Re: Montrose Road Project Date
Total Page:16
File Type:pdf, Size:1020Kb
Begin forwarded message: From: Marc Samwick < [email protected] > Subject: Re: Montrose Road project Date: December 5, 2019 at 4:18:23 PM EST To: Xue Su < [email protected] > Cc: Steve Pappalardo < [email protected] > Xue Su, Thank you for your email. I have, via this email, copied the Village Manager, Steve Pappalardo, and ask that he look into this matter and rely to you. Best regards, Marc On Dec 5, 2019, at 4:12 PM, Xue Su < [email protected] > wrote: CAUTION: External sender. Hello Mayor Samwick, How are you? Hope all is well. Since I can't find the email addresses of the trustees, I am only sending this message to you and hope you can forward it to them. There is one thing I would like to bring up to your attention. Yesterday the village started a project to fix the curb stone on Montrose Road close to the Greenacres elementary school. While I was very excited to see the workers working on that, soon I realized the way they were doing it could cause safety and traffic problems in that area. I called the engineering department right away before the workers put in cement and hope somehow the way of doing it could be improved. Later I sent an email with pictures to show how narrow the pedestrian space was and how high the stones were set. I found out today that the workers were told to finish the job as planned. I am attaching three additional pictures during pick-up time today. I hope, for the safety of the children and the pedestrians, this issue can be addressed and resolved. Otherwise, I would wish the best luck for all the pedestrians (including some 5-years-old kindergarten children) and the drivers on this road everyday. Thanks for your attention! Xue Su ----- Forwarded Message ----- From: Xue Su < [email protected] > To: "[email protected] " < [email protected] > Cc: "[email protected] " < [email protected] > Sent: Wednesday, December 4, 2019, 01:10:41 PM EST Subject: Montrose Road project <IMG_5106.JPG> <IMG_5107.JPG> Hello Engineering Department, My name is Xue Su and I live on Kingston Road. On my way to pick up, I was very excited to see workers were fixing the curbside on Montrose Road and really appreciate your doing it! But later when I came back, I noticed where and how the workers are setting up the curb stones could cause serious safety hazards. It would leave less than two feets of space for pedestrians. While we all know for historical reasons, our village doesn’t have much sidewalks. But this area is quite different from other areas. It is very close to the elementary school with heavy traffic during morning and afternoon. Many parents walk their kids to school in this neighborhood and some have strollers with their younger children. I am sending a few pictures I just took and you can see there is barely space for strollers. Again we really appreciate you fixing the road but the workers may not be doing it in the right way. My suggestion would be: 1. Re-set the stone at least one to two feet more into the side; 2. Dig deeper so the stones won’t be too much higher than the surface of the road. Thanks and look forward to hearing from you! Sent from Yahoo Mail for iPhone <IMG_5106.JPG><IMG_5107.JPG><Montrose pict3.jpg><Montrose pict4.jpg><Montrose pict5.jpg> .