1.Oil and Gas Sector None 2.Electricity Sector
Total Page:16
File Type:pdf, Size:1020Kb
1.Oil and Gas Sector None 2.Electricity Sector Investment Opportunities Available in the Electricity Sector No. Project's name Capacity Implementation Province Mega time Watt 1 Replace the south 480 Maximum 2020 Baghdad steam station project (160*3) 2 Al-Khairat steam 1200 Maximum 2020 Baghdad Station Project 300*4 3 Al-Yusfiya steam 420 Maximum 2019 Baghdad Station Project 210*2 4 Al Rasheed Gas 250 Max 2021 Baghdad Station expansion 125*2= 250 Project to transfer gas stations from simple cycle to multiple cycle expected to be available in 2018-2020 no Project name Total Execution years Province Capacity in MW 1 Al Sadir gas 160 Max 2022 Baghdad station/1 (160*2)+160=480 2 Al-Khairat Station 625 Max 2021 Baghdad (120*10)+650=1875 3 Al Qudus Station 250 Max 2018 Baghdad (125*4)+250=750 4 Sothern Baghdad 125 Max 2023 Baghdad Station (125*2)+125 Ministry of Electricity letter no. 71278 in 29/12/2016 Investment projects in renewable energy field No. Project name Additional To be Province capacity/ executed in.. MW 1 (Abo Ghraib Solar 30 2017 Baghdad Station) 3. Communication Sector None 4.Health Sector Investment Opportunities in Health Sector announced by Provinces No Project’s Name Type of Province Investment Opportunities 1. Specialized cancer treatment center New Baghdad, Al Karkh and Al- construction Rusafa 2. Arabic Child Hospital in Al-Karkh (50 New Baghdad/ Al-Karkh beds) construction 3. 3 -4 Drugs and medical appliances New Baghdad, Al Karkh and Al- factory. construction Rusafa 4. 2 Sterility and fertility hospital New Baghdad in Al Karkh and construction Al-Rusafa 5. 2 Specialized ophthalmology hospital New Baghdad , Al Karkh and Al- construction Rusafa 6. 1 Specialized cardiac surgery hospital New Baghdad, Al Karkh and Al- construction Rusafa 7. 2 -3 hydrogen peroxide (pure New Baghdad, Al Karkh and Al- O2)Plant Construction Rusafa 8. 2 Complete medical city New Baghdad , Al Karkh construction 9. 4 General hospitals , capacity: 50 bed New Baghdad, Al-Karkh and Al- each construction Rusafa 10. 4 Specialized medical centers, New Baghdad , Al-Karkh and Al- capacity : (20 bed or more) construction Rusafa 11. Joint venture with international Contracting with Baghdad , Al-Karkh and Al- companies hospital management and specialized Rusafa other medical fields companies to open new hospitals in Iraq 12. Extra governmental hospitals to be Contracting with Baghdad , Al-Karkh and Al- submitted as an investment specialized Rusafa opportunity companies to open new hospitals in Iraq Investment opportunity in Environment Sector No. Department Project name Location 1 Observe and asses Monitoring gas and fine particles Oil refineries, power stations, industrial activities emissions due to polluted industrial and cement factories and hospitals and services. services activities. in Baghdad and provinces. 2 Climate changes and Supply and install fixed station for noise all provinces except KRG air type control metering in all provinces except KRG Supply and install fixed station for noise Baghdad and provinces metering non- ionized ray in Baghdad and provinces. 3 Information Develop the website by presenting Baghdad/ Ministry HQ. technology electronic services 4 Planning and Environment Clock for monitoring Baghdad/ green area Technical follow up climate changes / cost I b ID 5. Housing and Infrastructure sector: Available Investment Opportunities at Housing Sector* No. Project name Location allocated Province Notes area in dunem ** 1. Al Amiriya Complex Al Amiriya 36 Baghdad - (phase one) 2. Al Amiriya Complex Al Amiriya 29 Baghdad - (site 1/ phase two) 3. Al Amiriya Complex Al Amiriya 33 Baghdad - (site 2/ phase two) 4. Tajiat Complex Tajiat 100 Baghdad - 5. Housing for employees 1/406 district 27 33 Baghdad/ 20 dunem in the Hamamiat Al Taji southern part of plot total area 98 dunem next to Al Taji complex 6. Employees housing 3/8890 5 Baghdad/ Available units Al services, near the Mashtal main street, schools, health care Centers and markets 7. Housing complex For Plot 23005 m 11 35 dunem Baghdad Plot next to Oil Marketing SOMO building Company (SOMO) in Zayona/ 400 employees vertical housing units *according to Ministry of Transport letter 8839 in 15/2/2016 **Dunem is 2500m², ulk is 100m² 6. Transportation Sector Available Investment Opportunities in Transportation First: Railways State Company no Project name Details length Number Signals & Axial Speed (km/h) Total transport Estimate cost (million USD) Project of lines communication load/ (million) implementation ton period passengers Goods/ton passengers Goods/ Acquisitions implementation total ton Detailed designs were 1 Circle line 284 mixed ERTMS/ 25 200 140 23 46 430 2000 2430 5 years conducted 1982 by Italian around level 2 consulting company Baghdad (Sotkny) circle line length (ring) 112km, total length main and branches 284km. Detailed designs were 2 (Baghdad- Kut- 910 double ERTMS/ 25 250 140 14 35 2730 11000 13730 7 years conducted by British Basra) branch level 2 consulting company line (Kut- (Henderson Hughes) 1982, Nasriya- now old and lost. Main line 504km, double Sheaba- Um (Baghdad- Kut- Emaraa- Qasir) Basra, branch line 406km, double (Kut- Nasriya- Sheaba-Um Qasr) detailed designs were 3 (Baghdad- 700 mixed ERTMS/ 25 250 140 6 20 1650 7000 6850 7 years conducted by French Baquba- consulting company (Sorfrel) level 2 Kirkuk-Erbil- 1982, currently updated by Czech consulting company Mousil) branch (CZ Group).double line line (Baquba- length 455km single line Khanaqeen- length 200km, can be doubled. Total length of main Munthirya- and branches is 700-750 km Iran) No. Project name Descriptions Estimated cost in USD Notes 1 Mono Rail Project Vital project with good 1.5 b USD Details available in Baghdad financial revenues, prepared Investment Commission. by French Alstom Co. Ministers Council letter no. 480 in 23/10/2016 and Baghdad Investment Commission letter no. 4236 in 29/12/2016 No. Agency Project name Location Plot no. Area Estimated cost Execution in USD period 1 Iraqi A. 5 stars hotel with Baghdad Plot 9/10 dis. 17 Al 15000 m² 50m USD 3 years Airways complete services (within International Sewaib Company Baghdad International Airport Airport Area) B. trade Center Baghdad/ Plot 20/1 1000 dunem 20m USD 2 years Bataween 3 State A.Hotel, trade canter, parking Baghdad /Alawi Plot 400/1 Karadat 12 dunem Company for area Mariam 21 dunem Iraqi Railways B.housing units Baghdad /Al 360 dunem yousfiya 7.Industry and Minerals sector Available Investment Opportunities at Ministry of Industry and Minerals announced as Investment Opportunities which includes (New Projects and Rehabilitation Projects) No Project State Investment type Required Location Company investment 1. 2Abo Ghraib Diary State Company Rehabilitation and Baghdad for Food Development factory Industries 2. 4Nasir factory for Rehabilitation and m.55$ Baghdad Development tobacco and cigarettes 3. 1Bricks Factory/ State Company Rehabilitation and 0 m.5$ Baghdad Development Baghdad for construction 4. Abo Ghraib Structures Industries Rehabilitation and m.2.5$ Baghdad Development 5. Thermo stone Factory Rehabilitation and $ 25 m. Baghdad Development 6. Chloride Factory State Partnership $ 43 m. Baghdad Company for 7. Aluminum Powder mining Rehabilitation $ 2 m. Baghdad industries and Development factory 8. Al Taji Factory State Co. for Rehabilitation $ 9 m. Baghdad leather and and Development 9. Al Huriya Factory textiles Rehabilitation $ 7 m. Baghdad industries and Development 10. Handmade carpets Rehabilitation $ 12 m. Baghdad and Development Factory 11. Al Fatih Factory Rehabilitation $ 11 m. Baghdad and Development 12. Al Kadhimiya Rehabilitation $ 8 m. Baghdad and Development Factory 13. Baghdad Leather Rehabilitation and $ 3 m. Baghdad Development tanning factory *Suggested projects by Ministry of Transportation Project Location Area Cost Notes A. Asphalt plant Baghdad/ Yousfiya plot 10 10 b ID Private property 5/155 district 9 dunem B. Ready mixed Baghdad/ Abo Ghraib 4.8 9 b ID Governmental Concrete plot 10/30 district 14 dunem property Akarkoof 8.Tourism Sector: Available Investment Opportunities in Tourism Sector No. Project Location Allocated Land Province 1 Tourisim Multipurpose Baghdad 1 dunem 24 ulk Baghdad building in Habibiya 2 Floating rest. Karkh/ Sinak Br. 50 -150 m² Baghdad 3 Floating rest. Resafa/ Abo Nowas. 50 -150 m² Baghdad 4 Luna park Al-Husainiyah District 5 Dunam and 11 Baghdad 10m/6/30037 ulk 5 Luna park Al-Husainiyah District 16 Dunam and 11 Baghdad 20m/6/29847 ulk 6 Luna park Zouhor/ 29851/10m 50 dunem Baghdad Suggested project Location Area Cost Notes 5 stars hotel Baghdad/ Baghdad 15000 m² 5 million USD Private property within BIAP area International Airport/ plot 9/10 district 17 Swaib According to MoT letter 8839 in 15/2/2016 9. Education Sector Available Investment Opportunities at Education Sector No. Plot number address ownership Area Type of building 1 6/15493/6 m 10 Hussainiya Baghdad/ Local Administration 3400m² Primary Rusafa 1 school 2 6/6498 m 10 Hussainiya Baghdad/ Local Administration 2727m² Kindergarten Rusafa 1 3 6/28512 m 10 Hussainiya Baghdad/ Al Rashdiya 2877m² Kindergarten Rusafa 1 Municipality 4 6/6921 m 10 Hussainiya Baghdad/ Local Administration 2736m² Kindergarten Rusafa 1 5 6 5/2365 m 19 Al Ghazaliya Baghdad/ Ministry of Education 70800m² Educational Karkh 1 center 7 8/1088 m 20Al Dawoody Baghdad/ Local Administration 11318m² Secondary Karkh 1 School 8 7/2061 m 20 Al Dawoody Baghdad/ Local Administration 2734m² Primary Karkh 1 School 9 7/1840 m 19 Al Ghazaliya