PLAN (WKS) PROCUREMENT PLAN FOR WORKS WORLD BANK PROJECT (PHASE - I) WB LOAN / CREDIT NO 4802 IN NAME OF DISTRICT:- Implementing Agency:- BRRDA, UNDER RWD, GOVT. OF . Design / Estimate Prepared

/ Investigation & Sanctioned ) completed A/A for Basic work Description of Works (Date) Code SL No. SL Gr.No. (Date)** Public Disclosure Authorized Invitation ICB/NCB Domestic Currency) Rs. in Lac in Rs. Method of of Method to Bidding Bidding to of Contract of **WBRNo. ( Expenditure Expenditure (Date/Value/ Contract No. Contract Procurement Procurement Package No. Package Submission Date Value Estimated Cost Cost Estimated decided (Date / / (Date decided Contract Award Award Contract incurred to Date to incurred Contract Signed Signed Contract Value / Currency / Value Document (Date) Document to Contract Award Award Contract to /Nationality ZIP & Preparation of Bid Bid of Preparation Opened On (Date) On Opened Date of completion completion of Date Document (Date)** Document

of D.P.R. Contractor of Name Preference Yes / No / Yes Preference Bank's No Objection Objection No Bank's Bank's No Objection Objection No Bank's 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Construction of road *PP 24.11.11 22.12.11 1485.35 10.03.12 No 22.03.12 27.04.12 28.04.12 21.05.12 04.06.12 25.06.12 - - 24.12.13 from Alamnagar MDH Sonamukhi kapasia with R 1 NCB five years maintenance 1563.55

RG/MA-I* with 2 nos. H.L. bridges. A BKFRP/RD&B Construction of road *PP 06.09.11 09.11.11 1344.12 10.03.12 No 22.03.12 27.04.12 28.04.12 21.05.12 04.06.12 25.06.12 - - 24.12.13 from Naya MDH R Nager Khurhan with five NCB 2 A-II* years maintenance. 1411.51 A BKFRP/RD/M 1.Construction of road

Public Disclosure Authorized *PP from Sonbarsa To 24.11.11 01.12.11 1181.15 10.03.12 No 22.03.12 27.04.12 28.04.12 21.05.12 04.06.12 25.06.12 - - 24.12.13 Shankarpur with five years maintenance. MDH R 2.Construction of road NCB 3 from NH-106 to Maura via Jaipura with five 1254.20 years maintenance with A 1 nos. H.L. bridge. BKFRP/RD&BRG/MA-III* 1.Construction of road *PP from Alamnagar Fullaut 24.11.11 22.12.11 2021.29 10.03.12 No 22.03.12 27.04.12 28.04.12 21.05.12 04.06.12 25.06.12 - - 24.12.13 Road with five years maintenance with 2 R MDH nos.H.L. bridges. NCB 4 -IV* 2.Construction of road from Dhaneshpur To 2085.32

Public Disclosure Authorized Morsanda with five years A maintenance. BKFRP/RD&BRG/MA

Construction of road *PP 06.09.11 09.11.11 1040.15 10.03.12 No 22.03.12 27.04.12 28.04.12 21.05.12 04.06.12 25.06.12 - - 24.12.13 from NH-106 Arar R MDH Babhangama Rajni V* NCB 5 Parsadi Chauk with five years maintenance. 1111.86 A BKFRP/RD/MA-

Page 1 of 5 Public Disclosure Authorized Design / Estimate Prepared

/ Investigation & Sanctioned ) completed A/A for Basic work Description of Works (Date) Code SL No. SL Gr.No. (Date)** Invitation ICB/NCB Domestic Currency) Rs. in Lac in Rs. Method of of Method to Bidding Bidding to of Contract of **WBRNo. ( Expenditure Expenditure (Date/Value/ Contract No. Contract Procurement Procurement Package No. Package Submission Date Value Estimated Cost Cost Estimated decided (Date / / (Date decided Contract Award Award Contract incurred to Date to incurred Contract Signed Signed Contract Value / Currency / Value Document (Date) Document to Contract Award Award Contract to /Nationality ZIP & Preparation of Bid Bid of Preparation Opened On (Date) On Opened Date of completion completion of Date Document (Date)** Document

of D.P.R. Contractor of Name Preference Yes / No / Yes Preference Bank's No Objection Objection No Bank's Bank's No Objection Objection No Bank's 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Construction of road *PP from NH-107 Denapatti 24.11.11 01.12.11 708.693 10.03.12 No - 27.04.12 28.04.12 21.05.12 - 25.06.12 - - 24.12.13 MDH Nadi Murho Madhuban NCB R 6 with five years 772.83 MA-VI* maintenance. A BKFRP/RD/

1.Construction of road *PP from Samda Bhawani NCB 15.09.11 09.11.11 981.62 10.03.12 No 22.03.12 03.05.12 04.05.12 28.05.12 11.06.12 02.07.12 - 01.01.14 pur Road with five years maintenance. 2.Construction of road R from Birpur Basdshah SUP Cowkto Bauraha Nepal 1 Boarder with five years 1059.26 maintenance.

BKFRP/RD/SU-I* 3. Construction of road from Matiyari to A Barhamotra Road with five years maintenance. 1.Construction of road *PP from Lalit Gram chapin NCB 03.09.11 09.11.11 942.22 10.03.12 No 22.03.12 03.05.12 04.05.12 28.05.12 11.06.12 02.07.12 - 01.01.14 to Tuisipatti Road with five years maintenance. 2.Construction of road R from Bishanpur Gulami SUP to Tharahe Road with 2 five years maintenance. 1027.35 3. Construction of road

BKFRP/RD/SU-II* from Lalitgram Railway station to Mahadev patti A Road with five years maintenance. 1.Construction of road *PP from Lalji Chauk Harihar NCB 20.09.11 09.11.11 940.342 10.03.12 No 22.03.12 03.05.12 04.05.12 28.05.12 11.06.12 02.07.12 - 01.01.14 Path to Sohta Kachni Road with five years maintenance. R 2.Construction of road SUP from Chhatapur bus 3 stand to Bhatta Bari 1032.81 Road with five years maintenance. BKFRP/RD/SU-III* 3. Construction of road A f Chh t A t Page 2 of 5

Design / Estimate Prepared

/ Investigation & Sanctioned ) completed A/A for Basic work (Date) Description of Works Code SL No. SL Gr.No. (Date)** Invitation ICB/NCB Domestic

Currency) Rs. in Lac in Rs. Method of of Method to Bidding Bidding to of Contract of **WBRNo. ( Expenditure Expenditure (Date/Value/ Contract No. Contract Procurement Procurement Package No. Package Submission Date Value Estimated Cost Cost Estimated decided (Date / / (Date decided

Award Contract incurred to Date to incurred Contract Signed Signed Contract Value / Currency / Value Document (Date) Document to Contract Award Award Contract to /Nationality ZIP & Preparation of Bid Bid of Preparation Opened On (Date) On Opened Date of completion completion of Date Document (Date)** Document

of D.P.R. Contractor of Name Preference Yes / No / Yes Preference Bank's No Objection Objection No Bank's Bank's No Objection Objection No Bank's 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 A from ChhatapurAnant Chowkto Bhatta Bari Road with five years 1.Construction of road *PP from Chuni to Charney 03.09.11 09.11.11 977.65 10.03.12 No 22.03.12 03.05.12 04.05.12 28.05.12 11.06.12 02.07.12 - 01.01.14 W.B. Road with five years maintenance. R 2.Construction of road SUP from Chhatapur NCB 4 Laxmipurto Khunti Road 1049.61 with five years

BKFRP/RD/SU-IV* maintenance. A

Construction of road *PP from Jadiya to Charney 03.09.11 09.11.11 851.81 10.03.12 No - 03.05.12 04.05.12 28.05.12 - 02.07.12 - 01.01.14 SUP Road with five years

R 5 V* maintenance. NCB 900.73 A BKFRP/RD/SU- 1.Construction of road *PP from Parsagadhi to NCB 12.09.11 09.11.11 980.33 10.03.12 No 22.03.12 03.05.12 04.05.12 28.05.12 11.06.12 02.07.12 - 01.01.14 Bishrampur Road with five years maintenance. 2.Construction of road R from Raghunathpurto SUP Faisya Kothi Road with 6 five years maintenance. 1056.96 3. Construction of road from Tamkulha to BKFRP/RD/SU-VI* Moihaliya Road with five A years maintenance.

1.Construction of road *PP from Laxminiya Garh to NCB 15.09.11 09.11.11 809.127 10.03.12 No - 03.05.12 04.05.12 28.05.12 - 02.07.12 - 01.01.14 Rampur Road with five years maintenance. 2.Construction of road R from Manganj to SUP Piluwaha W.B. Road 7

with five years 877.56 maintenance. 3. Construction of road BKFRP/RD/SU-VII* from TTriveniganj to A tit h R d ith fi Page 3 of 5

Design / Estimate Prepared

/ Investigation & Sanctioned ) completed A/A for Basic work (Date) Description of Works Code SL No. SL Gr.No. (Date)** Invitation ICB/NCB Domestic Currency) Rs. in Lac in Rs. Method of of Method to Bidding Bidding to of Contract of **WBRNo. ( Expenditure Expenditure (Date/Value/ Contract No. Contract Procurement Procurement Package No. Package Submission Date Value Estimated Cost Cost Estimated decided (Date / / (Date decided Contract Award Award Contract incurred to Date to incurred Contract Signed Signed Contract Value / Currency / Value Document (Date) Document to Contract Award Award Contract to /Nationality ZIP & Preparation of Bid Bid of Preparation Opened On (Date) On Opened Date of completion completion of Date Document (Date)** Document

of D.P.R. Contractor of Name Preference Yes / No / Yes Preference Bank's No Objection Objection No Bank's Objection No Bank's 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 A tituaha Road with five years maintenance. Construction of road *PP from Chattapur to 19.12.11 22.12.12 620.42 10.03.12 No - 03.05.12 04.05.12 28.05.12 - 02.07.12 - 01.01.14 SUP Ratansar with five years R NCB 8 VIII maintenance. 664.16 A BKFRP/RD/SU-

1.Construction of road *PP from Bhatkhora To 15.09.11 09.11.11 864.44 10.03.12 No - 11.05.12 12.05.12 03.06.12 - 07.07.12 - - 06.01.14 Tamautparsa Chauk with five years MDH maintenance. NCB R 7

2.Construction of road 929.55 from Singeshwar Biraili

BR/WB/19M-VII Belari Road with five A years maintenance. Construction of road *PP 14.09.11 09.11.11 835.82 10.03.12 No - 11.05.12 12.05.12 03.06.12 - 07.07.12 - - 06.01.14 from Shankarpur MDH madhaily Bishanpur R NCB

8 VIII* Chansara Road with five years maintenance. 904.35 A BKFRP/RD/MA Construction of road *PP 24.09.11 09.11.11 699.053 10.03.12 No - 11.05.12 12.05.12 03.06.12 - 07.07.12 - - 06.01.14 from Kumarkhand Rauta MDH Tengraha Road with five NCB R 9 MA-IX years maintenance. 753.08

A BKFRP/RD/ Construction of road *PP 14.09.11 09.11.11 877.8 10.03.12 No - 11.05.12 12.05.12 03.06.12 - 07.07.12 - - 06.01.14 from Kumarkhand MDH

X Israinkala Jorawarganj NCB R 10

with five years 942.05 maintenance. A BR/WB/19M- 1.Construction of road *PP from Puraini Karama 24.09.11 09.11.11 737.562 10.03.12 No - 11.05.12 12.05.12 03.06.12 - 07.07.12 - - 06.01.14 with five years MDH maintenance. NCB R 11 2.Construction of road fromPuraini Sapardah 803.69

BR/WB/19M-XI with five years A maintenance.

Page 4 of 5 Design / Estimate Prepared

/ Investigation & Sanctioned ) completed A/A for Basic work Description of Works (Date) Code SL No. SL Gr.No. (Date)** Invitation ICB/NCB Domestic Currency) Rs. in Lac in Rs. Method of of Method to Bidding Bidding to of Contract of **WBRNo. ( Expenditure Expenditure (Date/Value/ Contract No. Contract Procurement Procurement Package No. Package Submission Date Value Estimated Cost Cost Estimated decided (Date / / (Date decided Contract Award Award Contract incurred to Date to incurred Contract Signed Signed Contract Value / Currency / Value Document (Date) Document to Contract Award Award Contract to /Nationality ZIP & Preparation of Bid Bid of Preparation Opened On (Date) On Opened Date of completion completion of Date Document (Date)** Document

of D.P.R. Contractor of Name Preference Yes / No / Yes Preference Bank's No Objection Objection No Bank's Bank's No Objection Objection No Bank's 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1.Construction of road from W.B. Road To *PP Pipra Karauti with five NCB 24.09.11 09.11.11 1417.44 10.03.12 No 22.04.12 11.05.12 12.05.12 03.06.12 17.06.12 07.07.12 - - 06.01.14 years maintenance. 2.Construction of road from Basgarha MDH Bhawanandpur to 12 chharapatti with five

R 1520.55 years maintenance.

BR/WB/19M-XII 3. Construction of road from Kishanganj to Biriranpal with five years A maintenance.

Construction of road *PP from Alamnagar to MDH Sapardah. Dropped Due to Sanctioning of this road under State Plan in March 2011. R 12

A

*PP :Target dates agreed as per procurement Plan R:revision 1,2 etc. A:actual dates WBR No. :World Bank Reference Number

** Applicable in case of 'Prior Review' by Bank.

Note : For Column 5, state ICB/NCB/Direct Contracting/Shopping as appropriate. For Column Nos. 6 to 19, fill the information for all the three elements i.e. PP, R and A, as aplicable against each contract.

Land acquisition complete on ______

EXECUTIVE ENGINEER, EXECUTIVE ENGINEER, RURAL WORK DEPARTMENT, WORKS RURAL WORK DEPARTMENT, WORKS DIVISION, SUPAUL DIVISION, MADHEPURA

Page 5 of 5