Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices 5269

issue finality of any approval issued information related to this document and 2); for Vistra Operations Company under 10 CFR part 52. As explained in using any of the following methods: LLC (for Comanche Peak DG–1303, applicants and licensees • Federal Rulemaking website: Go to Plant, Unit Nos. 1 and 2); for Arizona would not be required to comply with https://www.regulations.gov and search Public Service Company (for Palo Verde the positions set forth in DG–1303. for Docket ID NRC–2020–0110. Address Nuclear Generating Station, Units 1, 2, Dated: January 12, 2021. questions about NRC Docket IDs in and 3); for PSEG Nuclear LLC (for Hope For the Nuclear Regulatory Commission. Regulations.gov to Jennifer Borges; Creek Generating Station and Salem telephone: 301–287–9127; email: Nuclear Generating Station, Unit Nos. 1 Meraj Rahimi, [email protected]. For technical and 2); and for Indiana Michigan Power Chief, Regulatory Guidance and Generic questions, contact the individual listed Company (for Donald C. Cook Nuclear Issues Branch, Division of Engineering, Office FOR FURTHER INFORMATION of Nuclear Regulatory Research. in the Plant, Unit Nos. 1 and 2), afford these CONTACT section of this document. licensees temporary relief from the [FR Doc. 2021–00940 Filed 1–15–21; 8:45 am] • NRC’s Agencywide Documents work-hour controls under 10 CFR BILLING CODE 7590–01–P Access and Management System 26.205(d)(1) through (d)(7). The (ADAMS): You may obtain publicly exemptions from 10 CFR 26.205(d)(1) NUCLEAR REGULATORY available documents online in the through (d)(7) ensure that the control of COMMISSION ADAMS Public Documents collection at work hours and management of worker https://www.nrc.gov/reading-rm/ fatigue do not unduly limit licensee [Docket Nos. 50–334, 50–412, 50–456, 50– adams.html. To begin the search, select flexibility in using personnel resources 457, 50–259, 50–260, 50–296, 50–325, 50– ‘‘Begin Web-based ADAMS Search.’’ For to most effectively manage the impacts 324, 50–454, 50–455, 50–317, 50–318, 50– problems with ADAMS, please contact of the COVID–19 PHE on maintaining 413, 50–414, 50–461, 50–397, 50–445, 50– the NRC’s Public Document Room (PDR) the safe operation of these facilities. 446, 50–298, 50–346, 50–275, 50–323, 50– reference staff at 1–800–397–4209, 301– Specifically, these licensees have stated 315, 50–316, 50–237, 50–249, 50–321, 50– 415–4737, or by email to pdr.resource@ that their staffing levels are affected or 366, 50–341, 50–354, 50–272, 50–311, 50– nrc.gov. are expected to be affected by the 003, 50–247, 50–286, 50–333, 50–348, 50– • Attention: The PDR, where you may COVID–19 PHE, and they can no longer 364, 50–261, 50–373, 50–374, 50–352, 50– 353, 50–369, 50–370, 50–245, 50–336, 50– examine and order copies of public meet or likely will not meet the work- 423, 50–263, 50–220, 50–410, 50–338, 50– documents, is currently closed. You hour controls of 10 CFR 26.205(d)(1) 339, 50–269, 50–270, 50–287, 50–243, 50– may submit your request to the PDR via through (d)(7). These licensees have 255, 50–528, 50–529, 50–530, 50–277, 50– email at [email protected] or call 1– committed to effecting site-specific 278, 50–440, 50–266, 50–301, 50–282, 50– 800–397–4209 or 301–415–4737, administrative controls for COVID–19 306, 50–254, 50–265, 50–244, 50–458, 50– between 8:00 a.m. and 4:00 p.m. (EST), PHE fatigue management for personnel 335, 50–389, 50–443, 50–400, 50–498, 50– Monday through Friday, except Federal specified in 10 CFR 26.4(a). 499, 50–280, 50–281, 50–387, 50–388, 50– holidays. The exemptions from certain 395, 50–424, 50–425, 50–382, 50–390, 50– For the convenience of the reader, 391; NRC–2020–0110] requirements of 10 CFR part 50, instructions about obtaining materials appendix E, ‘‘Emergency Planning and Issuance of Multiple Exemptions in referenced in this document are Preparedness for Production and Response to COVID–19 Public Health provided in the ‘‘Availability of Utilization Facilities,’’ section IV.F., Emergency Documents’’ section. ‘‘Training,’’ for (for FOR FURTHER INFORMATION CONTACT: Columbia Generating Station); for DTE AGENCY: Nuclear Regulatory James Danna, Office of Electric Company (for Fermi-2); for Commission. Regulation, U.S. Nuclear Regulatory PSEG Nuclear LLC (for Hope Creek ACTION: Exemptions; issuance. Commission, DC 20555– Generating Station and Salem Nuclear 0001; telephone: 301–415–7422, email: Generating Station, Unit Nos. 1 and 2); SUMMARY: The U.S. Nuclear Regulatory [email protected]. for Nuclear Operations, Inc. (for Commission (NRC) issued 68 SUPPLEMENTARY INFORMATION: Indian Point Nuclear Generating exemptions in response to requests from Station, Unit Nos. 1, 2, and 3; and 26 licensees. The exemptions afford I. Introduction Palisades Nuclear Plant); for Virginia these licensees temporary or permanent During the period from December 1, Electric and Power Company (for North relief from certain requirements under 2020, to December 28, 2020, the NRC Anna , Unit Nos. 1 and 2); NRC regulations. The exemptions are in granted 68 exemptions in response to for Generation Company, LLC response to the licensees’ requests for requests submitted by licensees from (for LaSalle County Station, Units 1 and relief due to the coronavirus disease September 30, 2020, to December 23, 2); for Oregon State University (for the 2019 (COVID–19) public health 2020. These exemptions allow the Oregon State TRIGA Reactor); for emergency (PHE). The NRC is issuing a licensees to deviate from certain Entergy Operations, Inc. (for River Bend single notice to announce the issuance requirements (as cited in this notice) of Station, Unit 1); for NextEra Energy of the exemptions. various parts of chapter I of title 10 of Seabrook, LLC (for Seabrook Station, DATES: During the period from the Code of Federal Regulations (10 Unit No. 1), grant temporary exemptions December 1, 2020, to December 28, CFR). from the biennial emergency 2020, the NRC granted 68 exemptions in The exemptions from certain preparedness exercise requirement. The response to requests submitted by requirements of 10 CFR part 26, exemptions allow a temporary licensees from September 30, 2020, to ‘‘Fitness for Duty Programs,’’ for Exelon exemption from the requirements of 10 December 23, 2020. Generation Company, LLC (for CFR part 50, appendix E, regarding the ADDRESSES: Please refer to Docket ID Braidwood Station, Units 1 and 2; Byron conduct of the biennial emergency NRC–2020–0110 when contacting the Station, Unit Nos. 1 and 2; Clinton preparedness exercise. These NRC about the availability of Power Station, Unit No. 1; LaSalle exemptions will not adversely affect the information regarding this document. County Station, Units 1 and 2; and Quad emergency response capability of the You may obtain publicly available Cities Nuclear Power Station, Units 1 facilities because affected licensee

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00140 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES 5270 Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices

personnel are currently qualified, and Station, Unit Nos. 1 and 2; and Oconee 3), will help to ensure that these the licensees’ proposed compensatory Nuclear Station, Units 1, 2, and 3); for regulatory requirements do not unduly measures will enable their staff to Energy Northwest (for Columbia limit licensee flexibility in using maintain their knowledge, skills, and Generating Station); for Vistra personnel resources in a manner that abilities without the conduct of the Operations Company LLC (for most effectively manages the impacts of biennial emergency preparedness Comanche Peak , the COVID–19 PHE on maintaining the exercise during the exemption term. Unit Nos. 1 and 2); for Pacific Gas and safe and secure operation of these The exemptions from certain Electric Company (for Diablo Canyon facilities and the implementation of the requirements of 10 CFR part 73, Nuclear Power Plant, Units 1 and 2); for licensees’ NRC approved security plans, appendix B, ‘‘General Criteria for Indiana Michigan Power Company (for protective strategy, and implementing Security Personnel,’’ section VI, Donald C. Cook Nuclear Plant, Unit Nos. procedures. These licensees have ‘‘Nuclear Power Reactor Training and 1 and 2); for Southern Nuclear committed to certain security measures Qualification Plan for Personnel Operating Co., Inc. (for Edwin I. Hatch to ensure response readiness and for Performing Security Program Duties,’’ Nuclear Plant, Unit Nos. 1 and 2; Joseph their security personnel to maintain for Energy Harbor Nuclear Corp. (for M. Farley Nuclear Plant, Units 1 and 2; performance capability. Beaver Valley Power Station, Units 1 and Vogtle Electric Generating Plant, The NRC is providing compiled tables and 2; Davis-Besse Nuclear Power Units 1 and 2); for DTE Electric of exemptions using a single Federal Station, Unit No. 1; and Perry Nuclear Company (for Fermi-2); for Entergy Register notice for COVID–19 related Power Plant, Unit No. 1); for Exelon Nuclear Operations, Inc. (for Indian exemptions instead of issuing Generation Company, LLC (for Point Nuclear Generating Unit Nos. 2 Braidwood Station, Units 1 and 2; Byron and 3; and Palisades Nuclear Plant); for individual Federal Register notices for Station, Unit Nos. 1 and 2; Calvert Cliffs Dominion Energy Nuclear Connecticut, each exemption. The compiled tables in Nuclear Power Plant, Units 1 and 2; Inc. (for Millstone Power Station, Unit this notice provide transparency , Unit No. 1; Nos. 1, 2, and 3); for Northern States regarding the number and type of Dresden Nuclear Power Station, Units 2 Power Company (for Monticello Nuclear exemptions the NRC has issued. and 3; James A. FitzPatrick Nuclear Generating Plant and Prairie Island Additionally, the NRC publishes tables Power Plant; LaSalle County Station, Nuclear Generating Plant, Units 1 and of approved regulatory actions related to Units 1 and 2; Limerick Generating 2); for Virginia Electric and Power the COVID–19 PHE on its public Station, Units 1 and 2; Nine Mile Point Company (for North Anna Power website at https://www.nrc.gov/about- Nuclear Station, Units 1 and 2; Peach Station, Unit Nos. 1 and 2; and Surry nrc/covid-19/reactors/licensing- Bottom Atomic Power Station, Units 2 Power Station, Unit Nos. 1 and 2); for actions.html. and 3; Quad Cities Nuclear Power NextEra Energy Point Beach, LLC (for II. Availability of Documents Station, Units 1 and 2; and R. E. Ginna Point Beach Nuclear Plant, Units 1 and Nuclear Power Plant); for 2); for Florida Power & Light Company The tables in this notice provide the Valley Authority (for Browns Ferry (for St. Lucie Plant, Unit Nos. 1 and 2); facility name, docket number, document Nuclear Plant, Units 1, 2, and 3; and for NextEra Energy Seabrook, LLC (for description, and ADAMS accession Bar Nuclear Plant, Units 1 and 2); Seabrook Station, Unit No. 1); STP number for each exemption issued. for Progress, LLC (for Nuclear Operating Company (for South Additional details on each exemption Brunswick Steam Electric Plant, Units 1 Texas Project, Units 1 and 2); for issued, including the exemption request and 2; Shearon Harris Nuclear Power Susquehanna Nuclear LLC (for submitted by the respective licensee and Plant, Unit 1; and H. B. Robinson Steam Susquehanna Steam Electric Station, the NRC’s decision, are provided in Electric Plant, Unit No. 2); for Units 1 and 2), for Dominion Energy each exemption approval listed in the Public Power District (for Cooper , Inc. (for Virgil C. tables in this notice. For additional Nuclear Station); for Duke Energy Summer Nuclear Station, Unit No. 1); directions on accessing information in Carolinas, LLC (for Catawba Nuclear and Entergy Operations, Inc. (for ADAMS, see the ADDRESSES section of Station, Units 1 and 2; McGuire Nuclear Waterford Steam Electric Station, Unit this document.

Document description ADAMS accession No.

Beaver Valley Power Station, Units 1 and 2 Docket Nos. 50–334 and 50–412

Beaver Valley Power Station, Units 1 and 2 -Request for a One-Time Exemption from 10 CFR part 73, appendix ML20303A213. B, section VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated October 28, 2020. Beaver Valley Power Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 ML20324A089. CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(l)(1) (EPID L–2020–LLE– 0171 [COVID–19]), dated December 15, 2020.

Braidwood Station, Units 1 and 2 Docket Nos. 50–456 and 50–457

Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) non-public, withheld pursu- Regarding 2020 Annual Force-on-Force Exercises due to COVID–19 Public Health Emergency, dated November ant to 10 CFR 2.390. 13, 2020. Braidwood Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part ML20322A338. 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0198) [COVID–19], dated December 10, 2020.

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00141 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices 5271

Document description ADAMS accession No.

Braidwood Station, Units 1 and 2 Docket Nos. 50–456 and 50–457

Braidwood Station, Units 1 and 2—COVID–19 Related Request for Exemption from 10 CFR part 26 Work Hours ML20323A008. Requirements, dated November 17, 2020. Braidwood Station, Units 1 and 2—Response to Request for Additional Information Related to Exemption from 10 ML20328A215. CFR part 26 Requirements, dated November 23, 2020. Braidwood Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID L–2020–LLE– ML20324A002. 0207 [COVID–19]), dated December 1, 2020.

Browns Ferry Nuclear Plant, Units 1, 2, and 3 Docket Nos. 50–259, 50–260, and 50–296

Browns Ferry Nuclear Power Plant, Units 1, 2, and 3—Request for a One-Time Exemption from 10 CFR part 73, ML20343A214. appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated December 8, 2020. Browns Ferry Nuclear Plant, Units 1, 2, and 3—Exemption from Annual Force-on-Force Exercise Requirement of ML20343A363. 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020– LLE–0233 [COVID–19]), dated December 15, 2020.

Brunswick Steam Electric Plant, Units 1 and 2 Docket Nos. 50–325 and 50–324

Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursu- C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 4, 2020. ant to 10 CFR 2.390. Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, ap- non-public, withheld pursu- pendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pan- ant to 10 CFR 2.390. demic, dated November 19, 2020. Brunswick Steam Electric Plant, Units 1 and 2 Exemption from Annual Force-On-Force Exercise Requirements of ML20338A329. 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020– LLE–0180 [COVID–19]), dated December 17, 2020.

Byron Station, Unit Nos. 1 and 2 Docket Nos. 50–454 and 50–455

Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) non-public, withheld pursu- Regarding 2020 Annual Force-on-Force Exercises due to COVID–19 Public Health Emergency, dated November ant to 10 CFR 2.390. 13, 2020. Byron Station, Unit Nos. 1 and 2—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part ML20323A393. 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3(l)(1) (EPID L–2020–LLE–0199) [COVID–19], dated December 10, 2020.

Byron Station, Unit Nos. 1 and 2 Docket Nos. 50–454 and 50–455

Byron Station, Unit Nos. 1 and 2—Subsequent Request for Exemption from 10 CFR part 26 Work Hours Require- ML20329A533. ments, dated November 24, 2020. Byron Station, Unit Nos. 1 and 2—Response to Request for Additional Information Related to Subsequent Exemp- ML20336A341. tion from 10 CFR part 26 Requirements, dated December 1, 2020. Byron Station, Unit Nos. 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID L–2020–LLE– ML20332A017. 0218 [COVID–19]), dated December 2, 2020.

Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Docket Nos. 50–317 and 50–318

Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) ML20318A288. Regarding 2020 Annual Force-on-Force Exercises due to COVID–19 Public Health Emergency, dated November 13, 2020. Calvert Cliffs Nuclear Power Plant, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement ML20321A243. of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3(l)(1) (EPID L–2020– LLE–0194 [COVID–19]), dated December 11, 2020.

Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50–413 and 50–414

Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursu- C.3.(I)(1), Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 4, 2020. ant to 10 CFR 2.390. Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, ap- non-public, withheld pursu- pendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pan- ant to 10 CFR 2.390. demic, dated November 19, 2020. , Units 1 and 2—Exemption from Annual Force-On-Force Exercise Requirements of 10 ML20337A128. CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE– 0180 [COVID–19]), dated December 17, 2020.

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00142 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES 5272 Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices

Document description ADAMS accession No.

Clinton Power Station, Unit No. 1 Docket No. 50–461

Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) non-public, withheld pursu- Regarding 2020 Annual Force-on-Force Exercises due to COVID–19 Public Health Emergency, dated November ant to 10 CFR 2.390. 13, 2020. Clinton Power Station, Unit No. 1—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part ML20323A434. 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3(l)(1) (EPID L–2020–LLE–0200 [COVID–19]), dated December 11, 2020.

Clinton Power Station, Unit No. 1 Docket No. 50–461

Clinton Power Station, Unit No. 1—COVID–19 Related Request for Exemption from 10 CFR part 26 Work Hours ML20339A318. Requirements, dated December 3, 2020. Clinton Power Station, Unit No. 1—Exemption from Select Requirements of 10 CFR part 26 (EPID L–2020–LLE– ML20339A538. 0232 [COVID–19]), dated December 16, 2020.

Columbia Generating Station Docket No. 50–397

Columbia Generating Station—Exemption Request from 10 CFR part 50, appendix E due to COVID–19 Pandemic, ML20303A348. dated October 29, 2020. Columbia Generating Station—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency ML20336A183. Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L–2020–LLE–0173 [COVID–19]), dated December 17, 2020.

Columbia Generating Station Docket No. 50–397

Columbia Generating Station—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, ML20303A286. subsection C.3.(I)(1) regarding Annual Force-On-Force Exercises due to COVID–19 Pandemic, dated October 29, 2020. Columbia Generating Station—Response to Request for Additional Information Related to Request for a One-Time ML20338A541. Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-On- Force Exercises due to COVID–19, dated December 3, 2020. Columbia Generating Station—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, ML20342A211. appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0172 [COVID–19]), dated December 17, 2020.

Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 Docket Nos. 50–445 and 50–446

Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR part ML20345A341. 73, appendix B, section VI, subsection C.3.(I)(l) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated December 10, 2020. Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2—Exemption from Annual Force-On-Force Exercise Re- ML20350B666. quirement of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0235 [COVID–19]), dated December 22, 2020.

Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 Docket Nos. 50–445 and 50–446

Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2—Request for Exemption from Specific Requirements of ML20346A565. 10 CFR part 26, ‘‘Fitness for Duty Programs,’’ dated December 11, 2020. Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2—Supplement to Request for Exemption from Specific ML20350B830. Requirements of 10 CFR part 26, ‘‘Fitness for Duty Programs,’’ dated December 15, 2020. Comanche Peak, Unit Nos. 1 and 2—Exemption from Selection from Requirements of 10 CFR part 26 (EPID L– ML20349A038. 2020–LLE–0236 [COVID–19]), dated December 16, 2020.

Cooper Nuclear Station Docket No. 50–298

Cooper Nuclear Station—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, sub- ML20309A663. section C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated October 27, 2020. Cooper Nuclear Station—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, ap- ML20323A237. pendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0178 [COVID– 19]), dated December 11, 2020.

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00143 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices 5273

Document description ADAMS accession No.

Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50–346

Davis-Besse Nuclear Power Station, Unit No. 1—Request for a One-Time Exemption from 10 CFR part 73, appen- ML20304A046. dix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pan- demic, dated October 29, 2020. Davis-Besse Nuclear Power Station, Unit No. 1—Response to Request for Additional Information Regarding Re- ML20342A199. quest for Exemption—10 CFR part 73 Force-on-Force Exercises (EPID L–2020–LLE–0175), dated December 7, 2020. Davis-Besse Nuclear Power Station, Unit No. 1—Exemption from Annual Force-on-Force Exercise Requirement of ML20345A205. 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020– LLE–0175 [COVID–19]), dated December 15, 2020.

Diablo Canyon Nuclear Power Plant, Units 1 and 2 Docket Nos. 50–275 and 50–323

Diablo Canyon Nuclear Power Plant, Units 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, ap- non-public, withheld pursu- pendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pan- ant to 10 CFR 2.390. demic, dated October 14, 2020. Diablo Canyon Nuclear Power Plant, Units 1 and 2—Response to Request for Additional Information Regarding non-public, withheld pursu- Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regard- ant to 10 CFR 2.390. ing Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated December 3, 2020. Diablo Canyon Nuclear Power Plant, Units 1 and 2—Exemption from Annual Force-On-Force Exercise Require- ML20346A024. ment of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0166 [COVID–19]), dated December 17, 2020.

Diablo Canyon Nuclear Power Plant, Units 1 and 2 Docket Nos. 50–275 and 50–323

Diablo Canyon Power Plant, Units 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, non-public, withheld pursu- section VI, subsection F.5.(a) Regarding Firearms Requalification due to COVID–19 Pandemic, dated October ant to 10 CFR 2.390. 14, 2020. Diablo Canyon Nuclear Power Plant, Units 1 and 2—Response to Request for Additional Information Regarding non-public, withheld pursu- Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection F.5.(a) Regarding ant to 10 CFR 2.390. Firearms Requalification due to COVID–19 Pandemic, dated December 3, 2020. Diablo Canyon Nuclear Power Plant, Units 1 and 2—Exemption from Annual Firearms Tactical Qualification ML20346A120. Course Requirement of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.F.5.(a) (EPID L–2020–LLE–0167 [COVID–19]), dated December 18, 2020.

Donald C. Cook Nuclear Plant, Units Nos. 1 and 2 Docket Nos. 50–315 and 50–316

Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, ap- ML20318A034. pendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pan- demic, dated November 4, 2020. Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2—Exemption from Certain Requirements of 10 CFR part 73, ap- ML20324A003. pendix B, ‘‘General Criteria for Security Personnel,’’ section VI (EPID L–2020–LLE–0182 [COVID–19]), dated December 8, 2020.

Donald C. Cook Nuclear Plant, Units Nos. 1 and 2 Docket Nos. 50–315 and 50–316

Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR 26.205(d) ML20338A324. due to COVID–19 Pandemic, dated November 30, 2020. Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID ML20336A111. L–2020–LLE–0221 [COVID–19]), dated December 3, 2020.

Dresden Nuclear Power Station, Units 2 and 3 Docket Nos. 50–237 and 50–249

Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) non-public, withheld pursu- Regarding 2020 Annual Force-on-Force Exercises due to COVID–19 Public Health Emergency, dated November ant to 10 CFR 2.390. 13, 2020. Dresden Nuclear Power Station, Units 2 and 3—Exemption from Annual Force-On-Force Exercise Requirements ML20322A303. of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L– 2020–LLE–0203 [COVID–19]), dated December 14, 2020.

Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 Docket Nos. 50–321 and 50–366

Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding ML20311A662. Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 6, 2020.

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00144 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES 5274 Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices

Document description ADAMS accession No.

Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of ML20329A488. 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(l)(1) (EPID L–2020– LLE–0215 [COVID–19]), dated December 4, 2020.

Fermi-2 Docket No. 50–341

Fermi-2—Request for One-Time Exemption from 10 CFR part 50, appendix E, ‘‘Biennial Emergency Preparedness ML20317A203. Exercise Requirements,’’ due to COVID–19 Pandemic, dated November 12, 2020. Fermi-2—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 ML20332A179. CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L–2020–LLE–0188 [COVID–19]), dated Decem- ber 8, 2020.

Fermi-2 Docket No. 50–341

Fermi-2—Request for Exemption from the Annual Force-on-Force Training Requirements of 10 CFR part 73, ap- ML20318A383. pendix B, section VI due to the COVID–19 Public Health Emergency, dated November 13, 2020. Fermi-2—Response to Request for Additional Information Regarding Exemption from the Annual Force-on-Force ML20338A333. Training Requirements of 10 CFR part 73, appendix B, section VI due to the COVID–19 Public Health Emer- gency, dated December 3, 2020. Fermi-2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ‘‘General ML20343A350. Criteria for Security Personnel,’’ subsection VI.C.3.(l)(1) (EPID L–2020–LLE–0204 [COVID–19]), dated Decem- ber 18, 2020.

Hope Creek Generating Station Docket No. 50–354 Salem Nuclear Generating Station, Unit Nos. 1 and 2 Docket Nos. 50–272 and 50–311

Hope Creek Generating Station and Salem Generating Station, Units Nos. 1 and 2—Exemption Request from 10 ML20287A628. CFR part 50, appendix E, ‘‘Biennial Emergency Preparedness Exercise Requirements,’’ due to COVID–19 Pan- demic, dated October 13, 2020. Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2—Temporary Exemption ML20315A434. from the Exercise Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L–2020– LLE–0164 [COVID–19]), dated December 7, 2020.

Hope Creek Generating Station Docket No. 50–354 Salem Nuclear Generating Station, Unit Nos. 1 and 2 Docket Nos. 50–272 and 50–311

Hope Creek Generating Station and Salem Generating Station, Unit Nos. 1 and 2—Request for Exemption from ML20358A186. Specific Requirements of 10 CFR part 26, ‘‘Fitness for Duty Programs,’’ dated December 23, 2020. Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2—Exemption from Select ML20358A281. Requirements of 10 CFR part 26 (EPID L–2020–LLE–0239 [COVID–19]), dated December 28, 2020.

Indian Point Nuclear Generating Station, Unit Nos. 1, 2, and 3 Docket Nos. 50–003, 50–247, and 50–286

Indian Point Nuclear Generating Station, Unit Nos. 1, 2, and 3—One-time Scheduler Exemption Request from 10 ML20282A612. CFR part 50, appendix E, ‘‘Biennial Emergency Preparedness Exercise Requirements,’’ due to COVID–19 Public Health Emergency, dated October 8, 2020. Indian Point Nuclear Generating Station, Unit Nos. 1, 2, and 3—Supplement to One-Time Exemption Request from ML20317A344. 10 CFR part 50, appendix E, ‘‘Biennial Emergency Preparedness Exercise Requirements’’ (EPID L–2020–LLE– 0160 [COVID–19]), dated November 12, 2020. Indian Point Nuclear Generating Station, Unit Nos. 1, 2, and 3—Temporary Exemption from Exercise Frequency ML20320A000. Requirements of 10 CFR part 50, appendix E, section IV.F.2.B (EPID L–2020–LLE–0160 [COVID–19]), dated December 8, 2020.

Indian Point Nuclear Generating Unit Nos. 2 and 3 Docket Nos. 50–247 and 50–286

Indian Point Nuclear Generating Unit Nos. and 3—Request for a One-Time Exemption from 10 CFR 73, appendix ML20317A299. B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID 19 Pan- demic, dated November 12, 2020. Indian Point Nuclear Generating Unit Nos. 2 and 3—Exemption from Annual Force-on-Force Exercise Requirement ML20321A121. of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L– 2020–LLE–0189 [COVID–19]), dated December 14, 2020.

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00145 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices 5275

Document description ADAMS accession No.

James A. FitzPatrick Nuclear Power Plant Docket No. 50–333

Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) ML20318A288. Regarding 2020 Annual Force-on-Force Exercises due to COVID–19 Public Health Emergency, dated November 13, 2020. James A. Fitzpatrick Nuclear Power Plant—Exemption from Annual Force-On-Force Exercise Requirements of 10 ML20337A004. CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE– 0197 [COVID 19]), dated December 8, 2020.

Joseph M. Farley Nuclear Plant, Units 1 and 2 Docket Nos. 50–348 and 50–364

Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding ML20311A662. Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 6, 2020. Joseph M. Farley Nuclear Plant, Units 1 and 2—Exemption from Certain Requirements of 10 CFR part 73, appen- ML20315A374. dix B, ‘‘General Criteria for Security Personnel,’’ subsection VI C.3.(I)(1) (EPID L–2020–LLE–0183 [COVID–19]), dated December 4, 2020.

H. B. Robinson Steam Electric Plant, Unit No. 2 Docket No. 50–261

Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursu- C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 4, 2020. ant to 10 CFR 2.390. Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, ap- non-public, withheld pursu- pendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pan- ant to 10 CFR 2.390. demic, dated November 19, 2020. H. B. Robinson Steam Electric Plant, Unit No. 2—Exemption from Annual Force-On-Force Exercise Requirements ML20339A521. of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1), dated Decem- ber 17, 2020.

LaSalle County Station, Units 1 and 2 Docket Nos. 50–373 and 50–374

LaSalle County Station, Units 1 and 2—Request for Exemption from the Biennial Emergency Preparedness Exer- ML20328A292. cise Requirements in 10 CFR part 50, appendix E, section IV.F.2.b, dated November 23, 2020. LaSalle County Station, Units 1 and 2—Supplemental Information Regarding Request for Exemption from the Bi- ML20342A259. ennial Emergency Preparedness Exercise Requirements of 10 CFR part 50, appendix E, section IV.F.2.b, dated December 7, 2020. LaSalle County Station, Units 1 and 2—Temporary Exemption from Biennial Emergency Preparedness Exercise ML20346A014. Frequency Requirements of 10 CFR part 50, appendix E, section IV.F.2.b (EPID–L–2020–LLE–0223 [COVID– 19]), dated December 18, 2020.

LaSalle County Station, Units 1 and 2 Docket Nos. 50–373 and 50–374

Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) non-public, withheld pursu- Regarding 2020 Annual Force-on-Force Exercises due to COVID–19 Public Health Emergency, dated November ant to 10 CFR 2.390. 13, 2020. LaSalle County Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR ML20324A104. part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3(l)(1) (EPID L–2020–LLE–0191 [COVID–19]), dated December 9, 2020.

LaSalle County Station, Units 1 and 2 Docket Nos. 50–373 and 50–374

LaSalle County Station, Units 1 and 2- COVID–19 Related Request for Exemption from 10 CFR part 26 Work ML20329A301. Hours Requirements, dated November 24, 2020. LaSalle County Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID L–2020– ML20330A326. LLE–0217 [COVID–19]), dated December 1, 2020.

Limerick Generating Station, Units 1 and 2 Docket Nos. 50–352 and 50–353

Exelon Generation—Limerick Generating Station, Units 1 and 2—Request for Exemption from 10 CFR part 73, ap- ML20318A288. pendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID–19 Public Health Emergency, dated November 13, 2020. Limerick Generating Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 ML20330A295. CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(l)(1) (EPID L–2020–LLE– 0201 [COVID–19]), dated December 10, 2020.

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00146 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES 5276 Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices

Document description ADAMS accession No.

McGuire Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50–369 and 50–370

Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursu- C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 4, 2020. ant to 10 CFR 2.390. Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, ap- non-public, withheld pursu- pendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pan- ant to 10 CFR 2.390. demic, dated November 19, 2020. McGuire Nuclear Station, Unit Nos. 1 and 2—Exemption from Annual Force-on-Force Exercise Requirements of 10 ML20330A321. CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE– 0180) [COVID–19], dated December 9, 2020.

Millstone Power Station, Unit Nos. 1, 2, and 3 Docket Nos. 50–245, 50–336, and 50–423

Millstone Power Station, Unit Nos. 1, 2, and 3—Request for a One-Time Exemption from 10 CFR part 73, appen- non-public, withheld pursu- dix B, section VI, subsection C.3.(1)(1) Regarding Annual Force-On-Force Exercises due to COVID–19 Pan- ant to 10 CFR 2.390. demic, dated December 3, 2020. Millstone Power Station, Unit Nos. 1, 2, and 3—Exemption from Annual Force-on-Force Exercise Requirement of ML20338A552. 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020– LLE–0227 [COVID–19]), dated December 16, 2020.

Monticello Nuclear Generating Plant Docket No. 50–263

Monticello and Prairie Island—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, non-public, withheld pursu- subsection C.3(l)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated October ant to 10 CFR 2.390. 30, 2020. Response to Request for Additional Information Regarding Request for a One-Time Exemption from 10 CFR part non-public, withheld pursu- 73, appendix B, section VI, subsection C.3(l)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 ant to 10 CFR 2.390. Pandemic, dated December 14, 2020. Monticello Nuclear Generating Plant—Exemption from Certain Requirements of 10 CFR part 73, appendix B, ML20317A136. ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0174 [COVID–19]), dated December 22, 2020.

Nine Mile Point Nuclear Station, Units 1 and 2 Docket Nos. 50–220 and 50–410

Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) ML20318A288. Regarding 2020 Annual Force-on-Force Exercises due to COVID–19 Public Health Emergency, dated November 13, 2020. Nine Mile Point Nuclear Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of ML20321A290. 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020– LLE–0195 [COVID–19]), dated December 14, 2020.

North Anna Power Station, Unit Nos. 1 and 2 Docket Nos. 50–338 and 50–339

North Anna Power Station, Unit Nos. 1 and 2—Request for One-Time Schedular Exemption from Offsite Biennial ML20317A162. Emergency Preparedness Exercise Requirement in 10 CFR part 50, appendix E, section IV.F.2.c, dated Novem- ber 10, 2020. North Anna Power Station, Unit Nos. 1 and 2—Temporary Exemption from Biennial Emergency Preparedness Ex- ML20324A222. ercise Frequency Requirements of 10 CFR part 50, appendix E, section IV.F.2.C (EPID L–2020–LLE–0184 [COVID–19]), dated December 8, 2020.

North Anna Power Station, Unit Nos. 1 and 2 Docket Nos. 50–338 and 50–339

North Anna Power Station, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix non-public, withheld pursu- B, section VI, subsection C.3.(I)(1) Regarding Annual Force-On-Force Exercises due to COVID–19 Pandemic, ant to 10 CFR 2.390. dated December 3, 2020. North Anna Power Station, Units Nos. 1 and 2—Exemption from Annual Force-On Force Exercise Requirement of ML20342A293. 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020– LLE–0231 [COVID–19]), dated December 15, 2020.

Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50–269, 50–270, and 50–287

Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursu- C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 4, 2020. ant to 10 CFR 2.390. Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, ap- non-public, withheld pursu- pendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pan- ant to 10 CFR 2.390. demic, dated November 19, 2020.

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00147 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices 5277

Document description ADAMS accession No.

Oconee Nuclear Station, Units 1, 2, and 3—Exemption from Annual Force-On-Force Exercise Requirements of 10 ML20344A004. CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE– 0180 [COVID–19]), dated December 17, 2020.

Oregon State University Docket No. 50–243

Oregon State University—Extension of Timeframe Required to Complete Biennial Emergency Exercise per Oregon ML20318A035. State TRIGA Reactor Emergency Response Plan, dated November 3, 2020. Oregon State University—Extension of Timeframe required to Complete Biennial Emergency Exercise per Oregon ML20350B726. State TRIGA Reactor Emergency Response Plan, dated December 10, 2020. Oregon State University—Temporary Exemption from the Requirements of 10 CFR part 50, appendix E, section ML20318A380. IV.F.2.b Related to Biennial Emergency Exercise [COVID–19], dated December 18, 2020.

Palisades Nuclear Plant Docket No. 50–255

Palisades Nuclear Plant—Request for One-Time Exemption from 10 CFR part 50, appendix E, ‘‘Biennial Emer- ML20275A110. gency Preparedness Exercise Requirements,’’ due to COVID–19 Pandemic, dated September 30, 2020. Palisades Nuclear Plant—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Re- ML20308A607. quirements of 10 CFR part 50, appendix E, section IV.F (EPID L–2020–LLE–0155 [COVID–19]), dated Decem- ber 9, 2020.

Palisades Nuclear Plant Docket No. 50–255

Palisades Nuclear Plant—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, sub- ML20317A300. section C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 12, 2020. Palisades Nuclear Plant—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, ap- ML20330A000. pendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0190 [COVID– 19]), dated December 3, 2020.

Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Docket Nos. 50–528, 50–529, 50–530

Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and Independent Spent Fuel Storage Installation—Sub- ML20356A292. sequent Request for Exemption from Specific Requirements of 10 CFR part 26, ‘‘Fitness for Duty Programs,’’ dated December 21, 2020. Palo Verde Nuclear Generating Station, Units 1, 2, and 3—Subsequent Request for Exemption from Select Re- ML20357A055. quirements of 10 CFR part 26 (EPID L–2020–LLE–0238 [COVID–19]), dated December 23, 2020.

Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos. 50–277 and 50–278

Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) ML20318A288. Regarding 2020 Annual Force-on-Force Exercises due to COVID–19 Public Health Emergency, dated November 13, 2020. Peach Bottom Atomic Power Station, Units 2 and 3—Exemption from Annual Force-on-Force Exercise Require- ML20325A017. ment of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(l)(1) (EPID L– 2020–LLE–0192 [COVID–19]), dated December 10, 2020.

Perry Nuclear Power Plant, Unit No. 1 Docket No. 50–440

Perry Nuclear Power Plant, Unit No. 1—Request for a One-Time Exemption from 10 CFR part 73, appendix B, ML20304A191. section VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated October 29, 2020. Perry Nuclear Power Plant, Unit No. 1—Response to Request for Additional Information Regarding Request for ML20335A531. Exemption—10 CFR part 73 Force-on-Force Exercises (EPID L–2020–LLE–0176), dated November 25, 2020. Perry Nuclear Power Plant, Unit No. 1—Exemption from Certain Requirements of 10 CFR part 73, appendix B, ML20309A135. section VI.C.3.(I)(1) Re: Annual Force-on-Force Exercise for CY 2020 (EPID L–2020–LLE–0176 [COVID–19]), dated December 14, 2020.

Point Beach Nuclear Plant, Units 1 and 2 Docket Nos. 50–266 and 50–301

Point Beach Nuclear Plant, Units 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, non-public, withheld pursu- section VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, ant to 10 CFR 2.390. dated November 19, 2020. Point Beach Nuclear Plant, Units 1 and 2—Response to Request for Additional Information, Request for Exemp- non-public, withheld pursu- tion from 10 CFR part 73, appendix B, section VI Regarding Annual Force-On-Force Exercise, dated December ant to 10 CFR 2.390. 8, 2020.

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00148 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES 5278 Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices

Document description ADAMS accession No.

Point Beach Nuclear Plant, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 ML20345A000. CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE– 0210 [COVID–19]), dated December 15, 2020.

Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50–282 and 50–306

Monticello and Prairie Island—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, non-public, withheld pursu- subsection C.3(l)(1) Re: Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated October 30, 2020. ant to 10 CFR 2.390. Response to Request for Additional Information, Request for a One-Time Exemption from 10 CFR part 73, appen- non-public, withheld pursu- dix B, section VI, subsection C.3(l)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, ant to 10 CFR 2.390. dated December 14, 2020. Prairie Island Nuclear Generating Plant, Units 1 and 2—Exemption from Certain Requirements of 10 CFR part 73, ML20317A259. appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0177 [COVID–19]), dated December 21, 2020.

Quad Cities Nuclear Power Station, Units 1 and 2 Docket Nos. 50–254 and 50–265

Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) non-public, withheld pursu- Regarding 2020 Annual Force-on-Force Exercises due to COVID–19 Public Health Emergency, dated November ant to 10 CFR 2.390. 13, 2020. Quad Cities Nuclear Power Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement ML20332A175. of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L– 2020–LLE–0193 [COVID–19]), dated December 4, 2020.

Quad Cities Nuclear Power Station, Units 1 and 2 Docket Nos. 50–254 and 50–265

Quad Cities Nuclear Power Station, Units 1 and 2—COVID–19 Related Request for Exemption from 10 CFR part ML20339A474. 26 Work Hours Requirements, dated December 4, 2020. Quad Cities Nuclear Power Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID ML20343A027. L–2020–LLE–0228 [COVID–19]), dated December 17, 2020.

R. E. Ginna Nuclear Power Plant Docket No. 50–244

Exelon Generation—Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection ML20318A288. C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 13, 2020. R. E. Ginna Nuclear Power Plant—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part ML20330A291. 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(l)(1) (EPID L–2020–LLE–0202 [COVID–19]), dated December 10, 2020.

River Bend Station, Unit 1 Docket No. 50–458

River Bend Station, Unit 1—One-Time Schedular Exemption Request from 10 CFR part 50, appendix E, ‘‘Biennial ML20338A539. Emergency Preparedness Exercise Requirements,’’ due to COVID–19 Public Health Emergency, dated Decem- ber 3, 2020. River Bend Station, Unit 1—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency ML20344A135. Requirements of 10 CFR part 50, appendix E, section IV.F.2.b (EPID–L–2020–LLE–0212 [COVID–19]), dated December 22, 2020.

St. Lucie Plant, Unit Nos. 1 and 2 Docket Nos. 50–335 and 50–389

St. Lucie Plant, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section non-public, withheld pursu- VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated De- ant to 10 CFR 2.390. cember 9, 2020. St. Lucie Plant, Unit Nos. 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part ML20352A118. 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0234) [COVID–19], dated December 18, 2020.

Seabrook Station, Unit No. 1 Docket No. 50–443

Seabrook Station, Unit No. 1—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, ML20329A205. subsection C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated Novem- ber 23, 2020. Seabrook Station, Unit No. 1—Response to Request for Additional Information in Response to One-Time Exemp- ML20343A112. tion from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exer- cises due to COVID–19 Pandemic, dated December 8, 2020.

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00149 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices 5279

Document description ADAMS accession No.

Seabrook Station, Unit No. 1—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, ML20336A006. appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0219 [COVID–19]), dated December 16, 2020.

Seabrook Station, Unit No. 1 Docket No. 50–443

Seabrook Station, Unit No. 1—One-Time Exemption Request for the Biennial Emergency Preparedness Exercise ML20338A493. Requirements of 10 CFR part 50, appendix E, sections IV.F.2.b and IV.F.2.c, dated December 3, 2020. Seabrook Station, Unit No. 1—Exemption from Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B ML20345A119. and IV.F.2.C (EPID L–2020–LLE–0229 and EPID L–2020–LLE–0230 [COVID–19]), dated December 21, 2020.

Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50–400

Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursu- C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 4, 2020. ant to 10 CFR 2.390. Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, ap- non-public, withheld pursu- pendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pan- ant to 10 CFR 2.390. demic, dated November 19, 2020. Shearon Harris Nuclear Power Plant, Unit No. 1—Exemption from Annual Force-on-Force Exercise Requirements ML20330A301. of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3(l)(1) (EPID L–2020– LLE–0180 [COVID–19]), dated December 17, 2020.

South Texas Project, Units 1 and 2 Docket Nos. 50–498 and 50–499

South Texas Project, Units 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, sec- ML20321A331. tion VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 16, 2020. South Texas Project, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR ML20330A312. part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0205 [COVID–19]), dated December 10, 2020.

Surry Power Station, Unit Nos. 1 and 2 Docket Nos. 50–280 and 50–281

Surry Power Station, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, non-public, withheld pursu- section VI, subsection C.3.(I)(1) Regarding Annual Force-On-Force Exercises due to COVID–19 Pandemic, ant to 10 CFR 2.390. dated December 3, 2020. Surry Power Station, Unit Nos. 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR ML20339A645. part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0226 [COVID–19]), dated December 14, 2020.

Susquehanna Steam Electric Station, Units 1 and 2 Docket Nos. 50–387 and 50–388

Susquehanna Steam Electric Station—Request for One-Time Exemption From 10 CFR part 73, appendix B, sec- ML20329A335. tion VI, subsection C.3.(1)(1) Regarding Annual Force-On-Force Exercises due to COVID–19 Pandemic, dated November 24, 2020. Susquehanna Steam Electric Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Require- ML20344A458. ment of 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE–0222), dated December 17, 2020.

Virgil C. Summer Nuclear Station, Unit No. 1 Docket No. 50–395

Virgil C. Summer Nuclear Station, Unit No. 1—Request for a One-Time Exemption from 10 CFR part 73, appendix non-public, withheld pursu- B, section VI, subsection C.3.(I)(1) Regarding Annual Force-On-Force Exercises due to COVID–19 Pandemic, ant to 10 CFR 2.390. dated December 3, 2020. Virgil C. Summer Nuclear Station, Unit No. 1—Exemption from Annual Force On-Force Exercise Requirement of ML20342A003. 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1)I (EPID L–2020– LLE–0225 [COVID–19]), dated December 18, 2020.

Vogtle Electric Generating Plant, Units 1 and 2 Docket Nos. 50–424 and 50–425

Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding ML20311A662. Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 6, 2020. Vogtle Electric Generating Plant, Units 1 and 2—Exemption from Annual Force-On-Force Exercise Requirement of ML20329A392. 10 CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI C.3.(I)(1) (EPID L–2020– LLE–0216 [COVID–19]), dated December 4, 2020.

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00150 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES 5280 Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices

Document description ADAMS accession No.

Waterford Steam Electric Station, Unit 3 Docket No. 50–382

Waterford Steam Electric Station, Unit 3—Request for a One-Time Exemption from 10 CFR part 73, appendix B, ML20317A301. section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID–19 Pandemic, dated November 12, 2020. Waterford Steam Electric Station, Unit 3—Exemption from Annual Force-On-Force Exercise Requirement of 10 ML20338A274. CFR part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI.C.3.(I)(1) (EPID L–2020–LLE– 0186 [COVID–19]), dated December 16, 2020.

Watts Bar Nuclear Plant, Units 1 and 2 Docket Nos. 50–390 and 50–391

Watts Bar Nuclear Plant, Units 1 and 2—Request for Exemption Regarding Calendar Year 2020 Force-on-Force ML20309A695. Exercise, dated November 4, 2020. Watts Bar Nuclear Plant, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR ML20318A036. part 73, appendix B, ‘‘General Criteria for Security Personnel,’’ subsection VI C.3(l)(1) (EPID L–2020–LLE–0179 [COVID–19]), dated December 8, 2020.

Dated: January 13, 2021. information related to this document Commission, Washington, DC 20555– For the Nuclear Regulatory Commission. using any of the following methods: 0001. James G. Danna, • Federal Rulemaking Website: Go to SUPPLEMENTARY INFORMATION: Chief, Plant Licensing Branch I, Division of https://www.regulations.gov and search Operating Reactor Licensing, Office of for Docket ID NRC–2020–0273. Address I. Introduction Nuclear Reactor Regulation. questions about Docket IDs in The NRC is considering extending the [FR Doc. 2021–01091 Filed 1–15–21; 8:45 am] Regulations.gov to Jennifer Borges; completion dates specified in BILLING CODE 7590–01–P telephone: 301–287–9127; email: Construction Permit Nos. CPPR–122 and [email protected]. For technical CPPR–123, issued to TVA for BLN, questions, contact the individuals listed Units 1 and 2. The Bellefonte site is NUCLEAR REGULATORY in the FOR FURTHER INFORMATION located on the west shore of the COMMISSION CONTACT section of this document. Guntersville Reservoir at Tennessee RM [Docket Nos. 50–438 and 50–439; NRC– • NRC’s Agencywide Documents 392, near Hollywood, Alabama, in 2020–0273] Access and Management System Jackson County, about 6 miles east- (ADAMS): You may obtain publicly northeast of Scottsboro, Alabama. Authority Bellefonte, available documents online in the As required by section 51.21 of the Units 1 and 2 Environmental ADAMS Public Documents collection at Code of Federal Regulations (10 CFR), Assessment and Finding of No https://www.nrc.gov/reading-rm/ ‘‘Criteria for and identification of Significant Impact adams.html. To begin the search, select licensing and regulatory actions ‘‘Begin Web-based ADAMS Search.’’ For requiring environmental assessments,’’ AGENCY: Nuclear Regulatory the NRC has conducted an Commission. problems with ADAMS, please contact the NRC’s Public Document Room (PDR) environmental review and prepared an ACTION: Environmental assessment and reference staff at 1–800–397–4209 or EA that evaluates the environmental finding of no significant impact; 301–415–4737, or by email to effects of extending the construction issuance. [email protected]. For the permit completion dates (proposed action). Based on the results of the SUMMARY: The U.S. Nuclear Regulatory convenience of the reader, the ADAMS environmental review conducted for Commission (NRC) is considering accession numbers are provided in a this EA, and in accordance with 10 CFR extending the completion dates for table in the ‘‘Availability of Documents’’ 51.31(a), the NRC has determined not to Construction Permit Nos. CPPR–122 and section of this document. prepare an environmental impact CPPR–123, issued to the Tennessee • Attention: The PDR, where you may statement and is issuing a FONSI. Valley Authority (TVA) for Bellefonte examine and order copies of public Nuclear Plant, Units 1 and 2 (BLN), documents, is currently closed. You Facility Site and Environs located on the west shore of the may submit your request to the PDR via The unfinished two-unit pressurized- Guntersville Reservoir at Tennessee email at [email protected] or call 1– water reactor nuclear power plant is River Mile (RM) 392 in Jackson County, 800–397–4209 or 301–415–4737, situated on a peninsula between Town Alabama. The NRC prepared this between 8:00 a.m. and 4:00 p.m. (EST), Creek and the at RM environmental assessment (EA) Monday through Friday, except Federal 392 on the west shore of Guntersville documenting the environmental review holidays. Reservoir in Jackson County near and finding of no significant impact FOR FURTHER INFORMATION CONTACT: Hollywood, Alabama. Most of the 1,600- (FONSI) for this proposed action. Omid Tabatabai, Office of Nuclear acre Bellefonte site has been impacted DATES: The EA and FONSI are available Reactor Regulation, telephone: 301– by the construction of BLN Unit 1 and January 13, 2021. 415–6616; email: Omid.Tabatabai@ 2. ADDRESSES: Please refer to Docket ID nrc.gov, and Jeffrey Rikhoff, Office of The affected environment at the NRC–2020–0273 when contacting the Nuclear Materials Safety and Bellefonte site is described in the June NRC about the availability of Safeguards, telephone: 301–415–1090, 1974 final environmental statement information regarding this document. email: [email protected]. Both are (FES) for the construction of BLN Units You may obtain publicly available staff of the U.S. Nuclear Regulatory 1 and 2 (FES–CP) prepared by the U.S.

VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00151 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES