PROJECT EXAMPLES SYNTHETIC GRASS PITCH DEVELOPMENTS Professional Sportsturf Design Ltd. (PSD)

Glasgow 2014 Commonwealth Games National Hockey Centre

Client 2014 Form of Contract

Commonwealth Games Dates 2014 Project Manager Designer PSD Ltd Cost Consultant Value Services Engineer Sports Facilities PSD Size Consultant CDM Co-ordinator Lead Contractor Spadeoak Ltd.

Description

Design and site monitoring for the construction of 2 No. Global Standard water-based hockey pitches. As a legacy project, the hockey centre is now the National Hockey Centre and the permanent home of Hockey .

Professional Sportsturf Design Ltd. (PSD)

Castlehead High School, Paisley

Client Renfrewshire Council Form of Contract

Dates Jul – Oct 2015 Designer PSD Ltd Project Manager PSD Ltd. Architect Cost Consultant PSD Ltd.

Sevices Engineer Value £ 340,000 Structural Engineer Size CDM Co-ordinator CDM Scotland Lead Contractor Allsports CM Ltd Description

The works Comprised constructing a 3G synthertic grass sports pitch on the site of am existing blaes sports pitch.

The works incorporated the installation of a drainage mat system, which also provided a protective layer between the new pitch construction and the existing blaes. This also assisted in removing the need to excavate the blaes and remove it to off-site tips.

Professional Sportsturf Design Ltd. (PSD)

Marr College Playing Fields, South Ayrshire

Client South Ayrshire Council Form of Contract

Dates Feb – Jun 2015 Designer PSD Ltd Project Manager PSD Ltd. Architect Cost Consultant PSD Ltd.

Services Engineer Value £ 880,000 Structural Engineer Size CDM Co-ordinator CDM Scotland Lead Contractor Kier Construction Pitch Contractor WH Malcom Description

The works comprised the construction of 2 No. synthetic grass pitches • One 3G sand/rubber filled synthetic grass pitch to accommodate both football & rugby • One sand dressed synthetic grass pitch for hockey.

The works also included the installation of ballstop fencing and floodlighting to both pitches.

The sandy nature of the indigenous soils allowed for novel drainage solutions to be adopted.

Professional Sportsturf Design Ltd. (PSD)

Fettes College, Edinburgh

Client Fettes College Form of Contract ICE 6th Ed.

Dates Nov 2013 – Mar 2014 Designer PSD Ltd Project Manager PSD Ltd. Architect Cost Consultant PSD Ltd.

Services Engineer Value £ 595,000 Structural Engineer Size CDM Co-ordinator CDM Scotland Lead Contractor McArdle Sport-Tec Ltd Description

The works were located within the grounds of Fettes College, Edinburgh.

The works involved the construction of a new FIH Global Standard water-based hockey pitch. The project incorporated ballstop fencing, floodlighting and an automated pitch irrigation system. To facilitate the irrigation system and to minimise on-going costs to the client, an irrigation bore was drilled, and SEPA approval gained, for the abstraction of irrigation water.

Professional Sportsturf Design Ltd. (PSD)

Stewart,s Mellville College, Inverleith Playing Fields

Client Erskine Stewart’s Melville Form of Contract ICE 6th Ed. Schools Dates July 2009 – Oct 2009 Project Manager Designer PSD Ltd PSD Ltd.

Cost Consultant PSD Ltd. Architect Services Engineer

Value £ 497,000 Structural Engineer CDM Co-ordinator CDM Scotland Size Lead Contractor Fairways Sportsgrounds Ltd

Description

The works were located within the grounds of the college’s Inverleith Playing Fields, Edinburgh.

The works involved the construction of a new FIFA & FIH synthetic grass pitch for hockey and football. The project incorporated ballstop fencing, floodlighting and access footpaths.

Professional Sportsturf Design Ltd. (PSD)

National Sports Training Centre, Inverclyde, Largs

Client sportscotland Form of Contract ICE 6th Ed.

Dates Jan – Mar 2010 Designer PSD Ltd Project Manager PSD Ltd. Architect Cost Consultant PSD Ltd.

Services Engineer Value £ 265,000 Structural Engineer Size CDM Co-ordinator CDM Scotland Lead Contractor Fairways Sportsgrounds Description

The works were located at the National Sports Training Centre at Inverclyde, Largs.

The works involve the removal and disposal of the existing dilapidated non-filled artificial grass carpet and preformed shockpad, and replacement with a new preformed shockpad and water based Global FIH pitch. Ancillary footpath and fencing works were also undertaken.

Professional Sportsturf Design Ltd. (PSD)

Brae Regional Hockey Centre, Shetland

Client Shetland Recreational Trust Form of Contract

Dates August 2013 Designer PSD Ltd Project Manager PJP Architects Architect Cost Consultant David Adamson & Ptnrs.

Services Engineer Value £ 266,000 Structural Engineer Size CDM Co-ordinator David Adamson & Ptnrs. Lead Contractor Hunter Construction Description

The works were located at the National Sports Training Centre at Inverclyde, Largs.

The works involve the removal and disposal of the existing dilapidated sand-filled artificial grass carpet, isolated shockpad repairs and installation of a new FIH approved sand-dressed artificial grass carpet.

Professional Sportsturf Design Ltd. (PSD)

Hutcheson’s Grammar School, Glasgow

Client Hutcheson’s Grammar Form of Contract School Dates April – October 2009 Project Manager Designer PSD Ltd Arcadis

Cost Consultant James McAulay & Sons Architect Services Engineer

Value £ 1.01M Structural Engineer CDM Co-ordinator Size Lead Contractor Malcolm’s Sports Services

Description

The works were located within the grounds of Hutcheson’s Grammar School, Glasgow.

The works involve Construction of a six-lane polymeric surfaced athletics track with high jump, long jump and shot facilities.

Additionally, a sand-dressed synthetic grass hockey pitch to FIH standards was constructed on the infield of the track. Ancillary footpath and fencing works were also undertaken.

Professional Sportsturf Design Ltd. (PSD)

Broadwood Stadium,

Client Council Form of Contract SBC/Q/SCOT

Dates June - August 2012 Designer PSD Ltd Project Manager PSD Ltd. Architect Cost Consultant PSD Ltd.

Services Engineer Value £470,000 Structural Engineer Size CDM Co-ordinator CDM Scotland Lead Contractor Greenfields (Allsports) Description

Construction of a new FIFA 2-Star synthetic grass 3G football pitch to replace the existing grass stadium pitch. The pitch is also constructed for rugby use and is compliant with IRB Regulation 22 standards. The project also included the re-laying of pitch edges to tie-in with existing grandstands and access/escape routes.

Professional Sportsturf Design Ltd. (PSD)

5 No. 3G Synthetic Grass Pitches, North Lanarkshire Council

Client North Lanarkshire Council Form of Contract JCT

Dates January - August 2009 Designer PSD Ltd Project Manager PSD Ltd. Architect Cost Consultant Bryan Byrne Consultants

CDM Co-ordinator Value £510,000 – £615,000 CDM Project Safety Lead Contractor Land Engineering Size Fairways Sportsgrounds Doe Sport (North) Description

Construction of a 5 No. new FIFA 1-Star synthetic grass 3G football pitches to replace existing grass & blaes pitches at various locations. 2 No. pitches were also constructed for rugby use and are compliant with IRB Regulation 22 standards. Each site was let as a separate contract and managed simultaneously.

St Patrick’s, Kilsyth FIFA 1-Star Abronhill, Cumbernauld FIFA 1-Star & IRB22 Ravenswood, Cumbernauld FIFA 1-Star Keir Hardie Sports Centre, Holytown FIFA 1-Star Airdrie Leisure Centre, Airdrie FIFA 1-Star & IRB 22

Professional Sportsturf Design Ltd. (PSD)

Murrayfield Stadium – Training Pitches

Client TIE / SRU Form of Contract

Dates 2011 Designer PSD Ltd Project Manager TIE Value £2 million Cost Consultant Services Engineer Size Structural Engineer CDM Co-ordinator Lead Contractor Souters Sports Description

Construction of a new 3G Synthetic Grass Pitch – IRB Reg. 22 compliant. 3 No. natural grass pitches.

Professional Sportsturf Design Ltd. (PSD)

Hibernian FC, Training Centre

Client Hibernian Football Club Form of Contract ICE

Dates March - December 2007 Designer PSD Ltd Project Manager PSD Ltd. Architect Cost Consultant PSD Ltd

Services Engineer Value £1.75M Structural Engineer Size CDM Co-ordinator Lead Contractor AJ Bain (Sportsgrounds) Description

Construction of all sports facilities for the new training academy, comprising: Full UEFA size FIFA 2-Star synthetic grass 3G football pitch Indoor FIFA 2-Star synthetic grass 3G football training pitch 5 No. Natural Grass UEFA size football pitches Goalkeeper training area Fitness trail with training hills Casual practise areas

Professional Sportsturf Design Ltd. (PSD)

Annan Athletic FC, Stadium, Annan

Client Dumfries & Galloway Form of Contract JTC Council Dates May - September 2012 Project Manager Designer PSD Ltd PSD Ltd.

Cost Consultant MR Rodger & Ptnrs Architect DG Design Services Engineer

Value £750,000 Structural Engineer CDM Co-ordinator MR Rodger & Ptnrs Size Lead Contractor WH Malcolm

Description

Construction of a new FIFA 2-Star synthetic grass 3G football pitch to replace the existing grass stadium pitch. The project also included the construction of admissions turnstiles and booths, new concrete terracings and the adaption of existing terraces to new pitch.

Professional Sportsturf Design Ltd. (PSD)

Aberdeen Sports Village

Client Aberdeen University Form of Contract

Dates Feb 2008 – Oct 2009 Architect Riach & Hall Project Manager Drivers Jonas Value £28 million Cost Consultant Thomson Bethune Services Engineer KJ Tait Size Structural Engineer SKM CDM Co-ordinator Lead Contractor Barr Construction Description

Provision of new regional sports hub.

PSD design of the sports facilities, including full-size indoor synthetic football pitch, indoor athletics training hall, water based synthetic hockey pitch & improvements to the existing athletics track

Professional Sportsturf Design Ltd. (PSD)

Banks O’ Dee JFC, Spain Park, Aberdeen

Client Banks O’ Dee Sports Club Form of Contract

Dates 2011 Designer PSD Project Manager PSD Value £600,000 Cost Consultant PSD Services Engineer Size Structural Engineer CDM Co-ordinator Lead Contractor Hunter Construction Description

Construction of a new 3G Synthetic Grass Football Pitch to FIFA 2 Star standard, including floodlighting, fencing, retaining walls and ancillary building work.

Professional Sportsturf Design Ltd. (PSD)

John Cumming Stadium, Carluke

Client South Lanarkshire Council Form of Contract NEC 3

Dates Nov 2009 – Feb 2011 Designer PSD Ltd Project Manager PSD Ltd. Architect The Miller Partnership Cost Consultant Carr McLean & Watson

Services Engineer Value £3.5 million WS Millar Structural Engineer Fairhurst Size CDM Co-ordinator CDM Scotland Lead Contractor Marshall Construction Description

Construction of a new 8 lane (8 lane straight) polymeric athletics track with a synthetic grass 3G football pitch in the infield. The project also included the construction of a new changing facility with a terraced grandstand to serve the local community and the local Junior Football Club. The works also involved identifying and stabilising an area of old mine workings located below the site.

Professional Sportsturf Design Ltd. (PSD)

Indoor Training Building Palace Sports Grounds, Hamilton

Client South Lanarkshire Council Form of Contract NEC

Dates 2007 Designer PSD Ltd Project Manager PSD Ltd. Architect Cost Consultant

Services Engineer Value £650,000 Structural Engineer Size 60 x 40m CDM Co-ordinator CDM Scotland Lead Contractor Land Engineering Ltd. Description

Construction of a new stretched fabric indoor training building with a 3G synthetic grass carpet sports surface. The project also incorporated the installation of piled foundations.

This development was the first stretched fabric sports training building to be constructed in Scotland.

Professional Sportsturf Design Ltd. (PSD)

Heriot Watt Sports Village, Riccarton, Edinburgh (Heart of Midlothian F.C.)

Client Heriot Watt University Form of Contract

Hearts F.C. Dates Dec 2002 – May 2003 Project Manager Designer PSD Ltd Cost Consultant

Architect Miller Partnership Services Engineer

Structural Engineer Value £650,000 CDM Co-ordinator Size 60 x 40m (Indoor) Lead Contractor MDW Ltd. / HBG Ltd.

Description

Construction of a new, and refurbishment of existing, sports facilities at heriot Watt Riccarton Campus, Edinburgh.

This development was a joint venture between Heriot Watt University and Heart of Midlothian F.C., with Hearts using this as their training academy

As well as upgrading the existing natural grass pitches, the project also included the construction of a new UEFA size 3G synthetic grass pitch and 3G synthetic grass training hall, within the new facility building.