The Brisbane Busway Successful Public Transit Serves Australia’S Fastest Growing Region SNAPSHOT: BRISBANE, AUSTRALIA The Brisbane Busway Successful Public Transit Serves Australia’s Fastest Growing Region Background Located in Western Australia, Brisbane is the capital city of the State of Queensland and the center of the fastest-growing region in the country. Population projections estimate that the region will grow from 2.7 million in 2006, to more than 4.2 million in 2031.1 In order to meet the transportation demands of its growing population and support a strong regional economy, Brisbane has developed an extensive bus rapid transit system. Modeled largely after the Ottawa, Canada system, the Brisbane system exemplifies the “quickway model” of BRT. The region is served by a network of dedicate busways that provide fast and convenient connection to the central business district (CBD) and major employment centers. Building on the success they’ve had to date, the region has set of goal of doubling the use of public transportation by 2031.2 Process Recognizing the Need. The city of Brisbane has long been served by an electrified commuter rail system, the “Citytrain.” The Citytrain network includes four corridors radiating out of the CBD and branching out into 7 primary corridors. While this system was historically well used, transportation planners recognized that residents located between the lines were not well served and had little access to reliable transit options linking them to employment centers. The decision to invest in the busway system is largely credited to Lord Mayor Jim Soorley, who was in office from 1991-2003. Soorley sought to transform the city of Brisbane into a globally competitive city and believed that an effective public transit system was critical to achieving this goal. Inspired by the Ottawa Transitway, the Lord Mayor believed that busways offered a way to achieve high- quality transit in a relatively short timeframe. As Brisbane’s population grew in the 1990s, plans were developed to expand the Pacific Motorway from six lanes to eight in order to increase capacity of the highway connecting Brisbane to the Gold Coast. However, studies found that building a two-lane dedicated busway would better serve the region, reducing congestion and improving access to the CBD. Today, during peak hours one lane of busway carries the equivalent number of people per hour as nine lanes of highway.3 1 Connecting SEQ 2031: An Integrated Regional Transport Plan for South East Queensland, online at http://www.connectingseq.qld.gov.au/ 2 Ibid. 3 Breakthrough Technologies Institute. “Bus Rapid Transit and Transit Oriented Development: Case Studies on Transit Oriented Development around Bus Rapid Transit Systems in North America and Australia.” April 2008. Snapshot: Brisbane, Australia | 1 Building and Expanding the System. The current Brisbane busway network includes 4 segments. The first of these, the South East Busway (SEB), was completed in 2001 and extends from the Queen Street Mall (a pedestrian-only, mixed use, downtown district) to the suburbs of “Eight Mile Plains” approximately 8 miles southeast. This busway had immediate impact: transit ridership grew by 56 percent, including 26 percent who were new riders and had previously driven cars.4 The SEB reduced the travel time from Eight Mile Plains to the CBD from 60-minutes by car to only 18-minutes by bus.5 In 2004, the Brisbane system expanded to include the Brisbane Inner Northern Busway (BIBN). This busway extends 2 miles north of downtown and provides direct access to the CBD via an underground tunnel. The line includes an underground station at King George Square and links to an existing underground bus station under the Queen Street Mall. The BIBN is now being expanded to connect to the growing suburbs further to the north. Current and future busway map. Source: www.translink.com.au Work is also underway on the Eastern Busway, which will connect eastern suburbs to Brisbane City, major shopping and employment centers, including the University of Queensland and Princess Alexandra Hospital. The fourth segment is the relatively short (1.5km) Boggo Road Busway, which provides connection between the southern and eastern districts of Queensland University and includes a 430m-tunnel running below an existing rail line and the Pacific Motorway. TransLink, an agency of the Queensland government formerly called Queensland Transport, controls the Brisbane system. Translink contracts with several operators and provides several types of service. “Spine” service offers high frequency service along each corridor with stops at each station. CityXpress service operates off-corridor and enters the Busway via a ramp. These buses typically allow for transfers to the spine and then proceed non-stop to the CBD. “Rockets,” similar to CityXpress connect the Woooloongabba station and provide access to the CBD and major office buildings to the southeast. Lessons Learned A Flexible System Grows with the Region. By developing a network of grade-separated busways, Brisbane has created a system that can be responsive to demand and can be adapted to meet the needs of the region over time. While the fixed infrastructure of the stations provides a level of reliability that can spur real estate investment, using buses rather than rail allows service to change in response to growth and commuter trends. There is even potential to convert the busways into light rail lines if that were to make sense in the future. 44 Currie, Graham. “Bus Rapid Transit in Australasia: Performance, Lessons Learned and Futures.” 2006. Available online at http://www.nctr.usf.edu/jpt/pdf/JPT%209-3S%20Currie.pdf 5 Ibid. Snapshot: Brisbane, Australia | 2 Branding and Design is Important. Brisbane has been very intentional about creating stations that reflect a high standard of design. Most stations follow a similar design, which provides consistency across the system. Typical stations include linear platforms that are 5 meters (16.4 ft) deep and 55 meters (181 ft) long. The buses that utilize the busways are not specifically branded. The decision to brand the stations rather than the buses reflects Brisbane’s infrastructure-focused approach, rather than a service- oriented strategy.6 By focusing the branding on the infrastructure, they are recognizing that the service may change and evolve over time. The strong branding that is consistent across the stations helps to identify them and elevate the visibility of the infrastructure investment. Capacity Remains a Challenge. As the busway has gained popularity and ridership has increased, the system is experiencing congestion and capacity challenges. Buses do get backed up, particularly at pinch points like bridges. Platform crowding is also a problem and because it’s not always clear where buses will pull up to the platform, there can at times be confusion on the platforms. This results in inefficiency as passengers fight to find their right bus. Platform crowding also increases unloading time. It’s estimated that these inefficiencies reduce station capacity by 10 percent.7 Busways Spur Investment. Among the most notable successes of the Brisbane busway has been the real estate investment and infill development that has taken place along the routes. Communities located along the SEB have experienced 20 percent increases in land value.8 To date, much of the transit-oriented development that has occurred has been market driven, and the government has done little to influence this development. One notable exception is the Boggo Road Urban Village, a mixed-use redevelopment project managed by the Department of Public Works. However, the government is now beginning to look at incentives that can be created to help target TOD investment. Land use planning in Southeast Queensland is under the authority of the Queensland State Government, which should allow for a more comprehensive approach. Pursuant to the Integrated Planning Act of 1997, local governments are required to prepare Local Growth Management Strategies to implement the regional plan. These local strategies are now required to identify opportunities for TOD. The current regional plan, “Connecting SEQ 2031” emphasizes the importance of transit-oriented development in support of the region’s transportation, economic and environmental goals. Thanks to Dr. Graham Currie, Monash University Snapshot written by Debra Perry, ISC. For More Information TransLink; www.translink.com.au 6 Federal Transit Administration. Advanced Network Planning for Bus Rapid Transit: The “Quickway” Model as a Modal Alternative to “Light Rail Lite,” 2008, available online at http://www.fta.dot.gov/documents/BRT_Network_Planning_Study_-_Final_Report.pdf 7 Jaiswal, S., Bunker, J and Ferreira, L. 2010. Modeling Bus Lost Time: Additional Parameter Influencing Bus Dwell Time and Station Platform Capacity at Bus Rapid trans Station Platform. Online at http://eprints.qut.edu.au/40888/ 8 Brisbane Australia: Brief online at http://onlinepubs.trb.org/onlinepubs/tcrp/tcrp90v1_cs/Brisbane.pdf Snapshot: Brisbane, Australia | 3 This case study was produced by the Institute for Sustainable Communities for our Sustainable Communities Leadership Academy. The Academy is a state-of-the-art training and technical assistance program on community-based climate solutions. Its purpose is to build the capacity of communities to take smarter, swifter, more effective action to increase energy efficiency, reduce climate pollution and dependency on fossil fuels, create green businesses and jobs, and strengthen their resilience to the local impacts of climate disruption. Learn more at www.iscvt.org. Snapshot: Brisbane, Australia | 4 .
Recommended publications
  • Queensland Transport and Roads Investment Program (QTRIP) 2019-20 to 2022-23
    Queensland Transport and Roads Investment Program 2019–20 to 2022–23 South Coast 6,544 km2 Area covered by district1 19.48% Beenleigh LOGAN 1 CITY Population of Queensland COUNCIL 919 km Jimboomba Oxenford Other state-controlled road network (Helensvale light rail station) Fassifern SOUTHPORT NERANG 130 km SURFERS Beaudesert Boonah PARADISE National Land Transport Network (Broadbeach SCENIC RIM light rail station) REGIONAL COUNCIL Mudgeeraba 88 km GOLD COAST National rail network CITY Coolangatta COUNCIL 1Queensland Government Statistician’s Office (Queensland Treasury) Queensland Regional Profiles. www.qgsa.gld.gov.auwww.qgso.qld.gov.au (retrieved 1626 AprilMay 2019)2018) Legend National road network State strategic road network State regional and other district road National rail network 0 15 Km Other railway (includes light rail) Local government boundary Legend Nerang Office National road network 36-38 Cotton Street | Nerang | Qld 4211 State strategic road network PO Box 442 | Nerang | Qld 4211 State regional and other district road (07) 5563 6600 | [email protected] National rail network Other railway (includes light rail) Local government boundary Divider image: Construction worksworks onon thethe StapleyStapley RoadRoad bridge bridge at at Exit Exit 84 84 of of the Pacific Motorway at ReedyReedy Creek.Creek. District program highlights • business case development for safety and capacity • commence extending the four-lane duplication of upgrades at Exit 38 and 41 interchanges on the Pacific Mount Lindesay Highway between Rosia Road and In 2018–19 we completed: Motorway at Yatala Stoney Camp Road interchange at Greenbank • duplication of Waterford-Tamborine Road, from two to • business case development for the Mount Lindesay • commence construction of a four-lane upgrade of four lanes, between Anzac Avenue and Hotz Road at Highway four-lane upgrade between Stoney Camp Road Mount Lindesay Highway, between Camp Cable Road Logan Village and Chambers Flat Road interchanges.
    [Show full text]
  • FREE OFF-PEAK SENIORS BUS and RAIL TRAVEL Easing the Cost of Living for Seniors
    FREE OFF-PEAK SENIORS BUS AND RAIL TRAVEL Easing the Cost of Living for Seniors A Tim Nicholls-led Liberal National Government will provide free off-peak public transport to passengers with a seniors go card. The Problem A senior go card holder regularly travelling from the Gold Coast to Brisbane saved up to $148 per We understand increases in the cost of living make year, while those regularly travelling from Enoggera, it hard for Queenslanders to make ends meet – Indooroopilly or Newstead to the Brisbane CBD saved especially those on fixed incomes like seniors and $41 per year. pensioners. In regional Queensland, for example, seniors who are Under Annastacia Palaszczuk’s watch, Labor has regular bus passengers travelling in Townsville saved increased car registration by double the inflation up to $66 a year. rate for three years in a row. If you have a 4-cylinder car that’s an increase of over $50! Our Real Plan In recent years the cost of public transport has also risen dramatically – when Annastacia Palaszczuk A Tim Nicholls-led LNP Government will make was the transport minister in the Bligh Labor off-peak bus and rail travel free for senior go card Government, bus and train fares went up 15% year holders. after year after year. A total of 45%. This will mean many of the 20 million senior public While the Palaszczuk Labor Government has transport trips made each year will be free. no plan to tackle the cost of living issues facing The LNP is committed to tackling the rising cost of Queenslanders, the LNP team has been listening and living.
    [Show full text]
  • Customer Feedback Information
    Customer feedback information If you have feedback—including a suggestion, problem, issue, Who can provide feedback, including making a concern or compliment—about the services, decisions or actions complaint? of Queensland Rail, we would like to hear about it. Anyone can provide feedback or make a complaint, whether it is in Queensland Rail is committed to: person, in writing or by phone. • Acknowledging the importance and value of customer feedback How can I provide feedback? • Providing an accessible avenue for people to provide feedback There are several ways in which you can provide feedback on our or raise concerns about matters relating to Queensland Rail Travel network. Options include: • Ensuring all feedback is managed fairly, promptly, sensitively • Phone our Customer Feedback Team on 13 16 17 and efficiently. • Online at queenslandrail.com.au/customerservice where you Your feedback contributes to our continuous improvement can complete a feedback form towards the delivery of customer service excellence. Please take • Email [email protected] the time to fill out a Queensland Rail Customer Feedback Form. Your information is a valuable contribution which will assist in • Connect with us through facebook.com/queenslandrail or improving our business. twitter.com/queenslandrail • Send written feedback via mail to Customer Feedback Team, What can feedback be about? PO Box 1429, Brisbane QLD 4001 Feedback can be about: • Provide the feedback in person at any Queensland Rail station • The products and services we provide or Queensland Rail Travel centre. • Any perceived impact from our business operations For feedback on our City network, please contact TransLink: • Our practices and processes.
    [Show full text]
  • Why Busways? Styles of Planning and Mode-Choice Decision-Making in Brisbane's Transport Networks
    Why busways? Styles of planning and mode-choice decision- making in Brisbane's transport networks Author Tanko, Michael, Burke, Matthew Published 2015 Journal Title Australian Planner Version Accepted Manuscript (AM) DOI https://doi.org/10.1080/07293682.2015.1047873 Copyright Statement © 2015 Planning Institute of Australia. This is the author-manuscript version of the article published in Australian Planner, Vol. 52 (3), pp. 229-240, 2015. Reproduced in accordance with the copyright policy of the publisher.Please refer to the journal link for access to the definitive, published version. Downloaded from http://hdl.handle.net/10072/101442 Griffith Research Online https://research-repository.griffith.edu.au Why busways? Styles of planning and mode-choice decision-making in Brisbane's transport networks Michael Tanko & Matthew Burke To cite this article: Michael Tanko & Matthew Burke (2015) Why busways? Styles of planning and mode-choice decision-making in Brisbane's transport networks, Australian Planner, 52:3, 229-240, DOI: 10.1080/07293682.2015.1047873 Why busways? Styles of planning and mode-choice decision-making in Brisbane’s transport networks Michael Tanko* and Matthew Burke Urban Research Program, Griffith University, Brisbane, Australia Why did Brisbane build busways? And what does the city’s experience reveal about mode-choice decision-making and transport planning in Australian cities? This paper reports on the processes and decisions taken to introduce bus rapid transit (BRT) in Brisbane in the 1990s with specific focus on the styles of planning involved. Using theoretical frameworks provided by Innes and Gruber, Forester, and other planning theorists, different planning styles are identified. These concepts are used and tested in the case of the South East Busway, Brisbane’s first and very successful introduction of BRT.
    [Show full text]
  • Transdev Letterhead Template
    Wednesday, 27 January 2021 Dear Valued School Partners, Re: Back to School 2021. Welcome back to a new School Year. Thank you for choosing to travel with us! The following information has been prepared to assist students, parents/guardians and administrators as they return back to School for 2021. • School Bus Timetables – The latest route and timetable information for school bus routes can be found on the TransLink website, https://jp.translink.com.au/plan-your- journey/services-nearby/results • School Bus Passes – New passes for 2021 have been printed and are being distributed to schools and students over the coming weeks. Students should continue using their 2020 pass until they receive their new pass. • Code of Conduct – TransLink have issued a revised Code of Conduct for Students Travelling on Buses. The document details the expectations and behaviours required by students when travelling on public transport. Transdev Drivers operate services in line with the Code, and students, parents and guardians are encouraged to familarise themselves with the Code of Conduct before travelling. Information and a copy of the Code of Conduct is available at https://translink.com.au/travel-with-us/school-travel/school-travel-info/code-of- conduct. To assist our drivers in getting students to and from school safely and efficiently, students are asked to: • Allow extra time, arriving at the bus stop 10-minutes before scheduled departure • Clearly hail the Bus, allowing enough time for the Driver to pull over • Pay the correct fare, using their go
    [Show full text]
  • Station Access Guide (SMS) Only: 0428 774 636 Effective February 2020 General: 13 16 17 TTY: 133 677
    queenslandrail.com.au For further information Accessibility Assistance Station Access Guide (SMS) only: 0428 774 636 Effective February 2020 General: 13 16 17 TTY: 133 677 Queensland Rail Limited ABN 71 132 181 090 Station listing Station legend Facilities andaccessibility Safety Hearing loops information customer Accessible train onanew Travelling atrain board to Using theramp point boarding Assisted stations Citytrain Accessing Introduction 10 9 6 5 4 3 3 2 1 1 South East Queensland train, busway and light rail network map Effective April 2018 8 Gympie North Sunshine Coast line Key 8 Traveston 8 Cooran 8 Pomona Ferny Grove and Beenleigh lines 8 Cooroy North 7 Eumundi Shorncliffe and Cleveland lines 7 Yandina 6 Airport and Gold Coast lines Nambour 6 Woombye Caboolture/Sunshine Coast 6 Palmwoods and Ipswich/Rosewood lines 5 Eudlo 5 Mooloolah Redcliffe Peninsula and Springfield lines 5 Landsborough Doomben line 5 Beerwah 4 Glasshouse Mountains Special event service only 4 Beerburrum Busway lines 4 Elimbah Caboolture line 3 Caboolture Redcliffe Peninsula line G:link light rail line 3 Morayfield Kippa-Ring 3 Rothwell 3 3 Burpengary Transfer to other train services Mango Hill East 3 3 Narangba Mango Hill 3 1 TransLink fare zones Murrumba Downs 3 3 Dakabin Kallangur 3 2/3 Transfer to busway services 3 Petrie 2 Lawnton Transfer to light rail service 2 Bray Park Special fares apply 2 Strathpine 2 Independent access 2 Bald Hills Shorncliffe line 2 Assisted access Carseldine Shorncliffe 2 2 2 Zillmere Sandgate 2 Ferny Grove 2 * King George Square busway station 2 2 Deagon 2 Ferny Grove line 1 Geebung Keperra Kedron Brook 2 2 North Boondall 2 ^ Queen Street bus station Grovely Sunshine 1/2 Boondall 2 1 Oxford Park 1 Royal Brisbane Women’s Hopital 1 Lutwyche irginia Nudgee 2 1 V Mitchelton Truro Street Banyo 2 There are many bus services scheduled to connect Gaythorne 1 1 Bindha 2 with train services at most train stations.
    [Show full text]
  • Eastern Transitway Stage 1—Consultation Summary
    BUS L A N E END LANE BUS BUS LANE END LANE BUS Eastern Transitway Stage 1 Stage Transitway Eastern BUS LANE Consultation Summary Consultation BUS LANE August 2020 August BUS LANE Introduction The Queensland Government is investing in the delivery of the Eastern Transitway. This cost-effective solution will improve priority for public transport along Old Cleveland Road, from Coorparoo to Carindale, and aims to extend the benefits of the existing Eastern Busway. Targeted bus priority measures will improve bus service reliability and bus travel times in peak periods, which will assist in managing congestion along the corridor. These measures will not reduce the number of general traffic lanes. The Eastern Transitway project will be delivered using a staged approach to minimise the impact to the community. Stage 1 will focus on the Creek Road intersection and extend along Old Cleveland Road to Narracott Street. Community participation Community feedback was received through our online survey, via email, phone and at meetings. This included feedback from: 18 emails 176 online surveys completed 5 phone enquiries 6 group meetings 18 individual meetings Consultation feedback summary The Department of Transport and Main Roads (TMR) would like to thank the community for their feedback and input into the Eastern Transitway Stage 1 design. Community consultation was completed between 29 June 2020 and 12 July 2020. Feedback was received through our online 'Get Involved' survey, via email, phone and at meetings. Overall, the feedback received from consultation demonstrated the majority (60 per cent) of the community who responded to the survey supported the proposed Eastern Transitway Stage 1 design.
    [Show full text]
  • Brisbane to Gold Coast Train Timetable
    Airport–City to Varsity Lakes outbound Monday to Friday services General information Abbreviations Departs Comes from SHC Fri All customers travelling on TransLink services must be in every possession of a valid ticket before boarding. For ticket Departs Services depart at time indicated within Station am am am am am am am am am am am am am am am am am pm pm pm pm pm pm pm pm pm pm pm pm pm pm pm pm pm pm pm am information, please ask at your local station or call 13 12 30. every the hour Domestic ... 5:42 6:00 6:28 6:58 7:28 7:58 8:14 8:29 8:44 8:59 9:14 9:28 9:44 9:58 :28 :58 3:28 3:45 3:58 4:13 4:28 4:48 5:02 . 5:30 5:45 5:58 6:28 6:58 7:13 7:28 8:00 .... While Queensland Rail makes every effort to ensure This station has a connecting bus service International ... 5:45 6:03 6:31 7:01 7:31 8:01 8:17 8:32 8:47 9:02 9:17 9:31 9:47 10:01 :31 :01 3:31 3:48 4:01 4:16 4:31 4:51 5:05 . 5:33 5:48 6:01 6:31 7:01 7:16 7:31 8:03 .... trains run as scheduled, there can be no guarantee of Parking available Eagle Junction pform ... #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 #1 ...
    [Show full text]
  • Mountain Biking YOUR FREE SPORT EVENT GUIDE
    Mountain Biking YOUR FREE SPORT EVENT GUIDE Embrace Before you leave... DOWNLOAD THE GC2018 APP THE RACE The GC2018 App The Gold Coast 2018 Commonwealth Games includes all the information you’ll (GC2018) Cycling events will give everyone need to know for the free events in the chance to catch the exciting and fast-paced one place. You’ll find course maps, action of world-class sport across the Gold Coast. fun facts and more. During GC2018 the Mountain Bike event will take place in the Nerang Mountain Bike trails. BE PREPARED There are some great vantage points along the trails, where you This event is outdoors and can watch the world’s bravest mountain bike riders take on the in bush terrain, so come first international-standard mountain bike trail in South East prepared for all weather conditions Queensland. Grab your friends and family and cheer on the athletes. and limit what you carry. Allow plenty ‘The Hub’, located at the entry to the trails, will provide food and of time for travel and be prepared for drink, toilets, bins and all the information you need about which crowds. There will be a water refill point designated walking route is best for access. It will open 2 hours at the Hub. Please bring a reusable before the race starts. Please note only spectators with tickets will water bottle to refill during the day. have access to the start and finish area. SHOW YOUR THURSDAY THE HUB OPENING HOURS: GC2018 SPIRIT! 8.30am – 4.00pm This is your chance to celebrate 12 APRIL GC2018! Get together, have some fun RACE TIMES: NERANG and don’t forget to share your special MOUNTAIN Women’s: 10.30am – 12.30pm moments with us by tagging #GC2018 on BIKE TRAILS Men’s: 1.30pm – 3.30pm Facebook Instagram and Twitter.
    [Show full text]
  • 310, N310, P315 Ticket Type Where to Buy Tickets How to Read This Timetable 1
    Ticketing information Timetable information 310, N310, P315 Ticket type Where to buy tickets How to read this timetable 1. Use the route map to find the two 310 Brighton via Airport Link to timing points you are located between. Brisbane City 2. Locate these points on the timetable. 3. Your bus is scheduled to arrive N310 Brisbane City to Sandgate between the times shown for these card agents card and (NightLink) go points. For example, if your bus stop is situated between timing points Brisbane City to Redcliffe A B P315 and on the map, then the bus is Selected website on the TransLink ^ operators bus TransLink Queensland Rail selected stations machines fare TransLink scheduled to arrive between the times TransLink go card ✔ * ✔ ~ listed for A and B . A smart card that Please be advised that the times stores value for Effective from 20 January 2014 travel on TransLink shown are approximate. We ask that services. passengers be at the bus stop no less TransLink single # ✔ ✔ ✔ than five minutes prior to the scheduled One-way ticket to departure time. reach your destination (not return). Final Travel tips transfers must be 1. Pre-plan your trip at translink.com.au made within two hours or call 13 12 30. of ticket issue. 2. Make sure you top up your go card Proof of concession entitlement must be presented upon request or full fare will be charged. Please visit translink.com.au for more information including where or have the correct fare ready before to buy a go card, or call TransLink on 13 12 30.
    [Show full text]
  • Gold Coast Rapid Transit
    Gold Coast Rapid Transit 5 Project Staging Gold Coast Rapid Transit Concept Design Impact Management Plan Volume 2 Chapter 5 – Project Staging Contents 1. Staging of the Gold Coast Rapid Transit Project 3 1.1 Project Stages 3 1.2 Factors determining staging 4 1.3 Indicative staging plan 6 2. Project Life Cycle of the Gold Coast Rapid Transit Project 8 2.1 Pre-feasibility phase 8 2.2 Feasibility phase 9 2.3 Procurement phase 10 2.4 Construction phase 10 2.5 Commissioning phase 10 2.6 Operations phase 11 2.7 Future Staged Development 11 Table Index Table 5 – 1 Indicative Staging Plan 7 Figure Index Figure 5 – 1 Sections of the GCRT 4 Figure 5 – 2 Project Life Cycle Phases 9 Vol 2 Chp 5 -2 Gold Coast Rapid Transit Concept Design Impact Management Plan Volume 2 Chapter 5 – Project Staging 1. Staging of the Gold Coast Rapid Transit Project 1.1 Project Stages World class, high capacity public transport projects are often implemented in stages to enable the efficient matching of investment in infrastructure and services with demand and/or funding. A key consideration with the development of the GCRT Project has been the development of a Concept Design which can be implemented in stages. Whilst the South East Queensland Infrastructure Plan and Program (SEQIPP) 2008-2026 does not provide a detailed breakdown of the Project, SEQIPP 2007-2026 described the GCRT in two stages: Stage 1 from Helensvale to Broadbeach – to be completed by 2011; and Stage 2 from Broadbeach to Coolangatta – to be completed by 2015.
    [Show full text]
  • SEB Case Study Report for QU
    This may be the author’s version of a work that was submitted/accepted for publication in the following source: Widana Pathiranage, Rakkitha, Bunker, Jonathan M.,& Bhaskar, Ashish (2014) Case study : South East Busway (SEB), Brisbane, Australia. (Unpublished) This file was downloaded from: https://eprints.qut.edu.au/70498/ c Copyright 2014 The Author(s) This work is covered by copyright. Unless the document is being made available under a Creative Commons Licence, you must assume that re-use is limited to personal use and that permission from the copyright owner must be obtained for all other uses. If the docu- ment is available under a Creative Commons License (or other specified license) then refer to the Licence for details of permitted re-use. It is a condition of access that users recog- nise and abide by the legal requirements associated with these rights. If you believe that this work infringes copyright please provide details by email to [email protected] Notice: Please note that this document may not be the Version of Record (i.e. published version) of the work. Author manuscript versions (as Sub- mitted for peer review or as Accepted for publication after peer review) can be identified by an absence of publisher branding and/or typeset appear- ance. If there is any doubt, please refer to the published source. Case Study: South East Busway (SEB), Brisbane, Australia CASE STUDY: SOUTH EAST BUSWAY (SEB), BRISBANE, AUSTRALIA By Rakkitha Widanapathiranage Jonathan M Bunker Ashish Bhaskar Civil Engineering and Built Environment School, Science and Engineering Faculty, Queensland University of Technology, Australia.
    [Show full text]