Minutes 20181212

Total Page:16

File Type:pdf, Size:1020Kb

Minutes 20181212 MeBUG Committee meeting Minutes Date/time: 13 December 2018, 7.30 pm Venue; Elaine Hopper’s home, 33 Amery Avenue Blackburn 1. Present David Simm (DS), Elaine Hopper (EH), David Blom (DB), Scott Green (SG), Michael Hassett (MH). 2. Approve Minutes of previous ordinary meeting, 19 April Approved 3. Outstanding Actions from above? Dealt with below 4. Treasurer’s report (e) Balance as at 10 December 2018, $1361.17. Full details in Attachment 1. (f) Michael requested approval to upgrade website to include email and other cloud document storage, additional cost $55 per year. Agreed (g) Further polite reminder next month to the few (currently six) members yet to renew. (EH) 5. Project Review (as on website) (a) Box Hill to Ringwood Shared Path I. Recent correspondence between DS and VicRoads - refer Attachment 2 II. Write to WCC (copied to new MPs for Box Hill and Ringwood) urging considerations of safer options than the proposal to route the path along the Laburnum St roadway shared with road traffic. {MH} III. Harvey Norman Lane: In light of refusal of WCC officers to assist with ownership details, go to Titles Office and request details be searched (on line facility has been tried unsuccessfully). (MH) IV. Continue approaches as regards McGlone St and Richards St. (DS) V. Chase up VicRoads regarding dogs on leash signs. (MH) (b) Healesville Freeway Reserve i. Write to Shaun Leans regarding next stage of community consultation (MH) ii. Reach out to HFR Friends and broach the idea of the bridge over the Dell (DS) (c) Heatherdale to Syndal Pipe Reserve i. Note work suspended by Melbourne Water because of fragile condition of pipes. ii. Write to WCC urging previously budgetted funds be applied to routing the path up to and around Forest Hill Secondary College (EH) (d) VicRoads Strategic Cycling Corridors i. Prepare a status update for general information and for website (DB) (e) Burwood Highway arterial cycling route i. Push fro ‘scope creep’ to provide cut throughs to service lanes. Note Shaun Leane and WCC support this. (DB) (f) Eastern Regional Trails Strategy i. Consultant work progressing. They have evidently ridden some of the trails. Note Maroondah Council is the coordinating council. Keep watching brief (DB) ii. Follow up specifically re Bushy Creek trail at Woodhouse Grove with WCC (DS) (g) Whitehorse Council Easy Rides project. i. No action, just monitor (All) (h) North East Link i. Watching brief. Leave to others on the Stakeholder group (i) Ringwood to Croydon Shared Path proposal i. Make representations to new MPs for Ringwood and Bayswater, after the general intro (item 6 below) has gone out. (DS) (j) Hawthorn to Box Hill SUP i. Recent coordination meeting with other BUGs held on 8th November. ii. General liaison on behalf of MeBUG (DB). iii. Petition drawn up but plans to promulgate it unknown. Follow up (EH) iv. Get details of property boundaries along Rail Line / Hopetoun Pde via planning maps on line (MH) 6. Contact with newly elected MPs Send introductory letter to newly elected MPs, Paul Hamer (Box Hill), Dustin Halse (Ringwood), Matt Fregon (Mount Waverley), Jackson Taylor (Bayswater), Sonja Terpstra (Eastern Metro) (MH) 7. V/Line trains bike issue (a) See if Laurie and Breta want to get involved (EH) (b) Write to MPs / Transport Minister proposing the French trains solution (DS) 8. Approaches to members/prospects (a) Approach Shaun Ruigrok to join MeBUG (MH) 9. Budget Direct promised donation Donation received. Budget Direct material to remain on website - no further action 10. Other items/business Nil 11. Next meeting Thursday 28th March 2019, venue tbd Attachment 1 Metro East Bicycle User Group Inc Financial Statement July 1 2018 to December 10 2018 Assets Bank account 1 July $1,196.59 2018 Member fees to 10 Dec $380.00 2018 Grant for T Shirts $825.00 Total Income $2,401.59 Expenses Clota Cottage Meeting $59.00 hire Payment for T Shirts $825.00 Hunting P/L Bank fees $2.40 Wordpress hosting $60.00 Croydon Trail print $94.02 materials Total Expenses $1,040.42 Cash in Bank 10 December 2018 $1,361.17 Attachment 2 From: Just Win Koay <[email protected]> Sent: Tuesday, 11 December 2018 10:09 AM To: David Simm <[email protected]> Cc: Sarah Smith <[email protected]>; Sharon Patterson <[email protected]>; Tim Wong <[email protected]> Subject: RE: Box Hill to Ringwood Shared Path Hi David, As requested, please find below the responses to your queries: Sagoe Lane to Middleborough Rd, • VicRoads has engaged Metro Trains Melbourne to project manage and delivery this section similar to Lindsey Street to Sagoe Lane. • Works are expected to commence in February and completed by April 2019. Middleborough Rd to Laburnum Street, Laburnum Street to Blackburn Station. • VicRoads is still having issues negotiating the design with Council. • Regardless, VicRoads has engaged a consultant to prepare the detailed design and re- engage the Council once the design is completed. The new street crossing of Springvale Rd, Nunawading, Alterations to the footpath in Walkers Rd, Nunawading. • VicRoads has engaged a contractor to deliver the works. • Works are expected to commence in February and completed by April 2019. The situation regarding connections to the completed sections of the path at the lane between Harvey Norman. • My understanding is that the path backs onto private property at this location. • Due to legal liability concerns, VicRoads is unable to assist further in this matter. and at Richards St and McGlone St, Mitcham. • This is the first time I’m made aware of access concerns at these locations, my apologies. • Please advise MeBug’s concerns at these locations and advise what can be done to address the concerns. • From a quick look on googlemaps, I have a few observations: ◦ It appears that the path backs onto Council local roads. ◦ There are no bicycle facilities on Richard Street, McGlone Street or the connecting service road adjacent Whitehorse Road. • Based on my brief observations, any works in these locations will require Council’s approval and may be outside the scope of works for the project. Also who is responsible for the provision of wayfaring signage. • Upon completion of the 10km path, VicRoads intends to review the route, develop the signage strategy and install the signs. Kind Regards Just Win Koay Senior Projects Engineer Metro South East VicRoads 12 Lakeside Drive BURWOOD EAST T 03 9881 8730 F 03 9887 7590 E [email protected] W vicroads.vic.gov.au.
Recommended publications
  • Submission Cover Sheets
    Submission Cover Sheet North East Link Project EES IAC 402 Request to be heard?: No, but please email me th Full Name: Phil Turner Organisation: Maroondah City Council Affected property: Attachment 1: Maroondah_Coun Attachment 2: Maroondah_Coun Attachment 3: Comments: To the North East Link Inquiry & Advisory Committee (IAC) Maroondah Council provides the following submission to the IAC, in relation to the EES for the North East Link project. While Council formally supports the objectives of the NEL project, I advise that the support of Maroondah Council has been conditional on appropriate traffic considerations being made with regard to the impact of the project on the Eastlink tunnels, the Ringwood Bypass and by extension the Ringwood Metropolitan Activity Centre. Council previously commissioned a review by O’Brien Traffic that considered the project in the context of the tunnels and impacts on Ringwood, and it was determined that without ancillary works to take traffic pressure off the Eastlink tunnels and the Ringwood Bypass, the project would potentially fail and have a major detrimental impact on the viability of the Ringwood Metropolitan Activity Centre. The O’Brien Traffic report attached to this submission details the basis for those concerns. Council’s concerns were previously forwarded to NELA and Council officers have met with NELA officers on these matters, however, to date Council has not received an appropriate response that addresses these concerns, including within the ESS. In support of this submission, the following documents have also been uploaded: o A submission letter signed by Council’s Mayor Rob Steane documenting the history of Council’s dealings regarding NEL, and outlining Council’s concerns current with the project; o Council Report September 2018; o O’Brien Traffic Review dated 12 September 2017; o Council letter to NELA (26 February 2018) and NELA response (14 March 2018); o Correspondence from Council on Bypass concerns (including technical reports); and o Minutes from MCC / NELA meetings 6 April 2018 and 30 April 2018.
    [Show full text]
  • Vicroads Annual Report 2016-2017
    VicRoads Annual 2016 Report –17 Connecting our communities vie roads TRAHSPORT FO~ORIA Published by: VicRoads 60 Denmark St, Kew Vic 3101 September 2017 Also published at vicroads.vic.gov.au © Copyright State of Victoria (VicRoads) 2017 You are free to re-use this work under a Creative Commons Attribution 4.0 licence, provided you credit the State of Victoria (VicRoads) as author, indicate if changes were made and comply with the other licence terms. The licence does not apply to any branding, including Government logos. Language: English International Standards Serial Number (ISSN): 1832-0732 VicRoads publication identification number 02926 Printed on Revive Laser 100% recycled paper Table of contents Chief Executive’s Message 1 Section 1: Year in review 3 Vision and values 3 Manner of establishment and relevant ministers 5 Nature and range of services provided 5 Departmental objectives, indicators and progress 7 Highlights and key achievements: performance against output performance measures 8 Operational and budgetary objectives and performance against those objectives 10 Key financial results 41 Section 2: Governance and organisational structure 49 Section 3: Workforce data 55 Employment and conduct principles 55 Comparative workforce data 56 Diversity and inclusion commitment 58 Section 4: Other disclosures 61 Local jobs first — Victorian Industry Participation Policy (VIPP) 61 Disclosure of government advertising expenditure 62 Consultancy expenditure 62 Disclosure of Information and Communication Technology expenditure 62 Disclosure
    [Show full text]
  • Whitehorse Open Space Strategy
    Whitehorse Open Space Strategy Part Two Precinct recommendations Prepared by THOMPSON BERRILL LANDSCAPE DESIGN PTY LTD in association with ENVIRONMENT & LAND MANAGEMENT PTY LTD ADOPTED BY COUNCIL NOVEMBER 19 2007 Table of contents PART ONE Background and overall strategy recommendations (refer to separate volume, pages 1 to 126) PART TWO Precinct Recommendations Page No. GLOSSARY 11 INTRODUCTION PART TWO 127 12. BLACKBURN 128 12.1 Overview 128 12.1.1 Suburb description 129 12.1.2 Heritage values of open space in Blackburn 129 12.1.3. Demographic summary for Blackburn 129 12.1.4 Open space summary for Blackburn 130 12.1.5 Summary of open space reserves and classification 131 12.2 Existing open space distribution 132 12.3 Community use of open space 133 12.4 Summary of anticipated future change in Blackburn 134 12.5 Open space quality and design 135 12.6 Blackburn precinct recommendations 136 12.7 Individual reserve recommendations for Blackburn 138 13 BLACKBURN NORTH 140 13.1 Overview 140 13.1.1 Suburb description 140 13.1.2 Heritage values of open space in Blackburn North 141 13.1.3. Demographic summary for Blackburn North 141 13.1.4 Open space summary for Blackburn North 142 13.1.5 Summary of open space reserves and classification 142 13.2 Existing open space distribution 143 13.3 Community use of open space 143 13.4 Summary of anticipated future change in Blackburn North 145 13.5 Open space quality and design 146 13.6 Blackburn North precinct recommendations 146 13.7 Individual reserve recommendations for Blackburn North 147 14 BLACKBURN SOUTH 149 14.1 Overview 149 14.1.1 Suburb description 149 WHITEHORSE OPEN SPACE STRATEGY PART TWO NOVEMBER 19 2007 PAGE i PART TWO TABLE OF CONTENTS Page No.
    [Show full text]
  • Habitat Corridors Strategy
    Habitat Corridors Strategy April 2005 Prepared by Context MAROONDAH HABITAT CORRIDORS STRATEGY Acknowledgements Contributions and assistance from officers of Maroondah City Council are gratefully acknowledged, particularly the Project Steering Committee: Vivienne Fraser Cormac McCarthy Luci Feher Roger Lord Brad Curtis Peter Goegan Sean McNamee A number of local residents and naturalists have shared their fauna records, local knowledge and ideas for the Strategy. Assistance was also provided by officers from adjoining municipalities and from several government agencies. ii MAROONDAH HABITAT CORRIDORS STRATEGY CONTENTS Acknowledgements ii SUMMARY VI 1. INTRODUCTION 1 2. HABITAT LINKS AND CORRIDORS: WHAT ARE THEY AND WHY ARE THEY IMPORTANT? 2 The importance of habitat connectivity 2 What makes a link or corridor 3 3. POLICY AND MANAGEMENT FRAMEWORKS 5 International and national levels 5 Victoria 5 Regional strategies 8 Adjoining municipalities 9 City of Maroondah 9 Current vegetation management practices 15 4. CREATING A NETWORK OF HABITAT LINKS IN MAROONDAH 18 Regional context 18 Identification and assessment of habitat links 18 Target species 33 Strengths, opportunities, weaknesses, and threats 41 Corridor management principles 47 5. ACTION PLAN 49 Council resources and activities 49 Habitat links on Council-managed and other public land 51 Habitat links on private land 51 REFERENCES 52 APPENDIX 1. DESCRIPTIONS OF HABITAT LINKS 53 1.1 Dandenong Creek Corridor 55 1.2 Mullum Mullum Creek Corridor 60 1.3 Bungalook Creek Corridor 65 1.4 Wicklow
    [Show full text]
  • North East Link (NEL) Traffic and Transport Review Expert Evidence Statement
    North East Link (NEL) Traffic and Transport Review Expert Evidence Statement Prepared by: GTA Consultants (VIC) Pty Ltd for North East Link Project on 15/07/19 Reference: V153791 Issue #: Final North East Link (NEL) Traffic and Transport Review Expert Evidence Statement Client: North East Link Project Instructed by: Clayton Utz Hearing Date: 25/07/19 Report Date: 15/07/19 Reference: V153791 Issue #: Final © GTA Consultants (VIC) Pty Ltd [ABN 34 137 610 381] 2019 The information contained in this document is confidential and intended solely for the use of the client for the purpose for which it has been prepared and no representation is made or is to be implied as being made to any third party. Use or copying of this document in whole or in part Melbourne | Sydney | Brisbane without the written permission of GTA Consultants constitutes an infringement of copyright. The intellectual property contained in this Adelaide | Perth document remains the property of GTA Consultants. CONTENTS Introduction 1 1.1. Introduction 1 1.2. Qualifications and Experience 1 1.3. Relationship to Applicant 1 1.4. GTA Peer Review of the TTIA 1 1.5. Further Work Since Preparation of the GTA Peer Review Report 2 1.6. Expert Evidence Statement Scope & Purpose 3 1.7. References 6 1.8. Consideration of Submissions 6 1.9. Summary of Key Issues, Opinions and Recommendations 6 1.10. Declaration 13 Project Background 14 2.1. Introduction 14 2.2. Project Rationale 14 2.3. Key Transport Issues Sought to be Resolved by NEL 18 2.4. Public Works Order 23 2.5.
    [Show full text]
  • Richard Simon, Director Simon Leisure Consulting 14 July 2019
    Expert Witness Report Active Open Space North East Link Project Joint Inquiry and Advisory Committee Hearing into the Project’s Environment Effects Statement and Draft Planning Scheme Amendment ABSTRACT [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.] PREPARED FOR Maddocks Lawyers, on behalf of - Banyule City Council - Boroondara City Council - Whitehorse City Council AUTHOR Richard Simon, Director Simon Leisure Consulting 14 July 2019 TABLE OF CONTENTS 1. PRELIMINARY INFORMATION ....................................................................... 1 1.1. Name and Address ..................................................................................................... 1 1.2. Qualifications and Experience ..................................................................................... 1 1.3. Area of Expertise ......................................................................................................... 1 1.4. Expertise to Provide Evidence .................................................................................... 2 1.5. Instructions .................................................................................................................. 3 1.6. Facts and Information Taken into Account .................................................................. 3 1.7. Declaration .................................................................................................................. 4 2. SUMMARY OF OPINION ................................................................................
    [Show full text]
  • Response to the North East Link Technical Summary
    Place – Sustainable Amenity and Built Environment 5.1 NORTH EAST LINK - COUNCIL RESPONSE TO THE NORTH EAST LINK TECHNICAL SUMMARY Author: Michelle Herbert - Senior Transport Engineer, City Development EXECUTIVE SUMMARY Corridor Option C is strongly supported as the preferred option for the North East Link. This is consistent with Council’s long held position recognising the need to complete Melbourne’s Ring Road as a direct orbital link from the Metropolitan Ring Road to Eastlink at Ringwood. On 7 August 2017, the North East Link Authority released a Technical Summary identifying four preferred Corridor Options, and held ten drop-in community sessions over a two week period in mid to late August. All four Corridor Options impact on the City of Banyule, although Corridor Options C and D are towards the municipality’s northern boundary. Whichever option is chosen, Banyule is in the unique position of being impacted by all options, to varying degrees. A response to the Technical Summary has been prepared for Council consideration. Corridor Option C is preferred as it provides an orbital connection from the Metropolitan Ring Road at Greensborough to EastLink, south of Ringwood. Corridor Option C is considered to provide greater regional benefits and better meet the North East Link project criteria. Corridor Option A, which provides connection from the Metropolitan Ring Road at Greensborough, through Banyule to connect with the Eastern Freeway at Bulleen is not supported. Consistent with Council’s North East Link Project Action Plan adopted in April 2017, the Banyule North East Link Transport Forum was held in May 2017.
    [Show full text]
  • Vicroads Annual Report 2016–17 I List of Figures
    VicRoads Annual 2016 Report –17 Connecting our communities vie roads TRAHSPORT FO~ORIA Published by: VicRoads 60 Denmark St, Kew Vic 3101 September 2017 Also published at vicroads.vic.gov.au © Copyright State of Victoria (VicRoads) 2017 You are free to re-use this work under a Creative Commons Attribution 4.0 licence, provided you credit the State of Victoria (VicRoads) as author, indicate if changes were made and comply with the other licence terms. The licence does not apply to any branding, including Government logos. Language: English International Standards Serial Number (ISSN): 1832-0732 VicRoads publication identification number 02926 Printed on Revive Laser 100% recycled paper Table of contents Chief Executive’s Message 1 Section 1: Year in review 3 Vision and values 3 Manner of establishment and relevant ministers 5 Nature and range of services provided 5 Departmental objectives, indicators and progress 7 Highlights and key achievements: performance against output performance measures 8 Operational and budgetary objectives and performance against those objectives 10 Key financial results 41 Section 2: Governance and organisational structure 49 Section 3: Workforce data 55 Employment and conduct principles 55 Comparative workforce data 56 Diversity and inclusion commitment 58 Section 4: Other disclosures 61 Local jobs first — Victorian Industry Participation Policy (VIPP) 61 Disclosure of government advertising expenditure 62 Consultancy expenditure 62 Disclosure of Information and Communication Technology expenditure 62 Disclosure
    [Show full text]
  • Green Areas & Rural Strategy
    Green Areas Submissions & Rural Strategy close 22 April Visioning Consultation 2020 Are you interested in the The 5 precincts in Knox: future of Knox’s green and Precinct 1: The Basin Rural Landscape rural areas? Precinct 2a: Lysterfield Valley and Hills We invite you to have your say on Precinct 2b: Lysterfield Quarries and Surrounds opportunities for 5 precincts that have environmental and landscape significance Precinct 3: Dandenong Creek Valley Precinct in Knox. This brochure provides key Precinct 4: Healesville Freeway Reservation findings from our preliminary analysis and Surrounds and presents a selection of the identified The project seeks to gather an evidence base opportunities and priorities for each and develop a stronger understanding of the precinct. The full set of project findings values and potential of these precincts. The and background reports are available on project aims to guide the planning framework the Knox website at knox.vic.gov.au/gars and provide future strategic directions to protect and enhance the environmental and social values By having your say, you can help Knox of these precincts, while realising compatible Council determine if we’ve got the land use potential (such as tourism, recreational and agriculture potentials). balance and priorities right. Your feedback will help Knox Council develop the Knox To have your say on the opportunities identified, be sure to make a submission by Green Areas and Rural Strategy, and set a 22 April 2020. Details on how to make a submission long-term vision and strategic directions can be found on the back cover. for each precinct. knox.vic.gov.au/haveyoursay About the 5 Green Areas and Rural Precincts in Knox The study area (refer to map below) is predominantly used for rural, conservation, open space, recreation and agriculture purposes.
    [Show full text]
  • Physical and Community Infrastructure Overview
    2015 PHYSICAL AND COMMUNITY INFRASTRUCTURE OVERVIEW Michael Blowfield Maroondah City Council CONTENTS CONTENTS .......................................................................................................................... 2 INTRODUCTION - NEXUS BETWEEN INFRASTRUCTURE AND HOUSING...................... 3 CONTEXT ............................................................................................................................. 4 THE TYPES OF INFRASTRUCTURE ................................................................................... 5 INFRASTRUCTURE IMPOVEMENTS SINCE 1997 ............................................................. 5 POLICY................................................................................................................................. 7 CHANCE PRESURES AND IMPACTS ................................................................................. 8 KEY PLAYERS IN INFRASTRUCTURE ............................................................................... 9 INVESTMENT IN URBAN INFRASTRUCTURE .................................................................. 11 STATE OF THE SECTORS ................................................................................................ 13 ENERGY ............................................................................................................................. 13 ELECTRICITY ................................................................................................................. 14 GAS ...............................................................................................................................
    [Show full text]
  • Knox Land for Business Background Report - September 2017 Update
    KNOX LAND FOR BUSINESS BACKGROUND REPORT KNOX CITY COUNCIL DECEMBER 2016 URBAN ENTERPRISE URBAN PLANNING LAND ECONOMICS TOURISM PLANNING INDUSTRY SOFTWARE 389 ST GEORGES RD NORTH FITZROY 3068 VIC | PH: (03) 9482 3888 | WWW.URBANENTERPRISE.COM.AU AUTHORS Urban Enterprise: Paul Shipp, Chris Funtera, Kurt Ainsaar, Jojo Chen, Brett Hannah Remplan: Matthew Nichol, Nick Byrne URBAN ENTERPRISE URBAN PLANNING LAND ECONOMICS TOURISM PLANNING INDUSTRY SOFTWARE 389 ST GEORGES RD, FITZROY NORTH, VIC 3068| PH: (03) 9482 3888 www.urbanenterprise.com.au FILENAME: Knox Land for Business –Background Report VERSION: 4 DISCLAIMER Neither Urban Enterprise Pty. Ltd. nor any member or employee of Urban Enterprise Pty. Ltd. takes responsibility in any way whatsoever to any person or organisation (other than that for which this report has been prepared) in respect of the information set out in this report, including any errors or omissions therein. In the course of our preparation of this report, projections have been prepared on the basis of assumptions and methodology which have been described in the report. It is possible that some of the assumptions underlying the projections may change. Nevertheless, the professional judgement of the members and employees of Urban Enterprise Pty. Ltd. have been applied in making these assumptions, such that they constitute an understandable basis for estimates and projections. Beyond this, to the extent that the assumptions do not materialise, the estimates and projections of achievable results may vary. CONTENTS 1. PROJECT BACKGROUND 2 1.1. INTRODUCTION 2 1.2. AIMS & OBJECTIVES 2 1.3. SCOPE 2 1.4. REPORT SECTIONS 3 1.5.
    [Show full text]
  • Ringwood Metropolitan Activity Centre Masterplan – Background Report
    Ringwood Metropolitan Activity Centre Masterplan – Background Report Working towards an attractive, thriving and well built community Attractive, thriving and well built Contents List of Figures 4 List of abbreviations 5 Introduction 6 Strategic Context 7 Plan Melbourne 7 Maroondah 2040: Our Future Together 9 Maroondah Strategic Framework 11 Context of the Ringwood MAC 12 Origins 12 Demographics 13 Vegetation and landscape 14 Ringwood MAC Planning Framework 15 Strategic Statement 15 Overlays 16 Methodology 20 Stage 1 – Initial scoping 20 Stage 2 – Background studies and technical work 20 Stage 3 – Preparation of development contributions plan 20 Stage 4 – Preparation of updated Masterplan 20 Stage 5 – Community consultation 20 Stage 6 – Final Ringwood MAC Masterplan 20 Background studies and technical work 21 Initial scoping 21 Overview 21 Sociodemographic 23 Housing and Residential Development 25 Urban Design 26 Transport and Movement 29 Commercial and Residential Capacity 41 Conclusion 45 RINGWOOD METROPOLITAN ACTIVITY CENTRE MASTERPLAN – BACKGROUND REPORT 3 Working towards an attractive, thriving and well built community List of Figures Figure 1 Metropolitan and major activity centres Figure 2 Maroondah 2040 themes Figure 3 Maroondah Strategic Framework Plan Forecast population, households and average household size - Figure 4 Ringwood (Metropolitan Activity Centre) Figure 5 Existing zones in Ringwood MAC Figure 6 Existing Environment and Landscape Overlays in Ringwood MAC Figure 7 Existing Built Form Overlays in Ringwood MAC Figure
    [Show full text]