Division Kaithal District Kaithal Tehsil Pundri Range Pundri C.A

Division Kaithal District Kaithal Tehsil Pundri Range Pundri C.A

eg Full Title of the Project :- Diversion of 0.4991 Ha. of Forest Land for construction of 400 KV D/C (Quad) Kurukshetra-Jind transmission line, under Forest Division & Distt. Kaithal, Haryana. File No :- FP/IIF/TRANS/2072312016 Date of Proposal z 19106/2017 CHECK LIST SERIAL NUMBER: 17 " Scheme for C.A." Name of the Forest/Reaches to be diverted: Diversion of 0.4991 Ha. of Forest Land for construction of 400 KV DIC (Quad) Kurukshetra-Jind transmission line, under Forest Division & District Kaithal. Forest Area: 0.4991ha. Details of degraded forest nd/non-forest land where C.A. is to be carried out. Division Kaithal District Kaithal Tehsil Pundri Range Pundri C.A. Site Name : P.F Fatehpur Escape Compartment No. C-5 Teh. Pundri Distt. Kaithal Area to be Afforested :- a) Whether the site selected for Compensatory Afforestation is a land bank (Yes or Not : Yes b) If the CA site is other than the land bank, reasons be given:-- N'A In case of non- forest area identified for CA, then what is the distance of CA site from the adjoining forest boundary'. i) Soiltype : Sandy Loam - ii) Topography : (a) Hi I lylUndulating/Plain (b) Slope: Steep/Med i u m/Gentle iii) whether the area is bearing any root stock of vegetation: _ Plantation Model :- Copy of the approved Compensatory Afforestation Scheme/Model showing component wise physical and financial break up is as under: 1. Schedule of Plantation Programme:- Detail of year wise break-up of requirements of funds is as under:- The plantation cost is calculated for Tall Plants norms at 4m x 2.5m spacing and it is approved by PCCF, Haryana's letter No. Misc- dated at tlre wage rate ttf Rs 2241- per day as under: Sr. No. Year Rate per Plant I Ist Year cost of afforestation Rs. 172l- Per Plant 2 IInd Year Plantation Rs. 64l- Per Plant J IIIrd Year Plantation Rs. 32l- Per Planl 4 IVth Year Plantation Rs. 25l- Per Plant 5 Vth Year Plantation Rs. 26l- Per Plant 6 VIth Year Plantation Rs. l5l- Per Plant 7 Vllth Year Plantation Rs. 8/- Per Plant 8 VIIIth Year Plantation Rs. 9/- Per Plant 9 IXth Year Plantation Rs. l0/- Per Plant l0 Xth Year Plantation Rs. I l/- Per Plant Total 372t- 1s ) Area to be Diverted : 0.4991 Ha. No. of trees to be felled:261 Plants to be damaged: 345 Area to be planted : Two time of the area to be diverted : 0.4991x02: 0.9982 Numberof PlantstobePlanted0.9982x1000:998.2Plants orsay 26lxl0:2.610 Plants S. Description Rate Total No. Amount (Rs.) Nett present value of Eorest Land to be diverted Rs. 8.87 Lacs/Ha 442702 B Compensatory A 6station Charges No. of Plants l" Year cost of afforestation 26 0 Rs.l72l- Per Plant 448920 2 2"d vear maintenance 26 0 Rs. 64l- Per Plant 167040 3 3'd vear maintenance zo 0 Rs. 32l- Per Plant 83520 4 4"t year maintenance 26 0 Rs. 25l- Per Plarrt 65250 5 5t" year maintenance 26 0 Rs. 26l- Per Plant 67860 6 6"t vear maintenance zo U Rs. 15f Per Plant 39150 ,7 7t" vear rnaintenance 26 0 Rs. 8/- Per Plant 20880 tt" 23490 8 v"ua maintenance LO 0 Rs. 9/- Per Plant e'l' v vear maintenance 26 0 Rs. 10/- Per Plant 26t00 l0 26r0 Rs. l l/- Per Plant 287 t0 il Barbed wire fencing charges 10.44 Rs. 76700/- per rkm ltlini 800748 Total C.A. charses (1 tol1) 1771668 t77167 C] Supervisory/Overhead/ Misc. Charger l0%o on the total CA charges D Tdditionul Compensatorv Afforestation.C harges : i45x2: 690 l'' Year cost of afforestation 690 I Rs. 172l- Pel Plant I 1 8680 ) 7iF'"rr*int* 690 I Rs. 64l- Per Plartt 44t60 3 3"t vear rnaintenance 690 Rs. 321 Per Plant 22080 4 4t't year maintenance 690 Rs. 25l- Per Plant t7250 t1940 5 5tlt year tna ntenance 590 Rs.26l- Per Plant r0350 6 6th year rna ntenance 690 Rs. l5/- Per Plant 5520 1 7"' year maintenance 690 Rs. 8f Per Plant *'u"ua 8 rnaintenance 690 Rs. 9/- Per Plant 62t0 9'l' 6900 9 vear maintenance 690 Rs. l0/- Per Plant Rs. l1/- Per Plattt 1 590 l0 '0"'vear maintenance 690 il Barbed wire fencing charges 2.'/6 Rs. 767001 per rkm llb9 Rknr Sub Total (D) Total Addl. C.A. Charees ll Penal C.A. 0 F Total C.A. Charses (B+C 1497r|J _c_ Fellins Charees 149.71 M' !l_ PI 0 I Any Other Charges Grand Total A+D+E+F+G+H+I to be depositcd in 3009619 CAMPA Fund Technical details:- Technic4l details of Compensatory Afforestation Scheme are as follows:- a) Compensatory Afforestation will be carried out alongwith P.F Fatehpur Escape, Compartment No. C-5 b) 4x2.5 c) Species :- Neem, Bakain, Papri, Jamun, Bar, Pipal, Suhajna etc. d) PlantationMethod: TallPlantation e) Soil and Moisture Conservation Works:- Nil f) Protection (Fenci man, People's Palticipation etc.): Fencing s) Proposed Monito anism : (M&E) h) Any other information:- Nil Kaithal..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us