Technical Archive List 05/02/2019

Total Page:16

File Type:pdf, Size:1020Kb

Technical Archive List 05/02/2019 National Railway Museum Technical Archive List 05/02/2019 Reference Company Name Type Contents Notes Code BR 3 boilers Standard Class 5 4 -6 -0 BOIL/BR/1* British Railways Record cards BR 4 boilers Standard Class 4 4 -6-0 BR 5 boilers Std. Class 4 2 -6 -4T BR 6 boilers Standard Class 3 2-6-0; BR 7 boilers Standard Class 4 2-6-0 BR 8 boilers Standard Class 2 2-6-0; BOIL/BR/2* British Railways Record cards Standard Cl 2 2-6-2T: BR 9 boilers Standard Cl 9F 2-10-0; survey of smokebox tubeplate fractures on E/NE region C1 9F 2-10-0s. April 1962 Standard boiler repair BOIL/BR/3 British Railways (Southern Region) BR 3 Std. Class 5 4-6-0 reports Standard boiler repair BOIL/BR/3* British Railways (Southern Region) BR 1 Std. Class 7 4-6-2 reports Standard boiler repair BOIL/BR/4 British Railways (Southern Region) BR 4 Std. Class 4 4-6-0 reports Standard boiler repair BOIL/BR/5 British Railways (Southern Region) BR 5 Std. Class 4 2-6-4T reports Standard boiler repair BR 6 Std. Class 3 2-6-0; Standard BOIL/BR/6 British Railways (Southern Region) reports Class 3 2-6-2T Standard boiler repair BOIL/BR/7 British Railways (Southern Region) BR 7 Std. Class 4 2-6-0 reports Standard boiler repair BOIL/BR/8 British Railways (Southern Region) BR 8 Std. Class 2 2-6-0; 2 2-6-2T reports Standard boiler repair BOIL/BR/9 British Railways (Southern Region) BR 9 Std. Class 9 2-10-0 reports Boiler building programmes 1939-1956; Ditto 1956 - (1962). Crewe Boiler Orders (Copies of Crewe Boiler Shop Boiler building Foremen's notebooks) B1/523- BOIL/CR/1-2* Crewe Works (LMS & BR) programmes, Orders B40/7099; B325-375 c1927- 33; B375- 426 c.1933-43; B380-416 c.1934-41; B417-497, c.1941-61; B418-497 c1943- 61 Page 1 National Railway Museum Technical Archive List 05/02/2019 Reference Company Name Type Contents Notes Code Doncaster Works Boiler Order Book BOIL/DON/1 Doncaster Works (GNR, LNER, BR) Boiler Order Books (Summary). Orders BO.590- BO.967, 1909 - 49 Order Book (materials required) BOIL/DON/2* Doncaster Works (GNR, LNER, BR) Boiler Order Books BO.530-BO.611, 1909-12 Order Book (materials required) BOIL/DON/3* Doncaster Works (GNR, LNER, BR) Boiler Order Books BO.613-BO719, 1912-27 Order Book (materials required) BO630- BOIL/DON/4* Doncaster Works (GNR, LNER, BR) Boiler Order Books BO915, 1915-46 Doncaster Boiler Register. 1-9560. Doncaster record of boiler changes BOIL/DON/5* Doncaster Works (GNR, LNER, BR) Boiler Register 1923-44; B Yeadon list of Doncaster Boilers 1-10849 BOIL/GNR/1* Great Northern Railway Boiler Registers Loco. Nos. 1-470; Nos 471-948 Locomotive Nos. 949-1422; Nos. 1423- BOIL/GNR/2* Great Northern Railway Boiler Registers 1605 Inverurie Works Boiler Register, BOIL/GNS/1 Great North of Scotland Railway Boiler Registers Locomotives, Steam Wagons and Stationery. Register of boilers built at Swindon and BOIL/GWR/1 Great Western Railway Boiler Registers by contractors. 1900-1921 Register of boilers built at Swindon and BOIL/GWR/2 Great Western Railway Boiler Registers by contractors. 1922-1961 GWR boiler classifications 1910, 1911, undated, 1915, 1921,1927, 1932, 1938, BOIL/GWR/3* Great Western Railway Boiler Registers Details of boilers built at Swindon 1899- 1943 0-6-0PT Locomotive Boiler History BOIL/GWR/4 Great Western railway Locomotives Cards London Brighton and South Coast LB&SCR Record BOIL/LBSC/1* Misc. LBSCR classes Railway Cards London Brighton and South Coast LB&SCR Record BOIL/LBSC/2* Misc. LBSCR classes Railway Cards Page 2 National Railway Museum Technical Archive List 05/02/2019 Reference Company Name Type Contents Notes Code Manuscript lists of boilers built at Crewe Works c.1925-60, compiled by J W P BOIL/LMS/1* London Midland & Scottish Railway Boiler records Rowledge. Misc. LMS boiler record cards and BR/SR boiler repair sheets for LMS boilers on Southern Region BOIL/LMS/2* London Midland & Scottish Railway Boiler records Record cards for G9AS boilers BOIL/LNER/1 & Boiler record cards Diagram 97 Class D49 4-4-0, class J38 London and North Eastern Railway 2* etc. &J39 0-6-0 Diagrams 116 Peppercorn Class K1 2-6- Boiler record cards 0; 3 Gresley Class K2 2-6-0; 96/96A BOIL/LNER/3* London and North Eastern Railway etc. Gresley Class K3/K5 2-6-0 110 Gresley Class K4 2-6-0 Boiler record cards Diagram 109 Class V2 2-6-2; Diagram BOIL/LNER/4* London and North Eastern Railway etc. 112/113 Class V4 2-6-2 BOIL/LNER/5 & Boiler record cards Diagram 100A Class B1 4-6-0; Class London and North Eastern Railway 6 etc. 01 2-8-0 Diagrams 94 Gresley Class A1/A3 4-6- Boiler record cards 2; Thompson Class A2 4-6-2; 107 BOIL/LNER/7* London and North Eastern Railway etc. Gresley Class A4 4-6-2; 117/118 Peppercorn Class A1 4-6-2 Boiler record cards Diagrams 102 Class V1/V3 2-6-2T; 115 BOIL/LNER/8* London and North Eastern Railway etc. Class L1 2-6-4T Boiler record cards BOIL/LNER/9* London and North Eastern Railway Diagram 57 Class 326 & 327 0-6-0 etc. Boiler record cards Diagrams 49 Class B15 4-6-0; 49, BOIL/LNER/10* London and North Eastern Railway etc. Class Q6 0-8-0 BOIL/LNER/11A Boiler record cards Diagrams 50 Class B15 4-6-0; 50 Class London and North Eastern Railway & 11B* etc. Q6 0-8-0 Boiler record cards BOIL/LNER/12* London and North Eastern Railway Diagram 73 Class 371 & 372 0-6-0T etc. Boiler record cards Diagrams 18 ex-GCR 4-6-2T; 120 BOIL/LNER/13* London and North Eastern Railway etc. Class 394 0-6-0ST Page 3 National Railway Museum Technical Archive List 05/02/2019 Reference Company Name Type Contents Notes Code Diagrams. 2. GNR ; 7. GNR 11. GNR ; 14. GCR DIC/D11 17. GCR; 25. GER ; 34. GER ; 37. GER Class J68 & 69 ; 39. Boiler record cards BOIL/LNER/14* London and North Eastern Railway GER Class J65/66/67; 54. NER Class etc. B13; 55.NER Class A7; 56. Class Q5/1; 61. NER ; 71 H&BR; 75. NER; 81. NBR; 93. GNS. Boiler record cards BOIL/LNER/15* London and North Eastern Railway Diagram 67 ex-NER 0-6-0, 0-6-2T etc. Diagrams 63 ex-NER 4-6-2T, 4-8-0T; Boiler record cards 68 ex-NER 2-2-4T, 0-4-4T, 0-6-0T; 69 BOIL/LNER/16* London and North Eastern Railway etc. ex-NER 4-4-0, 0-6-0, 0-4-4T, 2-4-2T & 0-6-0T Doncaster Registers of boiler Boiler record cards BOIL/LNER/17* London and North Eastern Railway movements and spare boilers. 9 etc. volumes. W B Yeadon registers of all boiler Boiler record cards changes on all LNER operated BOIL/LNER/18* London and North Eastern Railway etc. locomotives by class, 1923-65. 2 volumes BOIL/LNER/MIS Miscellaneous LNER Boiler history London and North Eastern Railway Locomotives C 1 cards BOIL/LNER/MIS Miscellaneous LNER Boiler history London and North Eastern Railway Locomotives C 2 cards BOIL/LSW/1* London & South Western Railway SR record cards. Class T9 4-4-0; Class M7 0-4-4T Miscellaneous LSWR classed including BOIL/LSW/2* London & South Western Railway SR record cards. PD & SWJR 0-6-0T & 0-6-2T Darlington Works 1900-16 Boiler Nos. D1602-46; 1647-1731; 1732-89; 1790- Appropriation of material sheets for 1821; 1842-51; 1822-41; 1852-71; 1872- BOIL/NER/1* North Eastern Railway Boiler records boilers, frames and cylinders etc. 83; 1884-1903; 1904-84; 1985-2034; 2037-40; 2035-36;2041-99; 426-510; 511 - 644. Page 4 National Railway Museum Technical Archive List 05/02/2019 Reference Company Name Type Contents Notes Code Appropriation of material sheets for boilers, frames & cylinders etc. BOIL/NER/2* North Eastern Railway Boiler records Gateshead Works 1900-1905. Boiler Nos. G1-33; 58- 155; 156- 280; 281- 395; 396- 447; 448- 490. Appropriation of material sheets for boilers, frames & cylinders etc. Gateshead Works 1906-1911. Boiler BOIL/NER/3* North Eastern Railway Boiler records Nos. G491-579 (G580-673); G674-764, 765-769; G770-865; G866-937; G938- 983 Register of new boilers built at BOIL/NER/4 North Eastern Railway Boiler records Darlington Works 1900-1962 Register of new boilers built at BOIL/NER/5 North Eastern Railway Boiler records Darlington Works Nov.1919 to Oct 1929 Register of boilers condemned at BOIL/NER/6 North Eastern Railway Boiler records Darlington Works, 1902-1964 Register of new boilers built at BOIL/NER/7 North Eastern Railway Boiler records Darlington Works, 1929 - 1936 Log of boiler repairs, 2 vols. Jan 1904 - BOIL/SEC/1* South Eastern and Chatham Railway Notebooks Dec. 1905 and Dec. 1905 - Dec. 1908 SR Record Cards & BR/SR repair Sheets, SR records cards, boilers numbered BOIL/SR/1* Southern Railway (includes some between 1 and 899 LSWR, LB&SCR, and SE&CR boilers SR Record Cards & BR/SR repair Sheets, SR records cards, boilers numbered BOIL/SR/2* Southern Railway (includes some between 900 and 1099 LSWR, LB&SCR, and SE&CR boilers Page 5 National Railway Museum Technical Archive List 05/02/2019 Reference Company Name Type Contents Notes Code SR Record Cards & BR/SR repair Sheets, SR records cards, boilers numbered BOIL/SR/3* Southern Railway (includes some between 1100 and 1199 LSWR, LB&SCR, and SE&CR boilers SR Record Cards & BR/SR repair Sheets, SR records cards, boilers numbered BOIL/SR/4* Southern Railway (includes some between 1200 - LSWR, LB&SCR, and SE&CR boilers SR Record Cards & BR/SR repair Sheets, BR/SR repair sheets, boilers numbered BOIL/SR/5* Southern Railway (includes some between 1 and 699 LSWR, LB&SCR, and SE&CR boilers SR Record Cards & BR/SR repair Sheets, BR/SR repair sheets, boilers numbered BOIL/SR/6* Southern Railway (includes some between 700 and 999 LSWR, LB&SCR, and SE&CR boilers SR Record Cards & BR/SR repair Sheets, BR/SR repair sheets, boilers numbered BOIL/SR/7* Southern Railway (includes some between 1000 and 1099 LSWR, LB&SCR, and SE&CR boilers SR Record
Recommended publications
  • Appendix: Statistical Information
    Appendix: Statistical Information Table A.1 Order in which the main works were built. Table A.2 Railway companies and trade unions who were parties to Industrial Court Award No. 728 of 8 July 1922 Table A.3 Railway companies amalgamated to form the four main-line companies in 1923 Table A.4 London Midland and Scottish Railway Company statistics, 1924 Table A.5 London and North-Eastern Railway Company statistics, 1930 Table A.6 Total expenditure by the four main-line companies on locomotive repairs and partial renewals, total mileage and cost per mile, 1928-47 Table A.7 Total expenditure on carriage and wagon repairs and partial renewals by each of the four main-line companies, 1928 and 1947 Table A.8 Locomotive output, 1947 Table A.9 Repair output of subsidiary locomotive works, 1947 Table A. 10 Carriage and wagon output, 1949 Table A.ll Passenger journeys originating, 1948 Table A.12 Freight train traffic originating, 1948 TableA.13 Design offices involved in post-nationalisation BR Standard locomotive design Table A.14 Building of the first BR Standard locomotives, 1954 Table A.15 BR stock levels, 1948-M Table A.16 BREL statistics, 1979 Table A. 17 Total output of BREL workshops, year ending 31 December 1981 Table A. 18 Unit cost of BREL new builds, 1977 and 1981 Table A.19 Maintenance costs per unit, 1981 Table A.20 Staff employed in BR Engineering and in BREL, 1982 Table A.21 BR traffic, 1980 Table A.22 BR financial results, 1980 Table A.23 Changes in method of BR freight movement, 1970-81 Table A.24 Analysis of BR freight carryings,
    [Show full text]
  • Didcot Railway CENTRE
    THE COMMUNICATION ORD No. 49 Winter 2018 C Shapland Andrew AWARDS AND ACCOLADES by Graham Langer Tornado in the dark. No. 60163 is seen at Didcot during a night photography session. At the annual Heritage Railway for “reaching out with Tornado to new film. Secondly we scooped the John Association awards ceremony held at the and wider audiences” in recognition Coiley Locomotive Engineering award for Burlington Arcade Hotel in Birmingham of the locomotive’s adventures in the work associated with the 100mph on 10th February, the Trust was 2017, initially on the ‘Plandampf’ series run. Trustees and representatives of DB honoured to be awarded not one but on the Settle & Carlisle railway, then Cargo, Ricardo Rail, Resonate, Darlington two national prizes. Firstly we received the 100mph run and its associated Borough Council and the Royal Navy the Steam Railway Magazine Award, television coverage and finally in her were among the Trust party who ➤ presented by editor Nick Brodrick, appearance in the PADDINGTON 2 attended the event. TCC 1 Gwynn Jones CONTENTS EDItorIAL by Graham Langer PAGE 1-2 Mandy Gran Even while Tornado Awards and Accolades up his own company Paul was Head of PAGE 3 was safely tucked Procurement for Northern Rail and Editorial up at Locomotive previously Head of Property for Arriva Tornado helps Blue Peter Maintenance Services Trains Northern. t PAGE 4 in Loughborough Daniela Filova,´ from Pardubice in the Tim Godfrey – an obituary for winter overhaul, Czech Republic, joined the Trust as Richard Hardy – an obituary she continued to Assistant Mechanical Engineer to David PAGE 5 generate headlines Elliott.
    [Show full text]
  • PACIFIC’ Coupling Rods Fitted to Tornado at Darlington Locomotive Works
    60163 Tornado 60163 Tornado 60163 Tornado THE A1 STEAM LOCOMOTIVE TRUST Registered Office, All Enquiries: Darlington Locomotive Works, Hopetown Lane, Darlington DL3 6RQ Hotline Answerphone: 01325 4 60163 E-mail: [email protected] Internet address: www.a1steam.com PRESS INFORMATION – PRESS INFORMATION - PRESS INFORMATION PR04/04 Monday 4 October 2004 MAJOR STEP FORWARD AS NEW STEAM LOCOMOTIVE BECOMES A ‘PACIFIC’ Coupling rods fitted to Tornado at Darlington Locomotive Works The A1 Steam Locomotive Trust, the registered charity that is building the first new mainline steam locomotive in Britain for over 40 years, today announced that No. 60163 Tornado is now a Pacific following the fitting of all four coupling rods to its six 6ft8in driving wheels (the name Pacific refers to the 4-6-2 wheel arrangement under the Whyte Notation of steam locomotive wheel arrangements) which now rotate freely together for the first time. Each of the four 7ft 6in rods weighs around two hundredweight and after forging, extensive machining and heat treatment, the four cost around £22,000 to manufacture. These rods are vital components within the £150,000 valve gear and motion assemblies, which are now the focus of work on Tornado at the Trust’s Darlington Locomotive Works. The Trust has also started work on the fitting of the rest of the outside motion. The bushes for the connecting rods are currently being machined at Ian Howitt Ltd, Wakefield and one side of the locomotive has now been fitted with a mock-up of parts of its valve gear. This is to enable accurate measurements to be taken to set the length of the eccentric rod as the traditional method of heating the rod to stretch/shrink it used when the original Peppercorn A1s were built in 1948/9 is no longer recommended as it can affect the rod’s metallurgical properties.
    [Show full text]
  • Download Download
    ARMAMENTS FIRMS, THE STATE PROCUREMENT SYSTEM, AND THE NAVAL INDUSTRIAL COMPLEX IN EDWARDIAN BRITAIN Professor Roger Lloyd-Jones History Department, Sheffield Hallam University Dr. Myrddin John Lewis History Department, Sheffield Hallam University This article examines the relationship between Britain’s armament firms and the state’s procurement system, presenting a case for a Naval Industrial Complex (NIC) in the years immediately before the Great War. It argues that in Edwardian Britain a nuanced set of institutional networks were established between the Admiralty and a small elite group of armament manufacturers. The NIC demonstrates the close collaboration between the armament firms supplying the Admiralty and between the Admiralty and an elite group of private contractors. This article concludes that the NIC did not lead to profiteering by contactors, and they did supply the warships and naval ordnance that enabled Britain to out build Germany in the naval race. This paper examines the relationship in Britain between the armaments industry and the military institutions of the state during the years preceding the Great War, when there were intensifying international tensions, and concerns over Britain’s defense capabilities. Through an assessment of the War Office (WO) and Admiralty procurement system, we apply John Kenneth Galbraith’s theory that businesses may establish institutional networks as “countervailing powers” to mediate business-state relations and, thus, we challenge the proposition that the state acted as a “monopsonist,” dominating contractual relations with private armaments firms.’ We argue that during the years prior to the war, Britain’s Naval Industrial Complex (MC) involved a strengthening collaboration between the British Admiralty and the big armament firms.
    [Show full text]
  • Doncaster's Wheels, Wings & Moving Things
    Doncaster's Wheels, Wings & Moving Things History | Health | Happiness Doncaster’s Wheels, Wings and Moving Things Introduction: Doncaster has a strong industrial and railway heritage; some of the most famous locomotives in the world were built and designed at ‘the Plant.’ Doncaster hosted one of the world’s first aviation meetings in 1909 and the first British fighter jets to be used in the Second World War, Gloster Meteors, were stationed at RAF Finningley, what is now a busy and expanding Robin Hood Airport. Ford cars also once rolled off production lines in the town. Perhaps you have your own memories of some of these great moving machines? What Above: Approach to Doncaster station. memories do wheels bring back for you? Your Image: Heritage Doncaster first bike, your first car, rail journeys to the seaside? In this pack you will find a variety of activities that relate to Doncaster’s history of wheels, wings and moving things. We hope you enjoy this opportunity to reflect. Please feel free to share your thoughts and memories by emailing: [email protected]. We’d love to hear from you! Contents Within the sections below you will find a variety of activities. Page 2: A Coaching Town Fit for the Races Page 3-10: Doncaster’s Railway Heritage Pages 11-13: Give us a Coggie/ Doncaster Cycling Stories/On your Bike Pages 14-15: Ford in Doncaster/British Made Ford Cars Page 16: Music on the Move Quiz Page 17: Word Search Page 18-19: Trams and Trolleybuses Page 20: Guess the Wheels, Wings and Moving Things Page 21: Crossword Page 22: England’s First Flying Show! Page 23: The Flying Flea The Gloster Meteor in level flight, 1st January 1946.
    [Show full text]
  • What Were the Investment Dilemmas of the LNER in the Inter-War Years and Did They Successfully Overcome Them?
    What were the investment dilemmas of the LNER in the inter-war years and did they successfully overcome them? William Wilson MA TPM September 2020 CONTENTS 1. Sources and Acknowledgements 2 2. Introduction 3 3. Overview of the Railway Companies between the Wars 4 4. Diminishing Earnings Power 6 5. LNER Financial Position 8 6. LNER Investment Performance 10 7. Electrification 28 8. London Transport Area 32 9. LNER Locomotive Investment 33 10. Concluding Remarks 48 11. Appendices 52 Appendix 1: Decline of LNER passenger business Appendix 2: Accounting Appendix 3: Appraisal Appendix 4: Grimsby No.3 Fish Dock Appendix 5: Key Members of the CME’s Department in 1937/38 12. References and Notes 57 1. Sources and Acknowledgements This paper is an enlarged version of an article published in the March 2019 edition of the Journal of the Railway & Canal Historical Society. Considerable use was made of the railway records in The National Archives at Kew: the primary source of original LNER documentation. Information was obtained from Hansard, the National Records of Scotland, University of Glasgow Archives Services, National Railway Museum (NRM) and Great Eastern Railway Society (GERS). Use was made of contemporary issues of The Railway Magazine, Railway Gazette (NRM), The Economist, LNER Magazine 1927--1947 (GERS) and The Engineer. A literature review was undertaken of relevant university thesis and articles in academic journals: together with articles, papers and books written by historians and commentators on the group railway companies. 2 The
    [Show full text]
  • Dvouzdrojové Lokomotivy Pro Nákladní Vlaky
    ČESKÉ VYSOKÉ UČENÍ TECHNICKÉ V PRAZE FAKULTA DOPRAVNÍ Martin Chýle DVOUZDROJOVÉ LOKOMOTIVY PRO NÁKLADNÍ VLAKY Bakalářská práce 2019 Poděkování Hlavní poděkování patří vedoucím bakalářské práce Ing. Michalu Drábkovi, Ph.D., a Ing. Zdeňku Michlovi za odborné vedení práce, množství rad a konzultací, které mi byly při tvorbě práce velice nápomocny. Zvláštní poděkování náleží Ing. Jiřímu Pohlovi ze společnosti Siemens Česká republika za cenné rady a připomínky z praktického provozu a pomoc při výpočtech v praktické části práce. Poděkování patří i všem kolegům ze školy a vlastní rodině, která mě při studiu a tvorbě bakalářské práce podporovala. 3 ABSTRAKT Tato práce je zaměřena na představení vývoje dvouzdrojových lokomotiv a srovnání s konvenčními lokomotivami, především dieselelektrickými. Dále jsou na příkladech z praktického provozu nákladních vlaků vyjádřeny rozdíly v nákladech na provoz dvouzdrojové a konvenční lokomotivy, včetně výhod a nevýhod jejich využití. V závěru práce jsou zhodnoceny ekonomické a další přínosy dvouzdrojových lokomotiv a doporučení jejich vhodného nasazení. KLÍČOVÁ SLOVA Dieselová lokomotiva, dvouzdrojová lokomotiva, ekonomika provozu, nákladní doprava, nákladní vlak, železniční doprava ABSTRACT This thesis focuses on development of dual-mode locomotives and comparison with conventional locomotives, especially diesel-electric. On the examples from real operation, the calculation of operating costs for both types of locomotives was made. In the next part of the thesis, the advantages and disadvantages of using dual-mode
    [Show full text]
  • Union Pacific 844 4-8-4 FEF “Northern”
    True Sound Project for Zimo Sounds designed by Heinz Daeppen US Steam Page 1 Version 160328 Union Pacific 844 4-8-4 FEF “Northern” The Prototype The category FEF locomotives of the Union Pacific Railroad (UP), also known as class 800, are steam locomotives with the wheel arrangement 2'D2 '(Northern). In the total of 45 locomotives, there are three series of delivery or subclasses FEF 1 FEF 2 and FEF-3, where the FEF-2 and -3 differ in driving axels and cylinder diameter to the FEF-1. The last locomotive of this series, no. 844, was the last steam locomotive built for UP. It was never taken out of service and is kept operational by the UP today. In the late 1930s, the pulling loads on train operations were so large that the 2'D1 locomotives Class 7000 reached its limits. After the failure of such a locomotive, which happened to be pulling a train containing the official car of the US President, ALCO was commissioned to build a stronger engine, which could pull 20 coaches with 90 mph (145 km/h) on the flat. The first 20 locomotives were delivered 1937. They got the numbers 800-819 and the name FEF, which stood for "four-eight-four" (the wheel arrangement 4-8-4 in the Whyte notation). They had a driving wheels of 77 inches (1956 mm). The first driving axel was displaced laterally, so that despite a solid wheelbase of 6.7 m the locomotive could still handle the same radius curves . Despite the size of the locomotives only two cylinders were used, as was almost always common in the United States.
    [Show full text]
  • West Coast Main Line North
    West Coast Main Line North 1 INTRODUCTION ...................................................................................... 2 2 A HISTORY .............................................................................................. 2 3 THE ROUTE ............................................................................................. 3 The West Coast Main Line in Railworks ................................................................................... 5 4 ROLLING STOCK ...................................................................................... 6 4.1 Electric Class 86 ............................................................................................................ 6 4.2 Intercity Mk3a Coaches................................................................................................... 6 5 SCENARIOS ............................................................................................. 7 5.1 Free Roam: Carlisle Station ............................................................................................. 7 5.2 Free Roam: Carstairs Station ........................................................................................... 7 5.3 Free Roam: Glasgow Central Station ................................................................................. 7 5.4 Free Roam: Mossend Yard ............................................................................................... 7 5.5 Free Roam Motherwell Station ........................................................................................
    [Show full text]
  • Best Practices and Strategies for Improving Rail Energy Efficiency
    U.S. Department of Transportation Best Practices and Strategies for Federal Railroad Improving Rail Energy Efficiency Administration Office of Research and Development Washington, DC 20590 DOT/FRA/ORD-14/02 Final Report January 2014 NOTICE This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or use thereof. Any opinions, findings and conclusions, or recommendations expressed in this material do not necessarily reflect the views or policies of the United States Government, nor does mention of trade names, commercial products, or organizations imply endorsement by the United States Government. The United States Government assumes no liability for the content or use of the material contained in this document. NOTICE The United States Government does not endorse products or manufacturers. Trade or manufacturers’ names appear herein solely because they are considered essential to the objective of this report. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
    [Show full text]
  • Scanned Document
    Report No. DOT/TSC-1452-3 A SURVEY OF RAILROAD AC ELECTRIFICATION SYSTEMS ,l THROUGHOUT THE WORLD Jeffrey J. LaMarca Charles M. King Alexander Kus ko January 25. 1979 Final Report Prepared for: U. S. Department of Transportation Federal Railroad Administration Office of Research and Development Washington, DC 20590 Alexander Kuske, Inc. 161 Highland Avenue Needham Heights, Mass. 02194 Technical Report Documentation Page 1. Report No. 2. Cavernm~nt Accession No. 3. Reeipient' s Catalog No. DOT/ TSC-1452-3 4. Title and Subtitle 5. Report Date "A Survey of Railroad AC Electrification Systems January 25, 1979 Throughout the World" 6. Performing Organization Code 8. P erf~rming Organization Report No. 7. Author's) LaMarca, J. J.' King, C. M., Kusko, A. 9. ?,.,forming Organization Name and Address 10. Work Unit No. (TRAIS) Alexander Kusko, Inc . ....,. 161 Highland A venue 11. Contract or Grant No. Needham Heights, MA 02194 DOT/ TSC-1452 13. Type of Report and Period Covered 12. Sponsoring Agency Nome and Address Final Report u.s. Department of Transportation July 1978 - January 1979 Federal Railroad Administratlon Office of Research and Development 14. Sponsoring Agency Code Washi_mrton DC 20!i!10 ; 15. Supplementary Notes ~:;Under contract to: u.s. Department of Transportation Technical Monitor: FrankL. Raposa Transportation Systems Center K.:>r~r1!:!l1 c;:,.,,,!:!.,..o (" !'!.,..,.., ]-,,... • r'f n"C> i\IT" n? 1 !l'J 16. Abstract . 0 This report describes the major features of various railroad electrification schemes for supplying the catenary from the source of power for ac operation. These features include: details of the pow'er source, high-voltage substation connections, substation details, catenary-to-substation connections, track sectioning methods, and any other special electrification features.
    [Show full text]
  • Master Pages For
    1 2 4 3 5 8 9 6 7 10 11 12 18 19 13 15 16 17 22 23 25 26 27 28 30 32 36 37 38 39 40 45 41 42 44 48 47 49 50 52 66 67 68 69 70 71 72 73 74 75 76 77 78 79 89 Part 96 99 97 98 100 103 101 102 104 105 106 107 108 109 110 111 113 115 116 118 119 117 121 122 123 124 125 126 127 131 128 129 130 132 139 Part 140 141 133 134 135 136 137 138 142 Part 143 144 Part 145 Part 146 Part 147 Part 148 Part 149 Part 150 Part 151 Part 152 Part 153 Part 154 Part 156 157 158 159 161 160 162 163 164 165 166 Part 167 Part 168 Part 169 Part 170 Part 171 Part 172 Part 175 Part 173 Part 174 Part 176 Part 179 Part 180 177 Part 178 Part Part 181 182 183 Part 184 Part Part Part 185 186 Part 187 Part 188 Part 189 190 191 192 193 194 195 196 Part Part 197 198 199 200 Part Part Part Part 201 202 203 204 Part Part Part Part 205 Part 206 Part 208 Part 210 211 212 213 214 216 215 217 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 239 Part 237 238 240 241 242 243 249 252 247 256 255 253 257 258 262 259 260 261 263 264 265 266 269 270 276 277 279 271 274 275 278 280 281 282 284 287 289 290 292 294 297 300 288 296 299 301 302 303 314 304 305 306 310 320 311 312 313 315 316 317 318 321 323 343 344 346 347 Part Part 348 Part 350 Part 352 353 354 355 356 358 361 372 373 375 376 377 378 379 380 384 385 386 387 405 406 407 409 410 411 412 Part 413 Part 416 417 418 424 425 431 436 438 485 486 487 488 491 Part 492 Part 493 Part 494 Part 495 Part 496 Part 497 501 512 528 529 531 533 534 542 555 557 558 561 565 566 567 568 569 570 571 572 573 574 575 576 577
    [Show full text]