District Census Handbook, Upper Subansiri, Part XII-A & B, Series-13
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Govt. of Arunachal Pradesh Planning Department Itanagar
GOVT. OF ARUNACHAL PRADESH PLANNING DEPARTMENT ITANAGAR. No.PD( MLALADS)-42/2010-11 Dated Itanagar, the 19 th October’2011. To. 1) The Deputy Commissioner, Tawang/Bomdila/Seppa/Yupia/Ziro/Koloriang/Daporijo/Aalo/Pasighat Yingkiong/Anini/Roing/Hawai/Tezu/Changlang/Khonsa Arunachal Pradesh. 2) The Additional Deputy Commissioner, Namsai/Longding/Jairampur/Basar/Rumgong/Mechuka, Arunachal Pradesh. Sub:- Allocation of funds under MLALADS for the year 2011-12 ( Third Quarter). Sir/Madam, I am directed to convey the Govt. approval for placement of Rs.2400.00 lakhs being the third installments release under MLALADS fund for 2011-12 at the rate of Rs.40.00 lakhs per Assembly Constituency at the disposal of respective Deputy Commissioners/Additional Deputy Commissioners. 2. The expenditure should be booked under Major Head “ 3451”-S.E.S.-Sub Major 00 Minor Head -102-District Planning Machinery –Sub-Head-01-MLA’s Local Area Development Fund- detail Head-(01-DC,Aalo), (02-DC,Tezu) (03-DC, Ziro), (04-DC, Bomdila),(05-DC, Khonsa), (06- DC, Pasighat), (07-DC, Anini), (08-DC, Daporijo), (09-DC, Seppa), (10-DC, Tawang), ( 11-DC, Changlang), (12-DC, Yupia), ( 13-DC, Yingkiong), (14-DC, Koloriang), (15-DC, Roing), ( 16-DC, Hawai ), ( 18-ADC,Namsai), ( 19-ADC,Longding), ( 21-ADC, Basar), ( 22-ADC, Rumgong), (23- ADC, Jairampur), ( 24-ADC,Mechuka) –Object Head-50-Code No.02 ( PLAN) demand No.6. 3. The district-wise allocation under MLALADS for the year 2011-12 up to third quarter is as under. ( Also given at Annexure-I enclosed) (Rs. in lakh) Sl District ( DC/ADC) No. -
Req of Fund for Completion of Ongoing Projects
Target for completion of ongoing projects and requirement of fund from NLCPR. (Rs. in Crore) Sl. Name of Project Approved Year of Total Requirement of fund for the year Total No. cost Sanction Release 2009-10 2010-11 2011-12 1 2345678 PH&WS: 1 Water Supply scheme at Along. (West Siang District) 3.370 1999-2000 3.021 0.349 0.000 0.000 3.370 2 Water Supply scheme at Pasighat (East Siang District) 5.050 1999-2000 4.850 0.180 0.000 0.000 5.030 3 Water Supply scheme at Roing (Lower Dibang Valley District) 4.050 1999-2000 3.829 0.197 0.000 0.000 4.026 4 Water Supply Project for Daporijo town, (Upper Subansiri District). 3.970 2002-03 3.666 0.28 0.000 0.000 3.946 5 Naharlagun- Nirjuli Water Supply scheme. (Papum Pare) 11.730 2002-03 11.040 0.302 0.000 0.000 11.342 6 Bomdila Water Supply Scheme. (West Kameng District) 17.090 2002-03 15.435 0.448 0.000 0.000 15.883 7 Improvement and extension of water supply at Lumla township. 4.883 2006-07 4.266 0.129 0.000 0.000 (Tawang). 4.395 8 Providing Potable Drinking Water Supply scheme for villages of Sille, 17.424 2006-07 10.490 5.192 0.000 0.000 Rani, Sikabamin, Sika Tode, Oyan at Sille. (East Siang District) 15.682 9 Providing/Augmentation of Water Supply facilities to all the 12.772 2007-08 8.000 3.495 0.000 0.000 administrative HQs and it’s villages under 14th Doimukh Assembly Constituency. -
Tentative Allotment of Funds During 2007-08 Under RIDF
GOVERNMENT OF ARUNACHAL PRADESH STATEMENT SHOWING BALANCE FUND REQUIREMENT BOTH UNDER RIDF LOAN AND STATE SHARE & TENTATIVE ALLOCATIONS UNDER RIDF LOAN DURING 2007-08 Page No. : 1 STATEMENT SHOWING BALANCE FUND REQUIREMENT BOTH UNDER NABARD AND STATE SHARE (Financial figures Rs. in lakh) Sl. Name of the SchemeYear of Sanction Cost Cummulative Expenditure upto Balance as on 03/2007 Proposed Outlay 2007-2008 Remarks No. Sanction 03/2007 NABARD State Total NABARD State Total NABARD State Total NABARD State Total 1 2 3 4 56 7 8 9 10111213141516 Under RIDF-V 1 C/o Permanent Bridge over river 96-97 166.79 187.01 353.80 38.36 215.23 253.59 128.43 -28.22 100.21 Site Siyom at Menchung abandoned 2 C/o Permanent Motorable Bailey 94-95 342.90 48.80 391.70 343.34 57.33 400.67 -0.44 -8.53 -8.97 Completed type Suspension Bridge over river Siyom to connect villages Mechuka on right bank with Mechuka HQ(Span 360 ft.) 3 C/o Bailey Suspension Bridge over 97-98 283.36 43.64 327.00 354.20 109.68 463.88 -70.84 -66.04 -136.88 Completed river Subansiri near Taliha in Upper Subansiri District (Span 97.56 mtrs.) 4 C/o Motorable Suspension Bridge 96-97 395.76 262.16 657.92 422.90 422.47 845.37 -27.14 -160.31 -187.45 Completed over Lohit river to connect Chequenty and Hawai. 5 C/o Road from Itanagar to Pappu 99-00 345.60 38.40 384.00 345.60 38.40 384.00 0.00 0.00 0.00 Completed Nallah via Jully village (12 km). -
Annual Operating Plan 2009-10 Outlay and Expenditure of Centrally Sponsored Schemes Including Fully Funded by Govt
GOVERNMENT OF ARUNACHAL PRADESH ANNUAL OPERATING PLAN 2009 - 10 INDEX SL.NO CONTENTS PAGE-NO. 1 Basic features i - v 2 Abstract of Outlay and Expenditure 1 - 2 3 Outlay and Expinditure on Direction and Administration under Plan 3 4 Specific schemes with various components 4 5 District wise break up of Outlay 5 6 Physical Targets and Achievement 6 7 District wise break up of Physical targets and Achievement 7 8 Achievement of tenth Plan and Targets for Annual plan 2009-10 8 9 Statement of staff strength of the Department 9 - 10 10 Statement on proposal for New Posts 11 - 12 11 Expenditure and Outlays for salaries and wages 13 12 Statement on Vehicles 14 13 Details of on going scheme 15-35 14 Proposal for new schemes / services 36-70 15 Outlay & Expenditure of loan linked schemes 71-74 16 Earmarked schemes by Planning Commissioning 75-78 17 Centrally Sponsored Schemes (Financial) 79-83 18 Centrally Sponsored Schemes (Physical) 84-89 19 Furnishing information relaeted NEC, NLCPR scheme 90-92 20 On-going incomplete Projects funded under PM's Package 93-97 21 Details of Assets 98-99 GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF POWER ANNUAL OPERATING PLAN FOR 2009 – 10 BASIC FEATURES The Plan Outlay of the Department of Power as allocated by State Planning Department for the financial year 2009-10 is Rs 5000.00 lakh (Rupees Five Thousand Lakh ) only including the earmarked schemes. The projected minimum resource requirement of the Department of Power for 2009-10 is Rs.37079.04 (Rupees Thirty Seven Thousand Seventy Nine Lakh and Four Thousand) only. -
Geology Mineral Resources Arunachal Pradesh
1 GSI Misc. Pub. 30 Pt. 4 Vol. 2(i) PGSI-315 700-2010 DSK-II GEOLOGY AND MINERAL RESOURCES OF ARUNACHAL PRADESH GEOLOGICAL SURVEY OF INDIA Miscellaneous Publication No. 30 Part IV Vol I(i) Arunachal Pradesh Published by the order of the Government of India 2010 2 CopyGSI Misc. right Pub. © India,30 Pt. 4 Geological Vol. 2(i) Survey, 2010 GEOLOGY AND MINERAL RESOURCES OF ARUNACHAL PRADESH Compiled by G. K. KESARI Senior Geologist under the guidance of G. DAS GUPTA Dr. H.S.M. PRAKASH Director AND Superintending Geologist Publication Division Publication Division Under the overall supervision by B.K. MOHANTY SUDIPTA LAHIRI J.N. RAY Ex-Dy. Director General Ex-Dy. Director General Dy. Director General Geological Survey of India NORTH EASTERN REGION Shillong- 793 003 Price: Inland : Rs. 91/- Foreign : £ 3.11 or $ 4.76 Printed at ESSAR OFFSET, Janapath Lane, G.S. Road, Ulubari, Guwahati-781007, Mobile : +91-9435106080 3 GSI Misc. Pub. 30 Pt. 4 Vol. 2(i) FOREWARD The Miscellaneous Publication 30 Series of the Geological Survey of India brings out concise information on the geology and mineral resources of the states of India. The present volume Part IV, Vol. 2(i) of the series, pertaining to the state of Arunachal Pradesh, is a revised and updated version of the first edition published in 1974. During the span of three and a half decades since the first edition was pub- lished, enormous knowledge has been added in the sphere of geology of the area warranting of a revised edition of this volume. -
1 Introduction 1.1 Brief History Arunachal Pradesh Is Situated On
Chapter - 1 Introduction 1.1 Brief History Arunachal Pradesh is situated on the extreme North-East extremity of India in the Trans- Himalayan region between the latitude 26º28` to 29º30` N and longitude 91º30` to 97º30` E with an area of 83,743 sq. km. and has a long international border with Bhutan to the West (160 Kms), China to the North and North-East (1080 Kms) and Myanmar to the East (440 Kms). This beautiful land of rising sun was popularly known as NEFA (North-East Frontier Agency) till January 21, 1972. It was administered by the President of India through the Governor of Assam acting as his Agent. NEFA attained the status of Union Territory from 21st January, 1972 under the provision of the North-Eastern Areas (Re-organization Act of 1971) with the new name of ARUNACHAL PRADESH under the charge of a Chief Commissioner with its Headquarters at Shillong, the capital of the State of Meghalaya. From 15th August, 1975 this Union Territory was endowed with a Legislative Assembly having Chief Minister with a cabinet of four Ministers to assist the Lieutenant Governor appointed on the same day as the Administrator of the union Territory. The first General Election to the 30 member Arunachal Pradesh Legislative Assembly was held in 1978, constituting a landmark in the political history of the Territory. The Headquarters of this Union Territory was then shifted from Shillong to Itanagar under then Subansiri District in 1978. Arunachal Pradesh had attained the status of a State on 20 February, 1987. Till May 1980, Arunachal Pradesh consisted of five districts; thereafter numbers of districts were added after passing of the Arunachal Pradesh Reorganization of Districts Acts, 1980, thus there are twenty districts at present in the State, namely, Tawang, West Kameng, East Kameng, Papum Pare, Kurung Kumey, Kra Dadi Lower Subansiri, Upper Subansiri, West Siang, East Siang, Upper Siang, Siang, Dibang Valley, Lower Dibang Valley, Lohit, Anjaw, Namsai, Changlang, Tirap & Longding. -
Introduction History Geography Divisions Demographics
Introduction Lower Subansiri district is one of the 17 administrative districts of the state of Arunachal Pradesh in north eastern India. History The district was formed when Subansiri district was bifurcated into Upper and Lower Subansiri districts in 1987. Lower Subansiri district has a long ancient history related with the Chutiya Kingdom. It was probably under Chutiya chieftain rule from a long time, and came under Birpal's rule in the 12th century. In 1999 Papum Pare district was split to form new district and this was repeated on 1 April 2001, with the creation of Kurung Kumey district. In October 2017 the state government approved the creation of Kamle district, involving the carving out of Raga, Dolungmukh and Kumpurijio circles from Lower Subansiri district. Geography The district headquarters are located at Ziro. The district occupies an area of 3,460 km² It is bounded on the north by the Upper Subansiri district of Arunachal, on the south by Papum Pare District of Arunachal Pradesh and Assam, on the east by West Siang and some part of Upper Subansiri, and on the west by East Kameng district of Arunachal Pradesh. Divisions There are 6 administrative circles in this district, namely, Ziro (Sadar), Yachuli, Pistana, Raga, Kamporijo and Dollungmukh. The district also divided into 3 blocks: Ziro-I, Ziro-II and Tamen-Raga. There are 2 Arunachal Pradesh Legislative Assembly constituencies located in this district: Yachuli and Ziro-Hapoli. Both of these are part of Arunachal West Lok Sabha constituency. Demographics According to the 2011 census Lower Subansiri district has a population of 82,839, roughly equal to the nation of Andorra.[6] This gives it a ranking of 623rd in India (out of a total of 640).The district has a population density of 24 inhabitants per square kilometre (62/sq mi) . -
Status of NLCPR Projects in AP As on 28Th May, 2008
YEAR-WISE AND SECTOR-WISE LIST OF PROJECTS SANCTIONED UNDER NON-LAPSABLE CENTRAL POOL OF RESOURCES (NLCPR) INDICATING ITS PRESENT STATUS AS ON 31st MAY 2008 IN RESPECT OF ARUNACHAL PRADESH YEAR OF NAME OF PROJECT ESTIMATED Fund Expenditure UC submitted UC yet to be Unspent Balance Remarks APPROVAL SANCTIONED COST (Rs. In Released incurred upto 31st submitted balance liability crore) (Rs.in crore) March, 2008 (Rs in crore ) 123456789 10 I PH&WS: PROJECTS AGAINST WHICH FULL FUNDS RELEASED: 1998-99 1. Water Supply scheme at Itanagar. 10.590 10.590 10.590 10.590 0.000 0.000 0.000 Completion Certificate submitted to the DoNER. 1999-2000 2. Special Restoration of Water supply 2.000 2.000 2.000 2.000 0.000 0.000 0.000 Completion Certificate submitted to the DoNER. facilities at Tezu. 2002-2003 3. Naharlagun- Nirjuli Water Supply 11.730 14.900 14.900 9.860 5.040 0.000 -3.170 - The estimated cost of the project has been revised to Rs. 14.90 crore. scheme. -The actual fund released from NLCPR is Rs. 11.04 crore and remaining amount of Rs. 3.86 crore is from State Plan Fund. - The project has been physically completed. Department is to submit Completion Certificate. 2002-2003 4. Water Supply Project for Daporijo 3.978 3.666 4.067 3.574 0.092 -0.401 0.312 Excess expenditure of Rs.0.401 crore have been made from State Plan fund. A revised town, Upper Subansiri District. estimate at the revised cost of Rs.10.38 crore against original cost of Rs.3.978 crore have been submitted to Ministry of DoNER, which is said to be lying pending in the CPHEEO for consideration. -
Government of India Ministry of Environment & Forests IA-I Division
Government of India Ministry of Environment & Forests IA-I Division ............ AGENDA FOR 66th MEETING OF EXPERT APPRAISAL COMMITTEE FOR RIVER VALLEY AND HYDROELECTRIC POWER PROJECTS Date : 3rd - 4th May, 2013 Venue: Annexee Conference Room Time : 10.00 a.m. SCOPE Complex Opp. Jawahar Lal Nehru Stadium Lodhi Road, New Delhi -110 003 1st Day – (3rd May, 2013) 1. Welcome by Chairman and Confirmation of Minutes of 65th Meeting held on 22-23rd March, 2013. 2. Consideration of Project Proposals for Scoping and Environment Clearance 2.1 Lower Orr Project in Shivpuri District of Madhya Pradesh by M/s. National Water Development Agency (NWDA) – For Reconsideration of TOR. 2.2 Nabha ( 4 x 250 MW) HEP in Upper Subansiri District, Arunachal Pradesh by M/s. Abir Infrastructure Pvt. Ltd – For consideration of TOR. 2.3 Teesta Low Dam-V HEP (80 MW) of WBSEDCL in District Darjeeling, West Bengal – For consideration of TOR 2.4 Panan HEP (300 MW) in North Sikkim District of Sikkim by Himagiri Hydro Energy Pvt. Ltd – For consideration of Environmental Clearance for revised capacity from 280 MW to 300 MW. 2.5 Environment Impact Assessment of and Environment Management Plan of Jeera irrigation Project – Odisha – For EC 2.6 Kalai HEP (1450 MW) project in Anjaw District of Arunachal Pradesh by M/s. Mountainfall India Pvt. Ltd – For consideration of downward revision of capacity from 1450 MW to 1304 MW & extension of validity of TOR 2.7 Hutong Stage-II HEP (1250 MW) project in Anjaw District of Arunachal Pradesh by M/s. Mountainfall India Pvt. -
The Arunachal Pradesh Gazette, October 13 , 2017 185
Part - I ] The Arunachal Pradesh Gazette, October 13 , 2017 185 The Arunachal Pradesh Gazette PUBLISHED BY AUTHORITY No. 19 Vol. XXVIII, Naharlagun, Friday, October 13, 2017 Asvina 21, 1939 (Saka) Separate paging is given to each part in order that it may be filed as a separate compilation. CONTENTS PAGE PART - I — Appointment, promotions, powers, and personal notices issued by the Governor. 185-194 PART - III — Resolutions, orders, notifications, rules etc., issued by the Government and 21-24 Heads of Departments. GOVERNMENT OF ARUNACHAL PRADESH PART - I Appointment, promotions, powers, and personal notices issued by the Governor. NOTIFICATION The 19th December, 2016 No. GA-34/2013/2001.—The Governor of Arunachal Pradesh is pleased to designate the Transport department as Nodal Department for Development of Inland Waterways. Hage Kojeen Commissioner (GA), Government of Arunachal Pradesh, Itanagar. ORDER The 17th March, 2017 No. APHPM&PB-06/2016/887-970.—In exercise of power conferred upon section 30, sub-section-1, 2, & 3 of the Arunachal Pradesh Horticultural Produce Marketing & Processing Board Act, 2014 to regulate the Horticultural Produces in the State, the Governor of Arunachal Pradesh is pleased to constitute district Horticultural Produce Market Committee in the various districts of Arunachal Pradesh. The market committee shall comprise of the following members as under :- (A) Ex-Officio Members : (i) DC/ADC - Chairman (ii) DHO/District Marketing Officer - Vice-Chariman (iii) DAO - Member (iv) DV - Member (v) ARCS - Member (vI) DFDO - Member (vii) SDHO/HDO (HQ) shall function as Marketing Manager-cum-Member Secretary (viii) HMO Assistant Marketing Manager. (B) Non-Officio Members : (i) One Non-Official Member from the notified market areas. -
Govt.Of Arunachal Pradesh Planning Department Itanagar
GOVT.OF ARUNACHAL PRADESH PLANNING DEPARTMENT ITANAGAR. No.PD(MLALADS)-42/2010-11 Dated Itanagar, the 18 th November’2010. To. 1) The Deputy Commissioner, Khonsa/Changlang/Tezu/Hawai/Roing/Anini/Yingkiong/Daporijo/Aalo/ Pasighat/Yupia/Koloriang/Ziro/Seppa/Bomdila/Tawang. Arunachal Pradesh. 2) The Additional Deputy Commissioner, Longding/Rumgong/Namsai/Jairampur/Basar/Mechukha. Arunachal Pradesh. Sub:- Allocation of funds under MLALADS for the year 2010-11, ( Third Quarter) Sir, I am directed to convey the Govt. approval for placement of Rs.1050.00.lakhs being the third installment release under MLALADS fund for 2010-11 at the rate of Rs.17.50.lakh per Assembly Constituency at the disposal of respective Deputy Commissioners/ Additional Deputy commissioners. 2. The expenditure should be booked under Major Head “ 3451”-S.E.S.-Sub Major Head 00 Minor Head-102-District Planning Machinery –Sub-Head-01-MLA’s Local area Development Fund –detail Head- (01-DC, Aalo), (02-DC,Tezu) ( 03-DC, Ziro), (04-DC,Bomdila), (05-DC,Khonsa), (06-DC, Pasighat), (07-DC, Anini), (08-DC, Daporijo), ( 09-DC,Seppa), (10-DC,Tawang), (11-DC, Changlang), ( 12-DC, Papumpare), (13-DC, Yingkiong), (14-DC, Koloriang ), (15-DC,Roing), (16-DC,Anjaw),(18-ADC Namsai), (19-ADC, Longding), (21-ADC,Basar), (22-ADC, Rumgong), (23-ADC, Jairampur ), (24-ADC,Mechuka)- Object Head-50-Code No.02 ( PLAN) demand No.6. The district-wise allocation under MLALADS for the year 2010-11 against third quarter is as under.( Also given at Annexure-I enclosed) ( Rs. in lakhs) Sl.No District (DC/ADC No.of Fund to be released in 3rd Remarks Assembly quarter. -
State Gazetteer of Arunachal Pradesh
©IF DMM ARUNACHAL PRADESH ARUNACHAL PRADESH STATE GAZETTEER OF ARUNACHAL PRADESH VOLUME-1 GOVERNMENT OF ARUNACHAL PRADESH GAZEHEERS DEPARTMENT GAZETTEER OF INDIA ARUNACHAL PRADESH STATE GAZETTEER OF ARUNACHAL PRADESH Volume - 1 GOVERNMENT OF ARUNACHAL PRADESH GAZETTEERS DEPARTMENT ARUNACHAL PRADESH GAZETTEERS STATE GAZETTEER OF ARUNACHAL PRADESH (VOLUME-I) b y SOKHEPKRI Editor GOVERNMENT OF ARUNACHAL PRADESH 2 0 10 Government of Arunachal Pradesh Price : Rs. ISBN -978-81906587-3-7 (Volume-I) Compiled by Shri Hage Nobin, Sr. Compiler (Gazetteers), Shri C.S. Namchoom, Compiler (Gazetteers) and Shri Duyu Tale, Research Assistant (Gazetteers) Government of Arunachal Pradesh, Chimpu, Itanagar Published by the State Editor (Gazetteers), Gazetteers Department, Government of Arunachal Pradesh Chimpu, Itanagar. Cover-design and Art-work by : Bablu Kr Dey Printed b y : Himalayan Publishers, Legi Shopping Complex, BankTinali, PostBoxNo. 177, Itanagar-791 111 Arunachal Pradesh-New Delhi. RAJ BHAWAN ITANAGAR-791111 TEL ; +91 360 2212432 FAX ; +91 360.2212442 genj]slngh@rediff mall.com GENERAL J.J. SINGH PVSM, AVSM, VSM (Retd) Governor Arunachal Pradesh FOREWORD It gives me immense pleasure to know that the first State Gazetteer of Arunachal Pradesh (Volume-I) is going to be published very soon. The State Gazetteer is a compendium, depicting a fairly comprehen sive picture of this frontier State, its physical and geographical aspects, the indigenous populace, their socio-cultural traditions, rich heritage and vibrant economy. The Gazetteer also highlights the proud history and tremendous de velopment of the Stale since independence. In the multi-faceted scenario of North Eastern India, Arunachal Pradesh, comprising of 16 districts is a unique and enchanting entity.