MOONEE PONDS CREEK STRATEGIC OPPORTUNITIES PLAN City of Melbourne Project Client: City of Melbourne Project Name: Moonee Ponds Strategic Opportunities Plan Project Number: 0650MEL Revision: Status: Date: by: Checked: A Draft 04.12.2017 MW CB B Draft 02.02.2018 MW CB C Draft 26.02.2018 MW CB D Draft WIP 02.05.2018 MW CB E Draft WIP 20.06.2018 MW CB F Draft WIP 22.06.2018 MW CB G Final 02.08.2018 MW CB H Final revision 1 10.09.2018 MW CB I Final revision 2 13.09.2018 MW CB J Final revision 3 14.09.2018 MW CB Studio: Melbourne Report Contact: Christian Borchert Consultants: Wave Consulting AUSTRALIA UNITED KINGDOM Melbourne Bristol Phone: +61 [0]3 9088 6500 Phone: +44 [0]7496 282281 Email:
[email protected] Email:
[email protected] Address: Level 4, 125 Flinders Lane, Melbourne Address: 77 Stokes Croft, Bristol VIC 3000, Australia. BS1 3RD, United Kingdom. Sydney CHINA Phone: +61 [0]2 9188 7500 Shenzhen Email:
[email protected] Phone: +86 136 0260 5947 Address: 21c Whistler Street, Manly, Email:
[email protected] NSW 2095, Australia. Address: 9D, 9th Floor, Shenzhen Zimao www.mcgregorcoxall.com Centre, 111 Taizi Road, Nanshan District, Shenzen 518000, China. 深圳市南山区太子路111号深圳自贸中心9楼9D, 518000 In collaboration with: DISCLAIMER This Study is for the confidential use only of the party to whom it is addressed (the client) for the specific purposes to which it refers. We disclaim any responsibility to any third party acting upon or using the whole or part of its contents or reference thereto that may be published in any document, statement or circular or in any communication with third parties without prior written approval of the form and content in which it will appear.