CR_413 Attachment 2

Great Neighbourhoods Capital Program - Project Update

Building Great Neighbourhoods Program (coordinated with Transportation's Neighbourhood Renewal Program, Drainage Neighbourhood Renewal Program and Great Neighbourhoods Capital Program) Neighbourhood Project Description Status Argyll Neighbourhood sign, benches and trees Finalizing design. 2014 outside of the Argyll District Park site; construction. sidewalk connection to the community league building. Belvedere Coordinated with renewal of Fort Road, pole Completed. type upgrade from 131 to 137 Avenue. Canora Walkway upgrades to meet shared use path 2014 construction. standards along 149 Street from 107 to 102 Avenue; street furniture along the pathway and in St. Anne Park. Clareview Campus Walkway to connect Clareview Community Completed. Recreation Centre and amenities to the LRT station. Cromdale Improvement of trail that connects the top of Design and construction bank with the main river valley trail. 2014/2015. Delton Trees along 123 Avenue from 90 to 97 Street. 2014 construction.

Downtown Street renovation along Capital Boulevard 2014 construction. (108 Avenue from 99 to 104 Avenue). Forest Heights Replace existing sidewalk connection through Design and construction Mary Findlay Park. 2014/2015. Fulton Place Pathway and pedestrian level lighting through Completed. Harry Hardin Park at 57 Street between 101 and 102 Avenue to establish a connection to the local business/commercial area.

Glenora Concrete path connection through Samuel Design and construction Dickson Rotary Park located at 131 Street 2014/2015. and . Gold Bar Sewer line relocation in Gold Bar Park to Completed. accommodate park site development. Hazeldean Pathway connection to the ravine. Walkway 2014 construction. and park furniture along the greenway to the ravine from 99 to 93 Street.

Laurier Heights Improvement of trail from 81 Avenue to Design and construction Buena Vista Park. Creation of a connection to 2014/2015. a staircase that leads to the main river valley trail. CR_413 Attachment 2

Meadowlark Park Resurfacing of main access road to Completed. Meadowlark Community League building. New connections between existing sidewalks to improve access to Jubilee Park, playground and League building. Planting of trees along Mill Woods Road. Completed. Montrose Pathway extension of the 121 Avenue on- 2014 construction. street bike route from to just west of 69 Street, connecting the east-west route across to the northeast LRT trail running to Downtown.

North Glenora Connection to the neighbourhood from Groat Construction 2013/2014. Road. Signage at key community access points. Parkallen Improved connections for residents to the Completed. local business district by addition of a walkway between the south east corner of the neighbourhood to 109 Street, and improvements to alleyways backing onto 61 Avenue and 113 Street. Sherbrooke Sidewalk to connect residents to 127 Street Completed. and the controlled crossing. Improvements to the pocket park on 129 Street that include a shared use path and landscaping.

Strathcona Pedestrian level lighting upgrades along Completed. Whyte Avenue from 103 to 106 Street. Upgrades to decorative poles to keep pole type consistent along 76 Avenue, Gateway Boulevard, and University Avenue (The Iron Gate). Windsor Park Shared use asphalt path to provide cyclists Completed. and pedestrians a direct route through Windsor Park at 89 Avenue between 118 and 119 Street. In partnership with Sustainable Transportation/Active Transportation, addition of cycling facilities along 89 Avenue west of 119 Street to and the university. Woodcroft Sidewalk to connect residents to the Sidewalk construction completed. Woodcroft Community League building and Tree planting 2014. other amenities; boulevard and trees along Woodcroft Avenue.

NB: The Building Great Neighbourhoods team will continue to engage residents in Avonmore, Bonnie Doon, Queen Alexandra, Rosslyn, Westmount, and Westwood as construction in these neighbourhoods is planned between 2015 to 2017. CR_413 Attachment 2

Neighbourhood Revitalization Strategy Project Description Status Avenue Initiative Streetscape improvements along 118 Avenue 2014 final landscaping from 78 to (Parkdale/Cromdale, from 106A to 103 Street, and 97 Street to 82 Street and 103 to 106 Street. Avenue, Spruce Wayne Gretzky Drive. Proposed development Design planning for 82 Street to Avenue, Eastwood, Delton, Elmwood Park) of the ArtsCommon at the Old Cycle Building WGD pending discussions location to create a community hub. regarding Northlands. Design planning for ArtsCommon pending Council's approval of the business case. Jasper Place Streetscape improvements along Stony Plain 149 to 158 Street construction (includes Britannia- Road from 149 to 158 Street. Acquisition of (Stage 1), Spring 2013 through Youngstown, Canora, MacEwan West Campus located at Stony Fall 2014. 158 to 170 Street Glenwood, West Jasper Place) Plain Road and 156 Street to create a (Stage 2) following Stage 1 community hub. completion. Negotiations for acquisition of the Grant MacEwan West Campus building are in progress. McCauley Streetscape improvements along 106 Avenue Final concept plans will be (97 to 101 Street) and 107A Avenue (95 to 97 presented to City Council in Q2 Street), and some lighting changes in 2014. Preliminary design, Summer Chinatown along 97 Street (107A Avenue to 2014. Detailed design, Fall 2014. CN underpass) and Little Italy along 95 Street Tender and start of construction, (107A to 109A Avenue). Enhancements along Spring 2015. 96 Street (Church Street).

Central The project will be developed in accordance Preliminary urban design 2014. McDougall/Queen with the direction and parameters set by the Mary Park Central McDougall/Queen Mary Park Revitalization Strategy.

Business Development Neighbourhood Project Description Status Highlands Public realm improvements along 112 Detailed design and construction Avenue. 2014/2015 Strathcona Bollards, flag poles, bike racks, benches, Completed. trees and small paving stone areas along 99 Street from 82 Avenue to Saskatchewan Drive.