tile Bristile (Brickworks Ltd) see Armadale Brick Malaga Brick Austral Bricks (Brickworks Ltd) see Armadale Brick Australind; titanium Cristal Global Sourced from SWIS 34,000 Company report (June 2009) Boddington; Mt Saddleback, BHP Billiton - Worsley bauxite Alumina Pty Ltd 243,000 AAC Sustainability report 2009 Bonaparte Basin; Blacktip gas ENI Australia project not known Bonaparte Basin; Puffin, oil AED Oil Ltd (in administration) not known Brockman Syncline 4 Iron Ore Rio Tinto (form. Project Hamersley Iron Pty Limited) 111,800 EPA Bulletin 1214 WA GREENHOUSE GAS EMISSIONS Page 2 Bronzewing - Mt McClure, gold Navigator Resources Ltd not known Burrup; Ammonia Plant, Burrup Burrup Fertilisers Pty NGER Greenhouse and Energy Information Peninsula Ltd 1,484,877 2010-11 Canning Basin; Blina, Lloyd, Buru Energy Ltd Sundown & West Terrace, oil 244 Data provided by Company Cape Preston; Central Block, Sino Iron (CITIC) -
Performance Audit and Asset Management System Review for Generation Licence EGL5 for Kemerton Power Station
Performance Audit and Asset Management System Review Report RATCH-Australia March 2017 Performance Audit and Asset Management System Review for Generation Licence EGL5 for Kemerton Power Station. Audit Authorisation Name Position Date Report Principal Prepared By Nicole Davies Consultant 21 March 2017 (GES Pty Ltd) Agreed By Wayne Roberts RATCH-Australia 22 March 2017 (licensee) Geographe Environmental Services Pty ltd March 2017 PO Box 572 DUNSBOROUGH WA 6281 Audit Report No: KRAC0317_1 Tel: 0438 938 394 Performance Audit and Asset Management System Review Report RATCH-Australia March 2017 1. EXECUTIVE SUMMARY ......................................................................................................... 4 1.1 Performance Audit Summary ___________________________________________________ 6 1.2 Asset Management System Review Summary ___________________________________ 11 2. PERFORMANCE AUDIT ....................................................................................................... 13 2.1 Performance Audit Scope _____________________________________________________ 13 2.2 Post Audit Implementation Plan _______________________________________________ 14 3. ASSET MANAGEMENT SYSTEM EFFECTIVENESS REVIEW ..................................................... 15 3.1 AMS Review Scope ___________________________________________________________ 15 3.2 Objective of the Asset Management System Review _____________________________ 21 3.3 Methodology for Asset Management System Review ____________________________ 21 3.4 Deviation -
Muja AB Power Station Refurbishment - Technical Review - RFQ FIN13047
ATTACHMENT 2 )d.011-16 Client: Public Utilities Office Title: Muja NB Power Station Refurbishment - Technical Review Subtitle: RFQ FIN13047 Document No: 2158941A-DMS-RPT-001 Date: 26 August 2013 A 16/08/2013 Draft Report 0 26/08/2013 Final Report to Public Utilities Office ■ 4Ni_oi)ro) ; i'k=\,-4(=-0 '=:11;•=.iit.;, l 'i-:°Thir°1'.0'3-i-r1L-• L Robertson - Prepared by: M Rudge Date: 26/08/2013 Signature: B Jarman Reviewed by: N McGimpsey Date: 26/08/2013 Signature: /7:Y2.____ Approved by: A Crichton Date: 26/08/2013 Signature: ,,--!/ ,-- -. D11,10141 Public Utilities Office, Parsons Brinckerhoff file, Parsons Brinckerhoff Library This document and the information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied by Parsons Brinckerhoff. Parsons Brinckerhoff makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information. The intellectual property of any new material (but excluding any Existing Material of Parsons Brinckerhoff) contained in this document is owned by the State of Western Australia. Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 5 503 Murray Street Perth WA 6000 PO Box 7181 Cloisters Square WA 6850 Australia Tel: +61 8 9489 9700 Fax: +61 8 9489 9777 Email: perth©pb.com.au www.pbworld.corn Certified to ISO 9001, ISO 14001, AS/NZS 4801 A GRI Rating: Sustainability Report 2011 Public Utilities Office Muja NB Power Station Refurbishment - Technical Review - RFQ FIN13047 onten s Page number Executive summary iv 1.