FullTitleof theProject:- Diversion of 0.0251 Ha. of Forest Land for access to the proposed petrol pump of Hindustan Petroleum Corporation Ltd. on to (SH-08) Road, At Village PATTI GADHAD, at Kaithal, under Forest Division & Distt. Kaithal. . File No :- FP/tIR/Others/24839 12017 Date of Proposal z 24103/2017

CHECK LIST SERIAL NUMBER: 17

" Scheme for C.A." Name of the Forest/Reaches to be diverted: Diversion of 0.0251 Ha. of Forest Land for access to the proposed petrol pump of Hindustan Petroleum Corporation Ltd. on Karnal to Kaithal (SH-08) Road, At Village PATTI GADHAD, at Kaithal, uncer Forest Division & District Kaithal.

Forest Area: 0.0251 ha. Details of degraded forest land/non-forest land where C.A. is to be carried out. Division Kaithal District Kaithal Tehsil Range Pundri C.A. Site Name : P.F Fatehpur Escape Compartment No. C-5 Teh. Pundri Distt. Kaithal Area to be Afforested :-

a) Whether the site selected for Compensatory Afforestation is a land bank (Yes or Not : Yes b) If the CA site is other than the land bank, reasons be given:-- N.A In case of non- forest area identified for CA, then lvhat is the distance of CA site frorn the adjoining forest boundary: i) Soil type : Sandy Loam - ii) Topograph5r : (a) Hil lyAJndulating/Plain (b) Slope: Steep/Mediurn/Gentle

iiD Whether the area is bearing any root stock ofvegetation: Plantation Model :- - Copy of the approved Conrpensatory Afforestation Scheme/ltlodel showing component wise physical and financial break up is as under: 1. Schedule of Plantatio:r Programme:- Detait of yearwise break-up of requirements of funds is as under:- The plantation cost is calculated for Tall Plants norms at 4mx 2.5rn spacing and it is approved by PCCF, Haryana's letter No. Misc- dated at the wase rate of Rs. 2241- per duy_g! .!d"., Sr. No. Year Rate per Plant I Ist Year cost of afforestation Rs.l72l- Per Plant 2 IInd Year Plantation Rs. 64l- Per Plant J lllrd Year Plantation Rs. 32l- Per Plant TA IVth Year Plantation Rs. 25l- Per Plant 5 Vth Year Plantation Rs. 26l- Per Plant 6 VIth Year Plantatiott Rs. 15/- Per Plant 7 VIIth Year: Plantatiorr Rs. 8/- Per Plant 8 VIIIth Year Plantation Rs. 9/- Per Plant 9 IXth Year Plantation Rs. I0/- Per Plant 10 Xth Year Plantation Rs. 1ll- Per Plant Total 3721- I 3,L

Area to be Diverted : 0.0251 Ha. No. of trees tobe felled: 10 Plants to be damaged: 0 Area to be planted : Two time of the area to be diverted : 0.0251x2:0.0502 Number of Plants to be Planted 0.0502x1000:50 plants or say 10x10: 100 plants

S. Description Rate Total No. Amount (Rs.) A Nett present value of Forest Land to be diverted Rs. 8.87 LacslHa 22264 B Compensatory Afforestation Charges \o. of Plants 1" Year cost of afforestation 00 Rs. 172l- Per Plant t7200 z 2"" year maintenance 00 Rs. 64l- Per Plant 6400 J 3'" year maintenance 00 Rs. 32l- Per Plant 3200 A T 4"' yeat maintenance 00 Rs. 25l- Per Plant 2500 5 5'' year maintenance 00 Rs. 26l- Per Plant 2600 6 year 6"' maintenance 00 Rs. l5l- Per Plant I 500 7 7"'yeat maintenance 00 Rs. 8/- Per Plant 800 otn 8 year maintenance 00 Rs. 9/- Per Plant 900 9 year mamtenance 00 Rs. 10/- Per Plant 1000 10 year malntenance 00 Rs. I l/- Per Plant I 100 l1 Barbed wire fencing charges 0.4 Rs. 76700/- per rkm 30680 Rkm Total C.A. charges (1 toll) 67880 c Supervisory/Overhead/ Misc. Charger l0%o on the total CA 6788 charses D Additional Compensatory Afforestation Charges I 1" Year cost of afforestation Nil P.s.l72l- Per Plant 0 2 2"" year maintenance Nil Rs. 64l- Per Plant 0 a J 3'o year maintenance Nil Rs. 32l- Per Plant 0 4 4"'yeat maintenance Nil Rs. 25l- Per Plant 0 yeof 5 5t" maintenance Nil Rs. 26l- Per Plant 0 6 6"'year ma ntenance Nit Rs. 15/- Per Plant 0 7 7"'year ma ntenance Nil Rs. 8/- Per Plant 0 o''' 8 year maintenance N Rs. 9/- Per Plant 0 9 "" yeaf maintenance N Rs. l0/- Per Plant 0 10 '--" year malntenance Nil Rs. I li- Per Plant 0 1t Barbed wire fencins charses Rkm Rs. 767004 per rkm 0 Sub Total (D) Total Addl. C.A. Charges 0 E Penal C.A. 0 F Total C.A. Charses (B+C) 74668 G Felling Charges L08 M' Rs. 1000/- per M' : 1080 H Plantation damage charges 0 plant Rs.236l- per plant 0 I Any Other Charges Grand Total A+D+E+F+G+H+I to be deposited in 98012 CAMPA Fund 33

Technical details:- 'Technical details of compensatory Afforestation Scheme are as follows:- a) General Details :- Compensatory Afforestation wilt be carried out alongwith P.F Fatehpur Escape, Compartment No. C-5 b) Spacing :- 4x2.5 c) Species :- Neem, Bakain, Papri, Jamun, Bar, pipal, Suhajna etc. d) PlantationMethod: TallPlantation e) Soil and Moisture Conservation Works:- Nil f) Protection (Fencing, Watch man, People's participation etc.): Fencing s) Proposed Monitoring Mechanism : (M&E) h) Any other information: Nit