Kahramaa to Set up Qatar's 1St Large-Scale Solar Power Plant

Total Page:16

File Type:pdf, Size:1020Kb

Kahramaa to Set up Qatar's 1St Large-Scale Solar Power Plant MONDAY OCTOBER 8, 2018 MUHARRAM 28, 1440 VOL.12 NO. 4416 QR 2 FINE Fajr: 4:12 am Dhuhr: 11:23 am HIGH : 37°C Asr: 2:45 pm Maghrib: 5:15 pm LOW : 32°C Isha: 6:45 pm Gulf / Middle East 10 Business 12 Sports 16 Iran parliament passes Oil market is balanced, Enable wins again, counter-terror finance bill says energy minister joins racing greats st IPEC KICKS OFF TODAY Kahramaa to set up Qatar’s 1 The meet to discuss large-scale solar power plant challenges to MENA & CA economy Project to produce 700MW of electricity when completed ● 350MW to reach the grid by 2020 SATYENDRA PATHAK & HISHAM ALJUNDI HISHAM ALJUNDI ergy percentage in Qatar’s economic and environmental DOHA energy mix, he said. development pillars of Qatar DOHA Qatar’s unique offerings “Since our country has National Vision 2030, Eng make it a premium QATAR General Electric- an abundance of solar radia- Kuwari said. THE International Products destination in the region ity & Water Corporation tion, and considering the de- The project will be on Exhibition and Conference for hosting key business (Kahramaa) has started the creasing costs of solar panels Public-Private Partnership (IPEC) will be an ideal plat- process to set up Qatar’s and the amount of natural (PPP) basis to encourage form to discuss economic events. Today, Qatar is first large-scale solar power gas that can be saved, Kah- private investments in large- challenges facing the Mid- accessible from all over plant with a total capacity of ramaa has decided to go for- scale projects. The project dle East, North Africa and the world and 73 percent 700MW. ward with a utility-scale so- is structured as a Build, Central Asia, Qatar Tour- of the world’s population “As the first stage, 350 lar power plant,” Kahramaa Own, Operate and Transfer ism Authority (QTA) Acting can enter the country MW will be connected to the president said. (BOOT) model for 25 years, Chairman Hassan al Ibra- grid by 2020. A 10 km2-plot The project is in line with following which the owner- him has said. visa-free of land near Al Kharsaah, the directives of the Amir HH ship will be transferred to In a statement, ahead of ~ QTA Acting Chairman west of Doha, has been allo- Sheikh Tamim bin Hamad al Kahramaa. Siraj Energy will the three-day IPEC which Hassan al Ibrahim cated for the construction of Thani to reduce the depend- Kahramaa President Eng Essa Hilal al Kuwari at a press conference participate in the project as a begins on Monday, Ibrahim the plant,” Kahramaa Presi- ence on oil and gas, and the in Doha on Sunday. (HANSON K JOSEPH) Strategic National Investor. said government delega- “Qatar’s unique offerings dent Eng Essa Hilal al Ku- The project is expected tions and companies from make it a premium destina- wari announced at a press to generate power at com- 11 friendly countries that tion in the region for hosting conference at Kahramaa OA 10 Km2-plot O Reduces OSaves natural petitive rates and save natu- have been supporting Qatar key business events. Today, main building in Doha on of land has been carbon emissions gas used in ral gas used in traditional since the imposition of the Qatar is accessible from all Sunday. power generation, reducing blockade on the country are over the world and 73 per- Kahramaa will invite allocated near and protects conventional carbon emissions and pre- taking part in IPEC along cent of the world’s popula- public tenders for the project Al Kharsaah environment power plants serving the environment. with more than 19 Qatari tion can enter the country before the end of 2018. The It is one of the objectives of government and semi-gov- visa-free,” Ibrahim said. company has already pre- OPower the national programmes ernment organisations. Qatar Consumers Com- qualified 16 international for conservation and energy In all, the exhibition will plex Companies Chairman developers from the large generation at efficiency ‘Tarsheed’ which feature more than 360 com- Ali Hassan al Khalaf said, number of companies and competitive prices aims to achieve 7 percent panies from Qatar and the “Qatar has developed rapidly consortiums that have shown reduction in harmful car- participating countries. In in the past 20 years and has interest in the project, Eng bon emissions in Qatar. addition, more than 2,000 made a sustainable develop- Kuwari said. Since its launch in 2012, individuals have registered ment strategy in all fields, The solar plant comes Tarsheed has managed to attend the event. and now the country is ap- within Kahramaa’s plans to to reduce 10.6 tonnes of There cannot be a better proaching its goals with such diversify power resources emissions. platform to discuss issues a large-scale exhibition.” and increase renewable en- related to trade than IPEC, he said. More on page 12 Ô ‘Qatar seeks to Qatar launches ‘Gaza is worthy of Lusail Expressway wins ENR’s qualify more Amir’s landmark Ecuador life’ campaign QATAR launched the ‘Gaza Global Best Project award cybersecurity visit strengthens ties is worthy of life’ campaign on Sunday. The campaign, professionals’ AMBASSADOR of Ecuador supervised by the Regula- to Qatar HE Yvonne A-Baki tory Authority for Charitable THE Ministry of Transport reiterated the impact of the Amir concludes Latin America tour Activities, seeks to raise and Communications pays two-day state visit of the THE Amir His Highness the accompanying delegation QR10 million to cover the considerable attention to qual- Amir His Highness Sheikh Sheikh Tamim bin Hamad al during the visit, where they urgent needs of the people ify more national profession- Tamim bin Hamad al Thani Thani concluded on Saturday discussed means of enhanc- of Gaza in five areas, includ- als in the field of cybersecurity to Ecuador in bolstering the a state visit to Argentina, the ing bilateral relations between ing health, education, social and equip them with the latest cooperation between Qa- last stop of the Amir’s tour of the two countries and ex- welfare, water and econom- tools and technologies, Minis- tar and the Latin American a number of friendly countries changed views on a number of ic empowerment. ter of Transport and Commu- country in many fields. in Latin America, which also regional and international is- (PAGE 2) nications HE Jassim bin Saif The Amir’s first visit to Ec- included Ecuador, Peru and sues of common concern. The Ahmed al Sulaiti has said. uador last week kicked off his Paraguay. Amir wished the president the He was speaking at a spe- Latin America tour. The Amir sent a cable best of health and happiness cial event held at the ministry Ambassador Baki said the to President of Argentina and the friendly people of Ar- Qatar’s nominal to honour the winners of the Qatari delegation – Mauricio Macri thanking and gentina further development. ‘Qatar Threat Hunters 2018 led by the Amir appreciating him for the warm The Amir was accompanied by GDP grows Competition’. and including welcome accorded to him and an official delegation. (QNA) 17.9% (PG 12) The MoTC also aims to top ministers – strengthen the capabilities of was the largest- in the signing of many bilateral The agreements signed USAIL Expressway has won the Engineering News the new generations to track, ever delega- agreements in various fields. during the visit include es- LRecord (ENR) award for 2018 Global Best Project detect and resolve all types of tion from the tablishing a ministerial Ministry issues in the Roads/Highway category. The expressway cyber threats, Sulaiti added. Gulf to visit Ecuador’s Ambassador committee on economic, is marked by the 5/6 Interchange which has the ‘Qatar Threat Hunt- Ecuador. to Qatar HE Yvonne trade, investments and Guidance Manuals highest landmark in Qatar -- 100-metre high arches ers 2018’ is a part of the The land- A-Baki at a press meet technical affairs. (PG 3 ) Arab ‘Threat Hunter’ mark visit in Doha on Sunday. to Qatari laws comprising 54 large steel pieces. (PAGE 4) competition. (PAGE 3) resulted (HANSON K JOSEPH) More on page 2 Ô QATAR AT Erdogan: Closely following YOUTH OLYMPICS case of missing Saudi scribe Qatar’s 17-year-old REUTERS said, adding without explana- Saudi consulate in Istanbul to star swimmer Yaqoub ANKARA tion: “My expectation is still get documents for his forthcom- al Khulaifi carries the positive.” ing marriage. Saudi officials say national flag during PRESIDENT Recep Tayyip Er- Erdogan said he was per- he left shortly afterwards but the opening ceremony dogan said on Sunday he was sonally following the issue, his fiancee, who was waiting of the third Youth closely following the case of without saying what he believed outside, said he never came out. Olympic Games in Bue- missing Saudi journalist Jamal had happened to Khashoggi. Two Turkish sources told nos Aires, Argentina, Khashoggi after Turkish offi- A former newspaper editor Reuters Turkish authorities on Saturday. Qatar has cials said they believed he had in Saudi Arabia and adviser to believe Khashoggi was delib- sent five athletes in been killed at the Saudi consu- its former head of intelligence, erately killed inside the con- three disciplines to the late in Istanbul. Khashoggi left the country last sulate, a view echoed by one of games that will con- “Entries and exits into the year saying he feared retribu- Erdogan's advisers, Yasin Ak- clude on October 18. embassy, airport transits and tion for his criticism of Saudi tay, who is also a friend of the (PAGE 19) all camera records are being policy in the Yemen war and its Saudi journalist.
Recommended publications
  • Geo-Hydrological Hazards Induced by Gorkha Earthquake 2015
    Geo-hydrological hazards induced by Gorkha Earthquake 2015: A Case of Pharak area, Everest Region, Nepal Buddhi Raj Shrestha, Narendra Raj Khanal, Joëlle Smadja, Monique Fort To cite this version: Buddhi Raj Shrestha, Narendra Raj Khanal, Joëlle Smadja, Monique Fort. Geo-hydrological hazards induced by Gorkha Earthquake 2015: A Case of Pharak area, Everest Region, Nepal. The Geograph- ical Journal of Nepal, Central Department of Geography, Faculty of Humanities and Social Studies, Tribhuvan University, 2020, 13, pp.91 - 106. 10.3126/gjn.v13i0.28154. halshs-02933571 HAL Id: halshs-02933571 https://halshs.archives-ouvertes.fr/halshs-02933571 Submitted on 17 Sep 2020 HAL is a multi-disciplinary open access L’archive ouverte pluridisciplinaire HAL, est archive for the deposit and dissemination of sci- destinée au dépôt et à la diffusion de documents entific research documents, whether they are pub- scientifiques de niveau recherche, publiés ou non, lished or not. The documents may come from émanant des établissements d’enseignement et de teaching and research institutions in France or recherche français ou étrangers, des laboratoires abroad, or from public or private research centers. publics ou privés. The Geographical Journal of Nepal Vol. 13: 91-106, 2020 Doi: http://doi.org/10.3126/gjn.v13i0.28154 Central Department of Geography, Tribhuvan University, Kathmandu, Nepal Geo-hydrological hazards induced by Gorkha Earthquake 2015: A Case of Pharak area, Everest Region, Nepal Buddhi Raj Shrestha1,4*, Narendra Raj Khanal1,4, Joëlle Smadja2,4, Monique Fort3,4 1 Central Department of Geography, Tribhuvan University, Kirtipur, Kathmandu Nepal 2 Centre for Himalayan Studies, UPR 299. CNRS, 7 rue Guy Môquet, 94800 Villejuif, France 3 Université Paris Diderot, GHES, Case 7001, UMR 8586 PRODIG CNRS, Paris Cedex 75013, France 4 ANR-13-SENV-0005-02 PRESHINE (* Corresponding Author: [email protected]) Received: 8 November 2019; Accepted: 22 January 2020; Published: March 2020 Abstract Nepal experienced disastrous earthquake events in 2015.
    [Show full text]
  • Bihar Military Police (BMP
    FORM 1 (I) Basic Information Sl.No. Item Details 1. Name of the project/s-Bihar Military Police (B.M.P- Bihar Govt. Project 12)Supaul 2. S.No. in the schedule 3. Proposed capacity /area/length/tonnage to be Plot area=283382 sq.m handled/command area/lease area/number of wells to be TotalBuilt up drilled. area=31190.65sq.m 4. New/Expansion/Modernization NEW 5. Existing Capacity/Area etc. NIL 6. Category of Project i.e. ‘A’ or ‘B’ B 7. Does it attract the general condition? If yes, please specify. NO 8. Does it attract the specific condition? If yes, please specify. YES 9. Location - Supaul Thana no.-1 Plot/Survey/Khasra No. Khata no.-339 Village - Birpur Kesra no.-1020 Tehsil- BASHAANTPUR District SUPAUL,MAUJA-BHIMNAGAR State - BIHAR 10. Nearest railway station/airport along with distance in kms. 32kmRadhupur ( railway station) 11. Nearest Town, city, district Headquarters along with 62 km. Supaul Head Quarter distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Birpur,Bhimnagar. Local body (complete postal addresses with telephone nos. supaul to be given) 13. Name of the applicant Dhananjay kumar (Senior Architect) 14. Registered Address Kautaliya nagar patna -14 15. Address for correspondence: Bihar police Building Name cconstruction corporation Designation (Owner/Partner /CEO) Sunil kumar. Pin code ADG CUM CMD E-mail 800014 Telephone No. [email protected] Fax No. 0612-2224529 0612-2224529 16. Details of Alternative Sites examined, if any. Location of Village-District-State these sites should be shown on a topo sheet. 1 NIL 2 3 17.
    [Show full text]
  • District Plan 2011 - 12
    I DISTRICT PLAN 2011 - 12 SUPAUL - i I Submitted by : District Planning Committee, Supaul Submitted to: Department of Planning & Development, Government of Bihar DISTRICT PLAN 2011 - 12 SUPAUL ¥ V *k g f II A © H f: © f&T SJkH*»»* Submitted by : District Planning Committee, Supaul Submitted to: Department of Planning & Development, Government of Bihar ACKNOWLEDGEMENTS For sustainable and planned economic development it is essential to formulate the Annual District Plan on the basis of available resources. As per the direction of the Department of Planning and Development, Government of Bihar, with an objective to prepare the effective Plan, we have collected relevant information and data ensuring the assimilation of district level important components from various departments as well as the priority sectors like Health, Education, Livelihood and Infrastructure etc. Keeping in view the past experience of formulation and implementation of various sectoral Action Annual Plans and recent directions of the department the Annual District Plan 2011 -12 for Rs. 103142.3 89 lakh has been prepared for the maximum utilization of available resources, so that the socio-economic development of the district can be further accelerated. I would like to thank Mr. Kunwar Jung Bahadur, Deputy Development Commissioner, Mr. D.N. Mishra, Regional Planning officer, Kosi Division, Mr. Prakash Yadav, District Planning Officer, Mr. Vivek Sharan (Ex. District Facihtator) and Mr. D P Karn, District Facihtator, GoI-UN Joint Convergence Program for their important contribution in formulation of Annual District Plan 2011 -12 for the district of Supaul. Mr. Brajesh Kumar Vikal, DPRO also deserves special thanks for his support in the Plan formulation.
    [Show full text]
  • Going Nepal Pvt. Ltd Arun Valley with Everest Base Camp Trek, Everest
    Going Nepal Pvt. Ltd Arun Valley with Everest Base Camp Trek Arun Valley with Everest Base Camp Trek Best Season: March-April-May and September-October-November Arun Valley with Everest Base Camp Trek, Everest Region Trekking lie in Sagarmatha and Makalu-Barun National Park. It is the most extreme hard and famous trekking to visit the panoramic view of above eight thousand mountains in the world. The Arun valley and Everest base camp provide really superb views of both Mt Everest and Mount Makalu. The trek requires stamina and fitness to fully appreciate the beauty of the region, which provides some outstanding mountain views. Commencing with a flight to Tumlingtar to the East of Everest, the first week is spent trekking through virgin territory into the Solu Khumbu region before a push up on the main Everest trail to Kala Pattar for tremendous close-ups of Everest Nuptse and Lhotse along with many others before a journey back to Lukla and a flight to Kathmandu. An Arun valley trek is still remote but there are available tea house facilities for a small group and it is easy trekking routes up to Lukla follow to the Arun River. It will be trekking on these trails. This trekking is possible to operate in any season. If anyone would like to walk back to Jiri and take a bus to Kathmandu it is also possible or keeps continues to Everest base camp as well. Culturally, the Arun Trek is very interesting - moving from Sherpa through to Rai villages, then down to Chhetri and Brahmin villages.
    [Show full text]
  • Page 01 Nov 27.Indd
    ISO 9001:2008 CERTIFIED NEWSPAPER Golden decade for petrochemicals industry Business | 21 Thursday 27 November 2014 • 5 Safar 1436 • Volume 19 Number 6262 www.thepeninsulaqatar.com [email protected] | [email protected] Editorial: 4455 7741 | Advertising: 4455 7837 / 4455 7780 Ministry survey Qatar win Gulf Cup on work habits sparks debate We are hardworking, say citizens DOHA: An official survey have the household and children suggesting that Qataris spent to take care of. much less time on income-gen- Meanwhile, a senior offi- erating activities has kicked cial from the Ministry of up a row, prompting the Development Planning and planning ministry to issue a Statistics, said at a news briefing clarification. yesterday that the lower average Some public representatives working hours mentioned in the objected to the survey whose survey were the average for the findings on Monday said the country’s entire population and average Qatari spent barely a not for Qataris alone. few hours a day on income-gen- Economically active Qatari erating activities. men on average actually spend If Qataris didn’t work hard, eight hours and 11 minutes Qatar wouldn’t be where it is a day on income-generating today in terms of economic and activities and this average was social advancement, said a public seven hours and 26 minutes for representative. (economically active) Qatari Qatari players celebrate with the Gulf Cup trophy after defeating Saudi Arabia 2-1 in the final of the 22nd edition of the tournament at the King Mohamed bin Ali Al Athba, women. Fahad Stadium in Riyadh yesterday.
    [Show full text]
  • List of Forest Divisions with Code
    Forest Account Name of Divisions in English & Hindi with Codes Sl. Divn No. Code Name of Divisions ize.Myksa dk uke 1 SMRFOR522 Sitamarhi Forest Division, Sitamarhi lhrke<h ou izze.My ] lhrke<h 2 ARRFOR504 Araria Forest Division, Araria vjfj;k ou ize.My] vjfj;k Office of the DFO-cum- 3 WCHFOR148 dk;kZy; ou ize.My inkf/kdkjh & lg& mi funs'kd Dy.Director,V.T.P.-2, Valmikinagar, okfYefd O;k?kz vkj{k]ize.My&2 okfYefd West Champaran uxj]if'pe pEikj.k 4 SRNFOR518 Saran Forest Division, Chapra lkj.k ou ize.My]Nijk 5 NWDFOR103 Nawada Forest Division, Nawada uoknk ou ize.My]uoknk 6 PRNFOR044 Purnea Forest Division, Purnea iwf.kZ;kWa ou izze.My ]iwf.kZ;kWa 7 PTNFOR040 Patna Forest Division, Patna iVuk ou izze.My ]iVuk 8 RTSFOR071 Rohtas Forest Division, Sasaram jksgrkl ou izze.My ] jksgrkl Office of the Pr. Chief Conservator of 9 PTSFOR501 Forests, Bihar, Patna dk;kZy;]iz/kku eq[; ou laj{kd]fcgkj]iVuk Office of the Regional Chief 10 BGPFOR513 Conservator of Forests, Bhagalpur dk;kZy; {kssf=; eq[; ou laj{kd]Hkkxyiqj Office of the Regional Chief 11 PTNFOR038 Conservator of Forests, Patna dk;kZy; {kssf=; eq[; ou laj{kd] iVuk Office of the Regional Chief 12 MUZFOR037 Conservator of Forests, Muzaffarpur dk;kZy; {ksf=; eq[; ou laj{kd]etq Q~Qjiqj Office of theWorking Plan Officer, dk;kZy; dk;Zokgd ;kstuk vf/kdkjh]ou dk; Z ;kstuk 13 PTNFOR041 Forest Working Plan Division, Patna izHkkx]iVuk 14 SPLFOR526 Supaul Forest Division, Supaul lqikSy ou ize.My]lqikSy 15 WCHFOR523 Bettiah Forest Division, Bettiah csfr;k ou izze.My ] csfr;k 16 PTSFOR530 Patna Park
    [Show full text]
  • Landscape Change in Sagarmatha (Mt. Everest) National Park, Khumbu, Nepal
    HIMALAYA, the Journal of the Association for Nepal and Himalayan Studies Volume 17 Number 2 Himalayan Research Bulletin: Article 16 Solukhumbu and the Sherpa 1997 Landscape Change in Sagarmatha (Mt. Everest) National Park, Khumbu, Nepal Alton C. Byers Follow this and additional works at: https://digitalcommons.macalester.edu/himalaya Recommended Citation Byers, Alton C.. 1997. Landscape Change in Sagarmatha (Mt. Everest) National Park, Khumbu, Nepal. HIMALAYA 17(2). Available at: https://digitalcommons.macalester.edu/himalaya/vol17/iss2/16 This Research Article is brought to you for free and open access by the DigitalCommons@Macalester College at DigitalCommons@Macalester College. It has been accepted for inclusion in HIMALAYA, the Journal of the Association for Nepal and Himalayan Studies by an authorized administrator of DigitalCommons@Macalester College. For more information, please contact [email protected]. Landscape Change in Sagarmatha (Mt. Everest) National Park, Khumbu, Nepal Alton C. Byers The Mountain Institute This study uses repeat photography as the primary Introduction research tool to analyze processes of physical and Repeat photography, or precise replication and cultural landscape change in the Khumbu (M!. Everest) interpretation of historic landscape scenes, is an region over a 40-year period (1955-1995). The study is analytical tool capable of broadly clarifying the patterns a continuation of an on-going project begun by Byers in and possible causes of contemporary landscapellanduse 1984 that involves replication of photographs originally changes within a given region (see: Byers 1987a1996; taken between 1955-62 from the same five photo 1997). As a research tool, it has enjoyed some utility points. The 1995 investigation reported here provided in the United States during the past thirty years (see: the opportunity to expand the photographic data base Byers 1987b; Walker 1968; Heady and Zinke 1978; from five to 26 photo points between Lukla (2,743 m) Gruell 1980; Vale, 1982; Rogers et al.
    [Show full text]
  • Lukla Airport – Gateway to Himalayas
    Lukla Airport – Gateway to Himalayas Lukla Airport, located at 2,846 m altitude, is an extreme airport that provides the thrilling flight experience from Kathmandu to Lukla and vice versa. Known as Tenzing Hillary Airport, it lies in Lukla, Khumbu, in Solukhumbu District of Province No. 1 or Eastern Nepal. Being the gateway to Everest Base Camp, Lukla is one of the most extreme airports of the world, having runway at 9,400 feet on top of a 2,000 feet cliff. Flights from Kathmandu to Lukla takes place every day during daylight hours if weather favors flying. There is frequent rainfall in Lukla while the Kathmandu is shining brightly, making visibility problems, causing delay and cancellation of flights. The plane crash records make Lukla a frightening flight. Seven crashes have occurred after 2000, that have killed more than fifty passengers and crew. Having no safety cushion if the landing is missed or in case of an equipment failure, Lukla- bound flights do not have excellent safety. If you are planning to take a flight to Lukla, keep extra days included as the cancellation of the trip is not uncommon. The airplane's alternative is the helicopter that you can charter for $1,500 to $2,500, which will carry 5 to 6 people. But helicopter crashes are also recorded. In 2013, a helicopter crashed that killed one passenger. The beautiful Everest Base Camp trail makes trekker take Lukla-bound flights. If you are a die-hard trekker, you can trek instead of flying, which will add another ten days to your trip.
    [Show full text]
  • Deo List Bihar
    Details of DEO-cum-DM Sl. No. District Name Name Designation E-mail Address Mobile No. 1 2 3 4 5 6 1 PASCHIM CHAMPARAN Kundan Kumar District Election Officer [email protected] 9473191294 2 PURVI CHAMPARAN Shirsat Kapil Ashok District Election Officer [email protected] 9473191301 3 SHEOHAR Avaneesh Kumar Singh District Election Officer [email protected] 9473191468 4 SITAMARHI Abhilasha Kumari Sharma District Election Officer [email protected] 9473191288 5 MADHUBANI Nilesh Ramchandra Deore District Election Officer [email protected] 9473191324 6 SUPAUL Sri Mahendra KUMAR District Election Officer [email protected] 9473191345 7 ARARIA Prashant Kumar District Election Officer [email protected] 9431228200 8 KISHANGANJ Aditya Prakash District Election Officer [email protected] 9473191371 9 PURNIA Rahul Kumar District Election Officer [email protected] 9473191358 10 KATIHAR Kanwal Tanuj District Election Officer [email protected] 9473191375 11 MADHEPURA Navdeep Shukla District Election Officer [email protected] 9473191353 12 SAHARSA Kaushal kumar District Election Officer [email protected] 9473191340 13 DARBHANGA Shri Thiyagrajan S. M. District Election Officer [email protected] 9473191317 14 MUZAFFARPUR Chandra Shekhar Singh District Election Officer [email protected] 9473191283 15 GOPALGANJ Arshad Aziz District Election Officer [email protected] 9473191278 16 SIWAN Amit Kumar Pandey District Election Officer [email protected] 9473191273 17 SARAN Subrat Kumar Sen District
    [Show full text]
  • Damage from the April-May 2015 Gorkha Earthquake Sequence in the Solukhumbu District (Everest Region), Nepal David R
    Damage from the april-may 2015 gorkha earthquake sequence in the Solukhumbu district (Everest region), Nepal David R. Lageson, Monique Fort, Roshan Raj Bhattarai, Mary Hubbard To cite this version: David R. Lageson, Monique Fort, Roshan Raj Bhattarai, Mary Hubbard. Damage from the april-may 2015 gorkha earthquake sequence in the Solukhumbu district (Everest region), Nepal. GSA Annual Meeting, Sep 2016, Denver, United States. hal-01373311 HAL Id: hal-01373311 https://hal.archives-ouvertes.fr/hal-01373311 Submitted on 28 Sep 2016 HAL is a multi-disciplinary open access L’archive ouverte pluridisciplinaire HAL, est archive for the deposit and dissemination of sci- destinée au dépôt et à la diffusion de documents entific research documents, whether they are pub- scientifiques de niveau recherche, publiés ou non, lished or not. The documents may come from émanant des établissements d’enseignement et de teaching and research institutions in France or recherche français ou étrangers, des laboratoires abroad, or from public or private research centers. publics ou privés. DAMAGE FROM THE APRIL-MAY 2015 GORKHA EARTHQUAKE SEQUENCE IN THE SOLUKHUMBU DISTRICT (EVEREST REGION), NEPAL LAGESON, David R.1, FORT, Monique2, BHATTARAI, Roshan Raj3 and HUBBARD, Mary1, (1)Department of Earth Sciences, Montana State University, 226 Traphagen Hall, Bozeman, MT 59717, (2)Department of Geography, Université Paris Diderot, 75205 Paris Cedex 13, Paris, France, (3)Department of Geology, Tribhuvan University, Tri-Chandra Campus, Kathmandu, Nepal, [email protected] ABSTRACT: Rapid assessments of landslides Valley profile convexity: Earthquake-triggered mass movements (past & recent): Traditional and new construction methods: Spectrum of structural damage: (including other mass movements of rock, snow and ice) as well as human impacts were conducted by many organizations immediately following the 25 April 2015 M7.8 Gorkha earthquake and its aftershock sequence.
    [Show full text]
  • Country's Biggest Automated Abattoir Begins Operations
    QatarTribune Qatar_Tribune QatarTribuneChannel qatar_tribune WEDNESDAY JANUARY 15, 2020 JUMADA AL-AWWAL 20, 1441 VOL.13 NO. 4843 QR 2 Fajr: 5:01 am Dhuhr: 11:43 am Asr: 2:45 pm Maghrib: 5:06 pm Isha: 6:36 pm MAIN BRANCH LULU HYPER SANAYYA ALKHOR Business 9 Sports 12 Doha D-Ring Road Street-17 M & J Building QNB’s 2019 net profit On a wing and a prayer: PARTLY CLOUDY MATAR QADEEM MANSOURA ABU HAMOUR BIN OMRAN HIGH : 22°C Near Ahli Bank Al Meera Petrol Station Al Meera jumps 4 percent to Qatar brace for crucial LOW : 14°C alzamanexchange www.alzamanexchange.com 44441448 QR14.4 billion Japan clash Amir issues a AMIR GRANTS AL WAJBAH DECORATION host of laws TO BOSNIA AND HERZEGOVINA ENVOY Country’s biggest THE Amir HH Sheikh Tamim bin Hamad al Thani on Tuesday issued a host of laws. The Amir issued Law No 1 of 2020 on the uni- automated abattoir fied economic register. TheAmir also issued Law No 2 of 2020 amending some provisions of the Penal Code issued by Law No 11 of 2004. The Amir issued Law No 3 of 2020 amending some provisions of Law No 9 of 1987 on combat- begins operations ing drugs and dangerous psychotropic substanc- es and regulating their trade and use. The Amir also issued Law No 4 of 2020 amend- ing some provisions of Law No 15 of 2014 on the Al Wakra Central Market becomes operational regulation of charitable activities. The Amir issued Law No 5 of 2020 amending some provisions of SATYENDRA PATHAK ning.
    [Show full text]
  • Geomorphic Processes, Rock Quality and Solid Waste Management—Examples from the Mt
    Journal of Water Resource and Protection, 2015, 7, 1291-1308 Published Online November 2015 in SciRes. http://www.scirp.org/journal/jwarp http://dx.doi.org/10.4236/jwarp.2015.716105 Geomorphic Processes, Rock Quality and Solid Waste Management—Examples from the Mt. Everest Region of Nepal Eva Posch1,2, Rainer Bell2, Johannes Thomas Weidinger1,3, Thomas Glade2* 1Department of Geography and Geology, University of Salzburg, University of Salzburg, Salzburg, Austria 2Department of Geography, University of Vienna, Vienna, Austria 3ERKUDOK Institute, K-Hof Museums, Gmunden, Austria Received 10 August 2015; accepted 8 November 2015; published 11 November 2015 Copyright © 2015 by authors and Scientific Research Publishing Inc. This work is licensed under the Creative Commons Attribution International License (CC BY). http://creativecommons.org/licenses/by/4.0/ Abstract Sagarmatha National Park and Buffer Zone (SNPBZ) in the Everest region in Nepal is among the most popular destinations for trekking tourism in Nepal. The dramatic growth of the tourism in- dustry has increased pressures on the environment and the National Park is heavily affected by the rapidly growing waste issue. Besides, major mass movements play an important role in the Himalaya and have been observed in SNPBZ. Also, seasonal monsoon floods, debris flows, rock falls, landslides and the creation of glacial lake outburst floods are frequently occurring in the re- gion. This paper explores the reciprocal interactions between the geo-environment and solid waste management in Everest’s SNPBZ. Therefore, geological characteristics and geomorphologi- cal processes, especially the two large rockslides in Lukla and Khumjung, as well as their conse- quences for rock quality, climatic and hydrologic conditions, are analyzed and simultaneously connected to the rapidly growing tourism-induced waste issue.
    [Show full text]