Division Kaithal District Kaithal Tehsil Pundri Range Pundri C.A

Division Kaithal District Kaithal Tehsil Pundri Range Pundri C.A

FullTitleof theProject:- Diversion of 0.0251 Ha. of Forest Land for access to the proposed petrol pump of Hindustan Petroleum Corporation Ltd. on Karnal to Kaithal (SH-08) Road, At Village PATTI GADHAD, at Kaithal, under Forest Division & Distt. Kaithal. Haryana. File No :- FP/tIR/Others/24839 12017 Date of Proposal z 24103/2017 CHECK LIST SERIAL NUMBER: 17 " Scheme for C.A." Name of the Forest/Reaches to be diverted: Diversion of 0.0251 Ha. of Forest Land for access to the proposed petrol pump of Hindustan Petroleum Corporation Ltd. on Karnal to Kaithal (SH-08) Road, At Village PATTI GADHAD, at Kaithal, uncer Forest Division & District Kaithal. Forest Area: 0.0251 ha. Details of degraded forest land/non-forest land where C.A. is to be carried out. Division Kaithal District Kaithal Tehsil Pundri Range Pundri C.A. Site Name : P.F Fatehpur Escape Compartment No. C-5 Teh. Pundri Distt. Kaithal Area to be Afforested :- a) Whether the site selected for Compensatory Afforestation is a land bank (Yes or Not : Yes b) If the CA site is other than the land bank, reasons be given:-- N.A In case of non- forest area identified for CA, then lvhat is the distance of CA site frorn the adjoining forest boundary: i) Soil type : Sandy Loam - ii) Topograph5r : (a) Hil lyAJndulating/Plain (b) Slope: Steep/Mediurn/Gentle iiD Whether the area is bearing any root stock ofvegetation: Plantation Model :- - Copy of the approved Conrpensatory Afforestation Scheme/ltlodel showing component wise physical and financial break up is as under: 1. Schedule of Plantatio:r Programme:- Detait of yearwise break-up of requirements of funds is as under:- The plantation cost is calculated for Tall Plants norms at 4mx 2.5rn spacing and it is approved by PCCF, Haryana's letter No. Misc- dated at the wase rate of Rs. 2241- per duy_g! .!d"., Sr. No. Year Rate per Plant I Ist Year cost of afforestation Rs.l72l- Per Plant 2 IInd Year Plantation Rs. 64l- Per Plant J lllrd Year Plantation Rs. 32l- Per Plant TA IVth Year Plantation Rs. 25l- Per Plant 5 Vth Year Plantation Rs. 26l- Per Plant 6 VIth Year Plantatiott Rs. 15/- Per Plant 7 VIIth Year: Plantatiorr Rs. 8/- Per Plant 8 VIIIth Year Plantation Rs. 9/- Per Plant 9 IXth Year Plantation Rs. I0/- Per Plant 10 Xth Year Plantation Rs. 1ll- Per Plant Total 3721- I 3,L Area to be Diverted : 0.0251 Ha. No. of trees tobe felled: 10 Plants to be damaged: 0 Area to be planted : Two time of the area to be diverted : 0.0251x2:0.0502 Number of Plants to be Planted 0.0502x1000:50 plants or say 10x10: 100 plants S. Description Rate Total No. Amount (Rs.) A Nett present value of Forest Land to be diverted Rs. 8.87 LacslHa 22264 B Compensatory Afforestation Charges \o. of Plants 1" Year cost of afforestation 00 Rs. 172l- Per Plant t7200 z 2"" year maintenance 00 Rs. 64l- Per Plant 6400 J 3'" year maintenance 00 Rs. 32l- Per Plant 3200 A T 4"' yeat maintenance 00 Rs. 25l- Per Plant 2500 5 5'' year maintenance 00 Rs. 26l- Per Plant 2600 6 year 6"' maintenance 00 Rs. l5l- Per Plant I 500 7 7"'yeat maintenance 00 Rs. 8/- Per Plant 800 otn 8 year maintenance 00 Rs. 9/- Per Plant 900 9 year mamtenance 00 Rs. 10/- Per Plant 1000 10 year malntenance 00 Rs. I l/- Per Plant I 100 l1 Barbed wire fencing charges 0.4 Rs. 76700/- per rkm 30680 Rkm Total C.A. charges (1 toll) 67880 c Supervisory/Overhead/ Misc. Charger l0%o on the total CA 6788 charses D Additional Compensatory Afforestation Charges I 1" Year cost of afforestation Nil P.s.l72l- Per Plant 0 2 2"" year maintenance Nil Rs. 64l- Per Plant 0 a J 3'o year maintenance Nil Rs. 32l- Per Plant 0 4 4"'yeat maintenance Nil Rs. 25l- Per Plant 0 yeof 5 5t" maintenance Nil Rs. 26l- Per Plant 0 6 6"'year ma ntenance Nit Rs. 15/- Per Plant 0 7 7"'year ma ntenance Nil Rs. 8/- Per Plant 0 o''' 8 year maintenance N Rs. 9/- Per Plant 0 9 "" yeaf maintenance N Rs. l0/- Per Plant 0 10 '--" year malntenance Nil Rs. I li- Per Plant 0 1t Barbed wire fencins charses Rkm Rs. 767004 per rkm 0 Sub Total (D) Total Addl. C.A. Charges 0 E Penal C.A. 0 F Total C.A. Charses (B+C) 74668 G Felling Charges L08 M' Rs. 1000/- per M' : 1080 H Plantation damage charges 0 plant Rs.236l- per plant 0 I Any Other Charges Grand Total A+D+E+F+G+H+I to be deposited in 98012 CAMPA Fund 33 Technical details:- 'Technical details of compensatory Afforestation Scheme are as follows:- a) General Details :- Compensatory Afforestation wilt be carried out alongwith P.F Fatehpur Escape, Compartment No. C-5 b) Spacing :- 4x2.5 c) Species :- Neem, Bakain, Papri, Jamun, Bar, pipal, Suhajna etc. d) PlantationMethod: TallPlantation e) Soil and Moisture Conservation Works:- Nil f) Protection (Fencing, Watch man, People's participation etc.): Fencing s) Proposed Monitoring Mechanism : (M&E) h) Any other information: Nit.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us