eg

Full Title of the Project :- Diversion of 0.4991 Ha. of Forest Land for construction of 400 KV D/C (Quad) - transmission line, under Forest Division & Distt. , . File No :- FP/IIF/TRANS/2072312016 Date of Proposal z 19106/2017 CHECK LIST SERIAL NUMBER: 17

" Scheme for C.A." Name of the Forest/Reaches to be diverted: Diversion of 0.4991 Ha. of Forest Land for construction of 400 KV DIC (Quad) Kurukshetra-Jind transmission line, under Forest Division & District Kaithal. Forest Area: 0.4991ha. Details of degraded forest nd/non-forest land where C.A. is to be carried out. Division Kaithal District Kaithal Tehsil Range Pundri C.A. Site Name : P.F Fatehpur Escape Compartment No. C-5 Teh. Pundri Distt. Kaithal Area to be Afforested :-

a) Whether the site selected for Compensatory Afforestation is a land bank (Yes or Not : Yes b) If the CA site is other than the land bank, reasons be given:-- N'A In case of non- forest area identified for CA, then what is the distance of CA site from the adjoining forest boundary'. i) Soiltype : Sandy Loam - ii) Topography :

(a) Hi I lylUndulating/Plain

(b) Slope: Steep/Med i u m/Gentle iii) whether the area is bearing any root stock of vegetation: _ Plantation Model :-

Copy of the approved Compensatory Afforestation Scheme/Model showing component wise physical and financial break up is as under: 1. Schedule of Plantation Programme:- Detail of year wise break-up of requirements of funds is as under:- The plantation cost is calculated for Tall Plants norms at 4m x 2.5m spacing and it is approved by PCCF, Haryana's letter No. Misc- dated at tlre wage rate ttf Rs 2241- per day as under:

Sr. No. Year Rate per Plant I Ist Year cost of afforestation Rs. 172l- Per Plant 2 IInd Year Plantation Rs. 64l- Per Plant J IIIrd Year Plantation Rs. 32l- Per Planl 4 IVth Year Plantation Rs. 25l- Per Plant 5 Vth Year Plantation Rs. 26l- Per Plant 6 VIth Year Plantation Rs. l5l- Per Plant 7 Vllth Year Plantation Rs. 8/- Per Plant 8 VIIIth Year Plantation Rs. 9/- Per Plant 9 IXth Year Plantation Rs. l0/- Per Plant l0 Xth Year Plantation Rs. I l/- Per Plant Total 372t- 1s

)

Area to be Diverted : 0.4991 Ha. No. of trees to be felled:261 Plants to be damaged: 345 Area to be planted : Two time of the area to be diverted : 0.4991x02: 0.9982 Numberof PlantstobePlanted0.9982x1000:998.2Plants orsay 26lxl0:2.610 Plants

S. Description Rate Total No. Amount (Rs.) Nett present value of Eorest Land to be diverted Rs. 8.87 Lacs/Ha 442702 B Compensatory A 6station Charges No. of Plants l" Year cost of afforestation 26 0 Rs.l72l- Per Plant 448920 2 2"d vear maintenance 26 0 Rs. 64l- Per Plant 167040 3 3'd vear maintenance zo 0 Rs. 32l- Per Plant 83520 4 4"t year maintenance 26 0 Rs. 25l- Per Plarrt 65250 5 5t" year maintenance 26 0 Rs. 26l- Per Plant 67860 6 6"t vear maintenance zo U Rs. 15f Per Plant 39150 ,7 7t" vear rnaintenance 26 0 Rs. 8/- Per Plant 20880 tt" 23490 8 v"ua maintenance LO 0 Rs. 9/- Per Plant e'l' v vear maintenance 26 0 Rs. 10/- Per Plant 26t00 l0 26r0 Rs. l l/- Per Plant 287 t0 il Barbed wire fencing charges 10.44 Rs. 76700/- per rkm ltlini 800748 Total C.A. charses (1 tol1) 1771668 t77167 C] Supervisory/Overhead/ Misc. Charger l0%o on the total CA charges D Tdditionul Compensatorv Afforestation.C harges : i45x2: 690 l'' Year cost of afforestation 690 I Rs. 172l- Pel Plant I 1 8680 ) 7iF'"rr*int* 690 I Rs. 64l- Per Plartt 44t60 3 3"t vear rnaintenance 690 Rs. 321 Per Plant 22080 4 4t't year maintenance 690 Rs. 25l- Per Plant t7250 t1940 5 5tlt year tna ntenance 590 Rs.26l- Per Plant r0350 6 6th year rna ntenance 690 Rs. l5/- Per Plant 5520 1 7"' year maintenance 690 Rs. 8f Per Plant *'u"ua 8 rnaintenance 690 Rs. 9/- Per Plant 62t0 9'l' 6900 9 vear maintenance 690 Rs. l0/- Per Plant Rs. l1/- Per Plattt 1 590 l0 '0"'vear maintenance 690 il Barbed wire fencing charges 2.'/6 Rs. 767001 per rkm llb9 Rknr Sub Total (D) Total Addl. C.A. Charees ll Penal C.A. 0 F Total C.A. Charses (B+C 1497r|J _c_ Fellins Charees 149.71 M' !l_ PI 0 I Any Other Charges Grand Total A+D+E+F+G+H+I to be depositcd in 3009619 CAMPA Fund Technical details:- Technic4l details of Compensatory Afforestation Scheme are as follows:- a) Compensatory Afforestation will be carried out alongwith P.F Fatehpur Escape, Compartment No. C-5 b) 4x2.5 c) Species :- Neem, Bakain, Papri, Jamun, Bar, Pipal, Suhajna etc. d) PlantationMethod: TallPlantation e) Soil and Moisture Conservation Works:- Nil f) Protection (Fenci man, People's Palticipation etc.): Fencing s) Proposed Monito anism : (M&E) h) Any other information:- Nil

Kaithal.