Missouri Route 47 Franklin & Warren Counties, MO

Total Page:16

File Type:pdf, Size:1020Kb

Missouri Route 47 Franklin & Warren Counties, MO Environmental Assessment and Finding of No Significant Impact Missouri Route 47 Franklin & Warren Counties, MO Missouri River Bridge at Washington JOB NUMBER J3P2155 and Missouri Department of Transportation Finding of No Significant Impact Missouri Route 47 Franklin & Warren Counties, MO Missouri River Bridge at Washington JOB NUMBER J3P2155 and Missouri Department of Transportation August 2011 This page intentionally blank Finding of No Significant Impact 23 CFR 771.121 Missouri Department of Transportation/Federal Highway Administration REGION STATE PROJECT NO. PROJECT TITLE, ENVIRONMENTAL DOCUMENT TYPE Missouri J3P2155 Missouri Route 47, Franklin and Warren Counties, Missouri Division Missouri River Bridge at Washington Environmental Assessment INCLUDES PROGRAMMATIC SECTION 4(f) and MEMORANDUM OF AGREEMENT FOR MITIGATION OF ADVERSE EFFECTS DECISION The Federal Highway Administration, Missouri Division, approved the Missouri Route 47, Franklin and Warren Counties, Missouri, Missouri River Bridge at Washington, Job Number J3P2155, Environmental Assessment (EA) on December 2, 2010. Notice of the EA’s availability was sent to agencies and the document was made available for public review on December 15, 2010. The EA was available at eight locations in the affected counties and also was posted on MoDOT’s District 3 website at http://www.modot.org/northeast/Route47BridgeatWashington.htm. The Selected Alternative to solve the transportation problems associated with the Route 47 Bridge is the adjacent upstream alternative. The selected alternative will replace the existing, deficient bridge with a new two-lane bridge approximately 50 feet upstream from the current location. This alternative will slightly realign the roadway beyond the bridge limits to tie into existing Route 47. The selected alternative will result in removal of the existing historic bridge after the new structure is built. The selected alternative was identified through public and agency involvement along with assessment of socioeconomic and environmental consequences. The public hearing was held in accordance with established MoDOT procedures. The department has considered possible social, economic, and environmental effects of the proposed improvements. No additional project impacts have been identified beyond those described in the original EA documentation. The project is consistent with local planning goals and objectives, and there are no potential conflicts of interest on this project. The City of Washington, Franklin County, and Warren County have all pledged funds toward the design of the new bridge. PUBLIC AND AGENCY REVIEW/COMMENT ON EA Public Comments A location public hearing was held February 28, 2011, at the City Hall in Washington from 5:00 - 6:30 p.m. Approximately 35 people attended the hearing, which was originally scheduled for January but postponed because of inclement weather. Comment sheets were available for attendees to provide written feedback. A ―virtual‖ public hearing was also available via the project’s website, where the EA and public hearing displays were posted for viewing by those not able to attend the public hearing in person. Because the document was available for public review in December 2010 and weather forced postponement of the hearing as originally scheduled, this project had an unusually long comment period, with comments on the EA accepted until March 14, 2011. Ten written comments were received from the public and local stakeholders: a January 21, 2011, letter from the Route 47 Bridge Committee, two comments at the hearing, and seven e-mailed comments. Most of the comments related to a bicycle facility in one way or another, reflecting a desire for a bike lane though not all favored the specific plan laid out. Two commenters mentioned safety concerns for Washington-bound bicyclists crossing Route 47 back and forth between the KATY Trail and the bridge. One proposed keeping all bicycle traffic on the east side of Route 47, instead of splitting the northbound and southbound bicyclists, to eliminate potentially dangerous crossings of the highway. The other wanted the KATY Trail connection with the bridge to avoid the Route 47/94 intersection, instead suggesting a separate new bike path going between Lake Creek and the Washington Airport east of Route 47. Response—Using the shoulders of Routes 94 and 47 from the trailhead at Dutzow to Augusta Bottom Road makes efficient use of the existing Route 47 and 94 infrastructure (graded shoulders), which will also be routinely maintained (cleared, resurfaced, and marked) with the pavement surface. This allows bicyclists to travel in the same direction as vehicular traffic; with rumble strips separating vehicular traffic from bicycle traffic, this is a safe and acceptable configuration. From Augusta Bottom Road to the City of Washington, both directions of bicycle travel would be on the east side of Route 47, protected by guardrail or barrier on the bridge. Two commenters proposed retaining the existing historic bridge or at least its main spans for use as a bike/pedestrian facility. One of those elaborated on the historic value of the bridge as one of the last remaining old truss bridges across the Missouri River in the state of Missouri and the iconic value of the bridge to the City of Washington. A complete summary of this individual’s comments and additional detailed response follows discussion of the Route 47 Bridge Committee’s comments. Response—Because of the expected on-going maintenance costs needed to retain the historic structure and the obstacles to navigation that the additional bridge piers would present, the existing bridge will be demolished if no proposals for adaptive reuse are forthcoming. Retaining the existing structure as a bicycle/pedestrian bridge, would result in a much greater future cost to reconfigure the new bridge to four lanes. Without bicycle/pedestrian accommodation, the new bridge would be 44 feet wide (two 12-foot lanes and 10-foot shoulders). Widening that in the future to the roughly 53-foot wide section of the selected alternative would require adding nine feet of roadway width, more than could be cantilevered from each side (typically a foot or two additional width). Therefore another girder line would be needed for that additional width and that girder line would need additional substructure, including another river pier, which would make the widening very expensive. One commenter suggested not overlooking tolling as a way to pay for the new bridge and asked whether the right of way planned would accommodate a toll collection facility. Another commenter proposed constructing the bridge wide enough to provide ten-foot shoulders in the four-lane configuration and questioning whether the four-lane configuration should have a traffic barrier to prevent crossovers. Response—Tolling is not currently an option for the bridge, so right-of-way requirements for a toll collection facility were not investigated. The initial two-lane bridge configuration with ten-foot shoulders is expected to perform at a satisfactory level of service for the foreseeable future based on twenty-year traffic projections. Although the bridge can be expected to last 75 to 100 years, traffic projections beyond twenty years are not considered reliable. The Route 47 Bridge Committee expressed agreement with the preferred alternative in their comment letter. Additionally, the committee raised several concerns and recommended several revisions to the EA including 1) the desire of local planners to provide as high a level of service as possible (and Washington officials’ willingness to work with MoDOT in the future to continually improve the level of service for Route 47), minimize peak hour traffic congestion, and ensure ―that traffic problems do not occur given the fact that the bridge is so crucial for the school, medical services, etc.‖; 2) local planners’ interest in the availability of sufficient right of way for a future transition of the bridge to four lanes; and 3) local designers’ desire for ―a careful review of expected traffic flows beyond the 2033 design year.‖ The Committee also requested that ―the bridge be easily expandable to 4 lanes, with adequate shoulders and 2 a bike path.‖ The bridge committee expressed particular concern about the proposed "S curve" at the south end of the bridge and requested softening or straightening this curve by acquiring a reasonable amount of additional right-of-way ―in order that a traffic and safety hazard not be created.‖ Sample preliminary drawings of such a possibility were provided. The committee requested clarification that the Traffic Management Plan would be drafted in concert with local emergency service officials from Washington and Warren County. Finally, the committee noted that the historic bridge is part of the identity of the community, ―Local branding for the Washington Area Chamber of Commerce, signs entering the community, signs and memorials in the City Hall complex area, signs for the Heidmann Industrial Park on the west side of town on Highway 100, all include a mock up of the graceful lines of the historic truss bridge.‖ They requested that aesthetics be addressed to provide a link between the design of the new bridge and the old bridge that will allow the community to retain this identity. Response—MoDOT appreciates the Route 47 Bridge Committee’s interest in the project and notes their desire for a high level of service. MoDOT’s practical design guidance determines the level of service to pursue, and
Recommended publications
  • 2016 Monitoring Network Plan, Revision 0
    APPENDIX 6 Comments and Responses on Proposed 2016 Monitoring Network Plan, Revision 0 COMMENTS AND RESPONSES ON PROPOSED 2016 MONITORING NETWORK PLAN, REVISION 0 The public comment period for the proposed 2016 Missouri Monitoring Network Plan opened on May 27, 2016 and closed on June 28, 2016. The Missouri Department of Natural Resources’ Air Pollution Control Program prepared the 2016 Monitoring Network Plan to address the requirements of 40 CFR 58.10 (a) (1) for annual submittal of a plan to provide information on current State or Local Air Monitoring Stations (SLAMS), other ambient air monitoring, and any proposed network changes for the upcoming year. The following is a summary of comments received and the Missouri Department of Natural Resources’ Air Pollution Control Program’s (Air Program’s) corresponding responses. SUMMARY OF COMMENTS: During the public comment period for the proposed 2016 Monitoring Network Plan, the Air Program received comments from Steven C. Whitworth (Ameren Missouri) and Maxine I. Lipeles (Washington University School of Law on behalf of the Sierra Club). The comments focus primarily on ambient air monitoring networks for the Ameren Missouri Labadie and Rush Island coal fired power plants and were generally related to the implementation approach of the 1-hour Sulfur Dioxide (SO2) National Ambient Air Quality Standards (NAAQS). The Air Program is responding to comments that relate specifically to ambient air monitoring issues as appropriate and applicable to the requirements of 40 CFR 58.10 (a) (1). Our responses follow the original comments identified in italics. COMMENT #1: Both commenters addressed the issue of ambient air monitor classifications relative to 40 CFR 58 and EPA’s SO2 Data Requirements Rule (DRR) 40 CFR 51 Subpart BB.
    [Show full text]
  • Monday, May 13Th, 2019@ 7:00 P.M
    CITY OF WASHINGTON, MISSOURI PLANNING & ZONING COMMISSION MEETING 405 JEFFERSON STREET, WASHINGTON, MISSOURI COUNCIL CHAMBERS -- GROUND LEVEL Monday, May 13th, 2019@ 7:00 P.M. 1) Announcement of Meeting I Call to Order/ Roll Call/ Pledge of Allegiance. 1 2) Approval of Minutes from April 8 h, 2019 3) File No. 19-0501-Applicant is requesting a Special Use Permit for 1807 E Fifth Street 4) File No. 19-0502-Applicant is requesting Preliminary Plat Approval 5) File No. 19-0503-Applicant is requesting to vacate E. Rose Lane 6) Zoning Code Amendment 7) File No. 19-0401-Applicant is requesting to rezone #4 & # 10 Franklin Avenue from C-1 Limited Commercial District to C-2, General Commercial 8) Other Business 9) Adjournment NOTE: ATTENDANCE AT THIS PLANNING AND ZONING COMMISSION MEETING BY A KNOWLEDGEABLE REPRESENTATIVE OF YOUR INTERESTS IS RECOMMENDED. ANY QUESTIONS CONCERNING YOUR REQUESTS THAT ARE NOT ANSWERED AT THIS MEETING MAY RESULT IN YOUR REQUEST BEING TABLED OR DENIED. CITY OF W ASIDNGTON, MISSOURI PLANNING & ZONING COMMISSION MEETING MINUTES Monday, April 8, 2019 7:00 p.m. The regular meeting of the Planning & Zoning Commission was held on the aforementioned date and time in the Council Chambers of City Hall, located at 405 Jefferson Street in Washington, MO. 1) The meeting was called to order, Pledge of Allegiance, and the following roll call was taken: Present: Carolyn Witt, Mark Hidritch, Mark Kluesner, Mark Piontek, Tom Holdmeier, Sandy Lucy, John Borgmann, Chuck Watson, Sal Maniaci Absent: Tony Gokenbach, Samantha Cerutti Wacker 2) Approval of Minutes from March 11, 2019-Motion made to approve, seconded and passed without dissent.
    [Show full text]
  • Abbreviated Preliminary Assessment Checklist
    ABBREVIATED PRELIMINARY ASSESSMENT CHECKLIST This checklist can be used to help the site investigator determine if an Abbreviated Preliminary Assessment (APA) is warranted. This checklist should document the rationale for the decision on whether further steps in the site investigation process are required under CERCLA. Use additional sheets, if necessary. Checklist Preparer: Michael Stroh Title: Project Manager Date: 8/11/2016 Address: P.O. Box 176 City: Jefferson City State: MO Zip: 65101 Telephone: 573-522-9902 E-mail Address: [email protected] Site Name: Sporlan Valve – JP Industrial Avenue Alias: Address or other Location Identifier: 711 Industrial Avenue City: Washington County: Franklin State: MO Zip: 63090 Latitude: 38.554033 Longitude: -91.01479 Describe the release (or potential release) and its probable nature: A potential release of trichloroethene (TCE) was suspected from a historic above ground storage tank and two vapor degreaser units that were in service for several decades before being removed from the facility in the early 1990s. Additionally, the facility was found to have discharged degreaser waste into the sewer between 2001 and 2003 in violation of their permit (https://yosemite.epa.gov/OA/RHC/EPAAdmin.nsf/Filings/5DF046090603127B8525764E0066977D/$File/DOCUM ENT17.pdf) Part 1 – Superfund Eligibility Evaluation If all answers are “no”, go on to Part 2, otherwise proceed to Part 3. 1. Is the site currently in CERCLIS or an “alias” of another site? Yes No X d Explain: In addition to this facility, Parker Hannifin operates two other active Sporlan Valve facilities in Washington, Missouri located at 206 Lange Drive and 1699 West Main Street.
    [Show full text]
  • FRANKLIN COUNTY PLANNING and ZONING MEETING 7/17/2018 Page 1
    FRANKLIN COUNTY PLANNING AND ZONING MEETING 7/17/2018 Page 1 1 FRANKLIN COUNTY PLANNING AND ZONING 2 PLANNING AND ZONING COMMISSION 3 FRANKLIN COUNTY GOVERNMENT CENTER 4 SECOND FLOOR COMMISSION CHAMBERS 5 400 EAST LOCUST STREET 6 UNION, MISSOURI 63084 7 8 9 TRANSCRIPT OF PROCEEDINGS 10 JULY 17, 2018 11 (COMMENCING AT 7:00 P.M.) 12 13 14 15 16 17 18 Reported by: 19 Patsy A. Hertweck, C. R. 20 Alaris Litigation Services 21 22 23 24 25 ALARIS LITIGATION SERVICES www.alaris.us Phone: 1.800.280.3376 Fax: 314.644.1334 FRANKLIN COUNTY PLANNING AND ZONING MEETING 7/17/2018 Page 2 1 I N D E X 2 PROCEEDING PAGE 3 CALL TO ORDER AND ROLL CALL 6 4 DISCLOSURES 7 5 MEETING PROCEDURES AND EXHIBITS 7 6 APPROVAL OF MINUTES JUNE 26, 2018 - POSTPONED 11 7 COMMUNICATIONS AND VISITOR COMMENTS 12 8 P U B L I C H E A R I N G S 9 OLD BUSINESS - NONE 10 NEW BUSINESS: 11 FILE 180070 - PLANNING AND ZONING DEPARTMENT: 12 PRESENTATION BY MS. EAGAN 13 13 DISCUSSION 14 14 PUBLIC COMMENTS 46 15 MOVED TO OLD BUSINESS 47 16 VOTE 82 17 FILE 1800702 - PLANNING AND ZONING DEPARTMENT: 18 PRESENTATION BY MR. KARIM 48 19 PUBLIC COMMENTS 55 20 DISCUSSION 69 21 MOVED TO OLD BUSINESS 77 22 VOTE 83 23 24 25 ALARIS LITIGATION SERVICES www.alaris.us Phone: 1.800.280.3376 Fax: 314.644.1334 FRANKLIN COUNTY PLANNING AND ZONING MEETING 7/17/2018 Page 3 1 I N D E X 2 (CONTINUED) 3 PROCEEDING PAGE 4 FILE 180073 - PLANNING AND ZONING DEPARTMENT: 5 PRESENTATION BY MS.
    [Show full text]
  • Legals 06.26.19.Indd
    4P WEDNESDAY, JUNE 26, 2019 THE MISSOURIAN WWW.EMISSOURIAN.COM North Front Door of the Court- souri, to-wit: house, City of Union, County of LOT SEVENTY-ONE (71) OF Public Hearing Franklin, State of Missouri, sell EAGLERIDGE ESTATES, A at public vendue to the highest SUBDIVISION IN THE CITY OF IN THE CIRCUIT bidder for cash the following de- UNION, ACCORDING TO THE COURT OF FRANKLIN scribed real estate, described in PLAT THEREOF RECORDED COUNTY said Deed of Trust, and situated IN PLAT BOOK P PAGE 303, OF STATE OF MISSOURI in Franklin County, State of Mis- THE FRANKLIN COUNTY RE- PROBATE DIVISION souri, to-wit: CORDS. IN RE THE MATTER OF: LOT 12 IN BLOCK 5 OF to satisfy said debt and cost. SOPHIE GRACE KLUESNER, ROBERTS SECOND SUBDIVI- MILLSAP & SINGER, P.C., Female, 12-11-17 BEGINNING AT THE IN- NORTH LINE THEREOF 655.60 SION, ACCORDING TO THE Successor Trustee Minor Child. Trustee’s Sale TERSECTION OF THE NORTH FEET TO A POINT IN THE PLAT THEREOF RECORDED 612 Spirit Drive Estate Number: LINE OF MAIN STREET WITH CENTERLINE OF THE PICK- IN PLAT BOOK D PAGE 41 OF St. Louis, MO 63005 19AB-PR00214 THE WEST LINE OF STATE LES FORD COUNTY ROAD, NOTICE OF THE FRANKLIN COUNTY RE- (636) 537-0110 STREET, THENCE SOUTH THENCE WITH THE CENTER- NOTICE OF HEARING TRUSTEE'S SALE CORDS. File No: 163850.070819.393234 For default in the payment of debt 77 DEGREES WEST ALONG LINE OF SAID ROAD SOUTH 2 Notice to all persons interested to satisfy said debt and cost.
    [Show full text]
  • FRANKLIN COUNTY, MISSOURI and INCORPORATED AREAS VOLUME 1 of 2
    FRANKLIN COUNTY, MISSOURI AND INCORPORATED AREAS VOLUME 1 of 2 COMMUNITY NAME COMMUNITY NUMBER Berger, City of 290132 Franklin County 290493 Unincorporated Areas Gerald, City of* 290734 Leslie, Village of* 290304 Miramiguoa Park, 290992 Village of New Haven, City of 290133 Oak Grove, Village of 290554 Pacific, City of 290134 Parkway, Village of* 290532 St. Clair, City of 290135 Sullivan, City of 290136 Union, City of 290137 Washington, City of 290138 *No Special Flood Hazard Areas Identified EFFECTIVE: October 18, 2011 Federal Emergency Management Agency FLOOD INSURANCE STUDY NUMBER 29071CV001A NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes. This Flood Insurance Study may not contain all data available within the repository. It is advisable to contact the community repository for any additional data. Part or all of this Flood Insurance Study may be revised and republished at any time. In addition, part of this Flood Insurance Study may be revised by the Letter of Map Revision process, which does not involve republication or redistribution of the Flood Insurance Study. It is, therefore, the responsibility of the user to consult with community officials and to check the community repository to obtain the most current Flood Insurance Study components. Selected Flood Insurance Rate Map panels for the community contain information that was previously shown separately on the corresponding Flood Boundary and Floodway Map panels (e.g., floodways, cross sections). In addition, former flood hazard zone designations have been changed as follows: Old Zone New Zone A1 through A30 AE V1 through V30 VE B X C X Countywide FIS Effective Date: October 18, 2011 TABLE OF CONTENTS VOLUME I Page 1.0 INTRODUCTION .........................................................................................................................
    [Show full text]