ATTACHMENT 4 Participant Involvement Program Appendices Y to AA

Part 5 of 5 Appendix Y March 2019 Open House Materials

Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 THE CYPRESS

Cypress Renewable Energy Centre WIND POWER PROJECT Limited Partnership

Cypress Renewable Energy Centre Limited Partnership is a partnership between EDF Renewables Inc. and Kainai Nation (Blood Tribe). COMMUNITY OPEN HOUSE Today you'll have the opportunity to receive project updates, meet the team, and have your questions answered.

Page 8 EDF RENEWABLES CANADA INC. (EDF RC)

Wind 1.9 gigawatts Solar Put into service, under WIND & SOLAR construction or in 1,598 MW Commissioned Capacity development. 289 MW in Development/Construction

OPERATIONS & MAINTENANCE 1,587 MW Wind 70 MW Solar $3.5+ billion invested EDF RC Office locations: Calgary, Toronto and Montreal in Canada since 2008

Page 9 is changing the mix of power generation to include a larger portion of renewable energy, including wind and solar.

WHAT IS THE In February 2018, the Alberta Electric System Operator (AESO) launched Round 2 of the Renewable Electricity Program AESO (REP Round 2) – a competitive procurement program to promote RENEWABLE the development of approx. 300 megawatts (MW) of large-scale renewable electricity generation. REP Round 2 focused on ELECTRICITY committing to work with Indigenous communities to encourage PROGRAM? participation in Alberta’s electricity sector. On December 17, 2018, the Government of Alberta announced the results of REP Round 2. REP Round 2 competition awarded five wind projects totaling 363 MW.

The Cypress Wind Power Project was selected and awarded a contract.

More information can be found at www.aeso.ca

Page 10 WHY CHOOSE THIS PROJECT SITE?

Close proximity to existing transmission

Strong wind resource

CompatibleSupportive local community with existing agricultural use Compatible with existing agricultural use Cypress Wind Power Project

Page 11 PROJECT AND COMMUNITY ENGAGEMENT TIMELINE

Page 12 ALBERTA’S RENEWABLE ENERGY APPROVAL PROCESS

Step 5* Step 7

The AUC issues a notice of The AUC issues its decision. Options the AUC may consider for: hearing, if it was not already Step 1 * Step 3 issued in Step 3. Power plant application: . Continued opportunity for . Approval of application. Public consultation by the The AUC issues a notice of consultation and negotiation . Approval of application with conditions. applicant. application or notice of with the applicant. . Denial of application. hearing.

Step 6* Step 8* Step 9 Step 2 Step 4* Hearing (potential) Options to appeal Approvals, construction Application filed with the Interested parties submit filings decision or ask the AUC and operation of facility, if Alberta Utilities Commission to the AUC with any outstanding to review its decision. approved. (AUC) . issues or objections. If the AUC does not receive any submissions, the application will be reviewed and a decision may be made without a hearing.

*Denotes opportunity for public involvement.

Page 13 Global Installed Wind Capacity 2001-2017 WHY WIND MAKES SENSE

=

1 MW ~ 300 homes Turbine Wind energy reduces dependence on other forms of Source: CanWEA Secret Is Out Brochure Clean power electricity generation that contribute to greenhouse gas https://canwea.ca/wp-content/uploads/2017/11/canwea-secretisout-brochure-en.pdf emissions.

Alberta now ranks third in Canada with Local job Contractors, suppliers and local businesses benefit from the an installed wind energy capacity of 1,483 opportunities direct and indirect economic activity the project brings to the MW. The province’s wind farms produce local economy. enough electricity each year to power 625,000 homes, equivalent to about eight Clear air Wind energy emits no greenhouse gas during the per cent of Alberta’s electricity demand. production of electricity.

Source: CanWEA https://canwea.ca/wind-energy/alberta/ Water Wind turbines do not use water to produce electricity. conservation

Predictable Wind generated electricity prices are fixed and stable, unlike pricing natural gas or oil which have volatile and unpredictable pricing.

Page 14 In 2014, Health Canada commissioned a $1.2 million study on the potential impacts of wind turbines on human health. A hardcopy of the key findings brochure is available. Please ask any EDF RC staff for a copy.

. Illness and disease HEALTH No evidence was found to support a link between exposure to wind turbine sound and any of the self- CANADA reported illnesses and/or chronic conditions. STUDY: WIND . Stress No association was found between the multiple TURBINE measures of stress and exposure to wind turbine NOISE AND sound. . Sleep HEALTH No association between wind turbine sound and STUDY self-reported or measured sleep quality. . Annoyance and quality of life No association was found with any significant changes in reported quality of life, or with overall quality of life and satisfaction with health.*

Ontario Chief Medical Officer’s 2010 report which concluded: There is “no scientific evidence of any direct causal link between wind turbines and adverse health effects.”

Page 15 *Assessed using the World Health Organization’s Quality of Life Scale. Three recent wind power project applications in Alberta received by the Alberta Utilities Commission (AUC) considered the potential impact of wind power projects on property value (Grizzly Bear Creek Wind Project - E.On Climate & Renewables Canada Ltd.; Bull Creek Wind Project - BluEarth Renewables Inc.; and Halkirk 2 Wind Project - Capital Power).

The AUC concluded that in all three cases, the Commission was not presented with sufficient evidence to suggest the respective projects would result in an adverse impact on property values. WIND AND PROPERTY VALUES

Page 16 Well sited wind projects should have minimal impacts upon local bird and bat populations.

■ Working closely with Alberta Environment and Parks, EDF RC has undertaken all required bird and bat studies to quantify potential risks and implement mitigation measures to ensure sustainable development. AVIAN & ■ Potential impact on birds and bats was considered in the BAT Environmental Evaluation for the Cypress Wind Power Project. IMPACTS ■ A multi-year post-construction wildlife monitoring program will be undertaken to determine effects.

A report published in Avian Conservation & Ecology stated:

“Overall…the effects of collisions, nest mortality, and lost habitat on birds associated with Canadian wind farms appear to be relatively small compared to other sources of mortality.”

Source: Zimmerling, R. J., Pomeroy, A.C., d’Entremont, M. V., and Francis, C.M. (2013)

Page 17 ■ We recognize that we need the support of local landowners and we work diligently to make sure we listen and co-operate. ■ Well designed wind energy projects complement farming activity with minimal disruption. ■ We work closely with our landowners to ensure project infrastructure fits with current and future land use.

IN HARMONY WITH AGRICULTURE

Page 18 We have engaged Alberta Environment and Parks (AEP) early and throughout the planning and development phases of the project to better understand the site and potential environmental impacts. We completed environmental studies in 2017 and 2018, including the following: . Wildlife – spring and fall birds, spring and fall ENVIRONMENTAL bats and sensitive species AND TECHNICAL . Vegetation . Wetlands ACTIVITIES . Noise Impact Assessment UNDERWAY . Historical Resources In 2019, we will be completing additional field studies to ensure wildlife Wind power project design data is current. We will continue to work closely with AEP to ensure a includes consideration of robust understanding of the site. Additionally, field work will be impacts on wildlife and completed for historical and paleontological resources in 2019. vegetation.

Page 19 . All wind energy projects must meet Alberta Utilities Commission (AUC) Rule 012: Noise Control.

. The Noise Impact Assessment will be completed for all residences and dwellings within 1.5 kilometres of the project. NOISE . The study includes the noise from the IMPACT project and nearby operational and ASSESSMENT proposed energy related facilities. . The results of the Noise Impact Assessment were used to determine the final turbine layout. The resulting noise contours are available on the Infrastructure, Shadow Flicker, and Noise Map.

. This Project meets the requirements of AUC Rule 012: Noise Control.

Page 20 We value the long-term benefits of working with the local stakeholders and Indigenous communities. If the project is approved, community benefits will include: . Employment opportunities during the construction and operational phases of the project. The project is anticipated to generate up to 250 jobs at peak construction, and up to 10 MUNICIPAL, permanent positions during operations. LOCAL AND . Contract opportunities for local businesses. . INDIGENOUS Local investments into hospitality and construction services during the development, construction and operational phases of COMMUNITY the project. BENEFITS . Tax revenues throughout the life of the project. . Indigenous Community Ownership

Page 21 Cypress Renewable Energy Centre Limited Partnership is a partnership between EDF Renewables Canada Inc. and Kainai Nation (Blood Tribe).

PROJECT Cypress Renewable Energy Centre Limited OWNERSHIP Partnership

75% ownership 25% ownership

Page 22 ■ Direct benefits The project will result in increased job opportunities for the local area. Some of these job opportunities may include:

• Surveying • Earthwork activities • Civil engineering • Maintenance of vehicle fleet • Mechanical work • Maintenance paths • Electrical work • Snow removal LOCAL • Road construction • Other related services ECONOMIC • Transportation equipment BENEFITS

■ Indirect benefits Increased spending on goods and services during construction and operational phases.

Page 23 ACCESS ROAD & TURBINE PAD

Construction Phase – 2.5 acres / turbine (1 hectare / turbine)

A temporary turbine pad area of about 100 metres by 100 metres will be created at each turbine location, in order to deliver all the required turbine components to each turbine pad.

Operational Phase – approximately 0.11 acres / turbine (0.05 hectares / turbine)

After construction, the access road width and the turbine pad will be reduced to limit impacts to agricultural use. Access road and turbine pad during Turbine pad after operations construction Page 24 TURBINE FOUNDATION & ELECTRICAL SYSTEM CONSTRUCTION

■ The turbines will be installed on top of a buried, cast-in-place reinforced concrete foundation.

Foundation excavation. Diameter approx. 20 metres Reinforcing steel installation. Between 40-50 tons of Each foundation requires approx. 400-600 m3 of (m) rebar concrete ■ The electrical system will consist of underground cables or overhead lines and a project substation. The cabling will be buried at a depth that will not interfere with normal agricultural practices.

Buried collection system Substation connecting a project to a transmission line

Page 25 TURBINE ASSEMBLY

Transportation of turbine Tower assembly components Up to 6 tower Approximately 12 trucks are sections. required for the delivery of a complete turbine.

Blade assembly Nacelle installation The blades will be The nacelle weighs attached to the hub on about 59 tonnes. the ground or lifted one at a time onto the hub.

Page 26 OPERATION AND MAINTENANCE BUILDING & PERMANENT METEOROLOGICAL TOWERS

■ An operation and maintenance (O&M) building may be built or rented to allow operators to maintain the turbines and house spare parts. ■ Wind speed, wind direction, temperature and humidity will be measured by permanent meteorological towers. We will permit up to nine but will install up to five permanent meteorological towers during project operations.

Page 27 DECOMMISSIONING & RECLAMATION

. The project is expected to be operational for up to 25 years . At the end of the project’s life, we will evaluate whether the project should be decommissioned or repowered . Decommissioning: . The project is de-energized. Turbines and all other above-ground infrastructure is removed and the land is restored to its original or equivalent land use. . Construction equipment will be utilized to remove infrastructure. . Underground infrastructure including electrical collector lines will be removed above 1 metre, or an agreed upon depth at the time of decommissioning. . Decommissioning and reclamation will be completed based on the Conservation and Reclamation Directive For Renewable Energy Operations and any updates at the time. . Repowering: . Turbines and/or other infrastructure is upgraded to extend the project’s life. . This is often attractive to developers since there will be many years of historical wind resource data and production. . Waste and debris generated during decommissioning activities will be collected and disposed at an approved facility.

Page 28 AVIATION IMPACTS

■ The Alberta Utilities Commission’s (AUC) ■ In 2017, we identified approval requires the completion of a aviation facilities nearby number of federal-level processes. This the proposed project area. requires approval from Transport Canada and NAV CANADA to ensure the wind project is visible and does not present a ■ We have integrated hazard to aviation safety. sufficient setbacks to ■ We will consult with all aviation facility ensure safe aviation owners near the project area to ensure safe operations. operations of the wind farm and aviation facilities.

Page 29 VISUAL IMPACTS

Location 1 View point: Facing South on Township Road 110 and 42

■ Visual simulations are provided from multiple vantage points. These simulations include turbine model specifications. ■ We acknowledge that visual impacts of the wind projects may be a concern for our neighbours in the community.

Page 30 CONSULTATION PROCESS

■ Public consultation continues throughout the project lifecycle. ■ EDF RC understands that there may be new neighbours in the project area after the Alberta Utilities Commission submission and throughout construction and operation stages of the project. We will include and engage with our new neighbours to provide updates on the project, and respond to any concerns they may have.

Page 31 DEVELOPER CYPRESS RENEWABLE ENERGY CENTRE LIMITED PARTNERSHIP PROJECT NAME CYPRESS WIND POWER PROJECT HOST MUNICIPALITY CYPRESS COUNTY CONTRACT CAPACITY 201.6 MW

ENERGY The project will generate sufficient electricity to power up to 100,000 homes PROJECT Located on approximately 13,240 acres of LOCATION DESCRIPTION privately owned land

Each turbine will be linked to the project substation by a collector system that will be underground ELECTRIC SYSTEM wherever practical. The location of the project substation is proposed to be located on NW-20- 10-4-W4M.

The project will be interconnected to the 240 INTERCONNECTION kilovolt transmission line 983L in the area, which is owned and operated by AltaLink Management Ltd.

Page 32 Based on your feedback and further technical analysis, we are now proposing to install a different turbine than those originally contemplated. We have now selected the Enercon E138 4.2 MW with 48 proposed turbine locations. We have updated the following: • Turbine technology, turbine locations, collector system, access roads and substation location • Project boundary modification • Noise Impact Assessment, Visual Simulations and Shadow Flicker Analysis • Environmental field studies PROJECT Fall 2017 PSIP Winter 2019 PSIP Change UPDATES Vestas V136 4.2 MW or Turbine Type Enercon E138 4.2 MW Similar size capacity Gamesa G132 3.465 MW 56 Vestas Number of Turbines or 48 Enercon E138 4.2 MW 13 fewer turbines 61 Siemens-Gamesa 82 metres (Vestas) or Hub Height 108 metres Taller towers 84 metres (Gamesa) 136 m (Vestas) or Rotor Diameter 138 m Slightly larger 132 m (Siemens-Gamesa) 235.2 MW (Vestas) or Total Project Capacity 211.37 MW (Siemens- 201.6 MW Smaller project capacity Gamesa)

Page 33 ■ Wind Turbine – Enercon Turbines – Blades (69 metres) – Hub Height (108 metres) – Rotor Diameter (138 metres) Hub Height 108 metres – Capacity (4.2 megawatts) ■ PROPOSED Access Roads ■ PROJECT Temporary Laydown Area ■ INFRASTRUCTURE Collector System ■ Project Substation Rotor Diameter ■ Operation and Maintenance 138 metres Building ■ Temporary and Permanent Meteorological Towers Tip Height 177 metres ■ 9 proposed permanent locations and up to 5 installed permanent towers

Page 34 . Shadow flicker is caused when the turbine blades cast a shadow on nearby residences.

. We have completed a shadow flicker study and provided the results in the Project Layout, Adjusted Case Shadow Flicker and Noise Map. The shadow flicker results are presented on a SHADOW colour scale that correlates with the annual hours of adjusted FLICKER case shadow flicker. ANALYSIS . Residences within 2 km of the project were considered in the shadow flicker analysis.

. This study considers the probability of cloud cover, but it does not consider the orientation of residences or the location of windows in residences.

. All residences fall within internationally accepted thresholds.

Page 35 Your feedback is important to us. Please take a moment to fill out a feedback form.

THANK YOU CONTACT US PHONE: 844-553-3336

WEBSITE: www.cypresswind.ca

EMAIL: [email protected]

Page 36

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

! ! ! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

! 11

Project Boundary !

!

Ä Ä

Ä 35

32 Ä 33 34 ! 36 31 34 35 Ä 32 33 524 Ä .! Proposed31 Turbine Location - Enercon E138 - 4.2MW 524

! 41 X Y X Y X Y X Y X Y X Y Proposed Project Substation ! ! Redcliff

#0 Temporary Met Tower !

!

Ä

VEINERVILLEÄ

! Ä

MedicineÄ Hat Ä #0 Ä 41a Proposed Permanent Met Tower ! 3

523

!

! Ã

Proposed Laydown/O&M Yard Location DESERT BLUME Ã Ä ! Ä

1 1 41 ì ì

Proposed Underground Collection Line ! DUNMORE

Ä IRVINE ! Ä 27 26 25 30 29 28

Proposed30 Access Road 29 ! 28 27 26 3 !

)"! Photomontage Location ! !

Photomontage Field of View Arc ! !

87 !

Occupied Residence ! ! ! ! ! ! ! ! ST41 !

87 Abandoned Residence ! !

Adjusted Case Shadow Flicker (Hours per! Year) Ä ! Ä 23 20 21 22 515

! 24 19

0 19 20 21 22 23 !

0 - 8 !

! Ä Ä

! T11 - R4

8 - 15 41

!

!

Ä 15 - 30 ! Ä 887 T11 - R3 T11 ! ELKWATER Over 30 !

- R5 ! Cypress Hills

40 dBA at 1.5m Height ! Provincial Park

!

Ä 14

18 17 16 15 Ä

!!!! 17 16 15 14 13 Existing Overhead18 Transmission Altalink 240kV 983L 514

Ä Paved Road 889 Ä

!!!!!

Gravel Road Ä ! Ä

! 889 Unimproved Road ! ! ! ! ! ! ! ! A! ! Oil & Gas Active Well ! (AER) A

! ! A Oil & Gas other wells ! (AER)

! 11

7 8 9 10 ! 12 7 8 9 10 11 Stream !

! A ! !

Wetland Class 3+ A! A

! !

Township ! ! A!

Section ! A! CYP 40 ! 87 A! CYP 30 87 A! Project Lands ! ! A! CYPA! 45 Parcel within 2015m ! 87

! 2 6 5 4 3 2 1 !

Parcel Within6 800m ! 5 4 3 A !

!

! A! ST41

!

! ! ! CYP 06 ! CYP 29 Loc7 Loc1 87 87 A! 10 ! ! 1 ! A! ") Township Rd 110 CYP 31 Township Rd A! Township Rd 110 )" A! A! 87

!

! 1 CYP 44 ! A! 87 ! A! A CYP 05 .! 87 ! A! A! 2 ! 3 ! A! .! A ! .! 33 34 35 34 35 36 31 32 36 31 ! 32 33 CYP 32 A! A!87 A! CYP 42! CYP 41 87 ! 87 4 ! 13 .! ! .! 5 ! .!

! A! A! 6 Range 43 Rd

! .! CYP 03 ! 87 #0

! Range Rd 42 RangeRd A! CYP 28 7 ! #0 14 87 .! ! .! ! 29 28 27 26 28 27 26 25 30 25 30 ! 29 #0 15

! .!18 .! 9 ! CYP 36 8 .!

! CYP 25 87 19 16 87 .!

! #0 A! .! .! ! Loc3

! Township Rd 104 )"! Township Rd 104 Township Rd 104 CYP 23

! 17 #0 20 87

! .! .!

X Y X Y X Y X Y X Y ! ! 10 Y

X A ! A A!

XY A

!

Y X ! .! XY X Y X Y X Y X Y A ! CYP 04 CYP 26 12 ! 87 87 .!

! 23 Range Rd 40 RangeRd 19 20 21 22 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 21 22 23 21 24 24! 19 20 .! CYP 22

Range Rd 35 Rd Range 87 ! CYP 02 87 22 11 ! .! CYP 27 .!

! #0 #0 87 23 27 ! T10 - R4 CYP 39 .! 87CYP 24 .! Loc9

! 87 ! CYP 21 A T10 - R3 !A! 87 ! )" 87

! A

! CYP 34 T10 - R5 CYP 33 26 ! CYP 07 87 25 A! .! .! ! 87 31

! CYP 01 87 24 #0 .! ! CYP 37 A! CYP 38 87 .! 14

! 15 87 13 18 17 16 13 17 16 15 14 41 ! ST ! CYP 19 ! A ! ! A 29 30 A 87

! #0 .! .! 35 36 28 CYP87 20 !! .! .! .!

! CYP 08 ! 87 A! Township Rd 102 A! A ! 34 ! 33 .!

! .! CYP 69 A! ! 41 ! 87 CYP 46 A 87 A! A! 32 .! ! .! 39 40 ! .! .! 11

! 10 12 CYP 09 7 8 9 12 7 8 9 10 11 37 ! 87 38 43 #0 .!

! .!

d ! R ! ! ! A e A 44

g ! .! CYP 18

n 87 ! a

R ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! CYP 35 87 43 47 ! CYP 16 ! .! 87 ! . CYP 15 ! 46 87 ! 42 A! ! 45 .! #0 .! ! ! . 4 3 2 1 !6 5 ! 5 4 3 2 A ! ! ! ! ! ! 1 6 48 CYP 14 .! 87

! A! CYPA 11 A! 87 CYP 10 87 ! Loc6 A ! A! Township Rd 100 CYP 12 A)"! ST515 Township Rd 100 87

! ! A! A A A! A! A! CYP 13 87 34 35 36 31 32 33 36 31 32 33 34 35 Range Rd 40 RangeRd A! A!

A!

A! CYP 17 A! 87 ST41 T9 - R5 A! 27 26 25 30 29 28 25 30 29 28 T9 - R4 27 26 T9 - R3 A!

A!

1

4

d

a

o R

e 21 22 23 g 19 20 20 21 22 23 24 24 19 n

a

R

0 0.5 1 2 3 4 5 km Source:ESRI Solas 2019, 2018, Altalis brendan.soule by 2018 | G:\Projects\CAN_West\Cypress_Wind\05_GIS\052_MapDocs\Infrastructure_Noise_Flicker_v22_CypressE_SIZE_Defrag_new.mxd 3/11/2019 Updated | Last PROJECT LAYOUT, ADJUSTED CASE SHADOW FLICKER, AND NOISE IMPACT ~ Cypress Wind Power Project | Cypress County, Alberta

Page 37 POWERING PROGRESS FOR A SUSTAINABLE FUTURE

30+ Years History of Renewable Industry Experience and Expertise in North America EDF Renewables North America (EDFR NA) 16 GW 10 GW 30+ YRS 1,112 DEVELOPED SERVICE EXPERIENCE EMPLOYEES is a market leading independent power CONTRACTS producer and service provider. Delivering robust pipeline grid-scale power: wind (onshore and GROWTH offshore), solar photovoltaic, and storage 1.9 GW projects; distributed solutions: solar, CANADA 24+ GW solar+storage, electrical vehicle charging of development across and energy management; and asset 13.3 GW North America optimization: technical, operational, U.S. (as of 12/2018) and commercial skills to maximize performance of generating projects. .8 GW EDF Renewables’ North American MEXICO portfolio consists of 16 GW of developed projects and 10 GW under service contracts. EDFR NA is a subsidiary of EDF Renewables, the dedicated renewable energy affiliate of the EDF Group.

Creating value from Origination to Commercial Operation EDFR NA is a technology agnostic provider of renewable generation, storage, and management solutions.

ORIGINATION DEVELOPMENT TRANSACTION CONSTRUCTION OPTIMIZATION

Comprehensive analysis, Resource assessment, Securitization of energy Implementation of all Operations and identification and permitting, site design, offtake and financing. aspects of the system maintenance, asset evaluation of prospective interconnection rights design, installation, and management, monitoring sites and matching those and technology selections. construction to ensure a and maintenance to ensure sites with customer needs. quality build. profitable and optimal performance of facility.

EDF Renewables 15445 Innovation Drive Let’s talk energy. San Diego, CA 92128 858.521.3300 www.edf-re.com

Page 38 2-2019 MEMORANDUM TO: David Warner EDF Renewables Canada Inc.

FROM: Steve Schnick, P.Eng. WSP Canada Inc.

SUBJECT: Shadow Flicker Explanation DATE: April 16, 2018

INTRODUCTION At the request of EDF Renewables Canada Inc. (“EDF”) WSP conducted a shadow flicker analysis for the proposed Cypress Wind Power Project (the “Project”). The objective of this analysis was to determine the locations within the Project and surrounding area that will be subject to shadow flicker and to quantify the extent of that shadow flicker. This memo discusses what shadow flicker is, how shadow flicker is caused, and the various factors that can reduce the shadow flicker experienced at a residence. The results of the shadow flicker analysis are presented on a per-residence basis in the Project maps provided by EDF.

WHAT IS SHADOW FLICKER? Shadow flicker from a wind turbine can be defined as alternating changes in light intensity caused by shadows cast from the moving blades. Shadow flicker only occurs under certain conditions and only affects certain areas in and around a wind farm. Conditions that affect shadow flicker include: — Location of the turbines relative to the receptor (residence): For there to be any possibility of shadow flicker, a turbine must be in the path of sun shining on the receptor. If the sun passes behind a turbine (as seen from the receptor) there will be shadow flicker; otherwise not. Because the location of the turbine is fixed and the path of the sun in known for all times of the day and all seasons, it is possible to determine the regions in an around a wind farm that will receive shadow flicker. — Time of day: Shadow flicker occurs as the sun passes behind a turbine, typically for a period of time following sunrise or prior to sunset when the sun is low in the sky. — Time of year: Shadow flicker occurs at specific times of year when the sun, turbine, and receptor line up. — Weather conditions: Shadow flicker only occurs during periods of bright sunshine. — Wind direction: The turbine pivots to face the wind and this changes the size of its silhouette. The size of the silhouette affects whether shadow flicker will occur and the intensity of the shadow. — Wind Speed: Shadow flicker occurs only when there is sufficient wind for the turbine to operate. During periods when the wind speed is below approximately 11 kilometres per hour (3 metres per second), the turbine will not operate, the blades will not spin, and there will be no shadow flicker. Page 39 — Distance from the turbine: As the distance from the turbine increases, the intensity of the flicker decreases, eventually diminishing to a point where it is no longer perceptible. — Obstacles: Obstacles, such as tall hedges, trees, or large structures may block the shadows from the turbine.

HOW IS SHADOW FLICKER CALCULATED? Shadow flicker is calculated using specialized computer software that models the location of the observer, the location of the turbines, the local terrain, and the path of the sun. The computer model determines when shadow flicker events can occur based on the position of the sun with respect to the turbine blades and the observer; shadow flicker events will only happen on specific days of the year and during specific times of the day. The model also assumes that the turbine blades are always spinning, that the turbine is always directly facing the sun (or the observer), and that the sun is always shining brightly between sunrise and sunset.

The result calculated by the model is called the worst-case shadow flicker because it is the maximum amount of shadow flicker that can be produced. However, actual wind and weather conditions will reduce or even eliminate some of the shadow flicker events. It is important to consider that the modeling assumptions used in the shadow calculation are conservative and may result in an overestimation of the shadow flicker amounts. The analysis assumes that the observer is sensitive to shadow flicker from any direction (this is referred to as “greenhouse mode”). The actual size, location and orientation of the windows relative to turbine locations may reduce the degree of flicker experienced by the observer. As well, the presence of trees and other obstacles not considered by the model may also reduce the effects of shadow flicker.

HOW DOES WEATHER AFFECT SHADOW FLICKER? Actual wind and weather conditions will reduce or even eliminate some of the shadow flicker events. This is because the sun does not shine brightly at all times (e.g., during cloudy periods), the turbine blades will not be spinning during low wind speed periods, and changes in wind direction will cause the turbine to cast a smaller shadow. These conditions will vary throughout a given year, and will also vary from year to year. To account for these changing conditions, the worst-case results are adjusted based on long-term average wind and weather data. The result of this adjustment is called the adjusted-case shadow flicker because it represents the amount of shadow flicker that can be expected on average over a long-term period. This is sometimes also referred to as the average shadow flicker, corrected- case shadow flicker or real-case shadow flicker.

HOW DOES WIND DIRECTION AFFECT SHADOW FLICKER? As the wind direction changes, the turbines pivot to face the wind and that changes the silhouette of the turbine. A reduced silhouette either reduces the intensity of the shadow flicker or eliminates it for certain periods. Figure 1 and Figure 2 show simulations1 of a turbine as it would appear at a distance of 1,750 m to the west. The size of the sun in the figures is representative of actual size (0.533 arc degrees) and

1 The simulations were generated with the WindPRO photomontage module. Page 40 is in the same position in both figures. In Figure 1, the wind is from the west and therefore the turbine is also facing west, into the wind. In this example, the turbine is presenting its maximum silhouette between the sun and the receptor. As the turbine blades rotate they will periodically pass in front of the sun causing a flickering shadow. In Figure 2, the wind is from the north and therefore the turbine is also facing north, into the wind. In this example, the blades will not pass in front of the sun while they are rotating and no shadow flicker will be generated. At other times, the sun may still pass behind the blades in which case there will be shadow flicker but at a reduced intensity.

Figure 1: Wind from West Figure 2: Wind from North

Figure 3 shows the wind direction distribution at met mast 1141. The wind blows predominantly from the southwest which means that the turbines will also be predominantly pointing to the southwest.

Figure 3: Wind Direction Distribution (Frequency %) at Red Rock Met Mast 1141

Page 41 HOW DOES DISTANCE FROM TURBINES AFFECT SHADOW FLICKER? The intensity of the shadow flicker decreases as the distance between the observer and the turbine increases, eventually becoming imperceptible. The reason for this is that as the distance from the turbine increases, the turbine blade will obscure less of the sun as it passes in front of it. Figure 4 and Figure 5 show two scenarios for a turbine. Figure 4 simulates what it would look like from 1,750 metres to the west. Figure 5 shows it as it would look at a distance of 550 m. The size of the sun in both figures is representative of actual size (0.533 arc degrees). As seen from 1,750 m away, the area of sun that is obscured by a passing turbine blade is small relative to the size of the sun, resulting in a diminished shadow flicker intensity. At 550 m, as depicted in Figure 5, the passing turbine blade will completely obscure the sun, causing a higher intensity shadow flicker. Shadow flicker is generally considered to be relevant when at least 20% of the area of the sun is obscured by the passing of the turbine blade.

Figure 4: 1,750 m from turbine Figure 5: 550 m from turbine

Regards,

Steve Schnick, P.Eng. WSP Canada Inc.

Page 42 Before

After

Title: Photomontage: Location 1 (E138) Notes: )" CYP 29 )"Township Road 110 Legend: VU41

Photographs taken with Canon ESO 5D Mk II camera and Canon EF24-70mm 11 TWP CYP 06 1 2 Township Line !. Project: f/2.8L lens set at 50 mm. Panoramic view compiled from multiple individual )" CYP 05 3 Photo Location !. !. photographs. Photomontage simulated using Enercon E138 EP3 turbine with 34 35 36 31 32 33 !. Section Line !. !. Cypress Wind Project rotor diameter of 138 m and hub height of 108 m using 48 turbine locations 13 4 Panorama Field of View (approximate) !. (Layout Lv22). 5 !. !. 6 Quarter-section Line !. !. !. !. RangeRoad 42 Project Lands !. !. )" !. Data Sources: CYP 03 CYP 28 7 !. !. Datum: NAD 83 14 " !. ) .! Proposed Turbine Location !. Populated places, roads, Alberta Township System, and municipal boundaries 0 Projection: UTM Zone 12N 27 18 25 4 15 30 29 28 !. !.

d !. !. from AltaLIS, licensed under the Open Government Licence – Alberta. a 8

o CYP 25 )" Residence !. !. 19 R 16 !.

)" !. e

TWP 10 TWP Township Road 104 g !. Prepared By: WSP Canada Inc. n !. 20 a Major Highway !. !. !. Scale: N.T.S. R Author: A. Medd 17 !. !. CYP 04 CYP 26 10 !. Reviewed: S. Schnick !. !. !. )" )" Minor Highway !. !. 24 19 20 21 Approved: R. Istchenko 22 23 !.

Date: 2019-03-08 22 !. !. RangeRoad 35

23 11 RangeRoad 34 WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability or responsibility 21 )" Road !. !. !. for the accuracy, completeness or usefulness of any results or any information contained in this figure and use or reliance CYP 27 CYP 24 )" !. thereof. The figure is intended to be used in its entirety and solely for the purpose of this project. No excerpts may be CYP 07 26 Version: 8 taken to be representative of the findings in the assessment. The use and interpretation of this figure and any other data )" )" CYP 33 25 VU515 contained therein to make any investment or acquisition decisions of any nature is solely the responsibility of the client for RGE 4 W4M RGE 3 W4M Page 43 Before

After

Title: 34 35 36 3 31 32 Photomontage: Location 3 (E138) Notes: 4 Legend: 41 Photographs taken with Canon ESO 5D Mk II camera and Canon EF24-70mm 13 VU Township Line !. Project: f/2.8L lens set at 50 mm. Panoramic view compiled from multiple individual Photo Location !. !. photographs. Photomontage simulated using Enercon E138 EP3 turbine with CYP 03 CYP 28 Section Line !. !. RangeRoad 43 14 !. rotor diameter of 138 m and hub height of 108 m using 48 turbine locations Panorama Field of View (approximate) !. Cypress Wind Project !. (Layout Lv22). 27 18 25 15 30 29 Quarter-section Line !. !. !.

RangeRoad 42 CYP 25 !. !. 19 16 Project Lands !. !. Data Sources: Township Road 104 !. !. !. Datum: NAD 83 20 ! !. Populated places, roads, Alberta Township System, and municipal boundaries . Proposed Turbine Location !. Projection: UTM Zone 12N 17 !. !. from AltaLIS, licensed under the Open Government Licence – Alberta. CYP 04 CYP 26 !. !.

TWP 10 TWP )" !. !. Residence !. 22 23 24 RangeRoad 40 19 20 !. WSP Canada Inc. !. !. Prepared By: !. !. !. Scale: N.T.S. CYP 02 23 21 RangeRoad 35 Major Highway Author: A. Medd !. !. 22 CYP 27 !. Reviewed: S. Schnick !. !. !. Minor Highway !. !. Approved: R. Istchenko CYP 01 CYP 07 CYP 33 !. Date: 2019-03-08 24 !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability or responsibility 15 14 13 18 17 Road !. !. !. for the accuracy, completeness or usefulness of any results or any information contained in this figure and use or reliance 29 !. thereof. The figure is intended to be used in its entirety and solely for the purpose of this project. No excerpts may be 28 Version: 8 taken to be representative of the findings in the assessment. The use and interpretation of this figure and any other data VU515 contained therein to make any investment or acquisition decisions of any nature is solely the responsibility of the client for RGE 4 W4M RGE 3 W4M Page 44 Before

After

)" CYP 07 )" )" CYP 33 Title: Notes: 24 25 26 31 Photomontage: Location 6 (E138) 17 16 15 Legend: 41 Photographs taken with Canon ESO 5D Mk II camera and Canon EF24-70mm 13 18 29 30 UV )" !. f/2.8L lens set at 50 mm. Panoramic view compiled from multiple individual 28 35 36 Photo Location Township Line !. Project: CYP 08 CYP 19 !. photographs. Photomontage simulated using Enercon E138 EP3 turbine with !. )" 33 34 Section Line !. !. Cypress Wind Project rotor diameter of 138 m and hub height of 108 m using 48 turbine locations Township Road 102 41 Panorama Field of View (approximate) !. (Layout Lv22). 32 40 !. !. Quarter-section Line !. !. CYP 09 39 10 Project Lands !. !. 12 )" 7 38 8 9 41 !. !. VU !. !. Data Sources: !. Datum: NAD 83 44 CYP 18 .! !. Populated places, roads, Alberta Township System, and municipal boundaries 10 TWP 37 Proposed Turbine Location !. Projection: UTM Zone 12N CYP 35 )" !. !. 47 !. !. from AltaLIS, licensed under the Open Government Licence – Alberta. )" 43 CYP 16 )" !. !. )" Residence !. 46 )" !.

RangeRoad 40 42 Prepared By: WSP Canada Inc. CYP 15 !. !. Scale: N.T.S. 1 6 5 48 4 3 Major Highway !. !. !. Author: A. Medd 45 !. !. CYP 11 !. Reviewed: S. Schnick CYP 10 !. !. !. )" )" Township Road 100 Minor Highway !. !. Approved: R. Istchenko 515 !. Date: 2019-03-08 )" VU !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability or responsibility CYP 12 Road !. !. !. for the accuracy, completeness or usefulness of any results or any information contained in this figure and use or reliance !. thereof. The figure is intended to be used in its entirety and solely for the purpose of this project. No excerpts may be 36 31 32 33 34 TWP 9 TWP Version: 8 taken to be representative of the findings in the assessment. The use and interpretation of this figure and any other data RangeRoad35 515 contained therein to make any investment or acquisition decisions of any nature is solely the responsibility of the client for VU RGE 4 W4M RGE 3 W4M Page 45 Before

After

Title: Photomontage: Location 7 (E138) Notes: CYP 29 Township Road 110 Legend: 41 Photographs taken with Canon ESO 5D Mk II camera and Canon EF24-70mm VU TWP 11 TWP CYP 06 CYP 31 f/2.8L lens set at 50 mm. Panoramic view compiled from multiple individual Township Line !. Project: 3 1 2 Photo Location !. !. photographs. Photomontage simulated using Enercon E138 EP3 turbine with !. 35 36 31 32 33 Section Line !. !. Cypress Wind Project rotor diameter of 138 m and hub height of 108 m using 48 turbine locations 4 Panorama Field of View (approximate) !. 13 CYP 32 !. !. (Layout Lv22). 5 !. Quarter-section Line !. !. 6 Project Lands !. !. !. Data Sources: !. !. !. Datum: NAD 83 CYP 28 7 !. 14 .! Proposed Turbine Location !. Populated places, roads, Alberta Township System, and municipal boundaries !. !. Projection: UTM Zone 12N 0

from AltaLIS, licensed under the Open Government Licence – Alberta. 18 25 4 15 30 29 28 !. !. d

a 8 9 )" Residence !. !. o !.

19 R !.

TWP 10 TWP CYP 25 e Township Road 104 !. !. Prepared By: WSP Canada Inc. g 16 !. 20 n Major Highway !. !. Scale: N.T.S. a !. Author: A. Medd R !. 17 41 !. Reviewed: S. Schnick CYP 26 VU !. !. !. 10 Minor Highway !. !. Approved: R. Istchenko 23 24 19 20 12 !. Date: 2019-03-08 11 !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability or responsibility 22 Road !. RangeRoad 35 !. 23 21 RangeRoad 34 27 !. for the accuracy, completeness or usefulness of any results or any information contained in this figure and use or reliance !. thereof. The figure is intended to be used in its entirety and solely for the purpose of this project. No excerpts may be CYP 27 Version: 8 taken to be representative of the findings in the assessment. The use and interpretation of this figure and any other data CYP 24 VU515 contained therein to make any investment or acquisition decisions of any nature is solely the responsibility of the client for RGE 4 W4M RGE 3 W4M Page 46 Before

After

)" Title: 4 5 Photomontage: Location 9 (E138) Notes: 13 Legend: 41 Photographs taken with Canon ESO 5D Mk II camera and Canon EF24-70mm 6 VU )" Township Line !. Project: f/2.8L lens set at 50 mm. Panoramic view compiled from multiple individual CYP 28 7 Photo Location !. !. 14 )" photographs. Photomontage simulated using Enercon E138 EP3 turbine with !. 18 25 15 30 29 28 Section Line !. !. Cypress Wind Project rotor diameter of 138 m and hub height of 108 m using 48 turbine locations 8 Panorama Field of View (approximate) !. (Layout Lv22). 19 9 !. !. CYP 25 )" Quarter-section Line !. !. 16 Township Road 104 !. !. 20 Project Lands !. !. Data Sources: 17 41 !. !. !. Datum: NAD 83 CYP 26 VU ! !. Populated places, roads, Alberta Township System, and municipal boundaries . Proposed Turbine Location !. Projection: UTM Zone 12N )" )" 10 !. !. from AltaLIS, licensed under the Open Government Licence – Alberta. 23 24 19 20 11 12 !. !.

TWP 10 TWP 21 " !. RangeRoad 40 ) !. Residence !.

RangeRoad 35 !. 23 )" RangeRoad 34 27 Prepared By: WSP Canada Inc. 22 )" !. !. Scale: N.T.S. CYP 27 CYP 24 )")" Major Highway !. !. !. Author: A. Medd 26 !. !. )" !. Reviewed: S. Schnick CYP 07 )" CYP 33 25 31 !. !. !. 24 Minor Highway !. !. Approved: R. Istchenko 14 13 18 17 16 !. Date: 2019-03-08 29 30 !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability or responsibility 28 35 36 Road !. !. !. for the accuracy, completeness or usefulness of any results or any information contained in this figure and use or reliance !. Township Road 102 thereof. The figure is intended to be used in its entirety and solely for the purpose of this project. No excerpts may be CYP 08 )" 34 Version: 8 taken to be representative of the findings in the assessment. The use and interpretation of this figure and any other data VU515 contained therein to make any investment or acquisition decisions of any nature is solely the responsibility of the client for RGE 4 W4M RGE 3 W4M Page 47 Appendix Z March 2019 Open House Advertisements

Page 48 8–Cypress Courier, The 40 Mile County Commentator, Bow Island, Alberta, Tuesday, March 12, 2019 Town council on the fence Rotary Festival as to where unspent reserve funds should go

By Jeremy Appel et, we had lots of proj- compliance with Alberta Newspaper ects we didn't have charges to the provin- Group money for," said cial Cemetery Act. Kilpatrick. "There were some The Town of Redcliff "There's 50 things we wording changes," said is holding on to could do, but we can Kilpatrick. "As people's unspent reserve funds only afford 10." attitudes change, we to figure out where The Lions Club have to change our they'd be best spent. Splash Park is one pos- bylaws too." The town's road sibility mentioned in The changes include maintenance reserves the agenda of council's specifying 'dead human have $140,000 that was Feb. 25 meeting. remains' instead of just supposed to go towards Council had allocat- 'remains'. installing a stop-light ed $100,000 in the budg- "It seems kind of camera on a light tower et to fund that project, harsh, when you could on the Trans-Canada but according to the probably diplomatically Highway, but the agenda, the splash park say 'remains' or even province kiboshed the will cost closer to 'human remains' project. $300,000. instead of 'dead human "They would allow it, An administrator remains'," Kilpatrick because a red light cam- went to the Lions Club said. "Are we planting era, if you advertise it meeting on Feb. 27 to live human remains out and use it, does reduce see how much addition- there?" accidents, but ... they al funding they require, Still, the town is wouldn't allow us to the mayor says making the changes to hook up to their power "All that was really ensure there's no dis- source," explained decided is that we'd crepancy between local Mayor Dwight take the wait-and-see and provincial regula- Kilpatrick. approach as to where tions. COMMENTATOR/COURIER FREELANCE PHOTO BY SHAUNA FOCKLER "It's not worth it for that money would be "That's what the PUTTING A TALENT TO WORK: Jessica Balfour of Dunmore sang "She Used to be Mine" by us to have our own best spent," Kilpatrick province put in for a Sara Bareilles at the Rotary Music Festival at the Medicine Hat College on March 9. power to just have a said. definition, so that's camera up there." Cemetery bylaw what we put in for a The town decided the update passes first definition," said funds set aside for that reading Kilpatrick. project would be better Council also passed The second and third used elsewhere. the first reading of a readings are scheduled Annual Meeting of "When we were bylaw to bring their for council's March 11 going through the budg- Cemetery Bylaw into meeting. SOUTH COUNTRY CO-OP County to move ahead Monday, March 25th, 2019 starting at 7:30 PM with water master • Review of the Financial Statement and other Reports • Coffee & Pastries will be served and plan criteria we will be giving out door prizes! • Director Election • Resolutions By Justin Seward in each Hamlet and expectations for Commentator/Courier Desert Blume Dunmore -Investigate and -Stormwater A water and waste- evaluate a regional com- evaluations in hamlets Chinook Village water management plan mission -Wastewater ou’re at home her for Cypress County is -Investigate of upgrades in Irvine and Y e. taking shape after coun- existing lines and mod- Veinerville 2801 13 Ave. S. E. • 03/08/19 41347943 cil approved the criteria eling -Incorporation requirements at its -Investigate of water lines in the Medicine Hat, AB March 5 meeting. funding existing and county. It was in a motion new infrastructure “This allows to look before the Christmas -Evaluate how at the county as a whole break that council water allocations is dis- with our water directed administration tributed throughout the resources,” said Coun. to begin the process to county Robin Kurpjuweit. create a water and -Evaluation of “It effects everything wastewater master how the model overlaps in the county moving plan for the county. with SMRID, City of forward that has any- Administration met Medicine Hat thing to do with water and created a list of 16 and coopera- and the management of criteria to implement tives wastewater and into the plan: -What is AEP Stormwater will fit -Public consul- (Alberta Environment under this master plan tation on serving and Parks) doing as a big strategic piece.” Cypress County regarding the He cautioned that the -Investigating acquisition of a Suffield line is a portion into serving only ham- water license of the county’s vision lets -Evaluating pop- and that the municipal- COMMUNITY - Fire suppres- ulation growth ity will stick to its prin- sion in hamlets -A phasing plan ciples when designing -Evaluating for infrastructure the line. existing infrastructure -Wastewater OPEN HOUSE Victorious Bulldogs EDF Renewables Canada Inc., believes that being responsible in business also means being a responsible neighbour to the communities that host our projects. We would like to hear from you! Please join us at our third community open house to take part in the conversation about our proposed Cypress Wind Power Project. You will receive updated project information and will have the opportunity to provide us with your input. Light refreshments will be served. PHOTOS SUBMITTED BY SHERIDAN SIEWERT

LEAGUE CHAMPS: Both the Irvine Bulldogs’ peewee and atom Tier 4 teams won their respec- tive league championships over the weekend. The peewees beat Vauxhaull in the third and TUESDAY, MARCH 26, 2019 deciding game 6-2 on home ice on Sunday. The atoms won 8-1 in Fort MacLeod on Saturday, sweeping the series in two games. 5:00p.m. – 8:00p.m. Irvine & District Agricultural Society 207 Francis St., Irvine AB, T0J 1V0

For more information please contact: [email protected] 1.844.553.3336 www.cypresswind.ca

Page 49 Cypress Courier, The 40 Mile County Commentator, Bow Island, Alberta, Tuesday, March 19, 2019–15

Redcliff Winter Festival

Commentator/Courier Photo by Justin Seward

The inaugural Redcliff Winter Festival took place on March 17 in the Rec-Tangle Arena parking lot. Above: Grace (l-r) and Ryder Becker, Dakota Cole and Charlie Fairbrother roasted marshmellows over the fire pit. Right: Hudson Kuzik gets his favourite Spiderman face painting. Bottom: Beckett Vatamaniuck and mother Stephanie pet the horse before they take off on the hay rides.

Annual Meeting of SOUTH COUNTRY CO-OP Monday, March 25th, 2019 starting at 7:30 PM • Review of the Financial Statement and other Reports • Coffee & Pastries will be served and we will be giving out door prizes! • Director Election • Resolutions

Chinook Village You’re at home here. 2801 13 Ave. S. E. • 03/08/19 41347943 Medicine Hat, AB

S RED ER AN G G D U

COMMUNITY O S R

“ OPEN HOUSE R ” Est. 1971 ! A E EDF Renewables Canada Inc., believes that being NG S E E U responsible in business also means being a RA NG responsible neighbour to the communities that ISED FOR RA host our projects. We would like to hear from you! Please join us at our third community open house to take part in the conversation about our proposed Cypress Wind Power Project. You will th receive updated project information and will have 46 Annual Performance Bull Sale the opportunity to provide us with your input. PM Light refreshments will be served. APRIL 9, 2019 | 1 TUESDAY, MARCH 26, 2019 PERLICH BROS. AUCTION MARKET LETHBRIDGE, ALBERTA 5:00p.m. – 8:00p.m.

Irvine & District Agricultural Society *FEATURING* 207 Francis St., Irvine J] ]UQ F,UC, FJQU= ] ]FC=FJ F,%Q] ,Y ]FJ=J]  AB, T0J 1V0 =J= F,UC, F]C =U]%]&Q] ]FJ F,%Q] ,Y ]FJ [=F%JZVYYV^^]VV=&Y Jason Slomp 403.635.1473. SHAWN 403.421.0162 KURT 403.421.0359 PERLICH BROS. 403.329.3101 For more information please contact: 1.877.888.BULL [email protected] [email protected] WWW.RODGERSREDANGUS.COM 1.844.553.3336 www.cypresswind.ca

Page 50 A16 - PRAIRIE POST - Friday, March 15, 2019 Alberta Nickel Group Developments: new company, new plan for millennial living BY RYAN DAHLMAN — [email protected] Chris Nickel is one who likes to think outside of the box. What is something that is innovative, will help people and hopefully change things for the better? Having grown up in a family where home building was a part of life, what better roots does an innovative idea grow from, than with the support and now working cooperation and know-how of family? Chris and his brother Dustin (BBA) are co-developers of Nickel Group Developments, a brand new building company which does builds custom homes, does commercial renovations as well as partake in some special developments. It is within this special development project realm where Chris expects the new family company to make some waves. He says mortgage laws, taxes, land prices have made single family dwellings harder to come by and somewhat of obsolete idea for millennials (ages 23-38). Photo contributed What they have in mind is large, high Pictured from left are Joel Jelinski (Chief Experience Officer); Matt Strong (Accounting); Dave Nickel (Project Manager); Chris Nickel (Co- end 20-25 unit multi-family buildings developer); Dustin Nickel (co-developer). which will feature major amenities including open concept "neutral" rooms Branding these multi-family Amongst these surge we've made a to have the ability to host parties, developments as "New Luxury", the cities include “We are our own cultural various functions, or just quiet spaces Nickel Group is targeting purchasing Medicine Hat, demographic that away from it all; the ability to get in costs of up to $450,000. They use their Lethbridge, Okotoks, brand . We are trying wants this. They housekeeping to come in to clean decades of connections to help keep Grand Prairie and don't want to wait dwellings; built in small businesses building costs lower. Fort McMurray,plus a to solve a problem for five or six flips to be within the building like eateries or These multi-family dwellings are few in the eastern able to do perhaps beautician type of businesses – ourselves.” targeted for smaller Alberta cities which interior of British Chris Nickel co founder of this...everything all the while sharing it under one they refer to as "surge centers". These Columbia including about our branding collective roof with like minded people smaller cities in which the millennial Kimberley. Nickel Group Developments on and research is that who want this type of lifestyle allowing families would be drawn to according to "That age group how the new multi-family they want an free access networking. Almost like a Nickel is because of this generation’s wants to move to the concept idea was derived (enjoyable living) live-in hotel or as Nickel describes it, a desire for a smaller urban centre, but surge centres so we're experience; they luxury feel on a budget. He says these with all the big city amenities and attacking those don't want younger professionals want the million opportunities minus the metropolitan places," explains landscaping (duties). dollar homes, but have a budget at less negatives. Nickel. "There's nothing in the price We have the opportunity to create than half of that. ranges in the bigger centres... surge amenity experience, they experience centres are ready to explode, we want to their culture within one building." give them another reason to explode. They are just starting a prototype in "Our entire business model is to change the Bowness area near the Bow River in the way young professionals look at Calgary.In Medicine Hat, the Nickel multi-family buildings. We are going to Group have worked with McInley attract a lot of younger families to this. Berkhart as well as worked with City of Our thinking is 'build it and they will Medicine Hat and Invest Medicine Hat. come.' We want the city of Medicine Hat The plan is to start building in to grow, we want Lethbridge to grow... Medicine Hat in 2019. "We (the Nickel business partners/ "Our Nickel Group has been 50 years COMMUNITY management team) are our own brand. in the making," explains Chris who says We are trying to solve a problem for from his grandfather on out have been ourselves." involved and influential in the Alberta Nickel explains millennials want home building industry.He himself has OPEN HOUSE larger more luxurious living right away been working in the industry in a and not want to wait to reach that goal. variety of capacities including "We are EDF Renewables Canada Inc., believes that being responsible in He says that his current leadership carrying a legacy,the credibility and the business also means being a responsible neighbour to the group was like his family and their start history of learning to solve a problem,” communities that host our projects. in the building industry.His family stated Nickel who is a director of the predecessors were successful because Canadian Home Builders' Association We would like to hear from you! they solved a problem and met the (CHBA) of Medicine Hat and an award demands of the market. winning Masterbuilder. His group's mindset is that rate of Chris started working for his father’s Please join us at our third community open house to take part in the inflation is going higher than the rate of construction company and learned from conversation about our proposed Cypress Wind Power Project. You will a family income. The biggest obstacle the very base what it takes to build a receive updated project information and will have the opportunity to obviously for this type of luxury living home. provide us with your input. Light refreshments will be served. is affordability. Dave Nickel is the Project Manager has "We've heard too many times that in more than 40 years of building the surge centres there's nothing there experience including operating a TUESDAY, MARCH 26, 2019 they like, nothing here to move to," construction business. For more than 30 explains Nickel using Medicine Hat as years owned and operated a successful an example. He says now that there are a construction business in Calgary 5:00p.m. – 8:00p.m. variety of big businesses having arrived and has built more than 1,000 homes or are coming to Medicine Hat, "we need across Western Canada. Irvine & District Agricultural Society to capitalize on that. Move people Joel Jelinski B.Eng Chief Experience 207 Francis St., Irvine, AB, T0J 1V0 around now as business comes, give Officer (CXO) with Matt Strong in them another option a bigger reason to Accounting and Ryan Schindel  do that, give them an opportunity.We're LLB (External Legal Council) round out not here to take anything away the core group. They have a from other builders, but there's a website, but also are on niché space with certain Facebook, Twitter, Instagam demographic this would work for; and LinkedIn.

)RUPRUHLQIRUPDWLRQSOHDVHFRQWDFW: F\SUHVVZLQGSURMHFW#HGIUHFRP  ZZZF\SUHVVZLQGFD

Page 51 A6 - PRAIRIE POST - Friday, March 22, 2019 Swift Current Long-term care residents and veterans receive hand-made quilts BY MATTHEW LIEBENBERG program. The money was used to [email protected] purchase batting and backing material Residents at The Meadows long-term for the project. care facility and several military Renee Hovdestad, a health services veterans will enjoy the warmth and manager at The Meadows, expressed comfort of hand-made quilts provided gratitude on behalf of the residents, by the Southwest Quilter's Guild. families and staff for this large The presentation of 56 wheelchair lap donation of lap quilts. quilts to The Meadows and seven quilts “It's pretty exciting, not only because to military veterans took place during of the gift of the quilts, but it's the gift a ceremony at the long-term care of friendship from the ladies that came facility,March 16. in and did the quilting,” she said. “It's Guild member Cecilia Mulhern was the friendship and it's an activity for the coordinator of the project. The the residents to come and see when the group of about 25 members will share ladies are quilting here and build Photo by Matthew Liebenberg quilts every year with different friendships.” Renee Hovdestad, a health services manager at The Meadows, speaks during the quilt organizations, and they decided for the This was the largest single donation presentation, March 16. Next to her is Cecilia Mulhern of the Southwest Quilter's Guild. 2018-19 sewing year to donate quilts to of quilts ever made to the long-term The Meadows and to Quilts of Valour. care facility in Swift Current, and they before his unit left Canada. He was Battalion, Princess Patricia's Canadian “When we started with the project in will be a real benefit to residents. deployed to a prisoner of war camp for Light Infantry,as well as with 2 Service the fall, I had optimistically thought “The majority of our residents are in German officers in Wainwright, Battalion, Petawawa. He was overseas that we would do 30,” she said. “I wheelchairs,” she noted. “We will Alberta, where he served until 1946. for six months in Cyprus, where thought if we can do 30 quilts I'll be check and see, and do a survey to see Friesen was an airplane mechanic Canadian forces were deployed as part over the moon, and then as the word which residents would benefit most from 1951 to 1956. NATO pilots from of the United Nations peacekeeping got out different people became and then we'll be able to make a Europe and the United Kingdom came force on the island. involved.” decision and hand them out to the to Canada during those early Cold War “I'm very humbled, I'm very Quilters who are not members of the people who need them the most to keep years to receive their training. He was honoured,” he said after the Southwest Quilter's Guild also them warm when they're in their stationed at various airfields across the presentation. “It surprised me actually participated in this project. These non- wheelchairs.” country,where he serviced Harvard when they reached out and told me that members are from Swift Current, Gull Swift Current resident Marcie Erick, and Beechcraft training planes. they heard I had served and they liked Lake, Hazlet and Tompkins. a regional coordinator for Quilts of Loeppky served for 10 years in the to present a quilt. It's very nice.” “So on behalf of the guild, I would Valour Canada, presented quilts to Royal Canadian Air Force. He was with Erick's goal as Quilts of Valour like to say thank you for everyone who seven military veterans. The recipients 440 Squadron's search and rescue in Canada representative is to reach out quilted,” she mentioned. “We were Jason Loeppky of Waldeck and Edmonton and also with 402 Squadron, to as many veterans as possible and to appreciate it very much.” Swift Current residents Les Ferris, which is a training and navigation present them with a quilt. She is able to Quilters used The Meadows as a Fidel Frenette, John Friesen, Andy school, in Winnipeg. combine two passions through her role. convenient location for some of their Keys, Peter Rymes, and Lloyd Williams. “I'm absolutely shocked and “Military veterans and quilting are sew days, and they had opportunities to Friesen and Williams were both honoured,” he said about receiving a two things I'm very passionate about,” connect with residents. pleasantly surprised to receive quilts, quilt. “I never thought that I would get she said. “We make quilts and hand We've had some really good and expressed their appreciation for one. I've known of the program for a them out to veterans, and we prioritize interactions,” she said. “We've had lots the gesture when they spoke to the few years, and I just never thought I our World War Two and our Korean War of encouragement from residents that Prairie Post. would get one, because I never served veterans, Bosnia and Afghanistan as come to see what's going on.” Williams, who will soon celebrate his overseas. ... It will definitely get a well. For me, I also prioritize veterans The Southwest Quilter's Guild 93rd birthday,was the oldest recipient. special place.” that live with PTSD. That's something received a grant of $1,000 through He received his infantry training in Les Ferris served for six years in the that's really important to me.” 1945, but the Second World War ended SaskEnergy's Share the Warmth Canadian Army with the 2nd and 3rd Continued on Page A7 WANTED COMMUNITY 30 PEOPLE WITH HEARING LOSS Now OVering a No-Cost Hearing Aid Trial Opportunity OPEN HOUSE We’re looking for people like you, who may struggle EDF Renewables Canada Inc., believes that being responsible in to hear and understand NOW business also means being a responsible neighbour to the conversations in noisy Testing communities that host our projects. environments, to try a remarkably sophisticated hearing aid[1] for yourself. We would like to hear from you! Find out if this is the solution to your hearing diNculties. Please join us at our third community open house to take part in the Call today for your FREE conversation about our proposed Cypress Wind Power Project. You will hearing test and hearing aid receive updated project information and will have the opportunity to trial – promotion ends March 29th 2019. provide us with your input. Light refreshments will be served.

TUESDAY, MARCH 26, 2019 Call today or book online: HearingLife.ca/HearingTrial

5:00p.m. – 8:00p.m. Medicine Hat 3070 Dunmore Rd SE | Call Alexandra at Irvine & District Agricultural Society 1-888-366-6649 207 Francis St., Irvine, AB, T0J 1V0 

TRUSTED PARTNER OF

)RUPRUHLQIRUPDWLRQSOHDVHFRQWDFW:

F\SUHVVZLQGSURMHFW#HGIUHFRP * O#er valid until March 29th, 2019 and is subject to change without notice. No-cost hearing tests are provided to adults ages 19 and older. A fee will apply for a copy of your audiogram. Child hearing tests are conducted at select locations for a fee, please contact us for  more information. Candidates must be private sale. Some conditions may apply. Please see clinic for details. O#er not valid in . [1] https://www.oticon.ca/solutions/opn ZZZF\SUHVVZLQGFD Promo Code NSP-WNTD3-PRPT Page 52 NATION Saturday, March 16, 2019 — THE MEDICINE HAT NEWS A7 Blair mulling ways to close loophole Wilson-Raybould tells constituents she’s in Safe Third Country Agreement sticking with Liberals for 2019 vote The Canadian Press encing an influx of “irregular” border crossers in early 2017, OTTAWA The Canadian Press shortly after U.S. President committee that Trudeau and March 4 saying she had lost Border Security Minister Bill several members of his senior confidence in the way the Blair says he is talking to law- Donald Trump announced he OTTAWA would end a program that Jody Wilson-Raybould, the staff were part of a prolonged Prime Minister’s Office had makers in the United States and co-ordinated effort to con- handled the SNC affair. about closing a loophole in offered temporary protected former cabinet minister who status to migrants from several accused Prime Minister Justin vince her to overrule a decision Trudeau has said he is still con- Canada’s border agreement by the director of public prose- sidering their future in the cau- with the U.S. - one countries in the United Trudeau of trying to influence States. her decision in a criminal case cutions to proceed with a crim- cus. Both have already been seen as giving asylum- inal trial against SNC-Lavalin nominated in their respective seekers reason to cross Over 40,000 asy- against engineering firm SNC- lum-seekers have Lavalin, has confirmed she on charges of bribery. ridings by the Liberals. into Canada through Trudeau said he A spokesman for fields and forests. since arrived in intends to run as a Liberal in Canada from the U.S., the next federal election. believed Wilson- Trudeau said Friday The Safe Third the prime minister has avoiding official bor- In a letter to constituents Raybould was open to Country Agreement not spoken with either der checkpoints where posted to her website Friday, receiving additional says asylum-seekers Wilson-Raybould or they would have been Wilson-Raybould said the information that could cannot claim refugee Bill Blair Philpott in recent days turned back. explosive political saga has affect her decision, and protection in Canada and has no comment The issue has sparked calls been a “wake-up call” for directed his staff to if they arrive at an official bor- on Wilson-Raybould’s for Canada to suspend or Canadians about the “culture of provide that informa- Jody Wilson- der checkpoint from a country letter. amend the agreement. conflict, empty partisanship tion - including the that is considered safe, such as Raybould Wilson-Raybould Blair said the U.S. has also and cynical games” that exists potential impact on the United States. said in her letter she had people crossing irregular- in Ottawa. SNC’s 9,000 Canadian But they can claim refugee believes the full SNC-Lavalin ly from Canada into America, Nonetheless, she said, she employees. He also wanted her status if they are already in story hasn’t yet been told. if not as many as have come plans to stand for re-election as to consider getting an outside Canada, which is why tens of legal opinion on the use of “These matters are still the other way. This has creat- a Liberal in the Vancouver- thousands of asylum-seekers remediation agreements, a new unfolding, and further clarity ed an “opportunity to the Granville riding next fall have been crossing into tool in Canadian law that can and information is needed,” mutual benefit of both coun- because she got into politics to Canada through unofficial avert a trial in exchange for she said. tries” to modernize the agree- change that culture - and entry points on foot. fines and outside monitoring. The Conservatives Monday ment, Blair said. believes she still has plenty of “There has been some dis- The justice committee and will seek to give Wilson- Other potential changes are work to do. cussion about how we might the ethics commissioner are Raybould more of a chance to also being discussed, but Blair apply the agreement to those “Beyond partisanship, spin both investigating the allega- provide more detail with a would not elaborate, saying it who present themselves at a and image, there lies a politics tions, the RCMP have been motion in the House of would not be appropriate to place other than the border of change that is driven for- asked to investigate and the Commons calling on Trudeau negotiate a bilateral treaty in where there’s clear evidence ward by galvanizing our core Organization for Economic to extend the time period on public. that they’ve come from the values - regardless of political Co-operation and the confidentiality waiver he United States, that they were in “There are ongoing discus- stripe - into concrete laws, poli- Development has expressed its issued his former attorney a place that was, in fact, a safe sions,” he said. “The agree- cies and actions that support concern, saying it is monitor- general, so it includes events third country, or if they’ve ment worked quite effectively Canada as an ever-advancing ing the investigations. that occurred after she was made application in the for well over a decade and society,” Wilson-Raybould Wilson-Raybould resigned shuffled out of the justice United States and they have continues to work at regular wrote. her cabinet seat Feb. 12, about portfolio. legal travel documents in the points of entry and at our air- She said she never expected a month after she was shuffled She has said the waiver United States,” Blair told The ports, but unfortunately there to find herself thrust into the from Justice to Veterans Affairs, doesn’t free her to explain Canadian Press Friday. is this exemption that exists in centre of a controversy that a move she believes was pre- why she resigned from cabi- “There are ways, we believe, the current agreement that culminated last month in her cipitated by her refusal to net or what she told the cabi- that we could apply the agree- allows people to avoid its resignation from cabinet. change her mind about the net in an unusual meeting ment more broadly to those terms if they present them- “I was just doing my job and SNC-Lavalin case, an allegation she attended a week after she people and therefore disincen- selves at an irregular border I did not expect it to become a Trudeau has denied. resigned. tivize them from crossing point, so that’s one of the national focus.” She remains a Liberal MP, as The justice committee is to irregularly.” things we are hoping to Wilson-Raybould told the does Jane Philpott, who meet Tuesday to determine if Canada first began experi- address in those discussions.” House of Commons justice resigned her own cabinet post it will recall her as a witness. Liberals urged to expunge cannabis records The Canadian Press bill last summer requiring ing to expungement, not par- OTTAWA California prosecutors to erase dons,” Rankin said in an inter- The Liberal government or reduce the severity of tens view. “The Democratic candi- should follow the lead of of thousands of convictions. dates for president are all talk- American jurisdictions that In Canada, the government ing about expungement. I have moved to erase criminal has introduced a law making it wish (Canada’s Liberals) would records for simple cannabis much easier to apply for a par- look south of the border to see possession, says NDP justice don for a past conviction for that the debate they’re having critic Murray Rankin. cannabis possession, which now has already happened In late February, officials in would leave a record of that and people understand that San Francisco announced they conviction accessible in cer- expungement is the way to would expunge more than tain circumstances. Another go.” 9,000 cannabis convictions term for it is a “record suspen- Expunging records means CP FILE PHOTO dating back to 1975 — a move sion.” permanently destroying or The Supreme Court of Canada is ruling part of the country’s internet that followed the passage of a “In California, they’re mov- removing them. child luring laws are unconstitutional and ordering a new trial for a Toronto-area man. Douglas Morrison posted an ad on Craigslist in 2013 seeking “a little girl to meet and have some fun with him,” and then had sexually explicit conversations by computer with a police officer claiming to be a 14-year-old girl. SCOC rules ‘belief’ requirement in child-luring law is unconstitutional

The Canadian Press but found Morrison guilty OTTAWA nonetheless. The Supreme Court of In a unanimous ruling COMMUNITY Canada says a provision of the Friday, the Supreme Court country’s law forbidding the said Parliament’s wording of luring of children via the inter- the law violates the presump- net is unconstitutional and is tion of innocence promised by the Charter of Rights and OPEN HOUSE ordering a new trial for a Toronto-area man. Freedoms. Douglas Morrison posted Under the new ruling, the !"# $ %   &believe ' being responsible in an ad on Craigslist in 2013 Crown has to prove the business also means being responsible ('$)to the entitled “Daddy looking for his accused actually believed the communitthat host our project. little girl,” and then had sexu- alleged victim was underage. ally explicit conversations by It isn’t even necessarily computer with a police officer enough to show that the We    to hear from you claiming to be a 14-year-old. accused asked the alleged vic- tim’s age and was told he or The conversations took *  +oin us at our  community open house to take part in the place over a span of more than she was an age too young for two months. Morrison invited sexual activity. conversation about our proposed Cypress Wind Project   the “girl” to touch herself sex- “In short, there is but one ,updatedroject         ually, suggested she watch pathway to conviction: proof ,) ') )    pornography and also pro- beyond a reasonable doubt posed the two meet to engage that the accused believed the in sexual activity - a meeting other person was underage. that never happened. Nothing less will suffice,” ,  During his trial, Morrison Justice Michael Moldaver said he believed the respon- wrote for the majority.   – 8p.m. dent was an adult and that The accused can defend they were role-playing, point- him- or herself by proving ing to Craigslist rules that they took “reasonable” steps to Irvine & District Agricultural Society required users to be 18 or figure out if the alleged victim older. was underage. If he or she did 207 Francis St., Irvine, AB    He challenged the constitu- not, then an accused cannot tionality of a provision of the argue they fully believed the law that presumes an accused person was of legal age. knows a victim is underage Stemming from that, the unless the accused person can justices ruled in an 8-1 deci- prove he or she took reason- sion to overturn Morrison’s able steps to find out other- conviction, citing errors made wise. The law presumed by the trial judge, and ordered       : Morrison believed the girl to Morrison a new trial. be 14 years old, despite his The court didn’t deal with       arguments to the contrary. another aspect of the appeal  The trial judge agreed with around Morrison’s case: his   the constitutional argument, sentence. Page 53 NATION Saturday, March 23, 2019 — THE MEDICINE HAT NEWS A7 Chinese importers have Wilson-Raybould to reveal more stopped buying Canadian details, documents on SNC-Lavalin canola seed: Industry group The Canadian Press

The Canadian Press the United States. OTTAWA Liberals are urging former Chinese companies have The council said canola exporters are now looking at attorney general Jody Wilson- stopped buying canola seed Raybould to use her parliamen- from Canadian producers, other markets, including Japan, Mexico, the United tary privilege to tell the House leaving exporters trying to sell of Commons whatever she their supply to other markets. States, the United Arab Emirates, Pakistan, wants about the SNC-Lavalin The ongoing trade dispute affair. that started earlier this month Bangladesh and Europe. “It’s very difficult to replace But they want her and her when China revoked the per- former cabinet ally Jane Philpott mit of a major Canadian a market that takes as much as China takes,” said Innes. In to tell their stories in full all at exporter is also hitting canola once, rather than dragging out farmers, who are grappling 2018, canola seed exports to China were worth $2.8 billion, the controversy with partial with lower prices and delayed statements and hints of more to shipments. according to the council. The most immediate prob- come, which have overshad- “Chinese buyers became owed all other aspects of the CP FILE PHOTO uninterested in buying lem though, Innes said, is a Jody Wilson-Raybould plans to reveal more — in writing — about drop in price for the com- government’s agenda. Canadian canola,” said Brian “That should happen right her accusation that she faced improper pressure to prevent the Innes, vice-president of public modity, especially for farmers criminal prosecution of SNC-Lavalin. who still have unsold canola away,” Environment Minister affairs for the Canola Council Catherine McKenna said Friday. of Canada. from last year’s crop. “That canola is worth less “If there are serious concerns, dealings in Libya. She was fol- argument that diversity of opin- The change from a market we should all be concerned, but lowed by former prime ministe- ion within Liberal ranks is a that accounts for about 40 per now than it was a month ago.” David Reid, 42, is a partner we’ve also got to continue deliv- rial aide Gerald Butts, who said good thing . cent of Canada’s canola seed, ering what we’re delivering for there were miscommunications The Liberal-dominated jus- oil and meal exports came at the family farm he grew up on in Cremona, Alta. - about Canadians.” but no improper pressure, and tice committee shut down its after the formal notification McKenna made the com- then-Privy Council clerk investigation into the affair on that China blocked imports 90 kilometres northwest of Calgary. Canola accounts for ment shortly after Wilson- Michael Wernick, who denied Tuesday, with Liberal members from one of Canada’s largest Raybould informed the House about 30 per cent of what the Wilson-Raybould’s allegation concluding no rules or laws grain producers, Richardson of Commons justice committee that he’d issued veiled threats were broken. That denied farm produces. International Ltd., he said. The that she intends to make a writ- about her place in cabinet on Wilson-Raybould a potential The farm sells to a compa- Chinese decision cited an ten submission revealing more the prime minister’s behalf. opportunity to testify again and ny that exports the product to alleged detection of hazardous about her accusation that she Wilson-Raybould’s letter respond in person to Butts’s and other places, like China, but organisms in the company’s faced improper pressure last fall came the day after former cabi- Wernick’s accounts. after Richardson’s permit was product. to avert a criminal prosecution net ally Jane Philpott fanned the A different set of Liberal MPs revoked Reid said shipments All of the council’s mem- of Montreal engineering giant SNC-Lavalin fire in an interview will likely reject a bid by the slowed and he saw an imme- bers that export canola from SNC-Lavalin. with Maclean’s magazine, say- Conservatives to launch a sepa- diate price drop for his prod- Canada to China have report- In a letter to the committee, ing there is “much more to the rate investigation through the uct. ed that Chinese importers are Wilson-Raybould said she will story” - a report that landed in Commons ethics committee Prices fell by a dollar a currently unwilling to pur- provide “copies of text messages the midst of a 31-hour, next week. bushel, he said, which he chase their product, Innes and emails” that she referred to Conservative-orchestrated fili- Still, Toronto Liberal MP estimated to be a 12 per cent said. Council members last month when she testified buster over the controversy. Adam Vaughan said nothing is fall. include Viterra Inc., Louis for nearly four hours before the The filibuster, which contin- stopping the ex-ministers from The price of the commodi- Dreyfus Company, Cargill Ltd. committee. She will also make a ued until almost 1 a.m. Friday, saying whatever they want in and Parrish & Heimbecker ty also fell in futures contract written submission, based on was intended to protest the Commons, where they are Ltd. trading since Wanzhou’s “relevant facts and evidence in Trudeau’s refusal to offer a blan- protected by parliamentary “What we understand is arrest. The May canola my possession that further clar- ket waiver of privilege and con- privilege from lawsuits. that the concern or the reluc- futures contract was trading ify statements I made and eluci- fidentiality that Wilson- “If they want to tell their tance of Chinese buyers to at $451.20 per tonne Friday date the accuracy and nature of Raybould has claimed is neces- story, they have the best seat in purchase Canadian canola is afternoon - down nearly 3.8 statements by witnesses in testi- sary if she is to fully tell her side the house in this country to do not coming from their con- per cent. mony that came after my com- of the story - including things so. Parliamentary privilege cern about the quality of our Reid is now holding on to mittee appearance.” that occurred after her move to allows them to tell their truth product,” he said, adding more of his product in hopes Her written statement will be Veterans Affairs until her resig- and my advice to both of them they’ve had no quality ques- the price will rise. “within the confines of the nation from cabinet a month is avail yourself of the seat you tions from other markets. “We don’t know how long waiver of cabinet confidence later. have in the House of Innes said he can’t specu- we might have to wait for the and solicitor-client privilege” Philpott resigned from cabi- Commons,” he said. “Any mem- late on where the reluctance is price to increase,” he said, she was granted before testify- net early this month, saying ber can rise at any time on a coming from. adding that while it’s possible ing orally, she said. That waiver she’d lost confidence in the gov- point of privilege and make a At the time of the to store the product for a long covers up until Jan. 14, when ernment’s handling of the SNC- statement.” Richardson announcement, time, bin space will become she was shuffled out of her dual Lavalin case. Both former min- But Conservative House some suggested the move an issue by the fall when he’ll role as justice minister and isters remain in the Liberal cau- leader Candice Bergen said sug- could be retaliation for need room for the next cano- attorney general. cus and intend to seek re-elec- gestions that parliamentary Canada’s arrest of a top la crop. When she testified in person, tion this fall as Liberals but their privilege frees the former minis- Chinese tech executive. In He has already sold some Wilson-Raybould said she’d suf- continued stirring of the pot is ters to say what they like is “a December, Canadian authori- product at the lower price, fered a months-long campaign, testing the patience of their col- smokescreen.” She argued that ties arrested Huawei which hurts his bottom line. pushed by Prime Minister Justin leagues. opportunities to speak at length Technologies Co. Inc. senior “Everybody’s feeling it for Trudeau’s office, to get her to Liberal MPs publicly pro- in the Commons are limited executive Meng Wanzhou in sure,” he said of other canola order a “deferred prosecution fessed Friday to be comfortable and continued to push for a Vancouver at the behest of farmers he knows. agreement” be offered to SNC- with the pair remaining in cau- blanket waiver to let the pair Lavalin over its allegedly corrupt cus, in keeping with Trudeau’s testify in a committee hearing. Statistics Canada reports pace of inflation ticked higher in February

The Canadian Press OTTAWA The annual pace of inflation ments than they have in years edged higher in February as past when interest rates were gains in most spending catego- even lower, so still a bit of a ries offset lower gasoline prices, headwind for consumer spend- Statistics Canada said Friday. ing.” The agency reported the con- Helping push costs higher sumer price index in February was a 8.1 per cent increase in COMMUNITY climbed 1.5 per cent compared mortgage interest costs and a with a year ago. The move com- 14.3 per cent rise compared with pared with a year-over-over a year ago in the cost of fresh increase of 1.4 per cent in vegetables. The cost of passen- January. ger vehicle insurance premiums OPEN HOUSE Economists had expected a also rose 6.3 per cent. reading of 1.4 per cent for The cost of gasoline was !"# $ %   &believe ' being responsible in February. down 11.9 per cent compared Josh Nye, senior economist at with the same month last year as business also means being responsible ('$)to the the Royal Bank, said the slow overall energy prices slipped 5.7 communitthat host our project. pace of inflation will mean the per cent. Bank of Canada will likely However, Statistics Canada remain patient when it comes to said tighter oil supplies and the We    to hear from you raising interest rates. temporary closure of several “With inflation remaining refineries for seasonal mainte- *  +oin us at our  community open house to take part in the below two per cent now we nance helped boost gasoline think that’s going to mean a prices 1.9 per cent compared conversation about our proposed Cypress Wind Project   pause from the Bank of with January, the first month- ,updatedroject         Canada,” Nye said. over-month increase in gasoline ,) ') )    “So, households won’t be see- since July 2018. ing the same increase in borrow- Excluding gasoline, the annu- ing costs in 2019 that they did in al pace of inflation held steady at 2018. Still though, they are going 2.1 per cent, the same as ,  to be making higher debt pay- January.   – 8p.m. Spring & Irvine & District Agricultural Society 207 Francis St., Irvine, AB    Summe APPARELAAPP HAS ARRIVED!AR HUGEHUGE SSELECTIONSEE IN STSTOCK!

      :        648-3RD ST. SE | DOWNTOWN   403-527-8200 • www.stonefurs.com Page 54 Page 55 Appendix AA Consultation with Federal Agencies

Page 56 Consultation with Canadian Coast Guard

Page 57 From: CCG Wind Farm Coordinator / Coordinateur Parcs Eoliens GCC (DFO/MPO) Sent: Friday, May 3, 2019 9:37 AM To: Ingold, Nicholas; CCG Wind Farm Coordinator / Coordinateur Parcs Eoliens GCC (DFO/MPO) Cc: EDF EN Canada; Schnick, Steve; Susan Jin Subject: RE: Coast Guard request for review: Cypress Wind Power Project - Southern Alberta

Hello,

The status has not changed.

The Canadian Coast Guard does not have any communication or radar facilities in Alberta, therefore there are no interference issues for us to consider.

Regards / Salutations,

Martin Grégoire, P. Eng Canadian Coast Guard

From: Ingold, Nicholas Sent: May-03-19 8:39 AM To: CCG Wind Farm Coordinator / Coordinateur Parcs Eoliens GCC (DFO/MPO) Cc: EDF EN Canada ; Schnick, Steve ; Susan Jin ; Ingold, Nicholas Subject: Coast Guard request for review: Cypress Wind Power Project - Southern Alberta

Hello,

WSP, on behalf of Cypress Renewable Energy Centre Limited Partnership, would like toseek your input on potential interference between the proposed Cypress Wind Power Project and any Coast Guard operations or activities (e.g., radio communications, radars, etc.).

The proposed Cypress Wind Power Project is located in southeastern Alberta and consists of 48 Enercon E138 turbines with the following dimensions: - Total Turbine height (Blade at 12 o’clock position) = 177 m [580.71 ft] - Rotor Diameter = 138 m [452.76 ft] - Steel Tower Height (Hub Height) = 108 m [354.33 ft]

Based on our previous correspondence, WSP understands that the Canadian Coast Guard does not have any telecommunications or RADAR infrastructure in Alberta. Since some time has passed since our last correspondence, we would like to confirm that the Cypress Wind Power Project will not have any impacts on Coast Guard operations.

The turbine locations are shown in the attached map.

Should you have any questions or concerns, please let us know.

Best regards,

Page 58 Nicholas Ingold,EIT Project Designer, Aviation Transportation

T 1 613-690-1081 M 1 343-998-1279 [email protected]

2611 Queensview Drive, Suite 300 Ottawa, , K2B 8K2 Canada wsp.com

NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies. You are receiving this communication because you are listed as a current WSP contact. Should you have any questions regarding WSP's electronic communications policy, please consult our Anti-Spam Commitment atwww.wsp.com/casl. For any concern or if you believe you should not be receiving this message, please forward this message [email protected] so that we can promptly address your request. Note that not all messages sent by WSP qualify as commercial electronic messages.

AVIS : Ce message, incluant tout fichier l'accompagnant (« le message »), peut contenir des renseignements ou de l'information privilégiés, confidentiels, propriétaires ou à divulgation restreinte en vertu de la loi. Ce message est destiné à l'usage exclusif du/des destinataire(s) voulu(s). Toute utilisation non permise, divulgation, lecture, reproduction, modification, diffusion ou distribution est interdite. Si vous avez reçu ce message par erreur, ou que vous n'êtes pas un destinataire autorisé ou voulu, veuillez en aviser l'expéditeur immédiatement et détruire le message et toute copie électronique ou imprimée. Vous recevez cette communication car vous faites partie des contacts de WSP. Si vous avez des questions concernant la politique de communications électroniques de WSP, veuillez consulter notre Engagement anti- pourriel au www.wsp.com/lcap. Pour toute question ou si vous croyez que vous ne devriez pas recevoir ce message, prière de le transférer [email protected] afin que nous puissions rapidement traiter votre demande. Notez que ce ne sont pas tous les messages transmis par WSP qui constituent des messages electroniques commerciaux.

Page 59 Turbine 1

Turbine 2 Turbine 3

Turbine 4 Turbine 13 CYPRESS WIND POWER PROJECT BOUNDARY Turbine 5 Turbine 6

Turbine 7 Turbine 14 Turbine 18 Turbine 15 Turbine 9 Turbine 8 Turbine 19 Turbine 16

Turbine 20 Turbine 17 Turbine 10

Turbine 12 Turbine 21 Turbine 27 Turbine 22 Turbine 11

Turbine 23

Turbine 24

CYPRESS WIND POWER PROJECT BOUNDARY Turbine 25 Turbine 26 Turbine 31 Turbine 29

Turbine 30 Turbine 28 Turbine 35 Turbine 33 Turbine 36 Turbine 34 Turbine 41 Turbine 38 Turbine 32 Turbine 39 Turbine 40 Turbine 37 Turbine 44

Turbine 43 Turbine 47

Turbine 42 Turbine 46

Turbine 45

Turbine 48

Client: CYPRESS RENEWABLE ENERGY CENTRE LIMITED Scale 1:50,000 PARTNERSHIP 250 0 500 750 1250 2000 METRES Project:

1000 0 1250 2500 5000 FEET CYPRESS WIND POWER PROJECT

1. COORDINATE SYSTEM: NAD 83_CSRS_UTM_UTM_12N N Title:

2. PLEASE REFER TO ATTACHED MULTIPLE 1 APR 2019 SUBMITTED FOR REVIEW NI AIM COORDINATE LISTING SPREADSHEET WHICH APPENDIX A: PROJECT No. DATE DESCRIPTION BY APPD PROVIDES DETAILED COORDINATES AND ELEVATIONS FOR ANALYSIS. W E LOCATION REVISION / ISSUE 3. BASE MAP: ALTALIS MAP 72E Copyright Reserved Project No. 181-00733-00 Contract No. TBD S THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY OF WSP CANADA INC. ARCH full bleed D (24.00 x 36.00 Inches) April 11, 2019 P:\CY__ 19M-xxxx-00 Cypress Wind Power Project Agency Consultation\CAD\Working\Cypress Map.dwg REPRODUCTION OR USE FOR OTHER THAN THAT AUTHORIZED BY WSP CANADA INC. IS FORBIDDEN. Page 60 DRAWING No. APPENDIX A Consultation with Department of National Defense

Page 61 From: Susan Jin Sent: August 27, 2019 12:10 PM To: [email protected] Subject: RE: DND Wind Turbine Assessment: EDF Cypress Wind Power Project

[WARNING - EXTERNAL SENDER] Hi Nancy,

I hope this email finds you well. I just wanted to follow up with your review of our proposed Cypress Wind Power Project and see if you had any questions and/or comments. I previously attached our project files in my last email to you for reference on evaluation of the project on having any potential adverse impacts to operations of DND. Any updates on your evaluation would be helpful. We are looking to submit to the AUC in the next couple of weeks and DND’s comments on the project would be supplementary.

I truly appreciate your time and please let me know of any comments or questions you may have.

Thank you and I look forward to hearing from you.

Sincerely,

Susan Jin Associate Developer

T: 416-216-5879 M: 647-522-8440 F: 416-363-7959

Disclaimer: This email and any attachments sent to EDF employees or their intended recipients should be considered confidential, may contain legal, professional and/or other privileged information, and intended solely for the addressee. If you are not the intended recipient, do not use the information in this email in any way; delete and

notify the sender.

Page 62 From: Susan Jin Sent: August 9, 2019 10:16 AM To: [email protected] Subject: RE: DND Wind Turbine Assessment: EDF Cypress Wind Power Project

[WARNING - EXTERNAL SENDER] Hi Nancy,

Thank you for your response. I have attached here all files that were sent to DND back in June: 1. Correspondence from our consultant WSP to DND; 2. Cover letter with project specific details; 3. a map identifying turbine locations; and 4. a spreadsheet containing specific turbine coordinates and elevations. If you have any trouble with any of the documents, please let me know.

Our proposed Project – Cypress Wind Power Project will be located in southeast of Medicine Hat, Alberta, closest to the Hamlet of Dunmore, in jurisdiction of Cypress County.

Upon your review, if you have any questions at all, please do not hesitate to contact me. Thank you for your time and I look forward to hearing from you.

Sincerely,

Susan Jin Associate Developer

T: 416-216-5879

M: 647-522-8440

Disclaimer: This email and any attachments sent to EDF employees or their intended recipients should be considered confidential, may contain legal, professional and/or other privileged information, and intended solely for the addressee. If you are not the intended recipient, do not use the information in this email in any way; delete and

notify the sender.

Page 63 From: Ingold, Nicholas To: [email protected] Cc: EDF EN Canada; Susan Jin; Ingold, Nicholas; Schnick, Steve Subject: RE: DND Wind Turbine Assessment: EDF Cypress Wind Power Project Date: May 21, 2019 11:40:41 AM Attachments: image002.png image004.png image009.png

Good day, We would like to follow up on the status of our submission for a DND Wind Turbine Assessment of the proposed Cypress Wind Power Project in southern Alberta. If there is anything we can do to assist, or any additional details that you may require to complete your assessment, please do not hesitate to let us know. Best regards, Nicholas Ingold, EIT T 1 613-690-1081

From: Ingold, Nicholas Sent: April-22-19 11:21 AM To: [email protected] Cc: EDF EN Canada ; Susan Jin ; Ingold, Nicholas Subject: RE: DND Wind Turbine Assessment: EDF Cypress Wind Power Project Hello, Please see attached a revised copy of the DND Wind Turbine Submission for the Cypress Wind Power Project. The only change that has been made is the Owner’s name. The project has just received capitalization, therefore all applications and permits must be under the following name: “Cypress Renewable Energy Centre Limited Partnership”. It would be much appreciated if the entire Owner’s name, as shown in bold in this email, be used in any approval/determination that DND may have. Note that no other changes to the submission have been made. Many thanks! Nicholas Ingold, EIT T 1 613-690-1081

From: Ingold, Nicholas Sent: April-12-19 10:06 AM To: [email protected] Cc: EDF EN Canada ; Schnick, Steve ; Susan Jin ; Ingold, Nicholas Subject: DND Wind Turbine Assessment: EDF Cypress Wind Power Project Hello,

Page 64 WSP Canada Inc, on behalf EDF Renewables Canada, has been contracted to conduct industry and governmental consultations for potential impacts of the Cypress Wind Power Project. The proposed Cypress Wind Power Project consists of 48 wind turbines with a height of 177 m and will generate over 200 MW of electricity once operational. Attached to this email are the following files: 1. Cover letter with project specific details; 2. a map identifying turbine locations; and, 3. a spreadsheet containing specific turbine coordinates and elevations. Please do not hesitate to contact us should you have any questions or concerns. Best regards, Nicholas Ingold, EIT Project Designer, Aviation Transportation

T 1 613-690-1081 M 1 343-998-1279 [email protected] 2611 Queensview Drive, Suite 300 Ottawa, Ontario, K2B 8K2 Canada wsp.com

NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies. You are receiving this communication because you are listed as a current WSP contact. Should you have any questions regarding WSP's electronic communications policy, please consult our Anti-Spam Commitment at www.wsp.com/casl. For any concern or if you believe you should not be receiving this message, please forward this message to [email protected] so that we can promptly address your request. Note that not all messages sent by WSP qualify as commercial electronic messages.

AVIS : Ce message, incluant tout fichier l'accompagnant (« le message »), peut contenir des renseignements ou de l'information privilégiés, confidentiels, propriétaires ou à divulgation restreinte en vertu de la loi. Ce message est destiné à l'usage exclusif du/des destinataire(s) voulu(s). Toute utilisation non permise, divulgation, lecture, reproduction, modification, diffusion ou distribution est interdite. Si vous avez reçu ce message par erreur, ou que vous n'êtes pas un destinataire autorisé ou voulu, veuillez en aviser l'expéditeur immédiatement et détruire le message et toute copie électronique ou imprimée. Vous recevez cette communication car vous faites partie des contacts de WSP. Si vous avez des questions concernant la politique de communications électroniques de WSP, veuillez consulter notre Engagement anti-pourriel au www.wsp.com/lcap. Pour toute question ou si vous croyez que vous ne devriez pas recevoir ce message, prière de le transférer au [email protected] afin que nous puissions rapidement traiter votre demande. Notez que ce ne sont pas tous les messages transmis par WSP qui constituent des messages electroniques commerciaux.

-LAEmHhHzdJzBlTWfa4Hgs7pbKl

Page 65

2019-04-22 Confidential

Department of National Defence Wind Turbines Aerospace and Telecommunications Engineering Support Squadron (ATESS) 8 Wing Trenton Box 1000 Stn Forces ASTRA, Ontario K0K3W0 Subject: Proposed Cypress Wind Power Project – RADAR Impacts

Dear Madam/Sir: WSP Canada Inc. has been contracted by the Cypress Renewable Energy Centre Limited Partnership to consult with government agencies to support project approval from the Alberta Utilities Commission (AUC). The intention of this letter is to provide information to DND regarding the proposed wind power project and to assist in ensuring Canada’s defence RADAR and air traffic network are not negatively impacted by the project’s development.

INTRODUCTION AND PROJECT BACKGROUND The Cypress Wind Power Project (the project) is a proposed wind turbine farm in southeast Alberta. The project will consist of 48 wind turbines, and when operational, will generate 201.6 megawatts of electricity – enough to power 100,000 homes. The present turbine layout is shown in Appendix A. The project is located approximately 30 km southeast of Medicine Hat, AB.

PROJECT DETAILS Attached to this letter is the Wind Turbine Submission Form Spreadsheet providing the following information:

1. Coordinates for the proposed turbines; 2. Turbine base elevation (above sea level); 3. Turbine structure height (above ground level); 4. Turbine blade diameter; and, 5. Overall Turbine elevation (above sea level). Additional information is provided in the following sections.

Suite 300 2611 Queensview Drive Ottawa, ON, Canada K2B 8K2

T: +1 613 829-2800 F: +1 613 829-8299 wsp.com Page 66

DND INSTALLATION PROXIMITY Preliminary analysis has identified that the project is approximately 70 km southwest of CFB Suffield. The project is located approximately 86 km north of the Canada-United States Border.

PROPOSED TURBINE DIMENSIONS AND CONSTRUCTION Figure 1 shows the proposed wind turbine dimensions.

FIGURE 1 – PROPOSED TURBINE DIMENSIONS

The turbine tower is constructed of steel and the blades of composite fibreglass material. The wind turbines will be marked as per CAR Standard 621.

ANTICIPATED PROJECT SCHEDULE It is expected that the construction of the wind turbines will commence in Q2/Q3 2020 and last approximately 1 year.

SUPPLEMENTAL ATTACHMENTS Also included in this submission are the following supporting documents: • Cover Letter • Appendix A: Project Location Overview (1:50,000) • Wind Turbine Submission Form Spreadsheet If you have any questions or concerns, please do not hesitate to contact the author at 613-690-1081 or by email ([email protected]).

Yours sincerely,

Nicholas Ingold, EIT Project Designer, Aviation Planning and Advisory cc: [email protected], Steve Schnick – WSP Energy, Susan Jin – EDF-RE Page 67 Page 2

Turbine 1

Turbine 2 Turbine 3

Turbine 4 Turbine 13 CYPRESS WIND POWER PROJECT BOUNDARY Turbine 5 Turbine 6

Turbine 7 Turbine 14 Turbine 18 Turbine 15 Turbine 9 Turbine 8 Turbine 19 Turbine 16

Turbine 20 Turbine 17 Turbine 10

Turbine 12 Turbine 21 Turbine 27 Turbine 22 Turbine 11

Turbine 23

Turbine 24

CYPRESS WIND POWER PROJECT BOUNDARY Turbine 25 Turbine 26 Turbine 31 Turbine 29

Turbine 30 Turbine 28 Turbine 35 Turbine 33 Turbine 36 Turbine 34 Turbine 41 Turbine 38 Turbine 32 Turbine 39 Turbine 40 Turbine 37 Turbine 44

Turbine 43 Turbine 47

Turbine 42 Turbine 46

Turbine 45

Turbine 48

Client: CYPRESS RENEWABLE ENERGY CENTRE LIMITED Scale 1:50,000 PARTNERSHIP 250 0 500 750 1250 2000 METRES Project:

1000 0 1250 2500 5000 FEET CYPRESS WIND POWER PROJECT

1. COORDINATE SYSTEM: NAD 83_CSRS_UTM_UTM_12N N Title:

2. PLEASE REFER TO ATTACHED MULTIPLE 1 APR 2019 SUBMITTED FOR REVIEW NI AIM COORDINATE LISTING SPREADSHEET WHICH APPENDIX A: PROJECT No. DATE DESCRIPTION BY APPD PROVIDES DETAILED COORDINATES AND ELEVATIONS FOR ANALYSIS. W E LOCATION REVISION / ISSUE 3. BASE MAP: ALTALIS MAP 72E Copyright Reserved Project No. 181-00733-00 Contract No. TBD S THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY OF WSP CANADA INC. ARCH full bleed D (24.00 x 36.00 Inches) April 11, 2019 P:\CY__ 19M-xxxx-00 Cypress Wind Power Project Agency Consultation\CAD\Working\Cypress Map.dwg REPRODUCTION OR USE FOR OTHER THAN THAT AUTHORIZED BY WSP CANADA INC. IS FORBIDDEN. Page 68 DRAWING No. APPENDIX A National Defence | Défence nationale

Cypress Wind Power Project - V22 Turbine Coordinates and Elevations

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Example 1 60 39 16.59 -110 36 14.01 126.00 100.00 96 274 Turbine 1 49 52 12.94 -110 22 51.56 913.20 108 138 1091 Turbine 2 49 52 2.11 -110 22 12.66 918.60 108 138 1096 Turbine 3 49 52 1.11 -110 24 11.96 911.40 108 138 1089 Turbine 4 49 51 43.14 -110 23 33.57 929.10 108 138 1107 Turbine 5 49 51 34.64 -110 22 15.96 921.20 108 138 1099 Turbine 6 49 51 27.4 -110 21 30.29 919.00 108 138 1096 Turbine 7 49 51 13.78 -110 21 11.56 922.70 108 138 1100 Turbine 8 49 50 50.2 -110 21 42.77 940.30 108 138 1118 Turbine 9 49 50 52.39 -110 20 53.17 934.50 108 138 1112 Turbine 10 49 50 26.51 -110 21 24.67 956.10 108 138 1134 Turbine 11 49 50 1.69 -110 22 20.82 968.60 108 138 1146 Turbine 12 49 50 17.01 -110 21 9.28 958.20 108 138 1136 Turbine 13 49 51 39.08 -110 25 51.11 921.10 108 138 1099 Turbine 14 49 51 10.73 -110 25 33.47 937.50 108 138 1115 Turbine 15 49 50 58.83 -110 24 28.01 949.90 108 138 1127 Turbine 16 49 50 46.34 -110 24 19.12 965.10 108 138 1143 Turbine 17 49 50 31.73 -110 24 13.2 970.10 108 138 1148 Turbine 18 49 51 1.23 -110 26 50.81 935.30 108 138 1113 Turbine 19 49 50 46.49 -110 26 20.21 957.60 108 138 1135 Turbine 20 49 50 32.41 -110 25 49.63 968.10 108 138 1146 Turbine 21 49 50 9.99 -110 25 32.39 963.00 108 138 1140 Turbine 22 49 50 2.19 -110 25 15.51 965.30 108 138 1143 Turbine 23 49 49 53.77 -110 26 24.63 964.00 108 138 1141 Turbine 24 49 49 23.61 -110 23 36.71 984.10 108 138 1162 Turbine 25 49 49 35.14 -110 22 26.83 978.20 108 138 1156 Turbine 26 49 49 36.13 -110 21 37.26 982.20 108 138 1160 Turbine 27 49 49 51.3 -110 21 0.55 967.00 108 138 1144 Turbine 28 49 49 1.55 -110 23 43.7 1000.90 108 138 1178 Turbine 29 49 49 9.31 -110 23 7.18 997.40 108 138 1175 Turbine 30 49 49 10.4 -110 22 15.18 996.50 108 138 1174 Turbine 31 49 49 28.49 -110 21 7.38 984.00 108 138 1161 Turbine 32 49 48 35.37 -110 23 43.42 1025.50 108 138 1203 Turbine 33 49 48 45.61 -110 23 3.18 1018.90 108 138 1196 Turbine 34 49 48 47.2 -110 22 10.89 1017.80 108 138 1195 Turbine 35 49 49 1.43 -110 21 36.68 1002.10 108 138 1180 Turbine 36 49 49 1.46 -110 20 54.95 993.60 108 138 1171 Turbine 37 49 48 22.81 -110 23 32.44 1036.60 108 138 1214 Turbine 38 49 48 21.76 -110 22 59.3 1043.50 108 138 1221 Turbine 39 49 48 32.15 -110 22 9.11 1032.60 108 138 1210 Turbine 40 49 48 31.57 -110 21 29.67 1022.80 108 138 1200 Turbine 41 49 48 38.23 -110 20 52.5 1006.30 108 138 1184 Turbine 42 49 47 39.51 -110 23 31.75 1065.10 108 138 1243 Turbine 43 49 47 53.12 -110 22 59.08 1064.50 108 138 1242 Turbine 44 49 48 8.17 -110 22 16.15 1049.40 108 138 1227

Page 69 National Defence | Défence nationale

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Turbine 45 49 47 38.82 -110 22 51.77 1062.40 108 138 1240 Turbine 46 49 47 42.1 -110 22 21.84 1051.30 108 138 1229 Turbine 47 49 47 53.92 -110 21 41.06 1040.90 108 138 1218 Turbine 48 49 47 28.83 -110 22 8.84 1046.10 108 138 1224 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 70 From: [email protected] Sent: Friday, August 9, 2019 9:49 AM To: Susan Jin Subject: RE: DND Wind Turbine Assessment: EDF Cypress Wind Power Project

Susan

The files you attached were removed from your last email. Could you please resend all information. If not included please specify the nearest town as I have seen Cypress as both a location and a business name.

Thanks

Nancy

From: Susan Jin [mailto:[email protected]] Sent: August-06-19 9:58 AM To: +WindTurbines@ATESS@TRENTON Cc: EDF EN Canada Subject: RE: DND Wind Turbine Assessment: EDF Cypress Wind Power Project

Hello,

I would like to follow up on the email below to see if DND had a chance to review our Wind project for the Wind Turbine Assessment. We are anticipating to submit to the AUC Powerplant and Substation Application in the next coming weeks and your comments, if any, would be helpful in optimizing our project.

If you have any further inquiries on our project, please do not hesitate to contact me. We appreciate your time and look forward to hearing from you.

Sincerely, Susan

Susan Jin Associate Developer

T: 416-216-5879

M: 647-522-8440

Disclaimer: This email and any attachments sent to EDF employees or their intended recipients should be considered confidential, may contain legal, professional and/or other privileged information, and intended solely for the addressee. If you are not the intended recipient, do not use the information in this email in any way; delete and notify the sender.

Page 71 6/20/2019 Mail - EDF EN Canada - Outlook

From: Susan Jin Sent: Tuesday, June 18, 2019 8:31 AM To: [email protected] Cc: EDF EN Canada Subject: DND Wind Turbine Assessment: EDF Cypress Wind Power Project

CAUTION: This email was sent outside of your organization

Hello,

I hope this email finds you well.

My name is Susan and I am contacng you from EDF Renewables Canada Inc., owner of Cypress Renewable Energy Centre Limited Partnership (Cypress Wind Power Project). A colleague of ours from WSP, on behalf of us, has previously contacted the DND to conduct industry and governmental consultaons for potenal impacts of the proposed Project. We have submied a DND Wind Turbine Assessment for the Project in southern Alberta. I have aached our email correspondence above.

Today, I just wanted to follow up on confirmaon of receipt of our submission and if somebody had the opportunity to review for any potenal impacts.

In case our previous emails did not come through, I have re-aached the files here for reference: 1. Cover leer with project specific details; 2. a map idenfying turbine locaons; and, 3. a spreadsheet containing specific turbine coordinates and elevaons.

If there is anything we can do to assist or if you have any inquiries upon compleon of assessment, please do not hesitate to let me know.

Thank you.

Sincerely,

Susan Jin Associate Developer

53 Jarvis street suite 300 Toronto, ON M5C 2H2

T: 416.216.5879 M: 647.522.8440 [email protected] www.edf-re.ca

Disclaimer: This email and any attachments sent to EDF employees or their intended recipients should be considered confidential, may contain legal, professional and/or other privileged information, and intended solely for the addressee. If you are not the intended recipient, do not use the information in this email in any way; delete and notify the sender.

Page 72 https://mail.communica.ca/owa/#path=/mail 1/1 Turbine 1

Turbine 2 Turbine 3

Turbine 4 Turbine 13 CYPRESS WIND POWER PROJECT BOUNDARY Turbine 5 Turbine 6

Turbine 7 Turbine 14 Turbine 18 Turbine 15 Turbine 9 Turbine 8 Turbine 19 Turbine 16

Turbine 20 Turbine 17 Turbine 10

Turbine 12 Turbine 21 Turbine 27 Turbine 22 Turbine 11

Turbine 23

Turbine 24

CYPRESS WIND POWER PROJECT BOUNDARY Turbine 25 Turbine 26 Turbine 31 Turbine 29

Turbine 30 Turbine 28 Turbine 35 Turbine 33 Turbine 36 Turbine 34 Turbine 41 Turbine 38 Turbine 32 Turbine 39 Turbine 40 Turbine 37 Turbine 44

Turbine 43 Turbine 47

Turbine 42 Turbine 46

Turbine 45

Turbine 48

Client: CYPRESS RENEWABLE ENERGY CENTRE LIMITED Scale 1:50,000 PARTNERSHIP 250 0 500 750 1250 2000 METRES Project:

1000 0 1250 2500 5000 FEET CYPRESS WIND POWER PROJECT

1. COORDINATE SYSTEM: NAD 83_CSRS_UTM_UTM_12N N Title:

2. PLEASE REFER TO ATTACHED MULTIPLE 1 APR 2019 SUBMITTED FOR REVIEW NI AIM COORDINATE LISTING SPREADSHEET WHICH APPENDIX A: PROJECT No. DATE DESCRIPTION BY APPD PROVIDES DETAILED COORDINATES AND ELEVATIONS FOR ANALYSIS. W E LOCATION REVISION / ISSUE 3. BASE MAP: ALTALIS MAP 72E Copyright Reserved Project No. 181-00733-00 Contract No. TBD S THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY OF WSP CANADA INC. ARCH full bleed D (24.00 x 36.00 Inches) April 11, 2019 P:\CY__ 19M-xxxx-00 Cypress Wind Power Project Agency Consultation\CAD\Working\Cypress Map.dwg REPRODUCTION OR USE FOR OTHER THAN THAT AUTHORIZED BY WSP CANADA INC. IS FORBIDDEN. Page 73 DRAWING No. APPENDIX A National Defence | Défence nationale

Cypress Wind Power Project - V22 Turbine Coordinates and Elevations

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Example 1 60 39 16.59 -110 36 14.01 126.00 100.00 96 274 Turbine 1 49 52 12.94 -110 22 51.56 913.20 108 138 1091 Turbine 2 49 52 2.11 -110 22 12.66 918.60 108 138 1096 Turbine 3 49 52 1.11 -110 24 11.96 911.40 108 138 1089 Turbine 4 49 51 43.14 -110 23 33.57 929.10 108 138 1107 Turbine 5 49 51 34.64 -110 22 15.96 921.20 108 138 1099 Turbine 6 49 51 27.4 -110 21 30.29 919.00 108 138 1096 Turbine 7 49 51 13.78 -110 21 11.56 922.70 108 138 1100 Turbine 8 49 50 50.2 -110 21 42.77 940.30 108 138 1118 Turbine 9 49 50 52.39 -110 20 53.17 934.50 108 138 1112 Turbine 10 49 50 26.51 -110 21 24.67 956.10 108 138 1134 Turbine 11 49 50 1.69 -110 22 20.82 968.60 108 138 1146 Turbine 12 49 50 17.01 -110 21 9.28 958.20 108 138 1136 Turbine 13 49 51 39.08 -110 25 51.11 921.10 108 138 1099 Turbine 14 49 51 10.73 -110 25 33.47 937.50 108 138 1115 Turbine 15 49 50 58.83 -110 24 28.01 949.90 108 138 1127 Turbine 16 49 50 46.34 -110 24 19.12 965.10 108 138 1143 Turbine 17 49 50 31.73 -110 24 13.2 970.10 108 138 1148 Turbine 18 49 51 1.23 -110 26 50.81 935.30 108 138 1113 Turbine 19 49 50 46.49 -110 26 20.21 957.60 108 138 1135 Turbine 20 49 50 32.41 -110 25 49.63 968.10 108 138 1146 Turbine 21 49 50 9.99 -110 25 32.39 963.00 108 138 1140 Turbine 22 49 50 2.19 -110 25 15.51 965.30 108 138 1143 Turbine 23 49 49 53.77 -110 26 24.63 964.00 108 138 1141 Turbine 24 49 49 23.61 -110 23 36.71 984.10 108 138 1162 Turbine 25 49 49 35.14 -110 22 26.83 978.20 108 138 1156 Turbine 26 49 49 36.13 -110 21 37.26 982.20 108 138 1160 Turbine 27 49 49 51.3 -110 21 0.55 967.00 108 138 1144 Turbine 28 49 49 1.55 -110 23 43.7 1000.90 108 138 1178 Turbine 29 49 49 9.31 -110 23 7.18 997.40 108 138 1175 Turbine 30 49 49 10.4 -110 22 15.18 996.50 108 138 1174 Turbine 31 49 49 28.49 -110 21 7.38 984.00 108 138 1161 Turbine 32 49 48 35.37 -110 23 43.42 1025.50 108 138 1203 Turbine 33 49 48 45.61 -110 23 3.18 1018.90 108 138 1196 Turbine 34 49 48 47.2 -110 22 10.89 1017.80 108 138 1195 Turbine 35 49 49 1.43 -110 21 36.68 1002.10 108 138 1180 Turbine 36 49 49 1.46 -110 20 54.95 993.60 108 138 1171 Turbine 37 49 48 22.81 -110 23 32.44 1036.60 108 138 1214 Turbine 38 49 48 21.76 -110 22 59.3 1043.50 108 138 1221 Turbine 39 49 48 32.15 -110 22 9.11 1032.60 108 138 1210 Turbine 40 49 48 31.57 -110 21 29.67 1022.80 108 138 1200 Turbine 41 49 48 38.23 -110 20 52.5 1006.30 108 138 1184 Turbine 42 49 47 39.51 -110 23 31.75 1065.10 108 138 1243 Turbine 43 49 47 53.12 -110 22 59.08 1064.50 108 138 1242 Turbine 44 49 48 8.17 -110 22 16.15 1049.40 108 138 1227

Page 74 National Defence | Défence nationale

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Turbine 45 49 47 38.82 -110 22 51.77 1062.40 108 138 1240 Turbine 46 49 47 42.1 -110 22 21.84 1051.30 108 138 1229 Turbine 47 49 47 53.92 -110 21 41.06 1040.90 108 138 1218 Turbine 48 49 47 28.83 -110 22 8.84 1046.10 108 138 1224 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 75

2019-04-22 Confidential

Department of National Defence Wind Turbines Aerospace and Telecommunications Engineering Support Squadron (ATESS) 8 Wing Trenton Box 1000 Stn Forces ASTRA, Ontario K0K3W0 Subject: Proposed Cypress Wind Power Project – RADAR Impacts

Dear Madam/Sir: WSP Canada Inc. has been contracted by the Cypress Renewable Energy Centre Limited Partnership to consult with government agencies to support project approval from the Alberta Utilities Commission (AUC). The intention of this letter is to provide information to DND regarding the proposed wind power project and to assist in ensuring Canada’s defence RADAR and air traffic network are not negatively impacted by the project’s development.

INTRODUCTION AND PROJECT BACKGROUND The Cypress Wind Power Project (the project) is a proposed wind turbine farm in southeast Alberta. The project will consist of 48 wind turbines, and when operational, will generate 201.6 megawatts of electricity – enough to power 100,000 homes. The present turbine layout is shown in Appendix A. The project is located approximately 30 km southeast of Medicine Hat, AB.

PROJECT DETAILS Attached to this letter is the Wind Turbine Submission Form Spreadsheet providing the following information:

1. Coordinates for the proposed turbines; 2. Turbine base elevation (above sea level); 3. Turbine structure height (above ground level); 4. Turbine blade diameter; and, 5. Overall Turbine elevation (above sea level). Additional information is provided in the following sections.

Suite 300 2611 Queensview Drive Ottawa, ON, Canada K2B 8K2

T: +1 613 829-2800 F: +1 613 829-8299 wsp.com Page 76

DND INSTALLATION PROXIMITY Preliminary analysis has identified that the project is approximately 70 km southwest of CFB Suffield. The project is located approximately 86 km north of the Canada-United States Border.

PROPOSED TURBINE DIMENSIONS AND CONSTRUCTION Figure 1 shows the proposed wind turbine dimensions.

FIGURE 1 – PROPOSED TURBINE DIMENSIONS

The turbine tower is constructed of steel and the blades of composite fibreglass material. The wind turbines will be marked as per CAR Standard 621.

ANTICIPATED PROJECT SCHEDULE It is expected that the construction of the wind turbines will commence in Q2/Q3 2020 and last approximately 1 year.

SUPPLEMENTAL ATTACHMENTS Also included in this submission are the following supporting documents: • Cover Letter • Appendix A: Project Location Overview (1:50,000) • Wind Turbine Submission Form Spreadsheet If you have any questions or concerns, please do not hesitate to contact the author at 613-690-1081 or by email ([email protected]).

Yours sincerely,

Nicholas Ingold, EIT Project Designer, Aviation Planning and Advisory cc: [email protected], Steve Schnick – WSP Energy, Susan Jin – EDF-RE Page 77 Page 2

5/21/2019 Mail - EDF EN Canada - Outlook

From: Ingold, Nicholas Sent: Tuesday, May 21, 2019 11:40 AM To: [email protected] Cc: EDF EN Canada; Susan Jin; Ingold, Nicholas; Schnick, Steve Subject: RE: DND Wind Turbine Assessment: EDF Cypress Wind Power Project

CAUTION: This email was sent outside of your organization

Good day,

We would like to follow up on the status of our submission for a DND Wind Turbine Assessment of the proposed Cypress Wind Power Project in southern Alberta.

If there is anything we can do to assist, or any addional de tails that you may require to complete your assessment, please do not hesitate to let us know.

Best regards,

Nicholas Ingold, EIT T 1 613-690-1081

Page 78 https://mail.communica.ca/owa/#path=/mail/inbox 1/1 23/04/2019 Mail - EDF EN Canada - Outlook

From: Ingold, Nicholas Sent: Monday, April 22, 2019 9:20 AM To: [email protected] Cc: EDF EN Canada; Susan Jin; Ingold, Nicholas Subject: RE: DND Wind Turbine Assessment: EDF Cypress Wind Power Project

CAUTION: This email was sent outside of your organization

Hello,

Please see aached a revised copy of the DND Wind Turbine Submission for the Cypress Wind Power Project.

The only change that has been made is the Owner’s name. The project has just received capitalizaon, therefore all applicaons and permits must be under the following name: “Cypress Renewable Energy Centre Limited Partnership”. It would be much appreciated if the enre Owner’s name, as shown in bold in this email, be used in any approval/determinaon that DND may have.

Note that no other changes to the submission have been made.

Many thanks!

Nicholas Ingold, EIT T 1 613-690-1081

Page 79 https://mail.communica.ca/owa/#path=/mail 1/1 Turbine 1

Turbine 2 Turbine 3

Turbine 4 Turbine 13 CYPRESS WIND POWER PROJECT BOUNDARY Turbine 5 Turbine 6

Turbine 7 Turbine 14 Turbine 18 Turbine 15 Turbine 9 Turbine 8 Turbine 19 Turbine 16

Turbine 20 Turbine 17 Turbine 10

Turbine 12 Turbine 21 Turbine 27 Turbine 22 Turbine 11

Turbine 23

Turbine 24

CYPRESS WIND POWER PROJECT BOUNDARY Turbine 25 Turbine 26 Turbine 31 Turbine 29

Turbine 30 Turbine 28 Turbine 35 Turbine 33 Turbine 36 Turbine 34 Turbine 41 Turbine 38 Turbine 32 Turbine 39 Turbine 40 Turbine 37 Turbine 44

Turbine 43 Turbine 47

Turbine 42 Turbine 46

Turbine 45

Turbine 48

Client: CYPRESS RENEWABLE ENERGY CENTRE LIMITED Scale 1:50,000 PARTNERSHIP 250 0 500 750 1250 2000 METRES Project:

1000 0 1250 2500 5000 FEET CYPRESS WIND POWER PROJECT

1. COORDINATE SYSTEM: NAD 83_CSRS_UTM_UTM_12N N Title:

2. PLEASE REFER TO ATTACHED MULTIPLE 1 APR 2019 SUBMITTED FOR REVIEW NI AIM COORDINATE LISTING SPREADSHEET WHICH APPENDIX A: PROJECT No. DATE DESCRIPTION BY APPD PROVIDES DETAILED COORDINATES AND ELEVATIONS FOR ANALYSIS. W E LOCATION REVISION / ISSUE 3. BASE MAP: ALTALIS MAP 72E Copyright Reserved Project No. 181-00733-00 Contract No. TBD S THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY OF WSP CANADA INC. ARCH full bleed D (24.00 x 36.00 Inches) April 11, 2019 P:\CY__ 19M-xxxx-00 Cypress Wind Power Project Agency Consultation\CAD\Working\Cypress Map.dwg REPRODUCTION OR USE FOR OTHER THAN THAT AUTHORIZED BY WSP CANADA INC. IS FORBIDDEN. Page 80 DRAWING No. APPENDIX A National Defence | Défence nationale

Cypress Wind Power Project - V22 Turbine Coordinates and Elevations

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Example 1 60 39 16.59 -110 36 14.01 126.00 100.00 96 274 Turbine 1 49 52 12.94 -110 22 51.56 913.20 108 138 1091 Turbine 2 49 52 2.11 -110 22 12.66 918.60 108 138 1096 Turbine 3 49 52 1.11 -110 24 11.96 911.40 108 138 1089 Turbine 4 49 51 43.14 -110 23 33.57 929.10 108 138 1107 Turbine 5 49 51 34.64 -110 22 15.96 921.20 108 138 1099 Turbine 6 49 51 27.4 -110 21 30.29 919.00 108 138 1096 Turbine 7 49 51 13.78 -110 21 11.56 922.70 108 138 1100 Turbine 8 49 50 50.2 -110 21 42.77 940.30 108 138 1118 Turbine 9 49 50 52.39 -110 20 53.17 934.50 108 138 1112 Turbine 10 49 50 26.51 -110 21 24.67 956.10 108 138 1134 Turbine 11 49 50 1.69 -110 22 20.82 968.60 108 138 1146 Turbine 12 49 50 17.01 -110 21 9.28 958.20 108 138 1136 Turbine 13 49 51 39.08 -110 25 51.11 921.10 108 138 1099 Turbine 14 49 51 10.73 -110 25 33.47 937.50 108 138 1115 Turbine 15 49 50 58.83 -110 24 28.01 949.90 108 138 1127 Turbine 16 49 50 46.34 -110 24 19.12 965.10 108 138 1143 Turbine 17 49 50 31.73 -110 24 13.2 970.10 108 138 1148 Turbine 18 49 51 1.23 -110 26 50.81 935.30 108 138 1113 Turbine 19 49 50 46.49 -110 26 20.21 957.60 108 138 1135 Turbine 20 49 50 32.41 -110 25 49.63 968.10 108 138 1146 Turbine 21 49 50 9.99 -110 25 32.39 963.00 108 138 1140 Turbine 22 49 50 2.19 -110 25 15.51 965.30 108 138 1143 Turbine 23 49 49 53.77 -110 26 24.63 964.00 108 138 1141 Turbine 24 49 49 23.61 -110 23 36.71 984.10 108 138 1162 Turbine 25 49 49 35.14 -110 22 26.83 978.20 108 138 1156 Turbine 26 49 49 36.13 -110 21 37.26 982.20 108 138 1160 Turbine 27 49 49 51.3 -110 21 0.55 967.00 108 138 1144 Turbine 28 49 49 1.55 -110 23 43.7 1000.90 108 138 1178 Turbine 29 49 49 9.31 -110 23 7.18 997.40 108 138 1175 Turbine 30 49 49 10.4 -110 22 15.18 996.50 108 138 1174 Turbine 31 49 49 28.49 -110 21 7.38 984.00 108 138 1161 Turbine 32 49 48 35.37 -110 23 43.42 1025.50 108 138 1203 Turbine 33 49 48 45.61 -110 23 3.18 1018.90 108 138 1196 Turbine 34 49 48 47.2 -110 22 10.89 1017.80 108 138 1195 Turbine 35 49 49 1.43 -110 21 36.68 1002.10 108 138 1180 Turbine 36 49 49 1.46 -110 20 54.95 993.60 108 138 1171 Turbine 37 49 48 22.81 -110 23 32.44 1036.60 108 138 1214 Turbine 38 49 48 21.76 -110 22 59.3 1043.50 108 138 1221 Turbine 39 49 48 32.15 -110 22 9.11 1032.60 108 138 1210 Turbine 40 49 48 31.57 -110 21 29.67 1022.80 108 138 1200 Turbine 41 49 48 38.23 -110 20 52.5 1006.30 108 138 1184 Turbine 42 49 47 39.51 -110 23 31.75 1065.10 108 138 1243 Turbine 43 49 47 53.12 -110 22 59.08 1064.50 108 138 1242 Turbine 44 49 48 8.17 -110 22 16.15 1049.40 108 138 1227

Page 81 National Defence | Défence nationale

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Turbine 45 49 47 38.82 -110 22 51.77 1062.40 108 138 1240 Turbine 46 49 47 42.1 -110 22 21.84 1051.30 108 138 1229 Turbine 47 49 47 53.92 -110 21 41.06 1040.90 108 138 1218 Turbine 48 49 47 28.83 -110 22 8.84 1046.10 108 138 1224 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 82

2019-04-22 Confidential

Department of National Defence Wind Turbines Aerospace and Telecommunications Engineering Support Squadron (ATESS) 8 Wing Trenton Box 1000 Stn Forces ASTRA, Ontario K0K3W0 Subject: Proposed Cypress Wind Power Project – RADAR Impacts

Dear Madam/Sir: WSP Canada Inc. has been contracted by the Cypress Renewable Energy Centre Limited Partnership to consult with government agencies to support project approval from the Alberta Utilities Commission (AUC). The intention of this letter is to provide information to DND regarding the proposed wind power project and to assist in ensuring Canada’s defence RADAR and air traffic network are not negatively impacted by the project’s development.

INTRODUCTION AND PROJECT BACKGROUND The Cypress Wind Power Project (the project) is a proposed wind turbine farm in southeast Alberta. The project will consist of 48 wind turbines, and when operational, will generate 201.6 megawatts of electricity – enough to power 100,000 homes. The present turbine layout is shown in Appendix A. The project is located approximately 30 km southeast of Medicine Hat, AB.

PROJECT DETAILS Attached to this letter is the Wind Turbine Submission Form Spreadsheet providing the following information:

1. Coordinates for the proposed turbines; 2. Turbine base elevation (above sea level); 3. Turbine structure height (above ground level); 4. Turbine blade diameter; and, 5. Overall Turbine elevation (above sea level). Additional information is provided in the following sections.

Suite 300 2611 Queensview Drive Ottawa, ON, Canada K2B 8K2

T: +1 613 829-2800 F: +1 613 829-8299 wsp.com Page 83

DND INSTALLATION PROXIMITY Preliminary analysis has identified that the project is approximately 70 km southwest of CFB Suffield. The project is located approximately 86 km north of the Canada-United States Border.

PROPOSED TURBINE DIMENSIONS AND CONSTRUCTION Figure 1 shows the proposed wind turbine dimensions.

FIGURE 1 – PROPOSED TURBINE DIMENSIONS

The turbine tower is constructed of steel and the blades of composite fibreglass material. The wind turbines will be marked as per CAR Standard 621.

ANTICIPATED PROJECT SCHEDULE It is expected that the construction of the wind turbines will commence in Q2/Q3 2020 and last approximately 1 year.

SUPPLEMENTAL ATTACHMENTS Also included in this submission are the following supporting documents: • Cover Letter • Appendix A: Project Location Overview (1:50,000) • Wind Turbine Submission Form Spreadsheet If you have any questions or concerns, please do not hesitate to contact the author at 613-690-1081 or by email ([email protected]).

Yours sincerely,

Nicholas Ingold, EIT Project Designer, Aviation Planning and Advisory cc: [email protected], Steve Schnick – WSP Energy, Susan Jin – EDF-RE Page 84 Page 2

5/1/2019 Mail - EDF EN Canada - Outlook

From: Ingold, Nicholas Sent: Friday, April 12, 2019 8:06 AM To: [email protected] Cc: EDF EN Canada; Schnick, Steve; Susan Jin; Ingold, Nicholas Subject: DND Wind Turbine Assessment: EDF Cypress Wind Power Project

CAUTION: This email was sent outside of your organization

Hello,

WSP Canada Inc, on behalf EDF Renewables Canada, has been contracted to conduct industry and governmental consultaons for potenal impacts of the Cypress Wind Power Project.

The proposed Cypress Wind Power Project consists of 48 wind turbines with a height of 177 m and will generate over 200 MW of electricity once operaonal.

Aached to this email are the following files: 1. Cover leer with project specific details; 2. a map idenfying turbine locaons; and, 3. a spreadsheet containing specific turbine coordinates and elevaons.

Please do not hesitate to contact us should you have any quesons or concerns.

Best regards,

Nicholas Ingold, EIT Project Designer, Aviation Transportation

T 1 613-690-1081 M 1 343-998-1279 [email protected]

2611 Queensview Drive, Suite 300 Ottawa, Ontario, K2B 8K2 Canada

wsp.com

Page 85 https://mail.communica.ca/owa/#path=/mail/AQMkADhjMjZkYjhhLWY2MDMtNDI5Yy05N2FkLTFkYjE2NgA1NGM0MTAALgAAA1qKUPtdyLNNudlQGjx… 1/1 National Defence | Défence nationale

Cypress Wind Power Project - V22 Turbine Coordinates and Elevations

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Example 1 60 39 16.59 -110 36 14.01 126.00 100.00 96 274 Turbine 1 49 52 12.94 -110 22 51.56 913.20 108 138 1091 Turbine 2 49 52 2.11 -110 22 12.66 918.60 108 138 1096 Turbine 3 49 52 1.11 -110 24 11.96 911.40 108 138 1089 Turbine 4 49 51 43.14 -110 23 33.57 929.10 108 138 1107 Turbine 5 49 51 34.64 -110 22 15.96 921.20 108 138 1099 Turbine 6 49 51 27.4 -110 21 30.29 919.00 108 138 1096 Turbine 7 49 51 13.78 -110 21 11.56 922.70 108 138 1100 Turbine 8 49 50 50.2 -110 21 42.77 940.30 108 138 1118 Turbine 9 49 50 52.39 -110 20 53.17 934.50 108 138 1112 Turbine 10 49 50 26.51 -110 21 24.67 956.10 108 138 1134 Turbine 11 49 50 1.69 -110 22 20.82 968.60 108 138 1146 Turbine 12 49 50 17.01 -110 21 9.28 958.20 108 138 1136 Turbine 13 49 51 39.08 -110 25 51.11 921.10 108 138 1099 Turbine 14 49 51 10.73 -110 25 33.47 937.50 108 138 1115 Turbine 15 49 50 58.83 -110 24 28.01 949.90 108 138 1127 Turbine 16 49 50 46.34 -110 24 19.12 965.10 108 138 1143 Turbine 17 49 50 31.73 -110 24 13.2 970.10 108 138 1148 Turbine 18 49 51 1.23 -110 26 50.81 935.30 108 138 1113 Turbine 19 49 50 46.49 -110 26 20.21 957.60 108 138 1135 Turbine 20 49 50 32.41 -110 25 49.63 968.10 108 138 1146 Turbine 21 49 50 9.99 -110 25 32.39 963.00 108 138 1140 Turbine 22 49 50 2.19 -110 25 15.51 965.30 108 138 1143 Turbine 23 49 49 53.77 -110 26 24.63 964.00 108 138 1141 Turbine 24 49 49 23.61 -110 23 36.71 984.10 108 138 1162 Turbine 25 49 49 35.14 -110 22 26.83 978.20 108 138 1156 Turbine 26 49 49 36.13 -110 21 37.26 982.20 108 138 1160 Turbine 27 49 49 51.3 -110 21 0.55 967.00 108 138 1144 Turbine 28 49 49 1.55 -110 23 43.7 1000.90 108 138 1178 Turbine 29 49 49 9.31 -110 23 7.18 997.40 108 138 1175 Turbine 30 49 49 10.4 -110 22 15.18 996.50 108 138 1174 Turbine 31 49 49 28.49 -110 21 7.38 984.00 108 138 1161 Turbine 32 49 48 35.37 -110 23 43.42 1025.50 108 138 1203 Turbine 33 49 48 45.61 -110 23 3.18 1018.90 108 138 1196 Turbine 34 49 48 47.2 -110 22 10.89 1017.80 108 138 1195 Turbine 35 49 49 1.43 -110 21 36.68 1002.10 108 138 1180 Turbine 36 49 49 1.46 -110 20 54.95 993.60 108 138 1171 Turbine 37 49 48 22.81 -110 23 32.44 1036.60 108 138 1214 Turbine 38 49 48 21.76 -110 22 59.3 1043.50 108 138 1221 Turbine 39 49 48 32.15 -110 22 9.11 1032.60 108 138 1210 Turbine 40 49 48 31.57 -110 21 29.67 1022.80 108 138 1200 Turbine 41 49 48 38.23 -110 20 52.5 1006.30 108 138 1184 Turbine 42 49 47 39.51 -110 23 31.75 1065.10 108 138 1243 Turbine 43 49 47 53.12 -110 22 59.08 1064.50 108 138 1242 Turbine 44 49 48 8.17 -110 22 16.15 1049.40 108 138 1227

Page 86 National Defence | Défence nationale

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Turbine 45 49 47 38.82 -110 22 51.77 1062.40 108 138 1240 Turbine 46 49 47 42.1 -110 22 21.84 1051.30 108 138 1229 Turbine 47 49 47 53.92 -110 21 41.06 1040.90 108 138 1218 Turbine 48 49 47 28.83 -110 22 8.84 1046.10 108 138 1224 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 87 2019-04-12 Confidential

Department of National Defence Wind Turbines Aerospace and Telecommunications Engineering Support Squadron (ATESS) 8 Wing Trenton Box 1000 Stn Forces ASTRA, Ontario K0K3W0 Subject: Proposed Cypress Wind Power Project – RADAR Impacts

Dear Madam/Sir: WSP Canada Inc. has been contracted by the EDF Renewables Canada to consult with government agencies to support project approval from the Alberta Utilities Commission (AUC). The intention of this letter is to provide information to DND regarding the proposed wind power project and to assist in ensuring Canada’s defence RADAR and air traffic network are not negatively impacted by the project’s development.

INTRODUCTION AND PROJECT BACKGROUND The Cypress Wind Power Project (the project) is a proposed wind turbine farm in southeast Alberta. The project will consist of 48 wind turbines, and when operational, will generate 201.6 megawatts of electricity – enough to power 100,000 homes. The present turbine layout is shown in Appendix A. The project is located approximately 30 km southeast of Medicine Hat, AB.

PROJECT DETAILS Attached to this letter is the Wind Turbine Submission Form Spreadsheet providing the following information: 1. Coordinates for the proposed turbines; 2. Turbine base elevation (above sea level); 3. Turbine structure height (above ground level); 4. Turbine blade diameter; and, 5. Overall Turbine elevation (above sea level). Additional information is provided in the following sections.

Suite 300 2611 Queensview Drive Ottawa, ON, Canada K2B 8K2

T: +1 613 829-2800 F: +1 613 829-8299 wsp.com Page 88 DND INSTALLATION PROXIMITY Preliminary analysis has identified that the project is approximately 70 km southwest of CFB Suffield. The project is located approximately 86 km north of the Canada-United States Border.

PROPOSED TURBINE DIMENSIONS AND CONSTRUCTION Figure 1 shows the proposed wind turbine dimensions.

FIGURE 1 – PROPOSED TURBINE DIMENSIONS

The turbine tower is constructed of steel and the blades of composite fibreglass material. The wind turbines will be marked as per CAR Standard 621.

ANTICIPATED PROJECT SCHEDULE It is expected that the construction of the wind turbines will commence in Q2/Q3 2020 and last approximately 1 year.

SUPPLEMENTAL ATTACHMENTS Also included in this submission are the following supporting documents: • Cover Letter • Appendix A: Project Location Overview (1:50,000) • Wind Turbine Submission Form Spreadsheet If you have any questions or concerns, please do not hesitate to contact the author at 613-690-1081 or by email ([email protected]).

Yours sincerely,

Nicholas Ingold, EIT Project Designer, Aviation Planning and Advisory cc: [email protected], Steve Schnick – WSP Energy, Susan Jin – EDF-RE Page 89 Page 2 Turbine 1

Turbine 2 Turbine 3

Turbine 4 Turbine 13 CYPRESS WIND POWER PROJECT BOUNDARY Turbine 5 Turbine 6

Turbine 7 Turbine 14 Turbine 18 Turbine 15 Turbine 9 Turbine 8 Turbine 19 Turbine 16

Turbine 20 Turbine 17 Turbine 10

Turbine 12 Turbine 21 Turbine 27 Turbine 22 Turbine 11

Turbine 23

Turbine 24

CYPRESS WIND POWER PROJECT BOUNDARY Turbine 25 Turbine 26 Turbine 31 Turbine 29

Turbine 30 Turbine 28 Turbine 35 Turbine 33 Turbine 36 Turbine 34 Turbine 41 Turbine 38 Turbine 32 Turbine 39 Turbine 40 Turbine 37 Turbine 44

Turbine 43 Turbine 47

Turbine 42 Turbine 46

Turbine 45

Turbine 48

Client: CYPRESS RENEWABLE ENERGY CENTRE LIMITED Scale 1:50,000 PARTNERSHIP 250 0 500 750 1250 2000 METRES Project:

1000 0 1250 2500 5000 FEET CYPRESS WIND POWER PROJECT

1. COORDINATE SYSTEM: NAD 83_CSRS_UTM_UTM_12N N Title:

2. PLEASE REFER TO ATTACHED MULTIPLE 1 APR 2019 SUBMITTED FOR REVIEW NI AIM COORDINATE LISTING SPREADSHEET WHICH APPENDIX A: PROJECT No. DATE DESCRIPTION BY APPD PROVIDES DETAILED COORDINATES AND ELEVATIONS FOR ANALYSIS. W E LOCATION REVISION / ISSUE 3. BASE MAP: ALTALIS MAP 72E Copyright Reserved Project No. 181-00733-00 Contract No. TBD S THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY OF WSP CANADA INC. ARCH full bleed D (24.00 x 36.00 Inches) April 11, 2019 P:\CY__ 19M-xxxx-00 Cypress Wind Power Project Agency Consultation\CAD\Working\Cypress Map.dwg REPRODUCTION OR USE FOR OTHER THAN THAT AUTHORIZED BY WSP CANADA INC. IS FORBIDDEN. Page 90 DRAWING No. APPENDIX A From: Schnick, Steve Sent: Thursday, March 22, 2018 2:07 PM To: '[email protected]' Cc: [email protected]; [email protected]; David Warner; Susan Jin; EDF EN Canada Subject: RE: DND request for review: EDF Cypress Wind Power Project

Hello,

As a follow-up to the emails below, I wanted to inform you that the proposed turbine layout for this wind project has been updated to reflect minor adjustments to some of the turbine locaons. As well, the final turbine model has been selected.

Please find aached a spreadsheet of the new turbine coordinates along with elevaons. The current proposed turbine is the following: · Vestas V136: total turbine height (to upper blade p) will be 150 m; the rotor will have a diameter of 136 m; the tower will be 82 m tall.

If you can please confirm receipt of this informaon and provide a meline for your review, that would be very much appreciated. Please let me know if you have any quesons or need any further informaon.

Thanks, Steve

Attachments: Turbines_v9_Vestas_20180205_forExternal.xlsx

Steve Schnick , P.Eng. | WSP 405 18 St SE, Calgary, Alberta T2E 6J5 Canada T +1 587-475-4950 | M +1 587-888-9463 | E [email protected]

Page 91 ID Type X_DD Y_DD Elev_m 1 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.439966 49.853269 932.2 2 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.440267 49.835416 965.4 3 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368687 49.854795 924.8 4 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.408863 49.817817 994.7 5 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368625 49.863591 916.7 6 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.347891 49.832544 964.7 7 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.346897 49.852607 924.4 8 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.453612 49.849191 935.5 9 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.428692 49.857075 929.0 10 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.362275 49.846178 944.0 11 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.436499 49.830832 967.4 12 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.449777 49.839972 950.4 13 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.348195 49.812670 1001.8 14 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.356078 49.839348 957.4 16 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.423939 49.830928 969.8 17 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.386294 49.821471 990.8 18 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.429848 49.842325 968.8 19 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.363562 49.818252 1000.7 20 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.415916 49.860364 919.9 21 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.357932 49.817027 1000.6 22 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.348025 49.819898 989.0 23 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.402852 49.816894 1003.0 24 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.398464 49.813115 1016.7 25 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.393637 49.808999 1029.0 26 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.384053 49.806171 1042.8 27 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368847 49.808577 1035.0 28 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.374164 49.812531 1024.0 29 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.359095 49.809336 1022.3 31 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.380067 49.801923 1055.5 32 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.375837 49.799019 1051.3 33 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.370052 49.791940 1047.8 34 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.391171 49.794149 1064.8 35 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.361003 49.795877 1041.5 36 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.373691 49.794920 1052.6 37 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.384721 49.791330 1067.9 38 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.395573 49.796657 1062.4 39 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.439431 49.846959 954.5 40 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.423835 49.853749 935.0 41 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.347566 49.845955 938.1 42 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.430872 49.861112 919.7 43 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368992 49.871136 911.3 44 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.352834 49.803116 1025.2 45 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.348916 49.826201 977.8 46 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.357316 49.855899 922.0 47 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.378681 49.817201 1005.6 48 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.362408 49.824350 985.5

Page 92 49 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.408393 49.871228 903.1 50 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.407225 49.846447 962.3 51 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.403711 49.842381 969.8 52 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.404123 49.834970 969.2 53 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.391363 49.863114 927.3 54 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.386295 49.848931 952.2 55 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.362550 49.838781 958.8 56 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.352315 49.835716 964.2 57 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.361382 49.802179 1039.0 58 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.392967 49.825688 979.7

Page 93 15 14 16 15 14 13 18 17 16

11 10 11 12 7 8 9 10 9 41 T11 - R3 T11 - R4 87

3 2 4 3 2 1 6 5 4

87 87 Township Rd 110 49 Township Rd 11087 .!! .!43

! 87 !

! ! 31 32 33 34 35 33 34 35 36 5

! ! ! ! ! 87 ! 53 ! ! .! ! 42 !

! .! ! ! 20 ! .! ! ! ! ! ! ! ! ! ! ! ! .! ! ! ! ! ! ! ! ! ! ! 46 !9

! Range Range 43 Rd ! ! .!

.! ! ! ! ! ! 3 ! 87 ! !

! ! 40 !

1 ! .! 7 ! ! ! ! 87 ! ! . ! ! ! ! .! Range Rd 42 Rd Range .! !

! ! ! ! 54 26 ! ! 30 29 ! 28 27 28 27 ! 26 25

! ! ! ! ! . 8 ! ! ! .! ! ! ! 39

! ! 50! 10 41 ! !

! !

! ! .! 87

! ! ! ! .! . .!

! !

"/ ! !

!

! " ! ) !

! !

! 51 Township! Rd 104

Township Rd 104!

! !

! ! ! ! 87

12 !18 .! ! . ! !

!! 14

. !

! ! 55

! ! !

! .!

! ! ! .

87 ! !

!

! 87

! !

! ! ! ! !

! ! 56 ! ! ! ! 23 ! ! ! ! 21 41 22

21 22 23 2 24! 52 19 20 .!

! !

.! ! ! 87

! 40 Rd Range ! ! .

! ! ! ! ! ! ! 6 87 ! ! !

!

!

! ! !

! 87 .!

11 16 ! ! ! ! ! !

R !

!

.! ! 87 .! ! ! ! ! ! !

! !

a 87 ! !

n !

T10 - R4 T10 - R3! ! ! 87 !

g 58 87 ! ! ! !45

87 ! ! 48 ! . e .! ! ! !

!

! ! .!

! 87 ! R 17 ! 15 14

! 17 16

13 18 ! ! ! 16 d 15 14 .! 22

! !

!

!

! 87 ! .! 19 !

4 ! 4 ! 47 !

3 ! .! 21

! ! ! !

.! 23 ! 87 ! .! .!

!

!

.! !

! 87 !

! 24 28 13 !

! ! !

.! ! .!

! ! ! . !

! !

!

! 29!

25 !

27 ! ! ! !! ! .! .!

! .! 10 11 9 10 11 12 7 ! 26 8 9 87 87 !

! .!

44 ! ! 57

! 31

!

! .! !

!

! .! ! .!

! 32 ! 87 .!! !

38 !

! 87

! 35 !

.! ! 36 .! 87 34 !

! .! !

.! ! 2 ! 33 3 4 3 2 1 6 37 5 4 .!! .! 87 87 87 515 Township Rd 100 Township Rd 10087 .! Turbine Location - Vestas V136 - 4.2 MW

Project Substation 41 87 "/ 34 35 33 34 35 36 31 32 33 )" O&M and Laydown Yard 38.3 dBA Sound Contour 40 Rd Range 87 Occupied Residence 87 Abandoned Residence 87 Worst Case Shadow Flicker Hours Per Year 27 26 28 27 26 25 30 29 28

0 Hours

Ä 0 - 8 Hours Ä T9 - R4 524 Ã

1

8 - 15 Hours ì Ä 23 22 Ä

21 22 23 24 19 20 21

41

Ä Ä

MedicineÄ Hat 15 - 30 Hours Ä

523 T9 -3 R3

à Ä

Over 30 Hours Ä

Ä 41 1 Ä ì ! Collection Lines 18 17 3 16 15 14 16Access Roads 15 14 13 Paved Road

Gravel Road 41

Neighboring Parcels

Within 2km Ä Within 800m Ä

Project Boundary 41

7 8 9 10 11 9 10 11 12 Ä Parcels and Land Owners Ä 515 Township 0 0.5 1 2 3 Section Kilometers Source: Source 1YYYY, Source 2 YYYY | G:\Projects\CAN_Alberta\Cypress_Wind\05_GIS\052_MapDocs\SitePlan_v8_TAB_Cypress.mxdLast| Updated 11/2/2017 by brendan.soule CYPRESS TURBINES V8 ~ Cypress Wind Project | Alberta

Page 94 Consultation with HALO Rescue

Page 95 From: Susan Jin Sent: Friday, June 21, 2019 12:38 PM To: [email protected] Cc: EDF EN Canada; Eileen McCord; Maya Lopez Subject: Cypress Wind Power Project - Project Specific Information Package

CAUTION: This email was sent outside of your organization

Hi Kim,

Thanks for your time earlier to quickly discuss about our proposed development of our Cypress Wind Power Project. As mentioned, our Project will be developed approximately 30km south east from the physical address of HALO Rescue (#28 - Halifax Way SW Medicine Hat, AB). We have conducted airstrip impact studies and they have shown that the Project does not anticipate any issues with/to any nearby aerodrome or aircraft operations.

I have attached here our Project information package for your review. This includes:  detailed project information;  turbine technology;  studies conducted so far;  maps; and  visual simulations

Upon review, if you have any questions, comments, or concerns, please feel free to contact me at any time. I remain available to answer any questions.

Thanks very much for your time and I look forward to hearing from you.

Sincerely,

Susan Jin Associate Developer

53 Jarvis street suite 300 Toronto, ON M5C 2H2

T: 416.216.5879 M: 647.522.8440 [email protected] www.edf-re.ca

Disclaimer: This email and any attachments sent to EDF employees or their intended recipients should be considered confidential, may contain legal, professional and/or other privileged information, and intended solely for the addressee. If you are not the intended recipient, do not use the information in this email in any way; delete and

notify the sender.

Page 96

EDF Renewables Canada Inc. 53 Jarvis Street, Suite 300 Toronto, Ontario M5C 2H2 T: 416.363.8380 F: 416.363.7959

March 8, 2019 Dear Neighbour, Thank you for your ongoing interest in the Cypress Wind Power Project (Project), and for taking the time to provide your input. The Project is owned by Cypress Renewable Energy Centre Limited Partnership and the Kainai Nation (Blood Tribe). Cypress Renewable Energy Centre Limited Partnership is a subsidiary of EDF Renewables Canada Inc. (EDF RC). In December 2018, it was our pleasure to announce that the proposed Project has been awarded a contract for this Project through the Alberta Electric System Operator’s Renewable Electricity Program Round 2 (REP Round 2). We also informed you of modifications to the Project boundary. As a result of stakeholder feedback, further technical evaluations and to reflect the requirements for REP Round 2, we have made some modifications to the Project. These proposed changes aim to mitigate environmental impacts and optimize the layout. The changes made include:  selection of the turbine technology;  addition of several permanent meteorological tower locations;  reduction in the number of turbine locations from 61 to 48 turbine locations; and  modification of the layout for the turbine locations, collector system, access roads, laydown area, operations and maintenance building, and Project substation. We would like to invite you to our upcoming public open house to discuss the Project, the proposed changes, and answer any questions you may have: Cypress Wind Power Project Open House Tuesday, March 26, 2019 5:00 p.m. to 8:00 p.m. (Mountain Time) Irvine & District Agricultural Society 207 Francis St., Irvine, Alberta, T0J 1V0 Our Project team and subject matter experts will be available to share Project updates, gather stakeholder feedback and answer questions. We have included four documents to accompany this letter with further information about the Project and EDF RC’s public involvement process:  A Project newsletter, which describes the proposed Project modifications, upcoming development activities, and frequently asked questions;  A Project map showing the current Project boundary, modified Project layout, updated shadow flicker results, and updated noise assessments demonstrating compliance;  Updated visual simulations of the selected turbine technology on the proposed turbine locations; and

Page 97  The Alberta Utilities Commission (AUC) Brochure — Public involvement in a proposed utility development.

Proposed Turbine Changes In Fall 2017, we indicated that we were considering one of two turbine models: Option A (Vestas 4.2 megawatt (MW)) and Option B (Gamesa 3.465 MW) on 56 and 61 potential turbine locations respectively. Based on your feedback and further technical analysis, we are now proposing to install the Enercon E138 4.2 MW turbine rather than either of the options previously presented. If approved, the proposed Project will have a total of 48 turbine locations. Each turbine will have a capacity of 4.2 MW, with a total Project capacity of 201.6 MW. The Project newsletter has more information on the proposed Enercon E138 turbine as well as updated noise and shadow flicker analyses on the Project map. CONTACT US Thanks to your input, we believe these changes reflect a reduced overall Project impact. We will continue to engage with the community, landowners, and local government, and we look forward to receiving your feedback about these changes and the Project. We will be filing our application to the AUC in the coming months. If you have any questions or concerns regarding the Cypress Wind Power Project, please feel free to contact a Project team member at: [email protected] Phone: 844-553-3336 www.cypresswind.ca

Sincerely,

David Warner Mark Gallagher Susan Jin Development Manager Development Manager Development Coordinator

Page 98 WINTER 2019

EDF Renewables Canada Inc. Blackspring Ridge Wind Project (300MW). Vulcan County, Alberta

THE PROJECT

201.6 The proposed Cypress Wind Power Project (the Project) is a partnership between Cypress Renewable MW Energy Centre Limited Partnership and Kainai Nation (Blood Tribe). Cypress Renewable Energy Centre Limited Partnership is a subsidiary of EDF Renewables Canada Inc. (EDF RC). The proposed Project will generate 201.6 megawatts (MW) of electricity, enough to power up to 100,000 Albertan homes. If approved, EDF RC will develop, construct, and operate the Project southeast of Medicine Hat, Alberta, closest to the Hamlet of Dunmore, near the intersection of Highway 41 and Township Road 100 in Cypress = County. In November 2017, EDF RC sent a Project-Specific Information Package (PSIP) and hosted a public open house with information on potential turbine models and locations. In December 2018, we sent a brief update to share the exciting news about the Renewable Electricity Program Round 2 (REP Round 2) results and to provide a map with the modified Project boundary. Since then, we have continued to engage with landowners and stakeholders to gather feedback about the Project. In this update, we would like to provide 100,000 information about our proposed changes to the Project, our development activities since December 2018, and the next steps for the Project.

*https://www.efficiencyalberta.ca/average-alberta-energy-consumption/

OPEN HOUSE

We are hosting our third open house in March 2019 and we would like to invite you to join us! Our Project team and subject matter experts will be present to share updates, gather feedback, and answer any questions you might have. 26

At this open house, we will present information on the following topics:

The selected Enercon E138 4.2MW turbine; CYPRESS WIND POWER Maps showing the updated Project boundary and turbine locations; PROJECT OPEN HOUSE Noise contour maps; Results of the shadow flicker analysis; TUESDAY, MARCH 26, 2019 Visual simulations which illustrate what views might look like if the 5:00 PM - 8:00 PM Project is approved. These simulations incorporate the actual turbine dimensions; Irvine and District Agricultural Society 207 Francis Street Construction and operations photographs and information; and Irvine, Alberta T0J 1V0 Potential benefits and impacts of the Project on the local community and information about EDF RC, the Kainai Nation (Blood Tribe), and our partnership. Page 99 Page 1 EDF Renewables Canada Inc. Blackspring Ridge Wind Project (300MW). Vulcan County, Alberta PROJECT UPDATES Since December 2018, we have made the following changes to the proposed Project layout: • selected the Enercon E138 4.2MW turbine; • removed 13 turbine locations from 61 initially to 48 currently; and • adjusted the locations of the turbines, collector system, access roads, laydown area, operations and maintenance building, and the Project substation. Turbine and Technology Specifications In our Fall 2017 PSIP, we indicated that we were considering two proposed turbine models: Option A (Vestas 4.2 MW) on 56 potential turbine locations and Option B (Gamesa 3.465 MW) on 61 potential turbine locations. Based on your feedback and further technical analysis, we are now proposing to install a different turbine than those originally contemplated. We have now selected the Enercon E138 4.2 MW turbine at a hub height of 108 metres (m) for the Project. Each turbine will have a capacity of 4.2 MW and the total Project will be 201.6 MW. Table 1 below Rotor Diameter outlines the features of the considered turbine technology: 138 metres

Table 1: Proposed turbine technology changes

Fall 2017 PSIP Winter 2019 PSIP Change

Vestas V136 4.2 MW or Turbine Type Similar size capacity Siemens-Gamesa G132 3.465 MW Enercon E138 4.2 MW

Number of Turbines 56 Vestas or 48 Enercon E138 13 fewer turbines 61 Siemens-Gamesa 4.2 MW

82 m (Vestas) or Hub Height 108 m Taller towers 84 m (Siemens-Gamesa)

136 m (Vestas) or Rotor Diameter 138 m Slightly larger 132 m (Siemens-Gamesa)

Hub Height Tip Height Total Project 235.2 MW (Vestas) or Smaller Project 201.6 MW 108 metres 177 metres Capacity 211.37 MW (Siemens-Gamesa) capacity

If approved by the Alberta Utilities Commission (AUC), the proposed Project will have a total of 48 turbine locations. As a result of this proposed turbine modification, the turbine layout has changed.Page 100 Page 2 Collector System and Interconnection Project Substation The Project will be interconnected to the existing 240-kiloVolt transmission line 983L in the area, which is owned and operated Each turbine will be linked to the Project’s substation by a by AltaLink Management Ltd. medium-voltage collector system. Collection cables will be buried underground, wherever practical. The Project substation was previously proposed to be located at SW-26-19-5-W4M and is now proposed at NW-20-10-4-W4M. Access Roads and Other Facilities We will work with Cypress County to develop a road use agreement. With permission, EDF RC will use existing municipal roads to access the Project site wherever practical. Additional Project Boundary and Design access roads will be required as part of the Project. There will be We have also altered the Project boundary to locate the an operations and maintenance building on the Project land or Project substation closer to transmission. The Project in the surrounding area. We have changed the location of the boundary now includes part of the North half of Sections operations and maintenance building to align with the latest 20, 21, and 22 in Township 10, Range 4, West of the Fourth Project layout. The operations and maintenance building is Meridian. proposed to be located at NE-32-10-3-W4M.

Meteorological Lattice Towers Temporary Laydown Area EDF RC previously installed two temporary meteorological The Project will use a temporary laydown area to assist in staging lattice towers at the Project site to measure wind speed, wind during the construction phase. Since our November 2017 Open direction, air temperature, and barometric pressure. We will House, we have modified the location of the laydown area to permit up to nine but will install up to five permanent meteoro- align with the latest Project layout. The temporary laydown area logical lattice towers on site for monitoring during the opera- is now proposed to be located at NE-32-10-3-W4M. tional phase. These permanent meteorological lattice towers are proposed to be 108 m tall. Page 101 Page 3 THE RENEWABLE ELECTRICITY PROGRAM In 2018, the Alberta Electric System Operator (AESO) launched a competitive procurement program called the Renewable Electricity Program Round 2 (REP2) and Round 3. EDF Renewables Canada has partnered with the Kainai Nation (Blood Tribe) on the Cypress Wind Power Project. As announced in our December 2018 update, we are pleased to have been awarded a contract for this Project. We look forward to a long-lasting partnership with the local community. PROJECT TIMELINE*

APRIL 2017 OCTOBER TO NOVEMBER 2017 Q4 2017-2018 Q2 2019 • First Project mail-out to • Update Project mail-out to • Completion of • Application submission Q2 2020 affected stakeholders affected stakeholders environmental to AUC for review • Start of • First open house • Second open house field studies and approval construction

Public engagement continues throughout the Project lifecycle

Q4 2016 JULY 2017 MARCH 2019 Q4 2019 to Q1 2020 June 2021 • Initiation of public • Update Project mail-out • Project update mail-out to • AUC approval • Commercial consultation to affected stakeholders affected stakeholders operations • Commence • Third open house upcoming environmental field studies March 26, 2019 *Project timeline is subject to change

EDF Renewables Canada Inc. Blackspring Ridge Wind Project (300MW). Vulcan County, Alberta

Page 102 Page 4 ENVIRONMENTAL AND TECHNICAL WORK

EDF RC engaged Alberta Environment and Parks (AEP) early and throughout the planning and development phases of the Project to better our understanding of the site and potential environmental impacts from the Project. EDF RC representatives completed environmental studies in 2017 and 2018, including the following:

Wildlife Noise Spring and fall birds, spring and fall bats, and Impact assessment sensitive species Historical resources Vegetation Archaeological and cultural features Habitat mapping and native prairie desktop studies

Wetlands Mapping and classification

Throughout 2019, EDF RC representatives will be in the Project area completing additional field studies to ensure that wildlife data is maintained and current. EDF RC continues to work closely with AEP and will seek sign-off for the wildlife referral report and the environmental evaluation from them in Q1 2019. Additional field work will also be completed for historical and paleontological resources in 2019.

EDF Renewables Canada Inc. Blackspring Ridge Wind Project (300MW). Vulcan County, Alberta

COMMUNITY BENEFITS jobs

EDF RC values the long-term benefits of working with the local community. If the Cypress Wind Power Project is approved, the local community will 250 benefit from the following: million tax • more than 250 jobs at peak construction and up to 10 permanent revenues positions during operations;

• contract opportunities for local businesses; over • local investments into hospitality and construction services during the $10 development, construction and operations phases of the Project; and • over $10 million in tax revenues throughout the life of the Project.

Page 103 Page 5 CONSULTATION AND NEXT STEPS

As EDF RC moves through the regulatory and permitting process, we will continue to work closely with the community, landowners and local WE TRULY government to design our Project in a way that is respectful to the needs, heritage and future of Cypress County. We truly appreciate the feedback we have received so far, and we encourage you to continue to provide APPRECIATE us with comments and concerns. EDF RC will provide a comprehensive summary of stakeholder feedback as part of our application to the AUC, which we anticipate submitting in Q2 2019. YOUR FEEDBACK

EMERGENCY RESPONSE PLAN

Over the last year, we heard from landowners and residents about the risk of fire and appropriate levels of insurance. Safety is one of EDF RC’s seven Core Values which are taken seriously. We operate more than 10,000 MW of electricity generation across North America and it is imperative that we do so safely. We have developed a site-specific Emergency Response Plan (ERP) to meet the need of the local community. It provides details on how fire risk is addressed and includes roles and responsibilities for notification and response in the unlikely event that a fire or any emergency occurs. We have reviewed the ERP with the Fire Chief to ensure we are working together on this important document. We will continue engaging with the local emergency services to ensure correct and up-to-date mitigation and response measures are applied as the Project evolves through different stages of development.

EDF Renewables Canada Inc. Blackspring Ridge Wind Project (300MW) Vulcan County, Alberta

CONTACT US

If you have any questions or concerns regarding the To learn more about EDF Renewables Canada Inc., Cypress Wind Power Project, or if you are unable to attend please visit our website. the open house and would like further information, please contact a Project team member: WWW.EDF-RE.CA [email protected] 1-844-553-3336 www.cypresswind.ca

Page 104 Page 6 FREQUENTLY ASKED QUESTIONS

How long will construction take? We anticipate construction will start in Q2 2020 and will end by June 2021. Construction typically includes civil works, access road preparation, foundation installation, turbine delivery and erection, collector system installation, and electrical and mechanical completions.

How do you plan to manage construction dust and increased traffic?

With any large infrastructure project there will be increased traffic during the construction phase. We will implement traffic control and dust mitigation measures during the Project’s construction. We will determine these measures in consultation with Cypress County. We will also discuss haul routes for turbines and other infrastructure with Cypress County. We will limit the time for construction-associated traffic in consultation with local authorities and work with local residents to ensure a safe process with as few impacts as possible to local residents and their seasonal agricultural practices.

Do wind turbines impact human health? There have been some claims that noise from wind turbines can impact human health. EDF RC has completed a third-party noise impact assessment. The assessment considers Alberta Utilities Commission Rule 012: Noise Control, and it includes cumulative sound emissions from nearby facilities, including oil and gas facilities. Noise levels must not exceed 40 decibels at nighttime. Our Project must comply with this Rule otherwise the AUC will not approve the Project. The results of the assessment are demonstrated in the Project Layout.

Health Canada completed a $1.4 million study from 2012 to 2015 assessing if wind turbines affected health. The study found that there is no scientific evidence to support negative effects on human health resulting from exposure to wind turbine noise. More information is available from the Health Canada study at www.canada.ca

What is shadow flicker?

Shadow flicker can occur at certain times of the year. Blades can cast a moving shadow over windows, creating a flicker effect indoors which can cause annoyance. Shadow flicker can occur when turbines are sited close to homes. A shadow Flicker Analysis Summary Report is available upon request.

EDF RC has conducted an independent shadow flicker analysis to ensure turbines are properly located to mitigate potential shadow flicker impacts. This study considers the probability of cloud cover, but it does not consider the orientation of residences or the location of windows in residences. The results of this study are available in the Project Layout, Adjusted Case Shadow Flicker and Noise Map. All residences fall within internationally accepted thresholds.

Page 105 Page 7 What is the emergency response protocol in the event of a fire? Safety is a core value of EDF Renewables Canada Inc. During construction, we will employ robust safety protocols, including restricting public access to the construction site. In addition, there will be security controls on site and we will employ traffic mitigation strategies. We will continue to consult with the community throughout the process. During operations, the Project will have a supervisory, control, and data acquisition system that connects each turbine to a central operating system. This system monitors the turbines 24 hours a day, seven days a week. In the event of an emergency, the controller will send an automatic alarm notification to the operations staff and the remote operations centre. The on-site staff or the remote operating staff will initiate a shut down. If a fire is detected, staff will immediately call 911 to dispatch the local fire department, and staff will implement the protocols outlined in the emergency response procedures. EDF RC has been working closely with local emergency services to develop an emergency response plan. We will continue engaging with local emergency services to adapt appropriate response measures through various phases of the Project.

Will my property value be impacted? There is no conclusive evidence in Alberta about whether property values are affected by neighbouring wind power projects. Three recent wind power project applications in Alberta received by the AUC considered the potential impact of wind power projects on property value. The AUC concluded the following:

“The Commission was not presented with sufficient evidence in this proceeding to suggest that the project will result in an adverse impact on property values of parcels adjacent to the project.” — Grizzly Bear Creek Wind Project (E.On Climate & Renewables Canada Ltd.)1 “The Commission has not been presented with sufficient cogent evidence in this proceeding to suggest that the project will result in an adverse impact on property values of parcels adjacent to the project and finds that any limitations on subdivision potential is too speculative.” — Bull Creek Wind Project (BluEarth Renewables Inc.)2 “The Commission finds that there was insufficient evidence presented to show that land use would be impacted by the project, particularly given that no components of the project will be sited on nonparticipating landowners’ property. With respect to the project’s potential impact on property values, the Commission was not presented with sufficient evidence in this proceeding to suggest that the project will result in an adverse impact on property values of parcels adjacent to the project.” — Halkirk 2 Wind Project (Capital Power)3

There have been numerous studies completed on this subject and the general consensus is that there is little evidence to support claims that property value is impacted by neighbouring wind power projects. To date, the most comprehensive study on wind power projects and property values was conducted by the Lawrence Berkeley National Laboratory. The study analyzed more than 50,000 home sales near 67 wind power projects across nine U.S. states over ten years and found no statistical evidence that operating wind power projects have had any measurable impacts on home sale prices. Similarly, the Municipal Property Assessment Corporation (MPAC) evaluated these claims in a detailed study in 2008, 2012 and 2016 entitled Impact of Industrial Wind Turbines on Residential Property Assessment in Ontario. This report studies properties within five kilometres of a wind turbine, and whether their assessment is equitable to those situated more than five kilometres

from a wind turbine. The assessed value of a property does not change due to nearby wind 1-AUC Decision 3329-D01-2016. May 19, 2016. 2-AUC Decision 2014-04. February 20, 2014. 3-AUC Decision 22563-D01-2018. April 13, 2017. turbines. This finding is consistent with MPAC’s reports.

What steps are you taking to protect the environment, specifically birds and bats? EDF RC has completed environmental studies for the Project. The subjects of these studies included vegetation, wildlife, and wetlands. Based on the survey results, we have applied the appropriate setbacks for the Project infrastructure from sensitive environmental features. We will submit the results of our surveys and our environmental evaluation to Alberta Environment and Parks for their review. All wind power projects in Alberta must consider their potential impact on wildlife. Examples of precautionary measures include implementing setbacks from habitats, avoiding the extensive use of above-ground transmission lines, and ensuring an appropriate distance between each turbine. EDF RC will complete post-construction monitoring as required. Page 106 Page 8

!

!

! !

!

! !

!

!

!

!

!

! Ä

Redcliff Ä

! Ä 41 1 1 Ä

Ä

Ä Ä

35 36 31 32 MedicineÄ 33 34 35

31 32 ! 33 34 41a

523 Hat à 3 à Ä

Ä

! Ä Ä DUNMORE 41 1 1 IRVINE

! 3 ì ì ! 29 28 27 26

30 29 ! 28 27 26 25 30

!

! Ä

! ! Ä

! 41 Ä ST Ä 515

! 23

19 20 21 22 23 24 19 20 21 22 41 !

! ELKWATER

Ä ! T11 - R4 T11 - R3 Ä Cypress Hills 514 Provincial Park ! 15 14 18 17 16 15 14 13 18 17 16 !! ! ! !

! 10 11

7 8 9 10 11 12 7 8 9

! ! CYP 40 ! CYP 30 8787 CYP 45 ! 41 87 ST 3 2

6 5 4 3 2 1 6 5 4 !

! ! CYP 29 Loc7 ! 87 CYP 06 87")! ! )" Township Rd 110 87 CYP 44 Loc1 1 CYP 31 CYP 05 .! 87

! 87 3 2 ! .! 34 35 36 .31 32 33 34 35 36 31 ! 32 33 87 CYP 42 87 87 13 4 CYP 32 ! CYP 41 .! 5

.! .! 6 Range Rd 43 ! .! CYP 03 87 CYP 28 0# 7 ! 14 0# .! 87 .! 18 15 29 28 27 26 25 30 ! 29 28 27 25 30 0# .! .! 8 CYP 36 16 CYP 25 9 ! 19 .! 87 0# ! 87 .! Loc3 .! .

! ! )" Township Rd 104 87

X Y X Y X Y #

Y X 0 .! .! 17 XY 10 X Y X Y X Y

! CYP 23 CYP 04 20 .! 12 87 CYP 26 87 .!

! 22 23 ! ! ! ! ! ! 20 21 22 23 19 20 24 19 .! 22 11 ! 87

CYP 02 87 RangeRd 40 CYP 22 21 .! CYP 27 87 .! 27 CYP 39 0# 0# Loc9 CYP 21 ! .! CYP 24 .! 87 87 )"! 8787 23 CYP 33 25 ! CYP 07 87 26 CYP 34 CYP 01 T10 - R4 87 .! .! 31 CYP 37 24 ! CYP 38 87 0# .! 87 87 13 18 .! 17 16 15 14 13 17 16 15 14 29 30 ! 87 CYP 19 0# .! .! 35 CYP 20 36 ! CYP 08 .! .! 87 .! 87 28 ! .! 33 34 .! CYP 69 87 32 40

! 87 .! .! 39 CYP 46 37 .! .! 41 T10 - R3 9 10 11 12 7 8 9 10 11 12! 7 8 87 0# .! ! 3 CYP 09 . 4 38 44

! CYP 18

d .! CYP 35 87 ! ! ! ! ! ! ! ! ! R 43 47 CYP 16 ! 87 e .! .! 46 87 ! g CYP 15 87 n .! a 0# .! 45 .! 4 3 2 ! ! ! 1 6 5 4 3 2 1 6 5 R 42 48 .! CYP 14 87 CYP 11 87 CYP 10 87 ! Township Rd 100 Township Rd 100 ") ST515 87 Loc6 CYP 12 CYP 13 87 34 35 36 31 32 33 34 35 36 31 32 33

ST41 RangeRd 40

CYP 17 87

27 26 25 30 29 28 27 26 25 30 29 28

22 23 24 19 20 21 22 23 24 19 20 21 .! Proposed Turbine Location - Enercon E138 - 4.2MW 15 - 30

X Y X Y X Y Proposed Project Substation Over 30 T9 - R3 0# Temporary Met Tower T9 - R4 40 dBA at 1.5m Height 0# Proposed Permanent Met Tower ! Existing Overhead Transmission Altalink 240kV 983L Proposed Laydown/O&M Yard Location 15 14 13 18 17 Paved16 Road 15 14 13 18 17 16 Proposed Underground Collection Line Gravel Road Proposed Access Road ST41 Unimproved Road 87 Occupied Residence Photomontage Field of View Arc 87 Abandoned Residence Project Boundary )"! Photomontage Location Township 7 8 9 10 11 12Adjusted Case Shadow7 Flicker (Hours per Year)8 9 10 11 12 Section 0 Project Lands

0 - 8 Parcel within 2015m

Parcel Within 800m 8 - 15 0 0.5 1 2 3 4 5 km 2 1 6 5 4 3 2 1 6 5 4 3 Source:WSP 2018, ESRI 2018, RDWI 2018 G:\Projects\CAN_West\Cypress_Wind\05_GIS\052_MapDocs\Infrastructure_Noise_Flicker_v22_Cypress.mxd | Last| Updated 3/11/2019 by brendan.soule

PROJECT LAYOUT, ADJUSTED CASE SHADOW FLICKER, AND NOISE IMPACT ~ Cypress Wind Power Project | Cypress County, Alberta

Page 107 Before

After

Title: Photomontage: Location 1 (E138) Notes: )" CYP 29 )"Township Road 110 Legend: VU41

Photographs taken with Canon ESO 5D Mk II camera and Canon EF24-70mm 11 TWP CYP 06 1 2 Township Line !. Project: f/2.8L lens set at 50 mm. Panoramic view compiled from multiple individual )" CYP 05 3 Photo Location !. !. photographs. Photomontage simulated using Enercon E138 EP3 turbine with 34 35 36 31 32 33 !. Section Line !. !. Cypress Wind Project rotor diameter of 138 m and hub height of 108 m using 48 turbine locations 13 4 Panorama Field of View (approximate) !. (Layout Lv22). 5 !. !. 6 Quarter-section Line !. !. !. !. RangeRoad 42 Project Lands !. !. )" !. Data Sources: CYP 03 CYP 28 7 !. !. Datum: NAD 83 14 " !. ) .! Proposed Turbine Location !. Populated places, roads, Alberta Township System, and municipal boundaries 0 Projection: UTM Zone 12N 27 18 25 4 15 30 29 28 !. !.

d !. !. from AltaLIS, licensed under the Open Government Licence – Alberta. a 8

o CYP 25 )" Residence !. !. 19 R 16 !.

)" !. e

TWP 10 TWP Township Road 104 g !. Prepared By: WSP Canada Inc. n !. 20 a Major Highway !. !. !. Scale: N.T.S. R Author: A. Medd 17 !. !. CYP 04 CYP 26 10 !. Reviewed: S. Schnick !. !. !. )" )" Minor Highway !. !. 24 19 20 21 Approved: R. Istchenko 22 23 !.

Date: 2019-03-08 22 !. !. RangeRoad 35

23 11 RangeRoad 34 WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability or responsibility 21 )" Road !. !. !. for the accuracy, completeness or usefulness of any results or any information contained in this figure and use or reliance CYP 27 CYP 24 )" !. thereof. The figure is intended to be used in its entirety and solely for the purpose of this project. No excerpts may be CYP 07 26 Version: 8 taken to be representative of the findings in the assessment. The use and interpretation of this figure and any other data )" )" CYP 33 25 VU515 contained therein to make any investment or acquisition decisions of any nature is solely the responsibility of the client for RGE 4 W4M RGE 3 W4M Page 108 Before

After

Title: 34 35 36 3 31 32 Photomontage: Location 3 (E138) Notes: 4 Legend: 41 Photographs taken with Canon ESO 5D Mk II camera and Canon EF24-70mm 13 VU Township Line !. Project: f/2.8L lens set at 50 mm. Panoramic view compiled from multiple individual Photo Location !. !. photographs. Photomontage simulated using Enercon E138 EP3 turbine with CYP 03 CYP 28 Section Line !. !. RangeRoad 43 14 !. rotor diameter of 138 m and hub height of 108 m using 48 turbine locations Panorama Field of View (approximate) !. Cypress Wind Project !. (Layout Lv22). 27 18 25 15 30 29 Quarter-section Line !. !. !.

RangeRoad 42 CYP 25 !. !. 19 16 Project Lands !. !. Data Sources: Township Road 104 !. !. !. Datum: NAD 83 20 ! !. Populated places, roads, Alberta Township System, and municipal boundaries . Proposed Turbine Location !. Projection: UTM Zone 12N 17 !. !. from AltaLIS, licensed under the Open Government Licence – Alberta. CYP 04 CYP 26 !. !.

TWP 10 TWP )" !. !. Residence !. 22 23 24 RangeRoad 40 19 20 !. WSP Canada Inc. !. !. Prepared By: !. !. !. Scale: N.T.S. CYP 02 23 21 RangeRoad 35 Major Highway Author: A. Medd !. !. 22 CYP 27 !. Reviewed: S. Schnick !. !. !. Minor Highway !. !. Approved: R. Istchenko CYP 01 CYP 07 CYP 33 !. Date: 2019-03-08 24 !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability or responsibility 15 14 13 18 17 Road !. !. !. for the accuracy, completeness or usefulness of any results or any information contained in this figure and use or reliance 29 !. thereof. The figure is intended to be used in its entirety and solely for the purpose of this project. No excerpts may be 28 Version: 8 taken to be representative of the findings in the assessment. The use and interpretation of this figure and any other data VU515 contained therein to make any investment or acquisition decisions of any nature is solely the responsibility of the client for RGE 4 W4M RGE 3 W4M Page 109 Before

After

)" CYP 07 )" )" CYP 33 Title: Notes: 24 25 26 31 Photomontage: Location 6 (E138) 17 16 15 Legend: 41 Photographs taken with Canon ESO 5D Mk II camera and Canon EF24-70mm 13 18 29 30 UV )" !. f/2.8L lens set at 50 mm. Panoramic view compiled from multiple individual 28 35 36 Photo Location Township Line !. Project: CYP 08 CYP 19 !. photographs. Photomontage simulated using Enercon E138 EP3 turbine with !. )" 33 34 Section Line !. !. Cypress Wind Project rotor diameter of 138 m and hub height of 108 m using 48 turbine locations Township Road 102 41 Panorama Field of View (approximate) !. (Layout Lv22). 32 40 !. !. Quarter-section Line !. !. CYP 09 39 10 Project Lands !. !. 12 )" 7 38 8 9 41 !. !. VU !. !. Data Sources: !. Datum: NAD 83 44 CYP 18 .! !. Populated places, roads, Alberta Township System, and municipal boundaries 10 TWP 37 Proposed Turbine Location !. Projection: UTM Zone 12N CYP 35 )" !. !. 47 !. !. from AltaLIS, licensed under the Open Government Licence – Alberta. )" 43 CYP 16 )" !. !. )" Residence !. 46 )" !.

RangeRoad 40 42 Prepared By: WSP Canada Inc. CYP 15 !. !. Scale: N.T.S. 1 6 5 48 4 3 Major Highway !. !. !. Author: A. Medd 45 !. !. CYP 11 !. Reviewed: S. Schnick CYP 10 !. !. !. )" )" Township Road 100 Minor Highway !. !. Approved: R. Istchenko 515 !. Date: 2019-03-08 )" VU !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability or responsibility CYP 12 Road !. !. !. for the accuracy, completeness or usefulness of any results or any information contained in this figure and use or reliance !. thereof. The figure is intended to be used in its entirety and solely for the purpose of this project. No excerpts may be 36 31 32 33 34 TWP 9 TWP Version: 8 taken to be representative of the findings in the assessment. The use and interpretation of this figure and any other data RangeRoad35 515 contained therein to make any investment or acquisition decisions of any nature is solely the responsibility of the client for VU RGE 4 W4M RGE 3 W4M Page 110 Before

After

Title: Photomontage: Location 7 (E138) Notes: CYP 29 Township Road 110 Legend: 41 Photographs taken with Canon ESO 5D Mk II camera and Canon EF24-70mm VU TWP 11 TWP CYP 06 CYP 31 f/2.8L lens set at 50 mm. Panoramic view compiled from multiple individual Township Line !. Project: 3 1 2 Photo Location !. !. photographs. Photomontage simulated using Enercon E138 EP3 turbine with !. 35 36 31 32 33 Section Line !. !. Cypress Wind Project rotor diameter of 138 m and hub height of 108 m using 48 turbine locations 4 Panorama Field of View (approximate) !. 13 CYP 32 !. !. (Layout Lv22). 5 !. Quarter-section Line !. !. 6 Project Lands !. !. !. Data Sources: !. !. !. Datum: NAD 83 CYP 28 7 !. 14 .! Proposed Turbine Location !. Populated places, roads, Alberta Township System, and municipal boundaries !. !. Projection: UTM Zone 12N 0

from AltaLIS, licensed under the Open Government Licence – Alberta. 18 25 4 15 30 29 28 !. !. d

a 8 9 )" Residence !. !. o !.

19 R !.

TWP 10 TWP CYP 25 e Township Road 104 !. !. Prepared By: WSP Canada Inc. g 16 !. 20 n Major Highway !. !. Scale: N.T.S. a !. Author: A. Medd R !. 17 41 !. Reviewed: S. Schnick CYP 26 VU !. !. !. 10 Minor Highway !. !. Approved: R. Istchenko 23 24 19 20 12 !. Date: 2019-03-08 11 !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability or responsibility 22 Road !. RangeRoad 35 !. 23 21 RangeRoad 34 27 !. for the accuracy, completeness or usefulness of any results or any information contained in this figure and use or reliance !. thereof. The figure is intended to be used in its entirety and solely for the purpose of this project. No excerpts may be CYP 27 Version: 8 taken to be representative of the findings in the assessment. The use and interpretation of this figure and any other data CYP 24 VU515 contained therein to make any investment or acquisition decisions of any nature is solely the responsibility of the client for RGE 4 W4M RGE 3 W4M Page 111 Before

After

)" Title: 4 5 Photomontage: Location 9 (E138) Notes: 13 Legend: 41 Photographs taken with Canon ESO 5D Mk II camera and Canon EF24-70mm 6 VU )" Township Line !. Project: f/2.8L lens set at 50 mm. Panoramic view compiled from multiple individual CYP 28 7 Photo Location !. !. 14 )" photographs. Photomontage simulated using Enercon E138 EP3 turbine with !. 18 25 15 30 29 28 Section Line !. !. Cypress Wind Project rotor diameter of 138 m and hub height of 108 m using 48 turbine locations 8 Panorama Field of View (approximate) !. (Layout Lv22). 19 9 !. !. CYP 25 )" Quarter-section Line !. !. 16 Township Road 104 !. !. 20 Project Lands !. !. Data Sources: 17 41 !. !. !. Datum: NAD 83 CYP 26 VU ! !. Populated places, roads, Alberta Township System, and municipal boundaries . Proposed Turbine Location !. Projection: UTM Zone 12N )" )" 10 !. !. from AltaLIS, licensed under the Open Government Licence – Alberta. 23 24 19 20 11 12 !. !.

TWP 10 TWP 21 " !. RangeRoad 40 ) !. Residence !.

RangeRoad 35 !. 23 )" RangeRoad 34 27 Prepared By: WSP Canada Inc. 22 )" !. !. Scale: N.T.S. CYP 27 CYP 24 )")" Major Highway !. !. !. Author: A. Medd 26 !. !. )" !. Reviewed: S. Schnick CYP 07 )" CYP 33 25 31 !. !. !. 24 Minor Highway !. !. Approved: R. Istchenko 14 13 18 17 16 !. Date: 2019-03-08 29 30 !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability or responsibility 28 35 36 Road !. !. !. for the accuracy, completeness or usefulness of any results or any information contained in this figure and use or reliance !. Township Road 102 thereof. The figure is intended to be used in its entirety and solely for the purpose of this project. No excerpts may be CYP 08 )" 34 Version: 8 taken to be representative of the findings in the assessment. The use and interpretation of this figure and any other data VU515 contained therein to make any investment or acquisition decisions of any nature is solely the responsibility of the client for RGE 4 W4M RGE 3 W4M Page 112 From: Susan Jin Sent: Friday, June 21, 2019 1:20 PM To: EDF EN Canada Cc: Eileen McCord Subject: ROC June 21, 2019

HALO Rescue - Called HALO rescue and spoke to Kim to inform them about the project development of Cypress Wind. - Advised them that the project is located approximately 30km away from their physical address and upon airstrip impact analysis there are no concerns. - Informed that I could share the PSIP with them for their review and comments if any. - Email to: [email protected]

Page 113 Consultation with Canadian Forces Base Suffield

Page 114 From: Susan Jin Sent: Thursday, July 18, 2019 2:05 PM To: '[email protected]' Cc: [email protected]; [email protected]; [email protected] Subject: RE: Cypress Wind Power Project - Project Update

Hi Mike,

Thank you for taking the time to review and providing your feedback. We truly appreciate it. As we move forward with the AUC and prepare for, we will continue to engage with you and CFB Suffield as any updates are made on the project. In the meantime, please feel free to contact me should you have any questions.

Thanks again and hope you have a great day.

Sincerely,

From: [email protected] Sent: Thursday, July 18, 2019 12:02 PM To: Susan Jin Cc: [email protected]; [email protected] Subject: FW: Cypress Wind Power Project - Project Update

Good morning Susan.

As discussed regarding the information presented as of today, CFB Suffield does not have any issues with the proposed project.

Take care,

Mike

Mike Locke, CD

Range and Training Area Management Officer, CFB Suffield National Defence / Government of Canada [email protected] /Tel: 403-544-4011 Ext 5181/ CSN: 520-5181 / Fax: 403-544-4776

Officier de la Gestion des Champs de tir et Secteurs d’Entrainment, BFC Suffield Défense Nationale / Gouvernement of Canada [email protected] /Tel: 403-544-4011 Ext 5181/ RCCC: 520-5181 / Fax: 403-544-4776

From: Susan Jin [mailto:[email protected]] Sent: July 17, 2019 3:01 PM To: Locke MQ@CFB Suffield@Suffield Cc: Finnemore NA@CFB Suffield@Suffield ; [email protected] Subject: RE: Cypress Wind Power Project - Project Update

Page 115 Hi Mike,

I hope you have been well since we last spoke. I would like to just follow up and see if you and the CFB Suffield Base Commander have comments, questions and/or foresee any issues with the Project? We’re working to submit to the AUC and are in process of closing off stakeholder engagement records where possible and your feedback would be very much appreciated in ensuring that our Project is in compliance and satisfaction of CFB Suffield.

Also, on a side note, we initiated engagement with Department of National Defense on Wind Turbine Assessment, and have not yet received any feedback. Would you happen to have a contact I can reach out to for review and comments? I’ve attached here our correspondence for reference.

Thank you for your time and please do not hesitate to contact me should you have any questions.

Sincerely,

Susan Jin Associate Developer

T: 416.216.5879

M: 647.522.8440

Page 116 Disclaimer: This email and any attachments sent to EDF employees or their intended recipients should be considered confidential, may contain legal, professional and/or other privileged information, and intended solely for the addressee. If you are not the intended recipient, do not use the information in this email in any way; delete and

notify the sender.

From: [email protected] Sent: Tuesday, June 25, 2019 12:40 PM To: Susan Jin Cc: [email protected]; [email protected] Subject: RE: Cypress Wind Power Project - Project Update

Susan,

Thank you for the information. We will have a look and brief the Base Commander as required. Once complete, we will send you any comments.

Take care,

Mike

Mike Locke, CD

Range and Training Area Management Officer, CFB Suffield National Defence / Government of Canada [email protected] /Tel: 403-544-4011 Ext 5181/ CSN: 520-5181 / Fax: 403-544-4776

Officier de la Gestion des Champs de tir et Secteurs d’Entrainment, BFC Suffield Défense Nationale / Gouvernement of Canada [email protected] /Tel: 403-544-4011 Ext 5181/ RCCC: 520-5181 / Fax: 403-544-4776

From: Susan Jin [mailto:[email protected]] Sent: June 24, 2019 8:32 AM To: Locke MQ@CFB Suffield@Suffield Cc: Finnemore NA@CFB Suffield@Suffield ; EDF EN Canada Subject: Cypress Wind Power Project - Project Update

Hi Michael,

I hope this email finds you well. Previously, my colleague David Warner contacted you regarding the development of our Cypress Wind Power Project to consult with you on any impacts you may see from the Project or for any questions/comments you may have. I would like to just follow up and provide you with an update to our Project.

Page 117 In December 2018, Cypress Wind Power Project was awarded a contract with the AESO through their Renewable Electricity Program (REP) Round 2 and will be anticipating to be constructed in 2021.

Since David has last reached out, there has been updates made to our Project. Some of them are: our layout has changed to accommodate the new turbine technology we are anticipating to use; and collection routing and access roads have been modified to accommodate stakeholder feedbacks.

There are more detailed information to the changes and you can find this in the attached Project Specific Information Package.

Upon your and your team’s review, if you have any questions or comments regarding our Project, please do not hesitate to contact me. I remain available to your inquiries. If you can also forward this to the Base Commander for their review and comments/sign-off, it would be greatly appreciated.

Thanks very much for your time and I look forward to hearing from you!

Sincerely,

Susan Jin Associate Developer

53 Jarvis street suite 300 Toronto, ON M5C 2H2

T: 416.216.5879 M: 647.522.8440 [email protected] www.edf-re.ca

Disclaimer: This email and any attachments sent to EDF employees or their intended recipients should be considered confidential, may contain legal, professional and/or other privileged information, and intended solely for the addressee. If you are not the intended recipient, do not use the information in this email in any way; delete and

notify the sender.

Page 118 Consultation with RCMP

Page 119 5/6/2019 Mail - EDF EN Canada - Outlook

From: [email protected] Sent: Friday, May 3, 2019 8:38 AM To: Ingold, Nicholas Cc: EDF EN Canada; Jin, Susan Subject: RE: RCMP project update: Cypress Renewable Energy Centre Limited

CAUTION: This email was sent outside of your organization

Dear Mr. Ingold,

This email will serve the purpose to update you on the RCMP co-ordinaon effort for "Cypress Renewable Energy Centre Limited".

Our reviewing engineer has noted that this analysis shows that there are sll no RCMP owned repeater sites or Point-To- Point microwave radio links operang above 890 MHz that would be affected by the proposed locaons of the wind turbines.

Best regards,

Jules Lefrançois Spectrum Unit Supervisor RCMP Naonal Radio Services

Page 120 https://mail.communica.ca/owa/#path=/mail/inbox 1/1 25/04/2019 Mail - EDF EN Canada - Outlook

From: [email protected] Sent: Thursday, April 25, 2019 6:21 AM To: Ingold, Nicholas Cc: EDF EN Canada; Jin, Susan Subject: RE: RCMP project update: EDF Cypress Wind Power Project

CAUTION: This email was sent outside of your organization

We will get back to you ASAP.

Raymond St-Jean Manager, Radio Architecture and Engineering Naonal Radio Services RCMP Tel:(613) 998-7325

Page 121 https://mail.communica.ca/owa/#path=/mail 1/1 22/04/2019 Mail - EDF EN Canada - Outlook

From: Ingold, Nicholas Sent: Monday, April 22, 2019 8:51 AM To: Windfarm_Coordinator Windfarm_Coordinator Cc: EDF EN Canada; Susan Jin; Ingold, Nicholas Subject: RE: RCMP project update: EDF Cypress Wind Power Project

CAUTION: This email was sent outside of your organization

Hi Raymond,

I would just like to follow up on my last email to you regarding the Cypress Wind Power Project.

We would like to note that the project has received Capitalizaon, under the following legal enty: “Cypress Renewable Energy Centre Limited Partnership”. It would be much appreciated if the enre owner’s name, as shown in bold in this email, be included in any approval/determinaon that RCMP may have.

Many thanks and looking forward to your response!

Nicholas Ingold, EIT T 1 613-690-1081

Page 122 https://mail.communica.ca/owa/#path=/mail 1/1 4/12/2019 Mail - EDF EN Canada - Outlook

From: Ingold, Nicholas Sent: Thursday, April 11, 2019 12:16 PM To: Windfarm_Coordinator Windfarm_Coordinator Cc: Schnick, Steve; EDF EN Canada; Susan Jin; Ingold, Nicholas Subject: RCMP project update: EDF Cypress Wind Power Project

CAUTION: This email was sent outside of your organization

Hello Raymond,

WSP on behalf of EDF-RE would like to provide you with an update on the Cypress Wind Power Project.

Since your last communicaon with Steve Schnick, there have been some changes to the locaons and dimensions of the proposed turbines.

EDF-RE has selected the new, larger, Enercon E138 turbine, thereby reducing the total number of turbines to 48. The new dimensions for the E138 turbine are as follows: Total Turbine height (Blade at 12 o’clock posion) = 177 m [580.71 ] Rotor Diameter = 138 m [452.76 ] Steel Tower Height (Hub Height) = 108 m [354.33 ]

The new turbine layout is Version 22 (V22) and the turbine locaons are shown in the aached map and mulple coordinate spreadsheet.

Given your previous responses, we do not ancipate that there will be any changes to your conclusions. If you could provide confirmaon that these updates are acceptable for RCMP operaons that would be much appreciated. However, should you have any quesons or concerns, please do not hesitate to let us know.

Best regards,

Nicholas Ingold, EIT Project Designer, Aviation Transportation

T 1 613-690-1081 M 1 343-998-1279 [email protected]

2611 Queensview Drive, Suite 300 Ottawa, Ontario, K2B 8K2 Canada

wsp.com

Page 123 https://mail.communica.ca/owa/#path=/mail 1/1 Turbine 1

Turbine 2 Turbine 3

Turbine 4 Turbine 13 CYPRESS WIND POWER PROJECT BOUNDARY Turbine 5 Turbine 6

Turbine 7 Turbine 14 Turbine 18 Turbine 15 Turbine 9 Turbine 8 Turbine 19 Turbine 16

Turbine 20 Turbine 17 Turbine 10

Turbine 12 Turbine 21 Turbine 27 Turbine 22 Turbine 11

Turbine 23

Turbine 24

CYPRESS WIND POWER PROJECT BOUNDARY Turbine 25 Turbine 26 Turbine 31 Turbine 29

Turbine 30 Turbine 28 Turbine 35 Turbine 33 Turbine 36 Turbine 34 Turbine 41 Turbine 38 Turbine 32 Turbine 39 Turbine 40 Turbine 37 Turbine 44

Turbine 43 Turbine 47

Turbine 42 Turbine 46

Turbine 45

Turbine 48

Client: CYPRESS RENEWABLE ENERGY CENTRE LIMITED Scale 1:50,000 PARTNERSHIP 250 0 500 750 1250 2000 METRES Project:

1000 0 1250 2500 5000 FEET CYPRESS WIND POWER PROJECT

1. COORDINATE SYSTEM: NAD 83_CSRS_UTM_UTM_12N N Title:

2. PLEASE REFER TO ATTACHED MULTIPLE 1 APR 2019 SUBMITTED FOR REVIEW NI AIM COORDINATE LISTING SPREADSHEET WHICH APPENDIX A: PROJECT No. DATE DESCRIPTION BY APPD PROVIDES DETAILED COORDINATES AND ELEVATIONS FOR ANALYSIS. W E LOCATION REVISION / ISSUE 3. BASE MAP: ALTALIS MAP 72E Copyright Reserved Project No. 181-00733-00 Contract No. TBD S THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY OF WSP CANADA INC. ARCH full bleed D (24.00 x 36.00 Inches) April 11, 2019 P:\CY__ 19M-xxxx-00 Cypress Wind Power Project Agency Consultation\CAD\Working\Cypress Map.dwg REPRODUCTION OR USE FOR OTHER THAN THAT AUTHORIZED BY WSP CANADA INC. IS FORBIDDEN. Page 124 DRAWING No. APPENDIX A National Defence | Défence nationale

Cypress Wind Power Project - V22 Turbine Coordinates and Elevations

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Example 1 60 39 16.59 -110 36 14.01 126.00 100.00 96 274 Turbine 1 49 52 12.94 -110 22 51.56 913.20 108 138 1091 Turbine 2 49 52 2.11 -110 22 12.66 918.60 108 138 1096 Turbine 3 49 52 1.11 -110 24 11.96 911.40 108 138 1089 Turbine 4 49 51 43.14 -110 23 33.57 929.10 108 138 1107 Turbine 5 49 51 34.64 -110 22 15.96 921.20 108 138 1099 Turbine 6 49 51 27.4 -110 21 30.29 919.00 108 138 1096 Turbine 7 49 51 13.78 -110 21 11.56 922.70 108 138 1100 Turbine 8 49 50 50.2 -110 21 42.77 940.30 108 138 1118 Turbine 9 49 50 52.39 -110 20 53.17 934.50 108 138 1112 Turbine 10 49 50 26.51 -110 21 24.67 956.10 108 138 1134 Turbine 11 49 50 1.69 -110 22 20.82 968.60 108 138 1146 Turbine 12 49 50 17.01 -110 21 9.28 958.20 108 138 1136 Turbine 13 49 51 39.08 -110 25 51.11 921.10 108 138 1099 Turbine 14 49 51 10.73 -110 25 33.47 937.50 108 138 1115 Turbine 15 49 50 58.83 -110 24 28.01 949.90 108 138 1127 Turbine 16 49 50 46.34 -110 24 19.12 965.10 108 138 1143 Turbine 17 49 50 31.73 -110 24 13.2 970.10 108 138 1148 Turbine 18 49 51 1.23 -110 26 50.81 935.30 108 138 1113 Turbine 19 49 50 46.49 -110 26 20.21 957.60 108 138 1135 Turbine 20 49 50 32.41 -110 25 49.63 968.10 108 138 1146 Turbine 21 49 50 9.99 -110 25 32.39 963.00 108 138 1140 Turbine 22 49 50 2.19 -110 25 15.51 965.30 108 138 1143 Turbine 23 49 49 53.77 -110 26 24.63 964.00 108 138 1141 Turbine 24 49 49 23.61 -110 23 36.71 984.10 108 138 1162 Turbine 25 49 49 35.14 -110 22 26.83 978.20 108 138 1156 Turbine 26 49 49 36.13 -110 21 37.26 982.20 108 138 1160 Turbine 27 49 49 51.3 -110 21 0.55 967.00 108 138 1144 Turbine 28 49 49 1.55 -110 23 43.7 1000.90 108 138 1178 Turbine 29 49 49 9.31 -110 23 7.18 997.40 108 138 1175 Turbine 30 49 49 10.4 -110 22 15.18 996.50 108 138 1174 Turbine 31 49 49 28.49 -110 21 7.38 984.00 108 138 1161 Turbine 32 49 48 35.37 -110 23 43.42 1025.50 108 138 1203 Turbine 33 49 48 45.61 -110 23 3.18 1018.90 108 138 1196 Turbine 34 49 48 47.2 -110 22 10.89 1017.80 108 138 1195 Turbine 35 49 49 1.43 -110 21 36.68 1002.10 108 138 1180 Turbine 36 49 49 1.46 -110 20 54.95 993.60 108 138 1171 Turbine 37 49 48 22.81 -110 23 32.44 1036.60 108 138 1214 Turbine 38 49 48 21.76 -110 22 59.3 1043.50 108 138 1221 Turbine 39 49 48 32.15 -110 22 9.11 1032.60 108 138 1210 Turbine 40 49 48 31.57 -110 21 29.67 1022.80 108 138 1200 Turbine 41 49 48 38.23 -110 20 52.5 1006.30 108 138 1184 Turbine 42 49 47 39.51 -110 23 31.75 1065.10 108 138 1243 Turbine 43 49 47 53.12 -110 22 59.08 1064.50 108 138 1242 Turbine 44 49 48 8.17 -110 22 16.15 1049.40 108 138 1227

Page 125 National Defence | Défence nationale

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Turbine 45 49 47 38.82 -110 22 51.77 1062.40 108 138 1240 Turbine 46 49 47 42.1 -110 22 21.84 1051.30 108 138 1229 Turbine 47 49 47 53.92 -110 21 41.06 1040.90 108 138 1218 Turbine 48 49 47 28.83 -110 22 8.84 1046.10 108 138 1224 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 126 From: Windfarm_Coordinator Windfarm_Coordinator [mailto:[email protected]] Sent: Friday, April 06, 2018 7:10 AM To: Schnick, Steve Subject: RE: RCMP project update: EDF Cypress Wind Power Project

Please find the RCMP's response.

Raymond St-Jean

Page 127 Protected A

Steve Schnick, P. Eng. WSP Canada Inc. GV 1620-7-3

April 6th, 2018

Dear Sir,

SUBJECT: Cypress Wind Power Project near Medicine Hat

Reference is made to your Cypress Wind Power project update provided on March 22nd, 2018, on your plans to install a wind farm near Medicine Hat, Alberta.

The RCMP has performed a re-analysis based on the updated information and found that the original conclusion still stands. The RCMP has no nearby facilities which could be impacted by your proposed plan.

If more information is required, or if you have any questions, please don't hesitate to contact us.

Sincerely,

Raymond St-Jean Manager, Spectrum Unit Tel: 613-998-7325 Fax:613-998-7528 Email: [email protected]

National Radio Services IM/IT Program Royal Canadian Mounted Police

Page 128 ID Type X_DD Y_DD Elev_m 1 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.439966 49.853269 932.2 2 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.440267 49.835416 965.4 3 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368687 49.854795 924.8 4 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.408863 49.817817 994.7 5 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368625 49.863591 916.7 6 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.347891 49.832544 964.7 7 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.346897 49.852607 924.4 8 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.453612 49.849191 935.5 9 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.428692 49.857075 929.0 10 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.362275 49.846178 944.0 11 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.436499 49.830832 967.4 12 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.449777 49.839972 950.4 13 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.348195 49.812670 1001.8 14 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.356078 49.839348 957.4 16 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.423939 49.830928 969.8 17 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.386294 49.821471 990.8 18 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.429848 49.842325 968.8 19 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.363562 49.818252 1000.7 20 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.415916 49.860364 919.9 21 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.357932 49.817027 1000.6 22 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.348025 49.819898 989.0 23 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.402852 49.816894 1003.0 24 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.398464 49.813115 1016.7 25 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.393637 49.808999 1029.0 26 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.384053 49.806171 1042.8 27 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368847 49.808577 1035.0 28 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.374164 49.812531 1024.0 29 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.359095 49.809336 1022.3 31 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.380067 49.801923 1055.5 32 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.375837 49.799019 1051.3 33 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.370052 49.791940 1047.8 34 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.391171 49.794149 1064.8 35 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.361003 49.795877 1041.5 36 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.373691 49.794920 1052.6 37 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.384721 49.791330 1067.9 38 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.395573 49.796657 1062.4 39 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.439431 49.846959 954.5 40 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.423835 49.853749 935.0 41 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.347566 49.845955 938.1 42 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.430872 49.861112 919.7 43 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368992 49.871136 911.3 44 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.352834 49.803116 1025.2 45 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.348916 49.826201 977.8 46 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.357316 49.855899 922.0 47 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.378681 49.817201 1005.6 48 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.362408 49.824350 985.5

Page 129 49 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.408393 49.871228 903.1 50 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.407225 49.846447 962.3 51 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.403711 49.842381 969.8 52 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.404123 49.834970 969.2 53 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.391363 49.863114 927.3 54 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.386295 49.848931 952.2 55 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.362550 49.838781 958.8 56 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.352315 49.835716 964.2 57 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.361382 49.802179 1039.0 58 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.392967 49.825688 979.7

Page 130 From: Schnick, Steve Sent: Thursday, March 22, 2018 2:07 PM To: Windfarm_Coordinator Windfarm_Coordinator Cc: Susan Jin; David Warner; EDF EN Canada Subject: RE: RCMP project update: EDF Cypress Wind Power Project

Hello,

As a follow-up to the emails below, I wanted to inform you that the proposed turbine layout for this wind project has been updated to reflect minor adjustments to some of the turbine locaons. As well, the final turbine model has been selected.

Please find aached a spreadsheet of the new turbine coordinates along with elevaons. The current proposed turbine is the following: · Vestas V136: total turbine height (to upper blade p) will be 150 m; the rotor will have a diameter of 136 m; the tower will be 82 m tall.

Given your previous response, I expect there will be no change to your conclusions. However, if you do have any quesons or concerns, please let me know.

Thanks, Steve

Attachments: Turbines_v9_Vestas_20180205_forExternal.xlsx

Steve Schnick , P.Eng. | WSP 405 18 St SE, Calgary, Alberta T2E 6J5 Canada T +1 587-475-4950 | M +1 587-888-9463 | E [email protected]

Page 131 From: Windfarm_Coordinator Windfarm_Coordinator [mailto:[email protected]] Sent: Monday, November 27, 2017 3:37 PM To: Schnick, Steve Subject: Re: RCMP project update: EDF Cypress Wind Power Project

Please find the RCMP's response.

Raymond St-Jean

Page 132 Protected A

Steve Schnick, P. Eng. WSP Canada Inc. GV 1620-7-3

November 27th, 2017

Dear Sir,

SUBJECT: Cypress Wind Power Project near Medicine Hat

Reference is made to your Cypress Wind Power project update provided on November 21st, 2017, on your plans to install a wind farm near Medicine Hat, Alberta.

The RCMP has performed a re-analysis based on the updated information and found that the original conclusion still stands. The RCMP has no nearby facilities which could be impacted by your proposed plan.

If more information is required, or if you have any questions, please don't hesitate to contact us.

Sincerely,

Raymond St-Jean Manager, Spectrum Unit Tel: 613-998-7325 Fax:613-998-7528 Email: [email protected]

National Radio Services IM/IT Program Royal Canadian Mounted Police

Page 133 From: Schnick, Steve Sent: Tuesday, November 21, 2017 4:17 PM To: Windfarm_Coordinator Windfarm_Coordinator Subject: RCMP project update: EDF Cypress Wind Power Project

Hello,

I am a project manager with WSP Canada Inc. and we are working as a technical consultant for EDF EN Development Canada (EDF).

EDF is the developer of the proposed Cypress Wind Power Project located about 30 km southeast of Medicine Hat, Alberta.

On behalf of EDF, I would like to share updated project details that have been defined since our previous communicaon.

There are currently two turbine model opons being considered for the project, each with its own proposed layout; only one of these opons would ulmately be constructed: Siemens-Gamesa G132: total turbine height (to upper blade p) will be 150 m; the rotor will have a diameter of 132 m; the tower will be 84 m tall. Layout Lv07. Vestas V136: total turbine height (to upper blade p) will be 150 m; the rotor will have a diameter of 136 m; the tower will be 82 m tall. Layout Lv08.

Please find aached maps showing the two turbine opons.

Given your previous response, I expect there will be no change to your conclusions. However, if you do have any quesons or concerns, please let me know.

Thanks, Steve

Steve Schnick , P. Eng. | WSP 405 18 St SE, Calgary, Alberta T2E 6J5 Canada T +1 587-475-4950 | M +1 587-888-9463 | E [email protected]

Page 134 15 14 16 15 14 13 18 17 16

11 10 11 12 7 8 9 10 9 41 T11 - R3 T11 - R4 87

3 2 4 3 2 1 6 5 4

87 87 Township Rd 110 49 Township Rd 11087 .!! .!43

! 87 !

! ! 31 32 33 34 35 33 34 35 36 5

! ! ! ! ! 87 ! 53 ! ! .! ! 42 !

! .! ! ! 20 ! .! ! ! ! ! ! ! ! ! ! ! ! .! ! ! ! ! ! ! ! ! ! ! 46 !9

! Range Range 43 Rd ! ! .!

.! ! ! ! ! ! 3 ! 87 ! !

! ! 40 !

1 ! .! 7 ! ! ! ! 87 ! ! . ! ! ! ! .! Range Rd 42 Rd Range .! !

! ! ! ! 54 26 ! ! 30 29 ! 28 27 28 27 ! 26 25

! ! ! ! ! . 8 ! ! ! .! ! ! ! 39

! ! 50! 10 41 ! !

! !

! ! .! 87

! ! ! ! .! . .!

! !

"/ ! !

!

! " ! ) !

! !

! 51 Township! Rd 104

Township Rd 104!

! !

! ! ! ! 87

12 !18 .! ! . ! !

!! 14

. !

! ! 55

! ! !

! .!

! ! ! .

87 ! !

!

! 87

! !

! ! ! ! !

! ! 56 ! ! ! ! 23 ! ! ! ! 21 41 22

21 22 23 2 24! 52 19 20 .!

! !

.! ! ! 87

! 40 Rd Range ! ! .

! ! ! ! ! ! ! 6 87 ! ! !

!

!

! ! !

! 87 .!

11 16 ! ! ! ! ! !

R !

!

.! ! 87 .! ! ! ! ! ! !

! !

a 87 ! !

n !

T10 - R4 T10 - R3! ! ! 87 !

g 58 87 ! ! ! !45

87 ! ! 48 ! . e .! ! ! !

!

! ! .!

! 87 ! R 17 ! 15 14

! 17 16

13 18 ! ! ! 16 d 15 14 .! 22

! !

!

!

! 87 ! .! 19 !

4 ! 4 ! 47 !

3 ! .! 21

! ! ! !

.! 23 ! 87 ! .! .!

!

!

.! !

! 87 !

! 24 28 13 !

! ! !

.! ! .!

! ! ! . !

! !

!

! 29!

25 !

27 ! ! ! !! ! .! .!

! .! 10 11 9 10 11 12 7 ! 26 8 9 87 87 !

! .!

44 ! ! 57

! 31

!

! .! !

!

! .! ! .!

! 32 ! 87 .!! !

38 !

! 87

! 35 !

.! ! 36 .! 87 34 !

! .! !

.! ! 2 ! 33 3 4 3 2 1 6 37 5 4 .!! .! 87 87 87 515 Township Rd 100 Township Rd 10087 .! Turbine Location - Vestas V136 - 4.2 MW

Project Substation 41 87 "/ 34 35 33 34 35 36 31 32 33 )" O&M and Laydown Yard 38.3 dBA Sound Contour 40 Rd Range 87 Occupied Residence 87 Abandoned Residence 87 Worst Case Shadow Flicker Hours Per Year 27 26 28 27 26 25 30 29 28

0 Hours

Ä 0 - 8 Hours Ä T9 - R4 524 Ã

1

8 - 15 Hours ì Ä 23 22 Ä

21 22 23 24 19 20 21

41

Ä Ä

MedicineÄ Hat 15 - 30 Hours Ä

523 T9 -3 R3

à Ä

Over 30 Hours Ä

Ä 41 1 Ä ì ! Collection Lines 18 17 3 16 15 14 16Access Roads 15 14 13 Paved Road

Gravel Road 41

Neighboring Parcels

Within 2km Ä Within 800m Ä

Project Boundary 41

7 8 9 10 11 9 10 11 12 Ä Parcels and Land Owners Ä 515 Township 0 0.5 1 2 3 Section Kilometers Source: Source 1YYYY, Source 2 YYYY | G:\Projects\CAN_Alberta\Cypress_Wind\05_GIS\052_MapDocs\SitePlan_v8_TAB_Cypress.mxdLast| Updated 11/2/2017 by brendan.soule CYPRESS TURBINES V8 ~ Cypress Wind Project | Alberta

Page 135 41 15 14 16 15 14 13 18 17 16

T11 - R3 T11 - R4 10 11 9 10 11 12 7 8 9

87

3 2 4 3 2 1 6 5 4

87 87

15 22 Township Rd 110

! ! !

! 87 Township Rd 110 !

.! .!

!

! 87 ! 23

.! !

16 ! 35

36 ! 31 32 33 34

33 34 35 !

.! ! 24

!

! 20 87 ! ! ! ! 21

8 62 ! .! .! ! .!

!!

! !

! ! !

. ! .

! ! !

! 25

!

! !

!

41

Range Range 43 Rd

9 ! !

! 13 . !

3 ! !

!

! !

! 26

! !

. .! ! ! !! !

. !

87 ! .! !

!

!

!

! !

! 4 87

! ! !

! ! ! !

Range Rd 42 Rd Range !

! 27

.! ! 26

29 ! 28 27

!

! 30

28 27 26! 25 ! .!

! 28

! 10 ! ! !

!

!

! .! ! !

! .!

2 ! 17 29

! ! !

! ! 87 .! .! .! !

!

"/ ! !

)" ! ! Township Rd 104

! 11

Township Rd 104 ! ! !

.! ! .! 87

!5 .!! !

! . 18 !

!!

! T10 - R3 30

! ! 61 ! 14

! ! ! ! 31 ! .! !

! ! .!

! 12 .!

! !

87 ! !

! 87

!

! !

! ! ! ! ! ! ! ! ! .

! ! 19 ! 23

! 20 21 22

19 ! 32

23 24!

21 22 !

! !

6 .! !

! ! .!

! 87

! 40 Rd Range ! ! .! !

87 ! !

! ! ! ! ! !

! 7 ! ! 87 33

! !

! !

!

1 ! ! ! .!

! ! ! ! ! ! 87 !

. ! ! ! ! .! ! !

! ! ! 87

!

! ! 34 !

!

! ! .! 87 T10 - R4 87 !

87 !

! !

! 51 ! 87 .! ! ! 14

15 14 13 ! 18 ! 17 16 15 16 ! 38 !! !

!

! .!

! 37 87

! 35 ! ! !

! 50 39 . ! ! ! ! ! . !

! 54 87

! .!! .!

!

!

! ! . !

87 53 !

! !

! 36

.!! !

! !

! 52 .!

! ! !

! !

. ! 41

! !

49 40!

! ! ! .!

! ! ! . ! .

11 12 7 ! 8 9 10 11 9 10 ! 87 ! 48 87 !

! .! !

!

3 47 ! !

! 42 57 !

4 !

.! .! ! .! ! !

46 41 !

d ! 43

87 .! !

R .! 87 ! !

e 56 44 87

59 !

!

! g ! .!! .! .! .! Turbinen Location - Gamesa G132 - 3.465MW 45 3 2 55 ! 5 ! 4

3 2 1 6 ! 4 a ! 60 .!! .! .! 87 "/ ProjectR Substation 87 )" O&M and Laydown Yard 87 Township Rd 100 Township Rd 100 515 38.3 dBA Sound Contour 87 87 Occupied Residence 87 87 Abandoned Residence 34 35 33 34 35 36 31 32 33

Worst Case Shadow Flicker Range Rd 40 Rd Range Hours Per Year

0 Hours 87

27 26 28 0 - 8 Hours 27 26 25 30 29 28

Ä Ä

8 - 15 Hours 524 Ã

ì1

Ä

15 - 30 Hours T9 - R4 41 Ä

Ä T9 - R3 Ä MedicineÄ Hat

19 20 21Ä 22 23

21 Over 30 Hours 22 23 24 523 3

à Ä

Access Roads Ä Ä 41 1 Ä ì !! Collection Lines 3 Paved Road

Gravel Road 41 17 16 15 14

16 Project Boundary 15 14 13 18

Parcels and Land Owners

Ä Township Ä

41

Section

Ä Within 2km Ä 0 0.5 1 2 3 515 Within 800m 10 11 9 10 11 12 7 Kilometers 8 9 Source: Source 1YYYY, Source 2 YYYY | G:\Projects\CAN_Alberta\Cypress_Wind\05_GIS\052_MapDocs\SitePlan_v7_Gamesa_TAB_Cypress.mxdLast| Updated 11/2/2017 by brendan.soule CYPRESS SITE PLAN V7 ~ Cypress Wind Project | Alberta

Page 136 From: Windfarm_Coordinator Windfarm_Coordinator [mailto:[email protected]] Sent: Thursday, June 01, 2017 5:27 AM To: Ryan, Leslie Subject: Re: Electromagnec Interference Consultaon for Proposed Wind Farm in Alberta

Good day,

Please see attached for our response to your wind farm coordination request.

Regards

Jonathan Lafrenière Wind farm administrative coordinator Tel : 613-949-3806 Fax: 613-998-7528 Email:[email protected]

Page 137 May 9, 2017 8:56 am

To whomever it may concern:

I am coordinating the consultation process with radiocommunication licensees in the vicinity of a proposed wind farm according to the recommendations in the document, Technical Information and Coordination Process Between Wind Turbines and Radiocommunication and Radar Systems, published by the Radio Advisory Board of Canada.

I would like your input on the potential for interference between RCMP radiocommunication facilities and a proposed wind farm to be located approximately thirty (30) kilometres southeast of Medicine Hat, Alberta. The project is in the design stage and subject to change upon consultation with stakeholders. The bounding box for the current project lands is provided below in WGS84 degree decimal coordinates. The attached map illustrates the approximate boundary of the current project lands.

The preliminary details of the wind power project are as follows:  Located north of Amherst, Nova Scotia: o North: 49.9349° N o South: 49.7193° N o East: 110.2232° W o West: 110.5569° W

The number and size of turbine to be installed is yet to be determined.

I would appreciate a response indicating whether or not there is a potential conflict. If there is a potential conflict, I would like to follow up with more detailed conversation to mitigate any concerns you may have.

Sincerely,

Les Ryan, P.Eng.

WSP Canada Inc. 405 18th Street SE Calgary, Alberta, Canada T2E 6J5 T +1 403.248.9463 #152 C +1 403.813.6327 www.wspgroup.com

Page 138 Consultation with STARS

Page 139 5/6/2019 Mail - EDF EN Canada - Outlook

From: Thiel, Jennifer Sent: Thursday, April 25, 2019 10:28 PM To: 'Ingold, Nicholas' Cc: EDF EN Canada; Susan Jin Subject: RE: STARS project update: EDF Cypress Wind Power Project

CAUTION: This email was sent outside of your organization

Hello Nicholas,

There has been no change in our comments from below in the email regarding the Cypress Renewable Energy Centre Limited Partnership.

Kind regards,

Jennifer Thiel Aviation Base Manager - Calgary

STARS 1441 Aviation Pk NE Calgary, AB T2E 8M7 Phone: 403-516-2766 Cell: 403-863-1433 Email: [email protected]

Page 140 https://mail.communica.ca/owa/#path=/mail 1/1 22/04/2019 Mail - EDF EN Canada - Outlook

From: Ingold, Nicholas Sent: Monday, April 22, 2019 8:30 AM To: [email protected] Cc: EDF EN Canada; Susan Jin; Ingold, Nicholas Subject: RE: STARS project update: EDF Cypress Wind Power Project

CAUTION: This email was sent outside of your organization

Hi Jennifer,

I would just like to follow up on my last email to you regarding the Cypress Wind Power Project.

We would like to note that the project has received Capitalizaon, under the following legal enty: “Cypress Renewable Energy Centre Limited Partnership”. It would be much appreciated if the enre owner’s name, as shown in bold in this email, be included in any approval/determinaon that STARS may have.

Many thanks and looking forward to your response!

Nicholas Ingold, EIT T 1 613-690-1081

Page 141 https://mail.communica.ca/owa/#path=/mail 1/1 4/12/2019 Mail - EDF EN Canada - Outlook

From: Ingold, Nicholas Sent: Thursday, April 11, 2019 12:27 PM To: [email protected] Cc: Schnick, Steve; EDF EN Canada; Susan Jin; Ingold, Nicholas Subject: RE: STARS project update: EDF Cypress Wind Power Project

CAUTION: This email was sent outside of your organization

Hello Jennifer,

WSP, on behalf of EDF-RE would like to provide you with an update on the Cypress Wind Power Project.

Since your last communicaon with Steve Schnick, there have been some changes to the locaons and dimensions of the proposed turbines.

EDF-RE has selected the new, larger, Enercon E138 turbine, thereby reducing the total number of turbines to 48. The new dimensions for the E138 turbine are as follows: Total Turbine height (Blade at 12 o’clock posion) = 177 m [580.71 ] Rotor Diameter = 138 m [452.76 ] Steel Tower Height (Hub Height) = 108 m [354.33 ]

The new turbine layout is Version 22 (V22) and the turbine locaons are shown in the aached map.

Given your previous response, we do not ancipate that there will be any changes to your conclusions. If you could provide confirmaon that these updates are acceptable for STARS operaons that would be much appreciated. However, should you have any quesons or concerns, please let us know.

Best regards,

Nicholas Ingold, EIT Project Designer, Aviation Transportation

T 1 613-690-1081 M 1 343-998-1279 [email protected]

2611 Queensview Drive, Suite 300 Ottawa, Ontario, K2B 8K2 Canada

wsp.com

Page 142 https://mail.communica.ca/owa/#path=/mail 1/1 National Defence | Défence nationale

Cypress Wind Power Project - V22 Turbine Coordinates and Elevations

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Example 1 60 39 16.59 -110 36 14.01 126.00 100.00 96 274 Turbine 1 49 52 12.94 -110 22 51.56 913.20 108 138 1091 Turbine 2 49 52 2.11 -110 22 12.66 918.60 108 138 1096 Turbine 3 49 52 1.11 -110 24 11.96 911.40 108 138 1089 Turbine 4 49 51 43.14 -110 23 33.57 929.10 108 138 1107 Turbine 5 49 51 34.64 -110 22 15.96 921.20 108 138 1099 Turbine 6 49 51 27.4 -110 21 30.29 919.00 108 138 1096 Turbine 7 49 51 13.78 -110 21 11.56 922.70 108 138 1100 Turbine 8 49 50 50.2 -110 21 42.77 940.30 108 138 1118 Turbine 9 49 50 52.39 -110 20 53.17 934.50 108 138 1112 Turbine 10 49 50 26.51 -110 21 24.67 956.10 108 138 1134 Turbine 11 49 50 1.69 -110 22 20.82 968.60 108 138 1146 Turbine 12 49 50 17.01 -110 21 9.28 958.20 108 138 1136 Turbine 13 49 51 39.08 -110 25 51.11 921.10 108 138 1099 Turbine 14 49 51 10.73 -110 25 33.47 937.50 108 138 1115 Turbine 15 49 50 58.83 -110 24 28.01 949.90 108 138 1127 Turbine 16 49 50 46.34 -110 24 19.12 965.10 108 138 1143 Turbine 17 49 50 31.73 -110 24 13.2 970.10 108 138 1148 Turbine 18 49 51 1.23 -110 26 50.81 935.30 108 138 1113 Turbine 19 49 50 46.49 -110 26 20.21 957.60 108 138 1135 Turbine 20 49 50 32.41 -110 25 49.63 968.10 108 138 1146 Turbine 21 49 50 9.99 -110 25 32.39 963.00 108 138 1140 Turbine 22 49 50 2.19 -110 25 15.51 965.30 108 138 1143 Turbine 23 49 49 53.77 -110 26 24.63 964.00 108 138 1141 Turbine 24 49 49 23.61 -110 23 36.71 984.10 108 138 1162 Turbine 25 49 49 35.14 -110 22 26.83 978.20 108 138 1156 Turbine 26 49 49 36.13 -110 21 37.26 982.20 108 138 1160 Turbine 27 49 49 51.3 -110 21 0.55 967.00 108 138 1144 Turbine 28 49 49 1.55 -110 23 43.7 1000.90 108 138 1178 Turbine 29 49 49 9.31 -110 23 7.18 997.40 108 138 1175 Turbine 30 49 49 10.4 -110 22 15.18 996.50 108 138 1174 Turbine 31 49 49 28.49 -110 21 7.38 984.00 108 138 1161 Turbine 32 49 48 35.37 -110 23 43.42 1025.50 108 138 1203 Turbine 33 49 48 45.61 -110 23 3.18 1018.90 108 138 1196 Turbine 34 49 48 47.2 -110 22 10.89 1017.80 108 138 1195 Turbine 35 49 49 1.43 -110 21 36.68 1002.10 108 138 1180 Turbine 36 49 49 1.46 -110 20 54.95 993.60 108 138 1171 Turbine 37 49 48 22.81 -110 23 32.44 1036.60 108 138 1214 Turbine 38 49 48 21.76 -110 22 59.3 1043.50 108 138 1221 Turbine 39 49 48 32.15 -110 22 9.11 1032.60 108 138 1210 Turbine 40 49 48 31.57 -110 21 29.67 1022.80 108 138 1200 Turbine 41 49 48 38.23 -110 20 52.5 1006.30 108 138 1184 Turbine 42 49 47 39.51 -110 23 31.75 1065.10 108 138 1243 Turbine 43 49 47 53.12 -110 22 59.08 1064.50 108 138 1242 Turbine 44 49 48 8.17 -110 22 16.15 1049.40 108 138 1227

Page 143 National Defence | Défence nationale

Turbine information Ground Nacelle Rotor Total Turbine LAT LONG Elevation Height Diameter Height Number dd mm ss.ss -ddd mm ss.ss (meters) (meters) (meters) (meters) Turbine 45 49 47 38.82 -110 22 51.77 1062.40 108 138 1240 Turbine 46 49 47 42.1 -110 22 21.84 1051.30 108 138 1229 Turbine 47 49 47 53.92 -110 21 41.06 1040.90 108 138 1218 Turbine 48 49 47 28.83 -110 22 8.84 1046.10 108 138 1224 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 144 Turbine 1

Turbine 2 Turbine 3

Turbine 4 Turbine 13 CYPRESS WIND POWER PROJECT BOUNDARY Turbine 5 Turbine 6

Turbine 7 Turbine 14 Turbine 18 Turbine 15 Turbine 9 Turbine 8 Turbine 19 Turbine 16

Turbine 20 Turbine 17 Turbine 10

Turbine 12 Turbine 21 Turbine 27 Turbine 22 Turbine 11

Turbine 23

Turbine 24

CYPRESS WIND POWER PROJECT BOUNDARY Turbine 25 Turbine 26 Turbine 31 Turbine 29

Turbine 30 Turbine 28 Turbine 35 Turbine 33 Turbine 36 Turbine 34 Turbine 41 Turbine 38 Turbine 32 Turbine 39 Turbine 40 Turbine 37 Turbine 44

Turbine 43 Turbine 47

Turbine 42 Turbine 46

Turbine 45

Turbine 48

Client: CYPRESS RENEWABLE ENERGY CENTRE LIMITED Scale 1:50,000 PARTNERSHIP 250 0 500 750 1250 2000 METRES Project:

1000 0 1250 2500 5000 FEET CYPRESS WIND POWER PROJECT

1. COORDINATE SYSTEM: NAD 83_CSRS_UTM_UTM_12N N Title:

2. PLEASE REFER TO ATTACHED MULTIPLE 1 APR 2019 SUBMITTED FOR REVIEW NI AIM COORDINATE LISTING SPREADSHEET WHICH APPENDIX A: PROJECT No. DATE DESCRIPTION BY APPD PROVIDES DETAILED COORDINATES AND ELEVATIONS FOR ANALYSIS. W E LOCATION REVISION / ISSUE 3. BASE MAP: ALTALIS MAP 72E Copyright Reserved Project No. 181-00733-00 Contract No. TBD S THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY OF WSP CANADA INC. ARCH full bleed D (24.00 x 36.00 Inches) April 11, 2019 P:\CY__ 19M-xxxx-00 Cypress Wind Power Project Agency Consultation\CAD\Working\Cypress Map.dwg REPRODUCTION OR USE FOR OTHER THAN THAT AUTHORIZED BY WSP CANADA INC. IS FORBIDDEN. Page 145 DRAWING No. APPENDIX A From: Schnick, Steve Sent: Thursday, March 22, 2018 2:07 PM To: Thiel, Jennifer Cc: Susan Jin; David Warner; EDF EN Canada Subject: RE: STARS project update: EDF Cypress Wind Power Project

Hi Jennifer,

As a follow-up to the emails below, I wanted to inform you that the proposed turbine layout for this wind project has been updated to reflect minor adjustments to some of the turbine locaons. As well, the final turbine model has been selected.

Please find aached a spreadsheet of the new turbine coordinates along with elevaons. The current proposed turbine is the following: · Vestas V136: total turbine height (to upper blade p) will be 150 m; the rotor will have a diameter of 136 m; the tower will be 82 m tall.

Given your previous response, I expect there will be no change to your conclusions. However, if you do have any quesons or concerns, please let me know.

Thanks, Steve

Attachments: Turbines_v9_Vestas_20180205_forExternal.xlsx

Steve Schnick , P.Eng. | WSP 405 18 St SE, Calgary, Alberta T2E 6J5 Canada T +1 587-475-4950 | M +1 587-888-9463 | E [email protected]

Page 146 ID Type X_DD Y_DD Elev_m 1 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.439966 49.853269 932.2 2 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.440267 49.835416 965.4 3 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368687 49.854795 924.8 4 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.408863 49.817817 994.7 5 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368625 49.863591 916.7 6 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.347891 49.832544 964.7 7 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.346897 49.852607 924.4 8 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.453612 49.849191 935.5 9 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.428692 49.857075 929.0 10 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.362275 49.846178 944.0 11 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.436499 49.830832 967.4 12 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.449777 49.839972 950.4 13 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.348195 49.812670 1001.8 14 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.356078 49.839348 957.4 16 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.423939 49.830928 969.8 17 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.386294 49.821471 990.8 18 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.429848 49.842325 968.8 19 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.363562 49.818252 1000.7 20 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.415916 49.860364 919.9 21 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.357932 49.817027 1000.6 22 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.348025 49.819898 989.0 23 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.402852 49.816894 1003.0 24 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.398464 49.813115 1016.7 25 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.393637 49.808999 1029.0 26 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.384053 49.806171 1042.8 27 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368847 49.808577 1035.0 28 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.374164 49.812531 1024.0 29 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.359095 49.809336 1022.3 31 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.380067 49.801923 1055.5 32 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.375837 49.799019 1051.3 33 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.370052 49.791940 1047.8 34 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.391171 49.794149 1064.8 35 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.361003 49.795877 1041.5 36 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.373691 49.794920 1052.6 37 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.384721 49.791330 1067.9 38 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.395573 49.796657 1062.4 39 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.439431 49.846959 954.5 40 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.423835 49.853749 935.0 41 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.347566 49.845955 938.1 42 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.430872 49.861112 919.7 43 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.368992 49.871136 911.3 44 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.352834 49.803116 1025.2 45 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.348916 49.826201 977.8 46 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.357316 49.855899 922.0 47 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.378681 49.817201 1005.6 48 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.362408 49.824350 985.5

Page 147 49 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.408393 49.871228 903.1 50 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.407225 49.846447 962.3 51 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.403711 49.842381 969.8 52 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.404123 49.834970 969.2 53 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.391363 49.863114 927.3 54 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.386295 49.848931 952.2 55 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.362550 49.838781 958.8 56 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.352315 49.835716 964.2 57 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.361382 49.802179 1039.0 58 Vestas_4200_136_S_2017_Mk3EHH82-104 -110.392967 49.825688 979.7

Page 148 From: Thiel, Jennifer [mailto:[email protected]] Sent: Tuesday, November 21, 2017 5:23 PM To: Schnick, Steve Subject: Re: STARS project update: EDF Cypress Wind Power Project

Hello Steve,

You are correct. No changes from comments below. Appreciate the update as always.

Kind regards,

Jennifer Thiel Aviation Base Manager - Calgary

STARS 1441 Aviation Pk NE Calgary, AB T2E 8M7 Phone: 403-516-2766 Cell: 403-863-1433 Email: [email protected]

Sent from my iPhone

On Nov 21, 2017, at 4:33 PM, Schnick, Steve wrote:

Hi Jennifer,

I am a project manager with WSP Canada Inc. and we are working as a technical consultant for EDF EN Development Canada (EDF).

EDF is the developer of the proposed Cypress Wind Power Project located about 30 km southeast of Medicine Hat, Alberta.

On behalf of EDF, I would like to share updated project details that have been defined since our previous communicaon.

There are currently two turbine model opons being considered for the project, each with its own proposed layout; only one of these opons would ulmately be constructed: Siemens-Gamesa G132: total turbine height (to upper blade p) will be 150 m; the rotor will have a diameter of 132 m; the tower will be 84 m tall. Layout Lv07. Vestas V136: total turbine height (to upper blade p) will be 150 m; the rotor will have a diameter of 136 m; the tower will be 82 m tall. Layout Lv08.

Please find aached maps showing the two turbine opons.

Given your previous response, I expect there will be no change to your conclusions. However, if you do have any quesons or concerns, please let me know.

Thanks, Page 149 Steve

Steve Schnick, P. Eng. | WSP 405 18 St SE, Calgary, Alberta T2E 6J5 Canada T +1 587-475-4950 | M +1 587-888-9463 | E [email protected]

Page 150 15 14 16 15 14 13 18 17 16

11 10 11 12 7 8 9 10 9 41 T11 - R3 T11 - R4 87

3 2 4 3 2 1 6 5 4

87 87 Township Rd 110 49 Township Rd 11087 .!! .!43

! 87 !

! ! 31 32 33 34 35 33 34 35 36 5

! ! ! ! ! 87 ! 53 ! ! .! ! 42 !

! .! ! ! 20 ! .! ! ! ! ! ! ! ! ! ! ! ! .! ! ! ! ! ! ! ! ! ! ! 46 !9

! Range Range 43 Rd ! ! .!

.! ! ! ! ! ! 3 ! 87 ! !

! ! 40 !

1 ! .! 7 ! ! ! ! 87 ! ! . ! ! ! ! .! Range Rd 42 Rd Range .! !

! ! ! ! 54 26 ! ! 30 29 ! 28 27 28 27 ! 26 25

! ! ! ! ! . 8 ! ! ! .! ! ! ! 39

! ! 50! 10 41 ! !

! !

! ! .! 87

! ! ! ! .! . .!

! !

"/ ! !

!

! " ! ) !

! !

! 51 Township! Rd 104

Township Rd 104!

! !

! ! ! ! 87

12 !18 .! ! . ! !

!! 14

. !

! ! 55

! ! !

! .!

! ! ! .

87 ! !

!

! 87

! !

! ! ! ! !

! ! 56 ! ! ! ! 23 ! ! ! ! 21 41 22

21 22 23 2 24! 52 19 20 .!

! !

.! ! ! 87

! 40 Rd Range ! ! .

! ! ! ! ! ! ! 6 87 ! ! !

!

!

! ! !

! 87 .!

11 16 ! ! ! ! ! !

R !

!

.! ! 87 .! ! ! ! ! ! !

! !

a 87 ! !

n !

T10 - R4 T10 - R3! ! ! 87 !

g 58 87 ! ! ! !45

87 ! ! 48 ! . e .! ! ! !

!

! ! .!

! 87 ! R 17 ! 15 14

! 17 16

13 18 ! ! ! 16 d 15 14 .! 22

! !

!

!

! 87 ! .! 19 !

4 ! 4 ! 47 !

3 ! .! 21

! ! ! !

.! 23 ! 87 ! .! .!

!

!

.! !

! 87 !

! 24 28 13 !

! ! !

.! ! .!

! ! ! . !

! !

!

! 29!

25 !

27 ! ! ! !! ! .! .!

! .! 10 11 9 10 11 12 7 ! 26 8 9 87 87 !

! .!

44 ! ! 57

! 31

!

! .! !

!

! .! ! .!

! 32 ! 87 .!! !

38 !

! 87

! 35 !

.! ! 36 .! 87 34 !

! .! !

.! ! 2 ! 33 3 4 3 2 1 6 37 5 4 .!! .! 87 87 87 515 Township Rd 100 Township Rd 10087 .! Turbine Location - Vestas V136 - 4.2 MW

Project Substation 41 87 "/ 34 35 33 34 35 36 31 32 33 )" O&M and Laydown Yard 38.3 dBA Sound Contour 40 Rd Range 87 Occupied Residence 87 Abandoned Residence 87 Worst Case Shadow Flicker Hours Per Year 27 26 28 27 26 25 30 29 28

0 Hours

Ä 0 - 8 Hours Ä T9 - R4 524 Ã

1

8 - 15 Hours ì Ä 23 22 Ä

21 22 23 24 19 20 21

41

Ä Ä

MedicineÄ Hat 15 - 30 Hours Ä

523 T9 -3 R3

à Ä

Over 30 Hours Ä

Ä 41 1 Ä ì ! Collection Lines 18 17 3 16 15 14 16Access Roads 15 14 13 Paved Road

Gravel Road 41

Neighboring Parcels

Within 2km Ä Within 800m Ä

Project Boundary 41

7 8 9 10 11 9 10 11 12 Ä Parcels and Land Owners Ä 515 Township 0 0.5 1 2 3 Section Kilometers Source: Source 1YYYY, Source 2 YYYY | G:\Projects\CAN_Alberta\Cypress_Wind\05_GIS\052_MapDocs\SitePlan_v8_TAB_Cypress.mxdLast| Updated 11/2/2017 by brendan.soule CYPRESS TURBINES V8 ~ Cypress Wind Project | Alberta

Page 151 41 15 14 16 15 14 13 18 17 16

T11 - R3 T11 - R4 10 11 9 10 11 12 7 8 9

87

3 2 4 3 2 1 6 5 4

87 87

15 22 Township Rd 110

! ! !

! 87 Township Rd 110 !

.! .!

!

! 87 ! 23

.! !

16 ! 35

36 ! 31 32 33 34

33 34 35 !

.! ! 24

!

! 20 87 ! ! ! ! 21

8 62 ! .! .! ! .!

!!

! !

! ! !

. ! .

! ! !

! 25

!

! !

!

41

Range Range 43 Rd

9 ! !

! 13 . !

3 ! !

!

! !

! 26

! !

. .! ! ! !! !

. !

87 ! .! !

!

!

!

! !

! 4 87

! ! !

! ! ! !

Range Rd 42 Rd Range !

! 27

.! ! 26

29 ! 28 27

!

! 30

28 27 26! 25 ! .!

! 28

! 10 ! ! !

!

!

! .! ! !

! .!

2 ! 17 29

! ! !

! ! 87 .! .! .! !

!

"/ ! !

)" ! ! Township Rd 104

! 11

Township Rd 104 ! ! !

.! ! .! 87

!5 .!! !

! . 18 !

!!

! T10 - R3 30

! ! 61 ! 14

! ! ! ! 31 ! .! !

! ! .!

! 12 .!

! !

87 ! !

! 87

!

! !

! ! ! ! ! ! ! ! ! .

! ! 19 ! 23

! 20 21 22

19 ! 32

23 24!

21 22 !

! !

6 .! !

! ! .!

! 87

! 40 Rd Range ! ! .! !

87 ! !

! ! ! ! ! !

! 7 ! ! 87 33

! !

! !

!

1 ! ! ! .!

! ! ! ! ! ! 87 !

. ! ! ! ! .! ! !

! ! ! 87

!

! ! 34 !

!

! ! .! 87 T10 - R4 87 !

87 !

! !

! 51 ! 87 .! ! ! 14

15 14 13 ! 18 ! 17 16 15 16 ! 38 !! !

!

! .!

! 37 87

! 35 ! ! !

! 50 39 . ! ! ! ! ! . !

! 54 87

! .!! .!

!

!

! ! . !

87 53 !

! !

! 36

.!! !

! !

! 52 .!

! ! !

! !

. ! 41

! !

49 40!

! ! ! .!

! ! ! . ! .

11 12 7 ! 8 9 10 11 9 10 ! 87 ! 48 87 !

! .! !

!

3 47 ! !

! 42 57 !

4 !

.! .! ! .! ! !

46 41 !

d ! 43

87 .! !

R .! 87 ! !

e 56 44 87

59 !

!

! g ! .!! .! .! .! Turbinen Location - Gamesa G132 - 3.465MW 45 3 2 55 ! 5 ! 4

3 2 1 6 ! 4 a ! 60 .!! .! .! 87 "/ ProjectR Substation 87 )" O&M and Laydown Yard 87 Township Rd 100 Township Rd 100 515 38.3 dBA Sound Contour 87 87 Occupied Residence 87 87 Abandoned Residence 34 35 33 34 35 36 31 32 33

Worst Case Shadow Flicker Range Rd 40 Rd Range Hours Per Year

0 Hours 87

27 26 28 0 - 8 Hours 27 26 25 30 29 28

Ä Ä

8 - 15 Hours 524 Ã

ì1

Ä

15 - 30 Hours T9 - R4 41 Ä

Ä T9 - R3 Ä MedicineÄ Hat

19 20 21Ä 22 23

21 Over 30 Hours 22 23 24 523 3

à Ä

Access Roads Ä Ä 41 1 Ä ì !! Collection Lines 3 Paved Road

Gravel Road 41 17 16 15 14

16 Project Boundary 15 14 13 18

Parcels and Land Owners

Ä Township Ä

41

Section

Ä Within 2km Ä 0 0.5 1 2 3 515 Within 800m 10 11 9 10 11 12 7 Kilometers 8 9 Source: Source 1YYYY, Source 2 YYYY | G:\Projects\CAN_Alberta\Cypress_Wind\05_GIS\052_MapDocs\SitePlan_v7_Gamesa_TAB_Cypress.mxdLast| Updated 11/2/2017 by brendan.soule CYPRESS SITE PLAN V7 ~ Cypress Wind Project | Alberta

Page 152 From: Thiel, Jennifer [mailto:[email protected]] Sent: Tuesday, June 13, 2017 12:25 PM To: Ryan, Leslie Subject: RE: Consultaon for Proposed Wind Farm in Alberta

Hello Les,

It looks like there isn’t any hospitals that we service in the area depicted in the map so the only type of call that would be effected from and takeoff and landing perspecve would be a scene call. Given the distance from Calgary most scene (hwy, industrial, recreaonal etc) calls would become interfacility with a pick up from the Medicine Hat hospital so minimal impact.

For enroute altudes for flying at night and in instrument condions our minimum altudes would potenally be higher due to the higher obstacles in the area.

Please let me know if you require any further informaon.

Kind regards,

Jennifer Thiel Aviation Base Manager - Calgary

STARS 1441 Aviation Pk NE Calgary, AB T2E 8M7 Phone: 403-516-2766 Cell: 403-863-1433 Email: [email protected]

Page 153 From: Ryan, Leslie [mailto:[email protected]] Sent: Monday, June 12, 2017 12:24 PM To: Thiel, Jennifer Subject: Consultation for Proposed Wind Farm in Alberta

Dear Ms. Thiel:

I am coordinang the consultaon process with stakeholders in the vicinity of a proposed wind power project to be located approximately forty (40) kilometres southwest of Medicine Hat, Alberta. The project is in the design stage and subject to change upon consultaon with stakeholders. The bounding box for the current project lands is provided below in WGS84 degree decimal coordinates. The aached map illustrates the approximate boundary of the current project lands.

The preliminary details of the wind power project are as follows: · Located southwest of Medicine Hat, Alberta: o North: 49.7994° N o South: 49.5833° N o East: 110.6736° W o West: 111.0075° W

The number and size of turbine to be installed is yet to be determined.

I would appreciate a response indicang whether or not there is a potenal conflict. If there is a potenal conflict, I would like to follow up with more detailed conversaon to migate any concerns you may have.

Sincerely,

Les Ryan, P.Eng.

WSP Canada Inc. 405 18th Street SE Calgary, Alberta, Canada T2E 6J5 T +1 403.248.9463 #152 C +1 403.813.6327 www.wspgroup.com

You are receiving this communication because you are listed as a current WSP contact. Should you have any questions regarding WSP’s electronic communications policy, please consult our Anti-Spam Commitmentwww.wspgroup.com/casl. For any concern or if you believe you should not be receiving this message, please forward this message [email protected] so that we can promptly address your request. This message is intended only for the addressee and may contain information which is privileged, confidential, proprietary, or exempt from disclosure under applicable law. If you are not the intended recipient, you are strictly prohibited from disclosing, distributing, copying, or in any way using this message. If you have received this communication in error, please notify the sender and delete any copies you may have received.

------

Vous recevez cette communication car vous faites partie des contacts de WSP. Si vous avez des questions concernant la politique de communications électroniques de WSP, veuillez consulter notre Engagement anti-pourrielwww.wspgroup.com/lcap. Pour toute question ou si vous croyez que vous ne devriez pas recevoir ce message, prière de le transférer [email protected] afin que nous puissions rapidement traiter votre demande. Ce message est destiné uniquement au destinataire et il peut contenir des informations privilégiées, confidentielles ou non divulgables en vertu de la loi. Si vous n’êtes pas le destinataire du présent message, il vous est strictement interdit de le divulguer, de le distribuer, de le copier ou de l’utiliser de quelque façon que ce soit. Si vous avez reçu la présente communication par erreur, veuillez en aviser l’expéditeur et supprimer le message.