Federal Register/Vol. 86, No. 11/Tuesday, January 19, 2021

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register/Vol. 86, No. 11/Tuesday, January 19, 2021 Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices 5269 issue finality of any approval issued information related to this document and 2); for Vistra Operations Company under 10 CFR part 52. As explained in using any of the following methods: LLC (for Comanche Peak Nuclear Power DG–1303, applicants and licensees • Federal Rulemaking website: Go to Plant, Unit Nos. 1 and 2); for Arizona would not be required to comply with https://www.regulations.gov and search Public Service Company (for Palo Verde the positions set forth in DG–1303. for Docket ID NRC–2020–0110. Address Nuclear Generating Station, Units 1, 2, Dated: January 12, 2021. questions about NRC Docket IDs in and 3); for PSEG Nuclear LLC (for Hope For the Nuclear Regulatory Commission. Regulations.gov to Jennifer Borges; Creek Generating Station and Salem telephone: 301–287–9127; email: Nuclear Generating Station, Unit Nos. 1 Meraj Rahimi, [email protected]. For technical and 2); and for Indiana Michigan Power Chief, Regulatory Guidance and Generic questions, contact the individual listed Company (for Donald C. Cook Nuclear Issues Branch, Division of Engineering, Office FOR FURTHER INFORMATION of Nuclear Regulatory Research. in the Plant, Unit Nos. 1 and 2), afford these CONTACT section of this document. licensees temporary relief from the [FR Doc. 2021–00940 Filed 1–15–21; 8:45 am] • NRC’s Agencywide Documents work-hour controls under 10 CFR BILLING CODE 7590–01–P Access and Management System 26.205(d)(1) through (d)(7). The (ADAMS): You may obtain publicly exemptions from 10 CFR 26.205(d)(1) NUCLEAR REGULATORY available documents online in the through (d)(7) ensure that the control of COMMISSION ADAMS Public Documents collection at work hours and management of worker https://www.nrc.gov/reading-rm/ fatigue do not unduly limit licensee [Docket Nos. 50–334, 50–412, 50–456, 50– adams.html. To begin the search, select flexibility in using personnel resources 457, 50–259, 50–260, 50–296, 50–325, 50– ‘‘Begin Web-based ADAMS Search.’’ For to most effectively manage the impacts 324, 50–454, 50–455, 50–317, 50–318, 50– problems with ADAMS, please contact of the COVID–19 PHE on maintaining 413, 50–414, 50–461, 50–397, 50–445, 50– the NRC’s Public Document Room (PDR) the safe operation of these facilities. 446, 50–298, 50–346, 50–275, 50–323, 50– reference staff at 1–800–397–4209, 301– Specifically, these licensees have stated 315, 50–316, 50–237, 50–249, 50–321, 50– 415–4737, or by email to pdr.resource@ that their staffing levels are affected or 366, 50–341, 50–354, 50–272, 50–311, 50– nrc.gov. are expected to be affected by the 003, 50–247, 50–286, 50–333, 50–348, 50– • Attention: The PDR, where you may COVID–19 PHE, and they can no longer 364, 50–261, 50–373, 50–374, 50–352, 50– 353, 50–369, 50–370, 50–245, 50–336, 50– examine and order copies of public meet or likely will not meet the work- 423, 50–263, 50–220, 50–410, 50–338, 50– documents, is currently closed. You hour controls of 10 CFR 26.205(d)(1) 339, 50–269, 50–270, 50–287, 50–243, 50– may submit your request to the PDR via through (d)(7). These licensees have 255, 50–528, 50–529, 50–530, 50–277, 50– email at [email protected] or call 1– committed to effecting site-specific 278, 50–440, 50–266, 50–301, 50–282, 50– 800–397–4209 or 301–415–4737, administrative controls for COVID–19 306, 50–254, 50–265, 50–244, 50–458, 50– between 8:00 a.m. and 4:00 p.m. (EST), PHE fatigue management for personnel 335, 50–389, 50–443, 50–400, 50–498, 50– Monday through Friday, except Federal specified in 10 CFR 26.4(a). 499, 50–280, 50–281, 50–387, 50–388, 50– holidays. The exemptions from certain 395, 50–424, 50–425, 50–382, 50–390, 50– For the convenience of the reader, 391; NRC–2020–0110] requirements of 10 CFR part 50, instructions about obtaining materials appendix E, ‘‘Emergency Planning and Issuance of Multiple Exemptions in referenced in this document are Preparedness for Production and Response to COVID–19 Public Health provided in the ‘‘Availability of Utilization Facilities,’’ section IV.F., Emergency Documents’’ section. ‘‘Training,’’ for Energy Northwest (for FOR FURTHER INFORMATION CONTACT: Columbia Generating Station); for DTE AGENCY: Nuclear Regulatory James Danna, Office of Nuclear Reactor Electric Company (for Fermi-2); for Commission. Regulation, U.S. Nuclear Regulatory PSEG Nuclear LLC (for Hope Creek ACTION: Exemptions; issuance. Commission, Washington DC 20555– Generating Station and Salem Nuclear 0001; telephone: 301–415–7422, email: Generating Station, Unit Nos. 1 and 2); SUMMARY: The U.S. Nuclear Regulatory [email protected]. for Entergy Nuclear Operations, Inc. (for Commission (NRC) issued 68 SUPPLEMENTARY INFORMATION: Indian Point Nuclear Generating exemptions in response to requests from Station, Unit Nos. 1, 2, and 3; and 26 licensees. The exemptions afford I. Introduction Palisades Nuclear Plant); for Virginia these licensees temporary or permanent During the period from December 1, Electric and Power Company (for North relief from certain requirements under 2020, to December 28, 2020, the NRC Anna Power Station, Unit Nos. 1 and 2); NRC regulations. The exemptions are in granted 68 exemptions in response to for Exelon Generation Company, LLC response to the licensees’ requests for requests submitted by licensees from (for LaSalle County Station, Units 1 and relief due to the coronavirus disease September 30, 2020, to December 23, 2); for Oregon State University (for the 2019 (COVID–19) public health 2020. These exemptions allow the Oregon State TRIGA Reactor); for emergency (PHE). The NRC is issuing a licensees to deviate from certain Entergy Operations, Inc. (for River Bend single notice to announce the issuance requirements (as cited in this notice) of Station, Unit 1); for NextEra Energy of the exemptions. various parts of chapter I of title 10 of Seabrook, LLC (for Seabrook Station, DATES: During the period from the Code of Federal Regulations (10 Unit No. 1), grant temporary exemptions December 1, 2020, to December 28, CFR). from the biennial emergency 2020, the NRC granted 68 exemptions in The exemptions from certain preparedness exercise requirement. The response to requests submitted by requirements of 10 CFR part 26, exemptions allow a temporary licensees from September 30, 2020, to ‘‘Fitness for Duty Programs,’’ for Exelon exemption from the requirements of 10 December 23, 2020. Generation Company, LLC (for CFR part 50, appendix E, regarding the ADDRESSES: Please refer to Docket ID Braidwood Station, Units 1 and 2; Byron conduct of the biennial emergency NRC–2020–0110 when contacting the Station, Unit Nos. 1 and 2; Clinton preparedness exercise. These NRC about the availability of Power Station, Unit No. 1; LaSalle exemptions will not adversely affect the information regarding this document. County Station, Units 1 and 2; and Quad emergency response capability of the You may obtain publicly available Cities Nuclear Power Station, Units 1 facilities because affected licensee VerDate Sep<11>2014 19:19 Jan 17, 2021 Jkt 253001 PO 00000 Frm 00140 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1 khammond on DSKJM1Z7X2PROD with NOTICES 5270 Federal Register / Vol. 86, No. 11 / Tuesday, January 19, 2021 / Notices personnel are currently qualified, and Station, Unit Nos. 1 and 2; and Oconee 3), will help to ensure that these the licensees’ proposed compensatory Nuclear Station, Units 1, 2, and 3); for regulatory requirements do not unduly measures will enable their staff to Energy Northwest (for Columbia limit licensee flexibility in using maintain their knowledge, skills, and Generating Station); for Vistra personnel resources in a manner that abilities without the conduct of the Operations Company LLC (for most effectively manages the impacts of biennial emergency preparedness Comanche Peak Nuclear Power Plant, the COVID–19 PHE on maintaining the exercise during the exemption term. Unit Nos. 1 and 2); for Pacific Gas and safe and secure operation of these The exemptions from certain Electric Company (for Diablo Canyon facilities and the implementation of the requirements of 10 CFR part 73, Nuclear Power Plant, Units 1 and 2); for licensees’ NRC approved security plans, appendix B, ‘‘General Criteria for Indiana Michigan Power Company (for protective strategy, and implementing Security Personnel,’’ section VI, Donald C. Cook Nuclear Plant, Unit Nos. procedures. These licensees have ‘‘Nuclear Power Reactor Training and 1 and 2); for Southern Nuclear committed to certain security measures Qualification Plan for Personnel Operating Co., Inc. (for Edwin I. Hatch to ensure response readiness and for Performing Security Program Duties,’’ Nuclear Plant, Unit Nos. 1 and 2; Joseph their security personnel to maintain for Energy Harbor Nuclear Corp. (for M. Farley Nuclear Plant, Units 1 and 2; performance capability. Beaver Valley Power Station, Units 1 and Vogtle Electric Generating Plant, The NRC is providing compiled tables and 2; Davis-Besse Nuclear Power Units 1 and 2); for DTE Electric of exemptions using a single Federal Station, Unit No. 1; and Perry Nuclear Company (for Fermi-2); for Entergy Register notice for COVID–19 related Power Plant, Unit No. 1); for Exelon Nuclear Operations, Inc. (for Indian exemptions instead of issuing Generation Company, LLC (for Point Nuclear Generating Unit Nos. 2 Braidwood Station, Units 1 and 2; Byron and 3; and Palisades Nuclear Plant); for individual Federal Register notices for Station, Unit Nos. 1 and 2; Calvert Cliffs Dominion Energy Nuclear Connecticut, each exemption. The compiled tables in Nuclear Power Plant, Units 1 and 2; Inc.
Recommended publications
  • Watts Bar Nuclear Plant (Wbn) - Unit 1 - Technical Specification (Ts) Change Ts-03-16, "Revision of Ultimate Heat Sink (Uhs) Temperature"
    Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 William R. Lagergren, Jr. Site Vice President, Watts Bar Nuclear Plant APR 0 7 2004 TVA-WBN-TS-03-16 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen: In the Matter of ) Docket No. 50-390 Tennessee Valley Authority ) WATTS BAR NUCLEAR PLANT (WBN) - UNIT 1 - TECHNICAL SPECIFICATION (TS) CHANGE TS-03-16, "REVISION OF ULTIMATE HEAT SINK (UHS) TEMPERATURE" Pursuant to 10 CFR 50.90, TVA is submitting a request for an amendment to WBN's License NPF-90 to change the Technical Specifications for Unit 1. The proposed TS change (TS 03-16) will revise the limiting condition for operation for TS Section 3.7.9, "Ultimate Heat Sink." The maximum essential raw cooling water (ERCW) temperature limit associated with Surveillance Requirement (SR) 3.7.9.1 will be annotated with a note allowing an occasional increase from 85 degrees Fahrenheit (0F) to 880F. This proposed change is based on recent evaluations of the ERCW system and the UHS functions and maximum temperatures that will satisfy the associated safety functions. In addition, an administrative change is proposed to clarify the maximum allowable internal containment pressure. Corresponding TS Bases changes are also included for the temperature increase for UHS and the containment pressure clarification including a minor change in the maximum calculated containment pressure resulting from the increased UHS temperature. 1--~56 Pa0ted.]n ,Ededpa U.S. Nuclear Regulatory Commission Page 2 APR 0 7 2004 TVA discussed its plans for this proposal in a meeting with NRC staff in August 2003.
    [Show full text]
  • Catawba Nuclear Station, Units 1 & 2, Revision 19 to Updated Final Safety Analysis Report, Chapter 1, Introduction &
    Catawba Nuclear Station UFSAR Chapter 1 Table of Contents 1.0 Introduction & General Description of Station 1.1 Introduction 1.2 General Station Description 1.2.1 Site Characteristics 1.2.2 Station Description 1.2.2.1 Principal Design Criteria 1.2.2.2 General Arrangement 1.2.2.3 Nuclear Steam Supply System 1.2.2.4 Engineered Safety Features 1.2.2.5 Unit Control 1.2.2.6 Electrical Systems 1.2.2.7 Instrumentation and Control 1.2.2.8 Steam and Power Conversion System 1.2.2.9 Fuel Handling and Storage 1.2.2.10 Cooling Waters 1.2.2.11 Fire Protection 1.2.2.12 Radioactive Waste Management 1.2.2.13 Shared Facilities and Equipment 1.2.2.14 Standby Shutdown Facility (SSF) 1.3 Comparison Tables 1.3.1 Comparisons with Similar Facility Designs 1.3.2 Comparison of Final and Preliminary Information 1.4 Identification of Agents and Contractors 1.5 Material Incorporated by Reference 1.5.1 Westinghouse Topical Reports 1.5.2 Duke Reports 1.5.3 B&W Reports 1.5.4 EPRI Reports 1.5.5 Other Reports 1.6 Drawings and Other Detailed Information 1.6.1 Electrical Instrumentation and Control Drawings 1.6.2 Piping and Instrumentation Diagrams 1.7 Regulatory Guides 1.7.1.1 Regulatory Guides 1.7.2 References 1.8 Response to TMI Concerns 1.8.1 Response to TMI Concerns 1.8.1.1 Shift Technical Advisor (I.A.1.1) 1.8.1.2 Shift Supervisor Administrative Duties (I.A.1.2) 1.8.1.3 Shift Manning (I.A.1.3) 1.8.1.4 Immediate Upgrading of Operator and Senior Operator Training and Qualification (I.A.2.1) 1.8.1.5 Administration of Training Programs for Licensed Operators (I.A.2.3)
    [Show full text]
  • Environmental Radiation Sample Plan
    2018 PLAN FOR ENVIRONMENTAL RADIATION SURVEILLANCE IN NORTH CAROLINA DEPARTMENT OF Health and Human Services Division of Health and Service Regulation, Radiation Protection Section 5505 Creedmor road Raleigh, North Carolina 27612 Telephone: (919) 814-2250 TABLE OF CONTENTS Page No. INTRODUCTION Purpose of Plan. 1 Present Objectives of Program . 1-2 2018-PLAN FOR ENVIRONMENTAL RADIATION SURVEILLANCE Summary. 3-4 Statewide Surveillance. 5-7 Nuclear Facility Surveillance. 8-10 Site and Sample Maps. 11 Introduction The 2018 Environmental Radiation Surveillance Program will continue monitoring the radioactivity levels in the North Carolina environment. The purpose of this plan and the program’s objectives are included in this brief introduction. Purpose of Plan The purpose of this plan is to present the environmental radiological sampling program in North Carolina. This plan will assist the program’s sample collection staff in scheduling their sampling frequencies and time of sampling. Program staff document information concerning procedures used in the field and the State Laboratory of Public Health, such as field sampling, sampling preparation, counting equipment operation and data analyses. This information is available by contacting the environmental group in the Radioactive Materials Branch (RAM) of the Radiation Protection Section (RPS) in the Division of Health and Service Regulation. For more information about the section, please visit the RPS Web site at www.ncradiation.net. Present Objectives The program’s basic objectives is to monitor for potential releases of radioactivity from the three nuclear power plants operating in North Carolina, which have a combined total of five reactors, and one operating nuclear plant in South Carolina.
    [Show full text]
  • Vermont Motion to Intervene Request on VY License Transfer
    UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) ENTERGY NUCLEAR VERMONT ) YANKEE, LLC AND ENTERGY ) Docket No. 50-271-LT-2 NUCLEAR OPERATIONS, INC.; ) CONSIDERATION OF APPROVAL ) June 13, 2017 OF TRANSFER OF LICENSE AND ) CONFORMING AMENDMENT ) ) (Vermont Yankee Nuclear Power Station) ) STATE OF VERMONT’S PETITION FOR LEAVE TO INTERVENE AND HEARING REQUEST Stephanie Hoffman Kyle H. Landis-Marinello Special Counsel Assistant Attorney General Vermont Department of Public Service Vermont Attorney General’s Office 112 State Street – Drawer 20 Environmental Protection Division Montpelier, VT 05620 109 State Street (802) 828-5543 Montpelier, VT 05609 [email protected] (802) 828-1361 [email protected] Counsel for the State of Vermont TABLE OF CONTENTS INTRODUCTION .......................................................................................................................... 1 STANDING .................................................................................................................................... 4 THE STATE PRESENTS TWO CONTENTIONS THAT MEET ALL OF THE REQUIREMENTS OF 10 C.F.R. § 2.309(f) AND ARE ADMISSIBLE ...................................... 4 CONTENTION I ............................................................................................................................ 7 THE LICENSE TRANSFER AND AMENDMENT REQUEST INVOLVES A POTENTIAL SIGNIFICANT SAFETY AND ENVIRONMENTAL HAZARD; DOES NOT PROVIDE SUFFICIENT
    [Show full text]
  • Sequoyah Nuclear Plant
    i Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402-2801 JUL 2 72004 10 CFR 50.54(f) U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentlemen: In the Matter of ) Docket No. 50-327 Tennessee Valley Authority ) 50-328 50-390 SEQUOYAH NUCLEAR PLANT (SQN) UNITS 1 AND 2 AND WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 - SIXTY-DAY RESPONSE TO NRC BULLETIN 2004-01, "INSPECTION OF ALLOY 82/182/600 MATERIALS USED IN THE FABRICATION OF PRESSURIZER PENETRATIONS AND STEAM SPACE PIPING CONNECTIONS AT PRESSURIZED-WATER REACTORS," DATED MAY 28, 2004 The purpose of this letter is to submit TVA's 60-day response to the subject bulletin for SQN and WBN, with the exception of that portion of the response identified by TVA in it.s extension request dated June 14, 2004. Specifically, as stated in the June 14 letter, TVA committed to sending a response within 60 days addressing Items (1)(a) through (1)(d) for SQN and WBN. TVA's response to Item (1)(a) would include the available information (e.g., Alloy 600/82/182 locations, joint configuration and design, etc.,) retrieved from plant records. The balance of the requested information would be obtained from the original equipment manufacturer (Westinghouse Electric Company [Westinghouse]). Westinghouse has projected that a comprehensive report would be provided to TVA by November 24, 2004. Accordingly, as committed to in the June 14 letter, TVA will submit a supplemental response within two weeks following receipt and subsequent confirmation of the information received from Westinghouse.
    [Show full text]
  • Management Handbook 2020
    MANAGEMENT HANDBOOK 2020 Energy Northwest may revise or discontinue policies, procedures, or benefits described in this handbook, and/or institute new policies, procedures, or benefits. This handbook nor any other Energy Northwest policies, procedures, or practices (whether verbal or written) or the acceptance or continuance of employment are to be construed as a contract of employment, a promise of continued employment, or as creating an implied or contractual duty between an employee and Energy Northwest. All employment may be terminated "at will” by Energy Northwest or the employee for lawful reasons. Management Handbook 2020 Introduction Congratulations and welcome to Energy Northwest’s leadership team! You are part of a group of highly skilled professionals focused each day on the relentless pursuit of excellence through continuous improvement. This ensures we provide our public power members and regional ratepayers with safe, reliable, cost-effective, responsible power generation and energy solutions. I want to personally thank you for stepping up to the challenge of leadership on our management team. It’s a very important position to our agency, and to the people you lead. This handbook gives you the guidelines and resources to manage and direct your staff to help them accomplish individual and agency goals. It contains much of the information you will need to be successful in your leadership role here at Energy Northwest; it describes the many important programs, processes and resources available to you. The handbook also lists key expectations for supervisors and managers. I encourage you to use this handbook often as you get started in management, and keep it as a reference throughout your career with the agency.
    [Show full text]
  • Final Environmental Assessment for the Energy Northwest WNP-1/4 Lease Renewal January 2017 I
    DOE/EA-2044 Assessment Energy Northwest WNP-1/4 Lease Renewal, Hanford Site, Washington January 2017 U.S. Department of Energy Richland Operations Office Richland, WA 99352 Approved for Public Release; Further Dissemination Unlimited U.S. Department of Energy DOE/EA-2044 Terms Used in this Document Area of Potential Effect (APE) – the geographic area within which an undertaking may cause changes in the character or use of historic properties, if such properties exist. The APE is influenced by the scale and nature of the undertaking. Best Management Practices (BMPs) – Standard activities, operating procedures, and practices that are used to prevent or reduce potential environmental impacts from project activities. Cultural Resources - A general term used to refer to a wide range of resources, including historic structures, archaeological sites, places of traditional, religious and cultural significance, sacred sites, Native American human remains, and associated objects that are entitled to special consideration under federal statute, regulations, and executive orders. Energy Northwest (EN) – the municipal corporation and joint operating agency that owns both the Industrial Development Complex (IDC) and the Columbia Generating Station (CGS) Federal Threatened or Endangered Species - Plant or animal species that are at risk of becoming endangered in the near future throughout all or a significant part of their range. Threatened or endangered status is formally designated by a listing process under the Endangered Species Act (16 USC 1531 et seq.). Industrial Development Complex (IDC) – the collective name applied to the area occupied by Washington Nuclear Projects Number 1 and Number 4 (WNP-1/4) that reflects the current industrial nature of the site.
    [Show full text]
  • Carolinas Energy Planning for the Future Summary Report
    CAROLINAS ENERGY Planning for the Future In December 2014, the South Carolina Energy Office, in collaboration with the North Carolina State Energy Program, Advanced Energy, and UNC Charlotte’s Energy Production and Infrastructure Center (EPIC), received a State Energy Program Competitive Award from the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy to develop a bi- state coordinated vision for energy planning that can help meet state policy goals, support electric reliability, and comply with environmental standards. As part of the two-year project, EPIC led the creation of a working document that examines North Carolina’s and South Carolina’s energy capacities, infrastructure, regulations, emerging technologies, and energy projections. To summarize the main findings from the working document, this condensed version has been written. This summary document is divided into three sections: Baseline, Projections, and Challenges and Opportunities. The Baseline section describes the region and its demographics, energy consumption, and utility landscape. The Projections section summarizes energy resource trends and forecasts from utility providers. The Challenges and Opportunities section covers the energy challenges facing both states along with opportunities for the future. Overall, this document aims to develop bi-state communication around commonalities in energy production and consumption in the Carolinas. The information presented here is only current as of the dates mentioned throughout the report. For the most current information, please visit the websites listed in the resources section. *Photography Credit: Duke Energy Project funded in part by U.S. Department of Energy, Award Number DE-EE0003884-CFDA #81.041 BASELINE Regional Population Energy Consumption BASELINE 3 Population is growing in the Carolinas.
    [Show full text]
  • TVA's Bad Nuclear
    TVA’s Bad Nuclear Bet: Gambling BILLIONS on Bellefonte Reactors Prepared by the Southern Alliance for Clean Energy August 2011 Executive Summary “The circumstances for Bellefonte Units 1 and 2 are unique; no other licensee has ever given up its construction permits, partially dismantled the plant and allowed the facility to degrade, then requested that the permits be reissued.” -Joseph F. Williams, NRC Senior Project Manager1 The history of the Tennessee Valley Authority’s (TVA) Bellefonte site in Jackson County, Alabama spans nearly 40 years. A total of four reactors have been proposed, and billions of dollars have been spent, but not a single kilowatt of electricity has ever been produced. After allowing the site to sit idle for more than 20 years and scrapping the facility for spare parts, TVA is now proposing to restart construction of the Bellefonte Unit 1 reactor, which may be one of the greatest gambles in the agency’s history. Southern Alliance for Clean Energy has serious concerns about TVA’s push to complete the mothballed, abandoned Bellefonte reactors. Bellefonte’s unique and complicated history is compounded by that fact that, in order to complete construction of the reactors, TVA faces unique and complicated problems—many worse than any other reactor project has previously faced. This report documents some of our concerns and makes it clear that finishing Bellefonte is not a gamble worth taking. Our concerns include Bellefonte's long, complicated history; multiple safety concerns that have not been addressed; the troubled history of the Babcock &Wilcox “Mark-C 205” design; the unnecessary and costly nature of Bellefonte; and additional obstacles.
    [Show full text]
  • Exelon Nuclear Fact Sheet Exelon Nuclear, a Division of Exelon Generation, Is Headquartered in Kennett Square, Pa
    Exelon Nuclear Fact Sheet Exelon Nuclear, a division of Exelon Generation, is headquartered in Kennett Square, Pa. and operates the largest U.S. fleet of carbon-free nuclear plants with more than 17,800 megawatts of capacity from 21 reactors at 12 facilities in Illinois, Maryland, New York and Pennsylvania. Dave Rhoades is President and Chief Nuclear Officer, Exelon Nuclear. There are more than 10,000 nuclear professionals working in Exelon Generation’s nuclear division. These professionals implement industry best practices to ensure safe, reliable operation throughout Exelon’s nuclear fleet. Exelon believes that clean, affordable energy is the key to a brighter, more sustainable future. Exelon’s nuclear power plants account for approximately 60 percent of Exelon’s power generation portfolio. Nuclear power plants are critical to the stability of the U.S. electrical grid because they can produce an uninterrupted flow of electricity for extended periods. This uninterrupted flow supplies the necessary level of baseload electricity for the grid to operate around-the-clock. Exelon’s nuclear stations Braidwood Generating Station Braceville, Illinois Byron Generating Station Byron, Illinois Calvert Cliffs Nuclear Power Plant Lusby, Maryland Clinton Power Station Clinton, Illinois Dresden Generating Station Morris, Illinois FitzPatrick Nuclear Power Plant Scriba, New York Ginna Nuclear Power Plant Ontario, New York LaSalle County Generating Station Marseilles, Illinois Limerick Generating Station Pottstown, Pennsylvania Nine Mile Point Nuclear Station Scriba, New York Peach Bottom Atomic Power Station Delta, Pennsylvania Quad Cities Generating Station Cordova, Illinois Updated: January 2021 .
    [Show full text]
  • Nuclear Power Summary – Licensing Actions August 2020
    NUCLEAR POWER SUMMARY – LICENSING ACTIONS AUGUST 2020 Congressional Legislative Action: o August 2020: • The American Nuclear Infrastructure Act of 2020, which was heard by the Senate’s Committee on Environment and Public Works on August 5, 2020, will enable U.S. international leadership, preserve America’s uranium supply chain, reduce carbon emissions, and strengthen our economic, energy, and national security. • The Nuclear Energy Leadership Act (NELA), included in the National Defense Authorization Act (NDAA) for fiscal year 2021, was passed by the Senate on July 23, 2020. NELA will help facilitate the path to market for advanced reactors by allowing the federal government to be an early adopter of commercialized technologies; providing for needed scientific research facilities; demonstrating advanced reactor concepts; breaking down fuel availability barriers when the market cannot; and training the next generation of nuclear scientists. • The Nuclear Energy for the Future Act (HR 6796), which was introduced to the House on May 8, 2020, builds on the Nuclear Energy Innovation Capabilities Act (NEICA) to provide full authorization for the Versatile Test Reactor. • The Nuclear Energy Research and Development Act (HR 6097) was passed by the House Science, Space, and Technology Subcommittee on Energy on March 12, 2020 and forwarded to the full Committee. This act would authorize many programs within the Office of Nuclear Energy, including further research and development on the existing fleet of reactors, advanced reactors, hybrid energy systems, and advanced fuels. • The Integrated Energy Systems Act of 2019 (S 2702), which was heard by the Senate Committee on Energy and Natural Resources on December 17, 2019, would direct the Department of Energy to establish an integrated energy systems research, development, and demonstration program.
    [Show full text]
  • Savannah River Site, 700/A Area, Site Administration, Safety, Security, And
    SAVANNAH RIVER SITE COLD WAR HISTORIC PROPERTY DOCUMENTATION 700/A AREA SITE ADMINISTRATION, SAFETY, SECURITY, AND SUPPORT Aiken County, South Carolina NEW SOUTH ASSOCIATES 6150 East Ponce de Leon Avenue Stone Mountain, Georgia 30083 SAVANNAH RIVER SITE COLD WAR HISTORIC PROPERTY DOCUMENTATION NARRATIVE AND PHOTOGRAPHY 700/A AREA – SITE ADMINISTRATION, SAFETY, SECURITY, AND SUPPORT Aiken County, South Carolina Report submitted to: Washington Savannah River Company • Aiken, SC Report prepared by: New South Associates • 6150 East Ponce de Leon Avenue • Stone Mountain, Georgia 30083 Terri Gillett Mary Beth Reed Mark T. Swanson Steven Gaither May 25, 2007 • Final Report New South Associates Technical Report 1433 ii ABSTRACT ABSTRACT This documentation was prepared in accordance with a Memorandum of Agreement (MOA) signed by the Department of Energy–Savannah River (DOE-SR) and the South Carolina Historic Preservation Office (SHPO) dated February 17, 2004, as well as the Consolidated MOA of August 2004. The MOA stipulated that a thematic study and photographic documentation be undertaken on A Area historic properties 703-A and 708-A. In addition, a Cultural Resource Management Plan was accepted and signed by DOE-SR and the SHPO on December 9, 2004 calling for documentation of the remainder of the A Area buildings that were deemed eligible for listing in the National Register of Historic Places (NRHP) as contributing resources to a Savannah River Site (SRS) Cold War Historic District. The impetus for the study was the imminent decommissioning and/or dismantling of the majority of NRHP eligible buildings in A Area. The resulting narrative is based on field analysis, oral history, primary documentation and research.
    [Show full text]