Election Comission of India:: Second Randomization Report
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Public Accounts Committee 1960-61
PUBLIC ACCOUNTS COMMITTEE 1960-61 THIRTY -SIXTH REPORT (SECOND LOK SABHA) [Audit Report on the Accounts ot' the Damodar Valley Corporation for thc year 1958-591 LO'K SABHA SECRETARIAT NEN DELHI April, 1961/Chaitra,1883 (Saka) Price : Re. 0.75 nP. LIST OF AUTHORISED AGENTS OF LOK SABHA SECRETARIAT ANDHRA PRADESH 15. The New Order 28. D. B. Taraporavala Book Company, Ellis & Sons, Co., (P) Limb I. G. R. Lakshmi- Bridge, Ahmedabad- ted, 210, Dr. Naoroji Chetty and 6. Road, Bombay-I. 8 General Mer- Newa 16. Swadeshi Vastu Bhan- 29. Deccan Book Stall, Newpet, dar, Booksellers e~., Fergusson College Road, Jamnagar. Poona-4. 30.. The Good Compa- KERALA nlons, Raspura, Baroda. 2. Hindustan Diary Pub- 17. C. V. Venkitachala lishers, Market Street, Iyer, Near Railway 31. The Imperial Book Secundrrabad. Station, Chalakudi. Depot, 266, Mahatma Gandhi , ,ad, Poorfa. 3. Hydcrabad Book De- 18. International Rook P Abid Road (Gun House, Main Road, The International Ekdry), Hydera- Trivandrum. 32book House, Private bad. Ltd., 9, Ash Lane, 4. International Consul- MADHYA PRADESH Mahatma Gandhi Road, Bombay-I. C. Marredpally,Corpora'on, (East),489 19ig6,Modern Jawahar Book House, 33. The International Ganj* Book Service, Deccan Secunderabad-3. Jabalpur-I. j. K. J. Asservadam and Gymkhana, Poona-4. Sons, Cloughpet, P. 0. 20. The IndoreLaw 34. Minerva Book Shop, Ongole, Ciuntur Dis- H~Use3 Old Shop No. 1/80, Ne~aii trict (Andhra Pra- i\gr&urtOpp' Subhash Road, Marme desh). Indore. Drive, Bombay-2. 6. M. S. R. Murthy & 35. The New Book Company, Visakhapat- MADRAS Company (P) Limited, nam. -
Central Coalfields Limited
Pre-feasibility Report of Konar Expansion OCP (Nominal / Peak capacity 8.00/ 11.00 MTPA) & Integrated Konar Non-coking Coal Washery (7 MTPA) 1.0 INTRODUCTION Konar Expansion OCP (8/11 MTPA normative/peak capacity & 729.40 Ha Project Area) & integrated non-coking coal Konar Washery (7 MTPA) falls under B&K Area, Central Coalfields Limited. The project is situated in the north western part of East Bokaro coalfield and covered on Survey of India Topo-sheet no- 73E/13 (1:50000 RF). The project is proposed by amalgamation as single mine the existing Konar OCP (3.50 MTPA capacity & 301.37 Ha Project Area) and Khasmahal OCP (0.60/1.50 MTPA normative/peak capacity & 219.56 Ha Project Area). The Karo Special underground mine workings partly overlap with proposed opencast mine workings, however this is almost exhausted/ not to be worked further due to thinning of seams and produced only 0.015 MT coal in 2014-15. As such, this has not been included in proposed opencast mine. Seams X, VIII & VI/VII combined are proposed to be extracted. Seam X is proposed to be worked by Shovel Dumper method and the coal from Seam VIII and Seam VI/VII combined is proposed to be extracted by Surface Miner. The base seam of Quarry has been considered as Seam-VI/VII combined. Coal from Seam X is Washery Grade-IV and Seam VI/VIII combined along with Seam VIII is E & F (G-10). The proposed Konar Expansion OCP has new Leasehold area of 729.40 Ha after including the area in the dip side and eastern part of Konar Block. -
Wt4ltr Deputy Secretar5r (DAS) Phone: O 1 1-2338 1O1, 2Ggststs
F. No.: 41912015- PMU(DASI Ministry of Informatlon and Broadeasting Shastri Bhawan, New Delhi **** Date: 2td November, 2015 hrblic Notice Reference list of urban areas to be covered in phase III of cable TV digitisation, which was issued by the Ministry on 30.4.2015. The updated list of urban areas for 16 States/UTs has been notified vide Rrblic Notice dated 16. 10.2015 Now, based on comments/data received from the State/UT Governments, the list of the following States/UTs has been updated; 1. Andhra Pradesh 2. Chhattisgarh 3. Jammu & Kashmir 4. Kerala 5. Madhya Pradesh 6. Manipur 7. Telengana 8. Daman & Diu 2. A copy of the updated list of these States/UTs is attached. Wt4ltr Deputy Secretar5r (DAS) Phone: O 1 1-2338 1O1, 2ggSTSTs 2ND UPDATED URBAN AREAS LIST FOR PHASE III OF CABLE TV DIGITISATION Andhra Pradesh S.No. Districts Urban Areas TV Households Remarks 1 Srikakulam Srikakulam (M + OG) 28,149 Palasa Kasibugga (M) 9,706 Ichchapuram (M) 6,242 Sompeta (CT) *Deleted Hiramandalam (CT) *Deleted Upgraded Palakonda 3,349 Tekkali (CT) *Deleted Rajam (NP) 7,367 Amadalavalasa (M) 6,844 Narasannapeta (CT) *Deleted Balaga (CT) *Deleted Ponduru (CT) *Deleted 2 Vizianagaram Parvathipuram (M) 9,382 Bobbili (M) 10,337 Salur (M) 8,644 Gajapathinagaram (CT) *Deleted Sriramnagar (CT) *Deleted Cheepurupalle (CT) *Deleted Tummikapalle (CT) *Deleted Kothavalasa (CT) *Deleted Vizianagaram (M + OG) 44,379 Kanapaka (CT) *Deleted Malicherla (CT) *Deleted Jarjapupeta (CT) *Deleted Upgraded Nellimarla 3,402 Chintalavalasa (CT) *Deleted Visakhapatnm All areas except Visakhapatnam 3 Greater Visakhapatnam (M. (MC)covered in Corp) ? Phase II Yelamanchali ? **Added Narsipatnam ? **Added 4 East Godavari Kakinada (M Corp. -
District Wise List of Village Having Population of 1600 to 2000 in Jharkhand
District wise list of village having population of 1600 to 2000 in Jharkhand VILLAGE BLOCK DISTRICT Base branch 1 Turio Bermo Bokaro State Bank of India 2 Bandhdih Bermo Bokaro Bank of India 3 Bogla Chandankiyari Bokaro State Bank of India 4 Gorigram Chandankiyari Bokaro State Bank of India 5 Simalkunri Chandankiyari Bokaro State Bank of India 6 Damudi Chandankiyari Bokaro State Bank of India 7 Boryadi Chandankiyari Bokaro State Bank of India 8 Kherabera Chandankiyari Bokaro Bank of India 9 Aluara Chandankiyari Bokaro Bank of India 10 Kelyadag Chandankiyari Bokaro State Bank of India 11 Lanka Chandankiyari Bokaro State Bank of India 12 Jaytara Chas Bokaro Jharkhand Gramin Bank 13 Durgapur Chas Bokaro Bank of India 14 Dumarjor Chas Bokaro Central Bank of India 15 Gopalpur Chas Bokaro Jharkhand Gramin Bank 16 Radhanagar Chas Bokaro Central Bank of India 17 Buribinor Chas Bokaro Bank of India 18 Shilphor Chas Bokaro Bank of India 19 Dumarda Chas Bokaro Central Bank of India 20 Mamar Kudar Chas Bokaro Bank of India 21 Chiksia Chas Bokaro State Bank of India 22 Belanja Chas Bokaro Central Bank of India 23 Amdiha Chas Bokaro Indian Overseas Bank 24 Kalapather Chas Bokaro State Bank of India 25 Jhapro Chas Bokaro Central Bank of India 26 Kamaldi Chas Bokaro State Bank of India 27 Barpokharia Chas Bokaro Bank of India 28 Madhuria Chas Bokaro Canara Bank 29 Jagesar Gomia Bokaro Allahabad Bank Bank 30 Baridari Gomia Bokaro Bank of India 31 Aiyar Gomia Bokaro State Bank of India 32 Pachmo Gomia Bokaro Bank of India 33 Gangpur Gomia Bokaro State -
River Action Plan Damodar
ACTION PLAN FOR REJUVENATION OF DAMODAR RIVER IN JHARKHAND JHARKHAND STATE POLLUTION CONTROL BOARD, DHURWA, RANCHI, JHARKHAND-834004 CONTENT CHAPTER I ❖ BACKGROUND ❖ INTRODUCTION ❖ PHYSIOGRAPHY ❖ WATER RESOURCES & RAINFALL ❖ ANNUAL RAINFALL ❖ DEVIATION OF RAINFALL ❖ SEASONAL RAINFALL ❖ RAINFALL TREND IN RABI SEASON ❖ AVERAGE MOTHLY RAINFALL ❖ MOVING AVERAGE OF THE RAINFALL ❖ EXTREME EVENT ANALYSIS ❖ SURFACE WATER RESOURCES ❖ GROUND WATER RESOURCES ❖ DRAINAGE SYSTEM AND MAPS CHAPTER II DAMODAR RIVER BASIN RIVER COURSE AND MAJOR TRIBUTARIES CHAPTER III- SOCIO-ECONOMIC IMPORTANCE ❖ WATER RESOURCES AND ITS USES ❖ MINING AND INDUSTRIAL ACTIVITIES ❖ NATURAL AND ANTHROPOGENIC HAZARDS ❖ IDENTIFIED STRETCHES FOR REDUCING POLLUTION CHAPTER IV- ACTION PLAN ❖ ACTION PLAN- SHORT TERM AND LONG TERM ACTION AND THE IDENTIFIED AUTHORITIES FOR INITIATING ACTIONS AND THE TIME LIMITS FOR ENSURING COMPLIANCE ❖ SHORT TERM AND LONG TERM ACTION PLANS FOR REJUVENATION OF RIVERS AND THE IMPLEMENTING AGENCIES RESPONSIBLE FOR EXECUTION OF THE ACTION PLANS AND THE TIME LIMITS ARE GIVEN IN TABLE AS BELOW ❖ PROPOSED ACTION PLAN BY VARIOUS DEPARTMENT OF GOVT. OF JHARKHAND ❖ PROPOSED ACTION PLAN FOR RESTORATION OF JHARKHAND RIVERS ❖ ACTION PLAN AT VILLAGE LEVEL ❖ TIMELINES FOR IMPLEMENTATION OF MODEL RESTORATION PLAN in 2019- 2020 and 2020-2021 Chapter-1 JHARKHAND & ITS WATER RESOURCES 1.1 BACKGROUND:-Hon’ble National Green Tribunal passed the following orders in OA No. 673/2018 & M.A. No. 1777/2018 titled News item published in “The Hindu “authored by Shri Jacob Koshy titled “More river stretches are now critically polluted: CPCB on 20.09.2018 as per excerpts below. “The issue taken up for consideration in this matter is abatement of pollution in 351 river stretches in the country, identified as such by the Central Pollution Control Board (CPCB). -
Mine Closure Report for Govindpur Phase-Ii Open Cast Project (1.2 Mty)
MINE CLOSURE REPORT FOR GOVINDPUR PHASE-II OPEN CAST PROJECT (1.2 MTY) (CENTRAL COALFIELDS LIMITED) AUGUST 2011 Regional Institute – III Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) Gondwana Place, Kanke Road Ranchi-834008, Jharkhand 1 INTRODUCTION 1.1 About the Mine Govindpur OCP was worked earlier. Upper Kargali seam was planned and worked under the name of Govindpur OCP. The same report was expanded to include the underlying Bermo seam under the name of Govindpur Expansion OCP. The present Govindpur Ph-II OCP was planned as a new project to extract coal up to the lower most opencastable seam (i.e. Karo-VI seam) including area already worked in Govindpur OCP & Govindpur Expansion OCP. Total leasehold area of Govindpur Ph-II OCP includes both virgin and worked area. The name Govindpur Ph-II is incidental as in Ph-I, the upper seams of Kargali and Bermo have already been worked under the name of Govindpur OCP & Govindpur Expansion OCP (Not as Govindpur Ph-I OCP). History of Mine The PR of this project was prepared as a new project. The report proposed to exploit the upper Karo Group of seams (Seam VI to XI) based on the “Geological Report on Coal Exploration Govindpur North Block, East Bokaro Coalfield” prepared in Dec 2001 and the area south of Bermo Seam incrop upto 180 m depth line on Seam-VI floor in the south, bounded on the east by Mantico Nalla and on the west by Borrea Fault (F7-F7). This is a sector not covered in the geological report of Gobindpur North block (2001), and has now been defined for including additional reserves south of the original limits of Gobindpur North block. -
SWAMI RAMKRISHNA PARAMHANSH TEACHER's TRAINING COLLEGE Dugda, P.O.- Karmatand, Dist - Bokaro, 828307
SWAMI RAMKRISHNA PARAMHANSH TEACHER'S TRAINING COLLEGE Dugda, P.O.- Karmatand, Dist - Bokaro, 828307 Details of Students Year of Admission (Session- 2017-19) Category Admission Fee Sl Year of Contact No./ Name of Student Admitted Father’s Name Address (Gen/SC Result Percentage (Reciept No. Admission Mobile No. /ST/OBC No., Date & /Others Amount 1 2 3 4 5 6 7 8 9 10 At - Bishanpur, W.No.-39 _ _ R.No.- 651 P.O.-Mirzapur, Bandwar 8009083316 1 VARTIKA KUMARI HEMANT JHA Gen 2017 17.08.2017 Begusarai 8709642865 8000/- (Bihar) Matigarha, Baghmara R.No. -652 _ _ 9431320568 2 RAJAN RAJ ARJUN RAJAK Dist- Dhanbad (Jharkhand) SC 2017 17.08.2017 8873520393 825307 8000/- AT- Punsia, P.O..+ P.S.- _ _ R.No. -653 3 SHWETA KUMARI RANJIT CHAUDHARI Rajaun Gen 2017 8877357455 17.08.2017 Dist- Banka (Bihar) 8000/- At - Sunday Bazar _ _ R.No. -654 Q.No.-15/5, R.A.Type 7479442489 4 ANUPAM MUKHERJEE AMBIKA MUKHERJEE Gen 2017 17.08.2017 Bermo 8434082031 8000/- (Bokaro) Vill- Baradih, P.O.- Saranda R.No. -655 _ _ 7766006021 5 SANTOSH PD. YADAV RUPAN YADAV Dist- Giridih (Jharkhand) OBC 2017 17.08.2017 7654602123 825324 8000/- Manjhlitand, _ _ R.No. - 656 Birni 8294112274 6 SADHU SHARAN KUSHWAHA RAM SAGAR MAHTO OBC 2017 18.08.2017 Saranda 7368878310 8000/- Dist- Giridih R.No. -657 Jodharih More Chas _ _ 8084389969 7 DIVYA NIVEDITA PANDEY RABINDRA PANDEY Gen 2017 18.08.2017 Dist-Bokaro 7319907485 8000/- Vill- Raidih, P.O+P.O.- _ _ R.No. -
Pre-Feasibility Report for Integrated Steel Plant of Electrosteel Steels Limited for Production of 3.0MTPA Hot Metal with Blast
2019 PRE-FEASIBILITY REPORT FOR INTEGRATED STEEL PLANT OF ELECTROSTEEL STEELS LIMITED FOR PRODUCTION OF 3.0 MTPA HOT METAL WITH BLAST FURNACE (1×1050 m3, 1×350 m3, 1×1700 m3) ALONG WITH CPP OF CAPACITY 160 MW M/s ELECTROSTEEL STEELS LIMITED (an enterprise of Vedanta Limited) at Siyaljori, Bhagabandh, Budhibinor, Alkusha, Dhandabar, Bandhdih, Hutupathar , Dist Bokaro, Jharkhand -827013 Pre-feasibility Report for Integrated Steel Plant of Electrosteel Steels Limited for production of 3.0MTPA Hot Metal with Blast Furnace (1×1050 m3, 1×350 m3, 1×1700 m3) along with CPP of Capacity 160 MW located at village Siyaljori, Bhagabandh, Budhibinor, Alkusha, Dhandabar, Bandhdih, Hutupathar, Dist Bokaro, Jharkhand-827013 Table of Contents CHAPTER-1............................................................................................................ 7 EXECUTIVE SUMMARY........................................................................................... 7 CHAPTER-2.......................................................................................................... 11 INTRODUCTION OF THE PROJECT......................................................................... 11 2.0 INTRODUCTION ..........................................................................................................11 2.1 IDENTIFICATION OF THE PROJECT & PROJECT PROPONENT.......................................12 2.2 BRIEF DESCRIPTION AND NATURE OF THE PROJECT...................................................13 2.2.1 Chronology of the Project Implementation..........................................................13 -
Environmental Statement of Bokaro Colliery Opencast Project for 2015-16
ENVIRONMENTAL STATEMENT OF BOKARO COLLIERY OPENCAST PROJECT FOR 2015-16 CENTRAL COALFIELDS LIMITED ENVIRONMENT DIVISION CCL,RANCHI Page-2 E X E C U T I V E S U M M A R Y E-1. This Annual Environmental Statement has been prepared as per the Gazette Notification No. G.S.R. 329(E) dated 13 th March’92, the Ministry of Environment & Forests, Government of India. E-2 Bokaro Opencast Project of Central Coalfields Limited is located in the East-Bokaro Coalfields of Bokaro Distt. of Jharkhand state. The mine block is situated on the north of Damodar river after railway line. The total area of the block is about 7 sq.Km.The project location and other surface features are given in the plan annexed as ANNEXURE . E-3 The annual target of production for the year 2015-16 is 70000 Tes. The project has achieved the production during 2015-16 is 84113 Tes. E-4 The Environmental Monitoring was carried out quarterly as per the guide lines of Ministry of Environment & Forest(MOEF).The Environmental Monitoring results for four quarters of 2015-16 are appended as ANNEXURE. E-5 Ambient air quality is monitored to study the level of air pollution. The main air pollutant is suspended particulate matter(SPM).It is difficult to quantity the amount of air pollutants generated due to opencast mining. E-6 Water is not directly used during mining for coal production. It percolates into working area during mining operation. However ,water is consumed for other purposes ,mainly for dust suppression. -
Block Level Forecast
METEOROLOGICAL CENTRE, RANCHI INDIA METEOROLOGICAL DEPARTMENT BLOCK LEVEL WEATHER FORECAST VALID TILL 0830 IST OF NEXT 5 DAYS AMFU, Ranchi : Districts of Central and North Eastern Plateau Zone FORECAST DISTRICTS BLOCK PARAMETERS DAY-1 DAY-2 DAY-3 DAY-4 DAY-5 17.04.21 18.04.21 19.04.21 20.04.21 21.04.21 BOKARO BOKARO Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 36 38 38 39 40 Min Temperature ( deg C) 25 25 23 22 24 Total cloud cover (octa) 4 3 2 0 0 Max Relative Humidity (%) 36 28 20 15 31 Min Relative Humidity (%) 9 12 11 6 6 Wind speed (kmph) 14 9 11 7 8 Wind direction (deg) 222 256 307 228 240 BOKARO BERMO Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 37 38 38 39 40 Min Temperature ( deg C) 25 25 23 22 24 Total cloud cover (octa) 4 3 2 0 0 Max Relative Humidity (%) 36 30 22 19 31 Min Relative Humidity (%) 9 12 11 6 6 Wind speed (kmph) 15 9 10 7 8 Wind direction (deg) 220 254 298 230 229 BOKARO CHANDANKIYARI Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 36 37 37 38 39 Min Temperature ( deg C) 25 24 21 22 24 Total cloud cover (octa) 3 3 2 0 0 Max Relative Humidity (%) 37 26 21 14 23 Min Relative Humidity (%) 10 12 11 7 7 Wind speed (kmph) 18 10 10 6 7 Wind direction (deg) 220 271 294 228 226 BOKARO CHANDRAPURA Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 36 38 38 39 40 Min Temperature ( deg C) 25 25 23 22 24 Total cloud cover (octa) 4 3 2 0 0 Max Relative Humidity (%) 36 28 20 15 31 Min Relative Humidity (%) 9 12 11 6 6 Wind speed (kmph) 14 9 11 7 8 Wind direction (deg) 222 255 306 228 239 BOKARO CHAS Rainfall (mm) 2 0 0 -
Sor 2087 Dt17-08-20.Pdf
MC/F-SOR/2020/ M/S. Sublhash Chandra "iwary, 9 At- 2220-2245 dated Baseria Basti, PO- 20.07.2020 Dhanbad, (Jharkhand) Kusunda, 04.02.2020 10. T.1,1.fT./i.u.s/ 03.02.2022 g,t TT./2020/1654-1675 M/S Oneiric Carrier 4 A-IV th Ways (P) Ltd. faTa 12.06.2020 Floor,Reliable Signature Tower |Katras Road,Dhanbad,826001,Jharkhand 12.06.2020 11.06.2022 T1.I. ./ü.I.s/qy- 11 ANATV2018/ 655 fai- M/s United Coal 12.10.2018 Jharia, Pin-828111,Carriers, Dhanbad Main Road, PO- 06.09.2018 05.09.2020 12 NT.f./u.u.u/q%- Ms Agarwal Roadways HtaATY2018/761 fai- Applid For 21.11.2018 At+PO-Motinagar, Dhanbad;Pin-828120 (Jharkhand).Sindri,Distt: 07.11.2018 06.11.2020 HT tT./Ä.I.I/U M/s 13 Bishnu Transport H3TT2018/658 T- At-GT Road, Sirshapahari,Company. PO- 12.10.18 Chirkunda, Pin-828202 Dhanbad (Jharkhand). Distt: 15.11.2018 14.11.2020 14 47.1,1.t./a.J.3/ M/s Hindustan Trade Flat Overseas Pvt g5-4T3AT/2020/188-20923.01.2020 feATR- No-1A, Radhe Krishna Ltd. Katras Road, Bank Apartment, 15 More, Dhanbad- 22.01.2020 826001 21.01.2022 BCCL/CMC/F- SOR/2020/767-789 dated M/s Paradise 23.03.2020 Deepraj Transporters Pvt Ltd, Apartment, Flat No.B Nagar East, 2, Shastri 17.03.2020 Dhanbad-82600 1 16.03.2022 16 BCCL/CMC/F. M/s NKAS SOR/2019/185-206 dated Court, Services Pvt 09.02.2019 9h Floor, Block Ltd.circular Bose Road, Kolkata-700017No-92, 8, AJC 12.01.19 M/s 11.01.2021 17 Devprabha Floor, Dev Construction Pvt. -
State District Branch Address Centre Ifsc Contact1 Contact2
STATE DISTRICT BRANCH ADDRESS CENTRE IFSC CONTACT1 CONTACT2 NO 26. MG ROAD ABERDEEN ANDAMAN BAZAR , AND PORT BLAIR NICOBAR -744101 ,A & ISLAND ANDAMAN PORT BLAIR N ISLANDS PORT BLAIR IBKL0001498 7044128298 7044128298 UPPER GROUND FLOOR, #6-5- 83/1, NEW BUS STAND ROAD, BHUKTAPUR, ANDHRA ADILABAD ANIL KUMAR PRADESH ADILABAD ADILABAD 504001 ADILABAD IBKL0001090 8978899001 ANIL KUMAR 8 1ST FLOOR, 14- 309,SREERA M ENCLAVE,RA ILWAY FEDDER ROADANANT APURANANT ANDHRA APURANDHR PRADESH ANANTAPUR ANANTAPUR A PRADESH ANANTAPUR IBKL0000208 08554-270244 D.NO.16- 376,MARKET STREET,OPP OSITE CHURCH,DH ARMAVARAM - 515671,ANAN ANDHRA DHARMAVAR TAPUR DHARMAVAR 091 PRADESH ANANTAPUR AM DISTRICT AM IBKL0001795 9494979797 IDBI BANK LTD, 10-43, BESIDE SURESH MEDICALS, RAILWAY SRINIVASA STATION RAO ROAD, MYLAPALLI - ANDHRA GUNTAKAL - +9196767066 PRADESH ANANTAPUR GUNTAKAL 515801 GUNTAKAL IBKL0001091 55 SRINIVASA RA 18-1-138, M.F.ROAD, AJACENT TO ING VYSYA BANK, HINDUPUR , ANANTAPUR DIST -PIN:515 201 ANDHRA ANDHRA 9949737159/9 PRADESH ANANTAPUR HINDUPUR PRADESH HINDUPUR IBKL0001162 849719117 AGRICULTUR E MARKET COMMITTEE, ANANTAPUR ROAD, TADIPATRI, ANANTAPUR DIST PIN : 515411 ANDHRA ANDHRA 08558226440 PRADESH ANANTAPUR TADIPATRI PRADESH TADPATRI IBKL0001163 /9032267892 BUKARAYAS UNDARAM MANDAL,NE AR HP GAS FILLING STATION,AN ANDHRA VADIYAMPET ANTHAPUR 91 PRADESH ANANTAPUR A 515731 ANANTAPUR IBKL0001505 9297104877 # 8-333, GROUND FLOOR, GANDHI ROAD, CHITTOOR, ANDHRA 08572 - ANDHRA PRADESH - 233800 / PRADESH CHITTOOR CHITTOOR 517001 CHITTOOR IBKL0001164 01 / 02 / 03 CTM ROAD, MADANAPAL LE, CHITTOOR DIST., ANDHRA ANDHRA MADANAPAL PRADESH, MADANAPAL PRADESH CHITTOOR LE PIN: 517325 LE IBKL0001674 9885343624 9885343624 IDBI BANK LTD, D.NO : 13-87, AVC BUILDING, MADAPALLI ROAD, 07382314738 ANDHRA PALAMNER- / PRADESH CHITTOOR PALAMNER 517408.