Green Gully Linear Park Management Plan
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Park Safety Program Progress Report & Future Considerations
Park Safety Program Progress Report & Future Considerations 1 Background 1.23 Achieve rating of “Very Satisfied” or “Satisfied” with the “Feeling of Safety in Parks” greater than or equal to the top 10% of the national benchmark cities as measured in the Community Survey In October 2018, a pilot Parks Security Program was implemented using the existing G4S contract; program concluded in late June 2020. At October 1st, 2020 WSS, City Staff was directed to evaluate and begin work on developing a long-term park security solution and re- activate the G4S Park Security Program to serve as a “security services bridge” until the permanent solution could be enacted. 2 Update: Security Bridge Timeline • Since last WSS, work began on re-implementation of G4S Park Security Program. • At last WSS meeting, the estimated timeline for full-scale G4S deployment with the same level of service delivery and coverage was approximately 1-month so that training, equipping, and appropriate staffing could be re-achieved. • Full-scale security deployment back into the parks is set to begin on November 5, 2020. It is believed this will have an immediate and positive impact on the feeling of safety in our parks. • Estimated cost for 1-year (November 1, 2020 – October 31, 2021) of G4S security services is: $441,965 3 Update: Park Security Program • Since last WSS, initial planning meeting(s) and consultation meetings have been conducted within & between the Police Department, Human Resources, Parks and Recreation, and Human Services. • In an assessment of needs and costs, a LOW financial estimate to bringing back a full-scale Park Ranger Program would cost 1.5 to 2 million dollars (salary, benefits, equipment, vehicles). -
Cycle Notes Widths of Off-Road Shared Use Paths
NO. 21 - JUNe 2010 Cycle Notes Widths of Off-Road Shared Use Paths Welcome to CYCLE NOTES No. 21. The purpose of CYCLE NOTES is to provide information on the design of bicycle facilities for engineers and planners. CYCLE NOTES should be read in conjunction with: Austroads Guides to Traffic Management and Road Design. Australian Standard 1742.9, Manual of Uniform Traffic Control Devices, Part 9 Bicycle Facilities. VicRoads Traffic Engineering Manual Volumes 1 and 2. Introduction Passings and Meetings The purpose of this edition of Cycle Notes is to provide When cyclists and pedestrians are using a shared path, guidance on the width of off-road shared use paths. In they will often “meet” other cyclists and pedestrians particular, it relates the widths of paths to the volume of travelling in the opposite direction or “pass” slower cyclists cyclists and pedestrians who use the path. and pedestrians travelling in the same direction. Guidance is also provided on the circumstances under Delayed Passings which consideration should be given to separating cyclists Delayed passings occur when faster cyclists must slow from pedestrians. down to pass other path users travelling in the same direction. This usually occurs when a “passing” happens Shared Use Paths at the same time as a “meeting” and there is insufficient Shared use paths are the most common form of off road room for the faster cyclist to pass the slower path users. path in Australia and are based on cyclists and pedestrians The number of delayed passings that occur along a path is sharing the path (Figure 1). -
285. La Trobe
In the matter of the NORTH EAST LINK PROJECT INQUIRY AND ADVISORY COMMITTEE SUBMISSIONS ON BEHALF OF LA TROBE UNIVERSITY THE PROJECT ................................................................................................................................... 2 FRAMEWORK FOR THE INQUIRY ............................................................................................... 3 The IAC’s Terms of Reference ................................................................................................. 3 The EES Scoping Requirements ............................................................................................... 4 The IAC’s report ....................................................................................................................... 6 EVIDENCE......................................................................................................................................... 6 LA TROBE UNIVERSITY IS A SIGNIFICANT ASSET TO THE REGION ................................. 8 The University is one of the north’s largest employers ............................................................ 8 The University has significant plans to become the University City of the Future .................. 8 Kingsbury Drive is of significance to the University and the region ....................................... 9 THE UNIVERSITY SUPPORTS THE PROJECT .......................................................................... 13 THE PROJECT’S TREATMENT OF PUBLIC TRANSPORT SHOULD BE IMPROVED .......... 14 Planning policy -
Eastern Metro Region Five Year Plan for Jobs, Services and Infrastructure 2018–2022
Eastern Metro Region Five Year Plan for Jobs, Services and Infrastructure 2018–2022 Eastern Metro Region © The State of Victoria Department of Environment, Land, Water and Planning 2018 This work is licensed under a Creative Commons Attribution 4.0 International licence. You are free to re-use the work under that licence, on the condition that you credit the State of Victoria as author. The licence does not apply to any images, photographs or branding, including the Victorian Coat of Arms, the Victorian Government logo and the Department of Environment, Land, Water and Planning (DELWP) logo. To view a copy of this licence, visit creativecommons.org/licenses/by/4.0/ Printed by (Impact Digital, Brunswick). ISBN 978-1-76077-179-9 (Print) ISBN 978-1-76077-180-5 (pdf/online/MS word) Disclaimer This publication may be of assistance to you but the State of Victoria and its employees do not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for any error, loss or other consequence which may arise from you relying on any information in this publication. Accessibility If you would like to receive this publication in an alternative format, please telephone the DELWP Customer Service Centre on 136 186, or email [email protected] (or relevant address), or via the National Relay Service on 133 677, www.relayservice.com.au. This document is also available on the internet at www.delwp.vic.gov.au. Office for Suburban Development Aboriginal acknowledgement The Victorian Government proudly acknowledges Victoria’s Aboriginal community and their rich culture and pays respect to their Elders past and present. -
City Manager's Weekly Report Department: Administration - City Manager Notable Notes: City Manager
Page 1 of 24 City Manager's Weekly Report Department: Administration - City Manager Notable Notes: City Manager: This week was again largely dedicated to the COVID-19, and I spent the majority of my time participating in both internal and external conference calls, coordinating our response efforts. Mayor Clifton, City Secretary Bensley, and I participated in two calls with the Governor and his staff. I spent time preparing information for Monday night's executive session and Council meeting. I participated in a number of calls with Solicitor Bilodeau and staff on a variety of legal issues. I also performed a preliminary review of a draft lease agreement for Lot 3 East with 96 East Main Street. I held a call with our lobbyist to discuss the City's needs in Dover. The remainder of my time was spent on personnel and general administrative related tasks. Chief Communications Officer: -Continue to share information on the website, Channel 22, social media and InformMe about operational changes, community safety, etc. -Completed the park naming survey and compiled a final list. A total of 618 names were submitted. -Working with Parks on messaging for playground/park safety. -Completed three additional PRSA webinars on the subject of communicating with internal and external stakeholders in the time of COVID-19. -Composed four press releases. -The open rate for our Constant Contact emails increased by 32%. - Facebook page likes increased 28% since last week, followers increased 55% since last week, post reach increased 70% since last week and post engagement increased 99%. -Twitter gained 123 followers and impressions increased 161%. -
Vice Chair) Peterson Hornbeck (Chair
AGENDA PLANNING COMMISSION Tuesday, August 14, 2018 – 5:30 PM City Council Chambers 125 E Avenue B, Hutchinson, Kansas 1. ROLL CALL Richardson Woleslagel Bisbee Hamilton Wells Roberts-Ropp Carr (Vice Chair) Peterson Hornbeck (Chair) 2. APPROVAL OF MINUTES – Meeting of July 10, 2018. 3. CORRESPONDENCE & STAFF REPORTS – Motion to accept correspondence and staff reports into the official record. 4. PUBLIC HEARINGS a. CUP18-000005 – Conditional Use Permit for Salvage Yard Request to operate a salvage yard use at 316 Spencer St. (Staff Representative: Amy Allison, Senior Planner) Action: Motion to recommend (approval / approval with conditions / denial) to the Hutchinson City Council of Conditional Use Permit request #CUP18-000005 for a salvage yard located at 316 Spencer St. b. ZA18-000004 – Zoning Amendments for the Land Use Table, R-6 Zoning District & Related Sections Request for Amendments to the City of Hutchinson Zoning Regulations pertaining to Definitions, Zoning Districts, Accessory Structures, and Supplemental Regulations. (Staff Representative: Amy Allison, Senior Planner) Action: Motion to recommend (approval / modification and approval / denial) to the Hutchinson City Council of Zoning Amendment case #ZA18-000001 for modification of the City’s regulations pertaining to Definitions, Zoning Districts, Accessory Structures, and Supplemental Regulations. 5. OLD BUSINESS – None 6. NEW BUSINESS a. CP18-000001 – Review the 2019-2023 Capital Improvement Program for Conformance to the Comprehensive Plan. (Staff Representative: Jim Seitnater, Planning & Development Director) Action: Motion to (approve and make a finding of conformance / amend and make finding of conformance / deny because a finding of conformance cannot be made) between the 2019-2023 Capital Improvement Program with the recommendations, spirit and intent of the 2017-2037 Comprehensive Plan. -
Mike Griggs Gabe Huffington
Parks and Recreation Department Mike Griggs Parks & recreation City of Columbia, Missouri Director Commission 79 FTE Parks & Recreation Advisory Gabe Huffington Assistant Director Parks & Recreation Tammy Miller Marketing Specialist Cavelle Cole-Neal Rosanna Johnson Gentry Building Administrative Supervisor Park Safety Supervisor Gentry Building Ranger Program Melinda Pope Sharon Delgaudio Park Safety Supervisor Sr. Administrative Supervisor Reports to Police Dept. Parks Management Center Sr. Admin. Support Asst Gentry Building Emily Wilmes Sr. Admin Support Asst. Erika Witzke Parks Management Center Sr. Admin. Support Asst. Gentry Building Erika Coffman Vacant Manager Manager Recreation Services Park Services Lida Gochenour Mike Snyder Reports Directly to the Administrative Supervisor Superintendent Park Service Manager ARC Park Development Park Services Division Reports Directly to the VACANT Zack Weitkemper Mark Kottwitz Recreation Services Manager Superintendent Construction Supervisor Park Supervisor Recreation Services Division Recreation & Community Services Park Planning Grounds and Facilities Joey Wilmes Ron Schmidt Matthew Boehner Travis March Recreation Supervisor Social Services Supervisor Senior Planner Park Supervisor Sports Programming CARE Program-Youth Empl Train- Park Planning Turf Management Dan Frost Camren Cross Recreation Supervisor Recreation Supervisor Toney Lowery Golf Courses Community Recreation Senior Planner Park Planning Janel Twehous Recreation Supervisor Liz Lynch Aquatics & Outdoor Recreation Planner Park Planning Brian Higginbotham Recreation Supervisor Janet Godon ARC Operations Planner Park Planning . -
Cycling Into the Future 2013–23
DECEMBER 2012 CYCLING INTO THE FUTURE 2013–23 VICTORIA’s cyCLING STRATEGY Published by the Victorian Government, Melbourne, December 2012. © State of Victoria 2012 This publication is copyright. No part may be reproduced in any process except in accordance with the provisions of the Copyright Act 1968. Authorised by the Victorian Government Melbourne Printing managed by Finsbury Green For more information contact 03 9655 6096 PAGE III CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY CONTENTS Minister’s foreword v Executive summary vi 1 Cycling in Victoria 1 2 Growing cycling in Victoria 5 Current cycling patterns 5 Potential growth 5 3 Benefits of cycling 8 Healthier Victorians 8 Better places to live 9 Stronger economy 9 Healthier environment 10 4 Strategic framework 11 Direction 1: Build evidence 12 Direction 2: Enhance governance and streamline processes 14 Direction 3: Reduce safety risks 16 Direction 4: Encourage cycling 20 Direction 5: Grow the cycling economy 22 Direction 6: Plan networks and prioritise investment 24 5 Implementation, monitoring and evaluation 29 Appendix 1: Cycling networks, paths and infrastructure 30 PAGE IV CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY Some of our work in metropolitan Melbourne includes: > a new bridge on the Capital City Trail at Abbotsford > bike lanes along Chapel Street > extensions and improvements to the Federation Trail, Gardiner’s Creek Trail and Bay Trail on Beach Road > Jim Stynes Bridge for walking and cycling between Docklands and the CBD along the Yarra River > Heatherton Road off-road bike path from Power Road to the Dandenong Creek Trail > a bridge over the Maroondah Highway at Lilydale > bike connections to Box Hill and Ringwood > Parkiteer bike cages and bike hoops at 16 railway stations > Westgate Punt weekday services > bike paths along the Dingley Bypass, Stud Road, Clyde Road and Narre Warren – Cranbourne Road > bike infrastructure as part of the Regional Rail Link project > a new trail in association with the Peninsula Link. -
Recreational Activity Surveys During COVID-19 and Comparison with Pre-Lockdown Activity Levels
More people out on bicycles: Recreational activity surveys during COVID-19 and comparison with pre-lockdown activity levels May 2020 Measuring recreational activity in unprecedented times Lockdown in Victoria On 30 March 2020, the Minister for Health and Medical Research signed an Order for stage 3 lockdown measures to be put in place across Australian states, following a national outbreak of the novel coronavirus. The Order, which in Victoria falls under section 200 of the Public Health and Wellbeing Act (2008)1, 2, places legally enforceable restrictions on all non-essential gatherings, as a means of minimising the spread of the deadly virus. During the stage 3 restrictions, there are only four reasons for Victorian residents to be outside: • purchasing food and essential supplies; • medical, care or compassionate needs; • exercise; and • work and study if they cannot be undertaken remotely2. How has this affected our recreational activities? An arising question is how these restrictions have affected the recreational needs of residents in Victoria and elsewhere. A recent survey by Bicycle Network3 found that, in response to stage 3 restrictions across Australian states: • 73 per cent [of respondents] are planning to use a bicycle to access essential services (shops, healthcare, work and education) in the coming weeks and months; • 84 per cent of healthcare workers said they would ride bicycles more or the same amount; and • Most respondents (39 per cent) said that they will be riding a bicycle outdoors to get their daily exercise. In addition, emerging data suggests an increase in bicycle purchases during lockdown restrictions4. These findings suggest that, given these increased needs for bicycle-related transport, exercise and recreation; Australian roads and shared paths may be exhibiting major deviations from normal bicycle traffic volumes. -
Perception of Personal Safety in Urban Recreation Sites L
Perception of Personal Safety in Urban Recreation Sites l Herbert W. Schroeder and L. M. Anderson ABSTRACT: Photograph of 17 urban recreation sites in Chicago and Atlanta were evaluated by college students (n = 68) in Illinois, Georgia, and Michigan, for either perceived securig, scenic qualily, or both. For most raters, high visibilig and developed park features significantly enhanced per- ceived securily. Scenic qualily, on the other hand, was enhanced for the major- ily of evaluators by a high degree of naturalness and vegetation. For both per- ceived safely and scenic qualily, a small minorig of raters held prefeences quite diJierent from the majorily. KEYWORDS: Urban parks, crime, public safely, scenic qualily. AUTHORS: Herbert W. Schroeder is with the North Central Forest Experiment Station; L. M. Anderson is with the Southeastern Forest Experiment Station. Journal of Leisure Research, 1984 Volume 16, Number 2, pp. 178-194. Copyright a 1984 by the National Recreation and Park Associ- ation. Urban parks can provide valuable recreation opportunities for the 70 percent of Americans who reside in cities (USDI 1978). Yet many existing sites are underused, in part because they are often seen as undesirable, threat- ening places where crimes frequently occur ('Jacobs 1961). This article de- scribes an effort to identify characteristics that affect the user's perception of personal safety in public recreation sites. The relation between perceived secu- rity and visual attractiveness will also be addressed, because both factors may be related to visibility in and utilization of park settings (Nasar 1982). 'This investigation was based in part on an informal study initiated in 1975 by Dr. -
Village of Essex Junction Trustees Regular Meeting Agenda
VILLAGE OF ESSEX JUNCTION Online & 2 Lincoln St. TRUSTEES Essex Junction, VT 05452 Tuesday, August 24, 2021 REGULAR MEETING AGENDA 6:30 PM E-mail: [email protected] www.essexjunction.org Phone: (802) 878-6951 This meeting will be held both remotely and in person. Available options to watch or join the meeting: • WATCH: the meeting will be live-streamed on Town Meeting TV. • JOIN ONLINE : Join Microsoft Teams Meeting. Depending on your browser, you may need to call in for audio (below). • JOIN CALLING: Join via conference call (audio only): (802) 377-3784 | Conference ID: 320 357 014# • PROVIDE FULL NAME: For minutes, please provide your full name whenever prompted. • CHAT DURING MEETING: Please use “Chat” to request to speak, only. Please do not use for comments. • RAISE YOUR HAND: Click on the hand in Teams to speak or use the “Chat” feature to request to speak. • MUTE YOUR MIC/TURN OFF VIDEO: When not speaking, please mute your microphone on your computer/phone. 1. CALL TO ORDER [6:30 PM] 2. AGENDA ADDITIONS/CHANGES 3. APPROVE AGENDA 4. PUBLIC TO BE HEARD a. Comments from Public on Items Not on Agenda 5. BUSINESS ITEMS a. *Work Session on Essex Junction Independence Initiative b. Consider approval of warning of first and second public hearings re: Charter for City of Essex Junction c. Consider approval of content from Our Village, Our Voices on the Village of Essex Junction website d. Consider authorizing the Village Clerk to mail out ballots to all active registered voters for the November 2nd election e. -
Creating Safe Park Environments to Enhance Community Wellness
Issue Brief 22377 BELMONT RIDGE ROAD | ASHBURN, VA 20148-4501 | 800.626.NRPA (6772) | www.nrpa.org NRPA’s mission is Creating Safe Park Environments to advance parks, recreation, and to Enhance Community Wellness INTRODUCTION environmental People seek out parks because they provide conservation efforts contact with the natural environment and a social that enhance the environment which offers opportunities for meeting quality of life with friends, watching others and being seen – all of which help to establish a feeling of comfort for all people. and security. Well-designed and well-used parks and recreation areas are a great asset for local communities. But that asset can quickly become a liability inattentiveness, irritability, and impulsivity, recognized “So-called ‘undesirables’ are not the when parks become unsafe and as by psychologists as precursors to violence. Green a result, lose their value and benefit problem. It is the measures taken to spaces also support frequent, casual contact among to the community. Keeping park and combat them that is the problem… neighbors. recreation facilities safe is a key to The best way to handle the problem community wellness and has a direct Evaluating Park Safety: of undesirables is to make the place relationship to their usage rate. The Safety Audit Process attractive to everyone else.” How is a park judged to be safe? Many look to crime – William H. Whyte Research by The Citizens’ Taskforce on the Use and Security of Central statistics, but these can be misleading. Many crimes, Park found that there was a direct particularly sexual assault, go unreported; and low relationship between the level of park use and the crime statistics may in fact be influenced by people’s ___________ perception of security: the larger the number of avoidance of areas they perceive to be high risk.