Federal Register/Vol. 85, No. 201/Friday, October 16, 2020/Notices

Total Page:16

File Type:pdf, Size:1020Kb

Load more

65880 Federal Register / Vol. 85, No. 201 / Friday, October 16, 2020 / Notices transaction of official business for an information related to this document licensee stated that its staffing levels are approved trip. using any of the following methods: affected or are expected to be affected by • Federal Rulemaking Website: Go to the COVID–19 PHE, and it can no longer III. Specific Requests for Comments https://www.regulations.gov and search meet or likely will not meet the work- The NRC is seeking comments that for Docket ID NRC–2020–0110. Address hour controls of 10 CFR 26.205(d)(1) address the following questions: questions about NRC Docket IDs in through (d)(7). The licensee has 1. Is the proposed collection of Regulations.gov to Jennifer Borges; committed to effecting site-specific information necessary for the NRC to telephone: 301–287–9127; email: administrative controls for COVID–19 properly perform its functions? Does the [email protected]. For technical PHE fatigue-management for personnel information have practical utility? questions, contact the individual listed specified in 10 CFR 26.4(a). 2. Is the estimate of the burden of the in the FOR FURTHER INFORMATION The exemptions from certain information collection accurate? CONTACT section of this document. requirements of 10 CFR part 50, 3. Is there a way to enhance the • NRC’s Agencywide Documents appendix E, ‘‘Emergency Planning and quality, utility, and clarity of the Access and Management System Preparedness for Production and information to be collected? (ADAMS): You may obtain publicly Utilization Facilities,’’ section IV.F., 4. How can the burden of the available documents online in the ‘‘Training,’’ for Energy Harbor Nuclear information collection on respondents ADAMS Public Documents collection at Corp. (for Perry Nuclear Power Plant, be minimized, including the use of https://www.nrc.gov/reading-rm/ Unit No. 1); Pacific Gas and Electric automated collection techniques or adams.html. To begin the search, select Company (for Diablo Canyon Nuclear other forms of information technology? ‘‘Begin Web-based ADAMS Search.’’ For Power Plant, Units 1 and 2); and Dated: October 9, 2020. problems with ADAMS, please contact Nebraska Public Power District (for Cooper Nuclear Station) to grant For the Nuclear Regulatory Commission. the NRC’s Public Document Room temporary exemptions from the biennial David C. Cullison, reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ emergency preparedness (EP) exercise NRC Clearance Officer, Office of the Chief requirement. The exemptions allow a Information Officer. nrc.gov. For the convenience of the reader, temporary exemption from the [FR Doc. 2020–22896 Filed 10–15–20; 8:45 am] instructions about obtaining materials requirements of 10 CFR part 50, BILLING CODE 7590–01–P referenced in this document are appendix E, regarding the conduct of provided in the ‘‘Availability of the biennial emergency preparedness Documents’’ section. exercise. These exemptions will not NUCLEAR REGULATORY adversely affect the emergency response FOR FURTHER INFORMATION CONTACT: COMMISSION capability of the facilities because James Danna, Office of Nuclear Reactor affected licensee personnel are currently [Docket Nos. 50–454, 50–455, 50–298, 50– Regulation, U.S. Nuclear Regulatory 275, 50–323, 50–237, 50–249, 50–341, 50– qualified, and the licensees’ proposed Commission, Washington, DC 20555– 166, 50–277, 50–278, 50–440, 50–280, 50– compensatory measures will enable 281, 50–387, 50–388; NRC–2020–0110] 0001; telephone: 301–415–7422, email: their staff to maintain their knowledge, [email protected]. skills, and abilities without the conduct Issuance of Multiple Exemptions in SUPPLEMENTARY INFORMATION: of the biennial emergency preparedness Response to COVID–19 Public Health I. Introduction exercise during the exemption term. Emergency The exemption from certain During the period from September 3, AGENCY: requirements of 10 CFR part 55, Nuclear Regulatory 2020, to September 28, 2020, the NRC Commission. ‘‘Operators’ Licenses,’’ for University of granted 10 exemptions in response to Maryland (for Maryland University ACTION: Exemptions; issuance. requests submitted by licensees from Training Reactor) affords the licensee a June 16, 2020, to September 14, 2020. SUMMARY: The U.S. Nuclear Regulatory temporary exemption from requirements These exemptions temporarily allow the Commission (NRC) issued 10 related to completion of biennial licensees to deviate from certain exemptions in response to requests from medical examinations of licensing requirements (as cited below) of various 8 licensees. The exemptions afford these operators and senior operators (under 10 parts of chapter I of title 10 of the Code licensees temporary relief from certain CFR 55.21 and 10 CFR 55.53(i)). This of Federal Regulations (10 CFR Ch. I). requirements under NRC regulations. licensee has committed to compensatory The exemptions from certain The exemptions are in response to the measures to address the delay in receipt requirements of 10 CFR part 26, licensees’ requests for relief due to the of recommendations from a licensed ‘‘Fitness for Duty Programs,’’ for Exelon coronavirus disease 2019 (COVID–19) physician concerning its licensed Generation Company, LLC (for Byron public health emergency (PHE). The operator’s health. Station, Unit Nos. 1 and 2; Dresden NRC is issuing a single notice to The exemptions from certain Nuclear Power Station, Units 2 and 3; announce the issuance of the requirements of 10 CFR part 73 for DTE and Peach Bottom Atomic Power exemptions. Electric Company (for Fermi-2), Station, Units 2 and 3), afford the Susquehanna Nuclear, LLC (for DATES: During the period from licensee temporary relief from the work- Susquehanna Steam Electric Station, September 3, 2020, to September 28, hour controls under 10 CFR 26.205(d)(1) Units 1 and 2), and Virginia Electric and 2020, the NRC granted ten exemptions through (d)(7). The exemptions from 10 Power Company (for Surry Power in response to requests submitted by CFR 26.205(d)(1) through (d)(7) ensure Station, Unit Nos. 1 and 2), afford these licensees from June 16, 2020, to that the control of work hours and licensees temporary exemptions from September 14, 2020. management of worker fatigue do not certain requirements of 10 CFR part 73, ADDRESSES: Please refer to Docket ID unduly limit licensee flexibility in using appendix B, ‘‘General Criteria for NRC–2020–0110 when contacting the personnel resources to most effectively Security Personnel,’’ section VI. The NRC about the availability of manage the impacts of the COVID–19 exemptions will help to ensure that information regarding this document. PHE on maintaining the safe operation these regulatory requirements do not You may obtain publicly available of these facilities. Specifically, the unduly limit licensee flexibility in using VerDate Sep<11>2014 18:59 Oct 15, 2020 Jkt 253001 PO 00000 Frm 00093 Fmt 4703 Sfmt 4703 E:\FR\FM\16OCN1.SGM 16OCN1 jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 85, No. 201 / Friday, October 16, 2020 / Notices 65881 personnel resources in a manner that Register notice for COVID–19-related II. Availability of Documents most effectively manages the impacts of exemptions instead of issuing The tables below provide the facility the COVID–19 PHE on maintaining the individual Federal Register notices for name, docket number, document safe and secure operation of these each exemption. The compiled tables description, and ADAMS accession facilities and the implementation of the below provide transparency regarding number for each exemption issued. licensees’ NRC-approved security plans, the number and type of exemptions the Additional details on each exemption protective strategy, and implementing NRC has issued. Additionally, the NRC issued, including the exemption request procedures. These licensees have publishes tables of approved regulatory submitted by the respective licensee and committed to certain security measures actions related to the COVID–19 PHE on the NRC’s decision, are provided in to ensure response readiness and for its public website at https:// each exemption approval listed in the their security personnel to maintain www.nrc.gov/about-nrc/covid-19/ tables below. For additional directions performance capability. reactors/licensing-actions.html. on accessing information in ADAMS, The NRC is providing compiled tables see the ADDRESSES section of this of exemptions using a single Federal document. Document description ADAMS Accession No. Byron Station, Unit Nos. 1 and 2 Docket Nos. 50–454 and 50–455 Byron Station, Unit Nos. 1 and 2—COVID–19 related request for exemption from 10 CFR part 26 work ML20248H361. hours requirements, dated September 3, 2020. Byron Station, Unit Nos. 1 and 2—exemption from select requirements of 10 CFR part 26 (EPID L–2020– ML20253A062. LLE–0139 [COVID–19]), dated September 16, 2020. Cooper Nuclear Station Docket No. 50–298 Cooper Nuclear Station—temporary exemption request from 10 CFR part 50, appendix E, biennial emer- ML20191A276. gency preparedness exercise requirements due to COVID–19 pandemic, dated June 16, 2020. Cooper Nuclear Station—exemption from biennial emergency preparedness exercise requirements of 10 ML20203M129. CFR part 50, appendix E, ‘‘Emergency Planning and Preparedness for Production and Utilization Facili- ties,’’ section IV.F (EPID L–2020–LLE–0102 [COVID–19]), dated September 3, 2020. Diablo Canyon Nuclear Power Plant, Units 1 and 2 Docket Nos. 50–275 and 50–323 Diablo Canyon Nuclear Power Plant, Units 1 and 2—temporary exemption request from 10 CFR part 50, ML20191A204. appendix E, biennial emergency preparedness exercise requirements due to COVID–19 pandemic, dated July 9, 2020. Diablo Canyon Nuclear Power Plant, Units 1 and 2—temporary exemption from biennial emergency pre- ML20247J651. paredness exercise frequency requirements of 10 CFR part 50, appendix E, sections IV.F.2.b and IV.F.2.c (EPID L–2020–LLE–0111 [COVID–19], dated September 18, 2020. Dresden Nuclear Power Station, Units 2 and 3 Docket Nos.
Recommended publications
  • American Nuclear Society ANS 3.5

    American Nuclear Society ANS 3.5

    ANSI/ANSANSI/ANS--3.53.5 DiscussionDiscussion OrganizationalOrganizational DefinitionsDefinitions ANSANS--3.53.5 WorkingWorking GroupGroup MembersMembers ANSI/ANSANSI/ANS--33--55 UsageUsage UpdateUpdate SummarySummary ofof ChangesChanges ANSI/ANSANSI/ANS--3.53.5 OrganizationalOrganizational DefinitionsDefinitions ANSANS -- AmericanAmerican NuclearNuclear SocietySociety ANSIANSI -- AmericanAmerican NationalNational StandardsStandards InstituteInstitute ANSANS--3.53.5 -- WorkingWorking GroupGroup isis comprisedcomprised ofof Industry,Industry, Regulatory,Regulatory, andand Organizational/IndividualOrganizational/Individual VolunteersVolunteers ANSANS--3.53.5 WorkingWorking GroupGroup MembershipMembership ANSANS--3.53.5 WorkingWorking GroupGroup BalanceBalance ofof InterestsInterests NRC-1 7% VENDORS-3 20% UTILITY-9 60% ORG-2 13% ANSANS--3.53.5 WorkingWorking GroupGroup MembersMembers ANSANS--3.53.5 OfficersOfficers ListList ChairChair -- TimothyTimothy DennisDennis – Individual (chair of ANS-21/member NFSC executive committee) ViceVice--chairchair -- JimJim FlorenceFlorence – Nebraska Public Power District - Cooper Nuclear Station SecretarySecretary -- KeithKeith WelchelWelchel – Duke Energy - Oconee Nuclear Station EditorEditor -- FF JJ (Butch)(Butch) ColbyColby – L3 Communications MAPPS Inc (formerly CAE) StyleStyle EditorEditor -- WilliamWilliam MM (Mike)(Mike) ShellyShelly – Entergy Services, Inc ParliamentarianParliamentarian –– LawrenceLawrence VickVick – U S Nuclear Regulatory Commission ANSANS--3.53.5 UtilitiesUtilities JamesJames
  • Ornl/Nsic-176

    Ornl/Nsic-176

    4 ggcBvePBtnc APR 291980 ORNL/NSIC-176 MASTER Descriptions of Selected Accidents that Have Occurred at Nuclear Reactor Facilities H. W. Bertini and Members of the Staff of the Nuclear Safety Information Center NUCLFAR SAFETY INFORMATION CENTER DIEmu'lhj \i 'uNLIMIlt.il c ORNL/NSIC-176 Contract No. W-7405-eng-26 Engineering Technology Division DESCRIPTIONS OF SFLEuTED ACCIDENTS THAT HAVE OCCURRED AT NUCLEAR REACTOR FACILITIES H. W. Bertini and Members of the Staff of the Nuclear Safety Information Center Date Published: April 1980 Prepared by the OAK RIDGE NATIONAL LABORArORY Oak Ridge, Tennessee 37830 operated by UNION CARBIDE CORPORATION for the DEPARTMENT OP ENERGY tP MTOWiOtl Cf THIS MCU«»T It IHWWTW iii CONTENTS (7 Page FOREWORD ...» v PREFACE . vli 1. INTRODUCTION 1 2. NUCLEAR REACTORS: FUNDAMENTALS .' 3 2.1 Basic Theory 3 2.2 The Components of a Nuclear Reactor 8 2.3 Radioactivity , 11 2.4 Electric Power Plants .... 16 2.5 Classification of Reactors 17 2.6 Light-Water Reactors for the Production of Electricity ..... 19 3. CENTRAL STATION POWER PLANTS. 32 3.1 Fuel Melting Incideat at the Fermi Reactor (1966) 32 3.2 Electrical Cable Fires at San Onofre 1 (1968) 33 3.3 Fuel Meltdown at St. Laurent (1969) 35 3.4 Uncovering of the Core at La Crosse (1970) 38 3.5 Seven Injured When Steam Nozzle Breaks at Robinson 2 (1970) 39 3.6 Discharge of Primary System into Drywell at Did 'en 2 (1970) 42 3.7 Turbine Damage Caused by Human Error at Robinson 2 (1970) 45 3.8 Construction Fire at Indian Point 2 (1971) 46 3.9 Valve Separations at Turkey Point 3 (1971) 47 3.10 Turbine Basement Flooded at Quad Cities V?I2) 48 3.11 Steam Generator Damaged in Hot Tests at Oconee 1 (1972) 49 3.12 Two Fatalities in Steam Line Accident at Surry 1 (1972) 50 3.13 Seawater Intrusion into Primary System at Millstone 1 (1972) ..
  • ML12333A320.Pdf

    ML12333A320.Pdf

    NLS2012124 Enclosure NLS2012124 ENCLOSURE COOPER NUCLEAR STATION FLOODING WALKDOWN REPORT H Nebraska Public Power District "Always there when you need us" CNS Memo 12-0002 To: Cooper Nuclear Station Licensing Department From: Cooper Nuclear Station Design Engineering Department CC: N/A Date: 11/26/2012 Re: Response to 10 CFR 50.54(f) Section 2.3 Flooding Validation and Acceptance of Vendor Provided Evaluations In response to the nuclear fuel damage at Fukushima Daiichi due to earthquake and subsequent tsunami, the United States Nuclear Regulatory Commission (NRC) is requesting information pursuant to Title 10 of the Code of Federal Regulations, Section 50.54 (f). As part of this request which is as defined in the Recommendation 2.3, Flooding, Enclosure 4 of the 50.54(f) Letter dated March 12, 2012, CNS was required to perform walkdowns to verify that plant features credited in the current licensing basis (CLB) for protection and mitigation from external flood events is available, functional, and properly maintained. In addition, the purpose of the walkdowns was to identify and address plant-specific degraded, non-conforming, or unanalyzed conditions (through the corrective action program) and associated APM (Available Physical Margin) and verify the adequacy of monitoring and maintenance procedures. This information was obtained in accordance with NEI 12-07, "Guidelines for Verification Walkdowns of Plant Flood Protection Features". This memo is being written for CNS Design Engineering to formally accept the walkdown packages, and final walkdown report as being technically accurate. The walkdowns were developed with APM determined from 906', which is what CNS is committed to the NRC to protect up to.
  • A Comparative Analysis of Nuclear Facility Siting Using Coalition Opportunity Structures and the Advocacy Coalition Framework

    A Comparative Analysis of Nuclear Facility Siting Using Coalition Opportunity Structures and the Advocacy Coalition Framework

    UNIVERSITY OF OKLAHOMA GRADUATE COLLEGE ORDER IN A CHAOTIC SUBSYSTEM: A COMPARATIVE ANALYSIS OF NUCLEAR FACILITY SITING USING COALITION OPPORTUNITY STRUCTURES AND THE ADVOCACY COALITION FRAMEWORK A DISSERTATION SUBMITTED TO THE GRADUATE FACULTY in partial fulfillment of the requirements for the Degree of DOCTOR OF PHILOSOPHY By KUHIKA GUPTA Norman, Oklahoma 2013 ORDER IN A CHAOTIC SUBSYSTEM: A COMPARATIVE ANALYSIS OF NUCLEAR FACILITY SITING USING COALITION OPPORTUNITY STRUCTURES AND THE ADVOCACY COALITION FRAMEWORK A DISSERTATION APPROVED FOR THE DEPARTMENT OF POLITICAL SCIENCE BY ______________________________ Dr. Hank C. Jenkins-Smith, Chair ______________________________ Dr. Carol L. Silva, Co-Chair ______________________________ Dr. Christopher M. Weible ______________________________ Dr. Deven E. Carlson ______________________________ Dr. Jill A. Irvine © Copyright by KUHIKA GUPTA 2013 All Rights Reserved. Dedication For my incredible parents, Anil and Alpana Gupta, for making all of this possible, and my husband, Joseph T. Ripberger, for being a constant inspiration. Acknowledgements This dissertation would not be possible were it not for the invaluable support I have received throughout my journey as an undergraduate at Delhi University in India, a graduate student at the University of Warwick in England, and my pursuit of a doctorate at the University of Oklahoma in the United States. During my time at Delhi University, Ramu Manivannan was an amazing mentor who taught me the value of making a difference in both academia and the real world. My greatest debt is to Hank Jenkins-Smith and Carol Silva at the University of Oklahoma, whose encouragement, guidance, and intellectual advice has made this journey possible. I am deeply grateful for their unending support; this dissertation would not exist without them.
  • Gao-13-493, Nuclear Reactor License Renewal: Nrc

    Gao-13-493, Nuclear Reactor License Renewal: Nrc

    United States Government Accountability Office Report to Congressional Requesters May 2013 NUCLEAR REACTOR LICENSE RENEWAL NRC Generally Follows Documented Procedures, but Its Revisions to Environmental Review Guidance Have Not Been Timely GAO-13-493 May 2013 NUCLEAR REACTOR LICENSE RENEWAL NRC Generally Follows Documented Procedures, but Its Revisions to Environmental Review Guidance Have Not Been Timely Highlights of GAO-13-493, a report to congressional requesters Why GAO Did This Study What GAO Found Many U.S. commercial nuclear power The scope of the Nuclear Regulatory Commission’s (NRC) license renewal reactors are reaching the end of their process focuses on managing the effects of aging on a reactor and its associated initial 40-year operating period. To systems, structures, and components (i.e. safety) and assessing certain potential continue operating, their owners must environmental impacts of extending a reactor’s operating-life. As a result, reviews renew their licenses with NRC, the done as part of this process are not required to address as many topics as independent federal agency reviews for initial licensing, which include security and emergency planning. responsible for licensing and regulating nuclear reactors. NRC evaluates NRC has regularly updated the safety review guidance it uses in the license license renewal applications under two renewal process but has not revised most of its environmental review regulations parallel reviews for safety and potential and guidance since they were first issued. NRC has revised its safety review environmental impacts. NRC’s license guidance twice—in 2005 and 2010—and has issued interim updates for selected renewal process has received safety issues between those revisions.
  • United States of America Nuclear Regulatory Commission

    United States of America Nuclear Regulatory Commission

    UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter Of ) ) EXELON GENERATION COMPANY, LLC, ) Docket No. 50-352-LR ) Docket No. 50-353-LR (Limerick Generating Station) ) (License Renewal Application) DECLARATION OF THOMAS B. COCHRAN, Ph.D., MATTHEW G. MCKINZIE, Ph.D. AND CHRISTOPHER J. WEAVER, Ph.D., ON BEHALF OF THE NATURAL RESOURCES DEFENSE COUNCIL INTRODUCTION We, Thomas B. Cochran (TBC), Matthew G. McKinzie (MGM), and Christopher J. Weaver (CJW), declare that the following statements are true and correct to the best of our knowledge.1 1. (TBC) My name is Thomas B. Cochran. I received my Ph.D. in Physics from Vanderbilt University in 1967. I am currently a consultant to the Natural Resources Defense Council (NRDC) at its Washington, D.C. office. Prior to retiring from NRDC in 2011, I was a senior scientist and held the Wade Greene Chair for Nuclear Policy at NRDC, and was director of its Nuclear Program until 2007. My curriculum vitae is provided in Attachment A. 2. (MGM) My name is Matthew G. McKinzie. I received my Ph.D. in Physics from the University of Pennsylvania in 1995. I am a Senior Scientist in the Nuclear Program and 1 This Declaration is presented jointly by all three of us but in some instances discrete points are offered by only one or two of us. Each paragraph is preceded by the initials of the Declarant(s) who are offering the information contained in that paragraph. Cochran, McKinzie and Weaver Declaration (NRDC), Docket No. 50-352-LR, No.
  • Mailing List of U.S. Domestic Nuclear Utilities

    Mailing List of U.S. Domestic Nuclear Utilities

    Mailing List of Domestic Nuclear Utilities ",Plant .. I Address Arkansas Nuclear One, Units 1 and 2 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Beaver Valley Power Station, Units 1 & 2 Eric A. Larson Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077 Browns Ferry Nuclear Plant, Units 1, 2 & 3 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 Brunswick Steam Electric Plant Units 1 & 2 George T. Hamrick, Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461 Byron Station, Units 1 & 2/Braidwood Station, Michael J. Pacilio Units 1 & 2 Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon -Nuclear 4300 Winfield Road Warrenville, IL 60555 Callaway Plant, Unit 1 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company Ameren Missouri P.O. Box 620 -Fulton, MO 65251 Calvert Cliffs Nuclear Power Plant Units 1 & 2 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC. Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Catawba Nuclear Station, Units 1 & 2 Mr. Kelvin Henderson Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745 All -2- Plant Address Clinton Power Station, Unit No. 1 Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555 Columbia Generating Station Mr.
  • Arkansas Nuclear One, Units 1 and 2, Cooper, Diablo, Units 1 and 2

    Arkansas Nuclear One, Units 1 and 2, Cooper, Diablo, Units 1 and 2

    UNITED STATES NUCLEAR REGULATORY COi\1fJHSSION REGION IV 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 9 Arkansas Nuclear One, Units 1 and 2, Docket Nos.: 50-313; 50-368 Cooper Nuclear Station, Docket No.: 50-298 Diablo Canyon Nuclear Power Plant, Units 1 and 2, Docket Nos.: 50-275; 50-323 Palo Verde Nuclear Generating Station, Units 1,2, and 3, Docket Nos.: 50-528; 50-529; 50-530 SUBJECT: GENERIC FUNDAMENTALS EXAMINATION RESULTS On June 8, 2011, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees. Please forvvard the results to the individuals along with the copies of their respective answer sheets. A "P" in the GRADE column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while an "F" indicates that the individual failed the examination. If you have any questions concerning this examination, please contact Larry Vick at (301) 415-3181. ( Mark S. Haire, Chief Operations Branch Division of Reactor Safety Enclosures: As stated cc w/enclosures: Sherrie Cotton, Training Manager Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Dan Sealock, Acting Manager Nuclear Training Nebraska Public Power District P.O. Box 98 - 2 - Lynn \/Vaiter, Director Learning Services Pacific Gas and Electric Company Diabio Canyon Power Plant P.O.
  • Gao-13-743, Nuclear Power

    Gao-13-743, Nuclear Power

    United States Government Accountability Office Report to Congressional Requesters September 2013 NUCLEAR POWER Analysis of Regional Differences and Improved Access to Information Could Strengthen NRC Oversight GAO-13-743 September 2013 NUCLEAR POWER Analysis of Regional Differences and Improved Access to Information Could Strengthen NRC Oversight Highlights of GAO-13-743, a report to congressional requesters Why GAO Did This Study What GAO Found The 2011 disaster at Japan's The Nuclear Regulatory Commission (NRC) relies on its staff’s professional Fukushima Daiichi Nuclear Power judgment in implementing its processes for overseeing the safety of U.S. Plant demonstrated that unexpected commercial nuclear power reactors. In implementing this oversight, NRC nuclear accidents with extreme allocates specific roles and responsibilities to resident inspectors assigned to consequences can occur and, thus, each plant, regional officials at one of four regional offices responsible for most heightened concerns about NRC’s oversight activities, headquarters officials, and the nuclear power industry. NRC ability to oversee the safety of U.S. also builds into its processes incentives for plant managers to identify concerns commercial nuclear power reactors. about reactor safety, report those concerns to NRC, and take prompt actions to NRC oversees safety through multiple correct them. NRC’s processes for identifying and assessing findings and processes, such as physically violations are based on prescribed agency procedures and include several points inspecting reactors and also responding to signs of declining where NRC staff must exercise their professional judgment, such as determining performance (i.e., findings) or whether issues of concern identified during physical inspections constitute violations of its requirements.
  • Commercial Nuclear Power Reactors Operating Reactors

    Commercial Nuclear Power Reactors Operating Reactors

    7 APPENDIX A Commercial Nuclear Power Reactors Operating Reactors Plant Name, Unit Number CP Issued 2014– Licensee Con Type Licensed OL Issued 2019* Location NSSS MWt Comm. Op. Capacity Docket Number NRC Architect Engineer License LR Issued Factor Region Constructor Number SR Issued (Percent) NRC Web page Address Exp. Date Arkansas Nuclear One, Unit 1 IV PWR-DRYAMB 2,568 12/06/1968 98 Entergy Operations, Inc. B&W LLP DPR-51 05/21/1974 89 London, AR BECH 12/19/1974 94 (6 miles WNW of Russellville, AR) BECH 06/20/2001 87 05000313 N/A 76 https://www.nrc.gov/info-finder/reactors/ano1.html 05/20/2034 87 Arkansas Nuclear One, Unit 2 IV PWR-DRYAMB 3,026 12/06/1972 85 Entergy Operations, Inc. CE NPF-6 09/01/1978 94 London, AR BECH 03/26/1980 89 (6 miles WNW of Russellville, AR) BECH 06/30/2005 70 05000368 N/A 82 https://www.nrc.gov/info-finder/reactors/ano2.html 07/17/2038 82 Beaver Valley Power Station, Unit 1 I PWR-DRYAMB 2,900 06/26/1970 86 Energy Harbor Nuclear Generation LLC/ WEST 3LP DPR-66 07/02/1976 90 Energy Harbor Nuclear Corp. S&W 10/01/1976 91 Shippingport, PA S&W 11/05/2009 99 (17 miles W of McCandless, PA) 05/27/2047 92 05000334 01/29/2036 91 https://www.nrc.gov/info-finder/reactors/bv1.html Beaver Valley Power Station, Unit 2 I PWR-DRYAMB 2,900 05/03/1974 98 Energy Harbor Nuclear Generation LLC/ WEST 3LP NPF-73 08/14/1987 90 Energy Harbor Nuclear Corp.
  • Beans Coming Attractions Facility Updates

    Beans Coming Attractions Facility Updates

    To: Jim Mehl, ERSIS Manager From: Zack Clayton, Rad Coordinator Subject: August Monthly Report Date: September 1, 2015 _________________________________________________________________ Beans Training: 0 Drills: 0 Meetings: 1 Technical Assistance: 3 Public Assistance: 3 Web Page Views: There were 19 page views in August. Radiological Safety Program Pages: http://epa.ohio.gov/derr/ersis/er/rad.aspx Coming Attractions 10/5 URSB 10/22 NEPAC Facility updates Davis-Besse Nuclear Power Station Davis-Besse operated at full power for the month. Davis-Besse provided an update on the elevated levels of tritium in ground water that were first detected on February 3, 2015. The sample results for August show 13 samples above the agreed reporting threshold of 2000 picocuries of tritium per liter (pCi/L). Generally the sample results are holding steady or slightly decreasing. The highest sample result was 6246 pCi/L. The limit for tritium in drinking water is 20,000 pCi/L. Perry Nuclear Power Plant Perry operated at full power for the month. Beaver Valley Power Station At approximately 530 am on August 26, a single warning siren in Beaver County Pennsylvania was inadvertently activated. No emergency was declared at the Beaver Valley Power Station. The plant is required to report this event to the Nuclear Regulatory Commission. See Event number 51345. Beaver Valley Unit I Unit I operated at full power for the month. Beaver Valley Unit II Unit II operated at full power for the month. At 0837 EDT on August 17, 2015, it was determined that Beaver Valley Unit 2 had experienced a small oil leak of approximately 1 liter from equipment located inside the Alternate Intake structure.
  • Federal Register/Vol. 71, No. 123/Tuesday, June 27, 2006/Notices

    Federal Register/Vol. 71, No. 123/Tuesday, June 27, 2006/Notices

    36556 Federal Register / Vol. 71, No. 123 / Tuesday, June 27, 2006 / Notices Docket Nos. 50–259, 50–260, & 50–296 Columbia Generating Station Energy Act (42 U.S.C. 2039, 2232b), the License Nos. DPR–33, DPR–52, & DPR– Docket No. 50–397 Advisory Committee on Reactor 68 License No. NPF–21 Safeguards (ACRS) will hold a meeting 10835 Shaw Rd. Snake River Warehouse on July 12–14, 2006, 11545 Rockville Athens, AL 35611 North Power Plant Loop Pike, Rockville, Maryland. The date of Mr. Michael Skaggs Richland, WA 99352 this meeting was previously published Site Vice President Mr. Christopher M. Crane in the Federal Register on Tuesday, Watts Bar Nuclear Plant, Unit 1 President and Chief Nuclear Officer November 22, 2005 (70 FR 70638). Tennessee Valley Authority AmerGen Energy Company, LLC Oyster Creek Nuclear Generating Station Wednesday, July 12, 2006, Conference Docket No. 50–390 Room T–2b3, Two White Flint North, License No. NPF–90 Docket No. 50–219 License No. DPR–16 Rockville, Maryland Highway 68 Near Spring City 4300 Winfield Road Spring City, TN 37381 8:30 a.m.–8:35 a.m.: Opening Warrenville, IL 60555 Remarks by the ACRS Chairman Mr. Randy Douet Mr. Christopher M. Crane (Open)—The ACRS Chairman will make Site Vice President President and Chief Nuclear Officer opening remarks regarding the conduct Sequoyah Nuclear Plant, Units 1 and 2 Exelon Generation Company, LLC of the meeting. Tennessee Valley Authority Dresden Nuclear Power Station, Units 2 8:35 a.m.–10 a.m.: Final Review of the Docket Nos. 50–327 and 50–328 and 3 License Renewal Application for the License Nos.