Community Agricultural Resource Management and Competitiveness Project

Total Page:16

File Type:pdf, Size:1020Kb

Load more

AGRICULTURAL PROJECT IMPLEMENTATION UNIT COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT COMPONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT PLAN RENOVATION OF PASTURES WATERING NETWORK IN GUSANAGHYUGH COMMUNITY OF THE RA SHIRAK MARZ October 2014 A. GENERAL PROJECT AND SITE INFORMATION INSTITUTIONAL AND ADMINISTRATIVE Country Republic of Armenia Name of the Project Community Agro Resource Management and Competitiveness Subproject Title Renovation of pastures watering network in Gusanaghuygh community of Shirak marz Institutional Project Team Project Local Counterpart Arrangements Leader (WB) Management and/or Recipient (Name and contacts) Nicolas Gagik Vasak Ghazaryan Ahouissoussi Khachatryan, Head of PIU Director Gusanaghyugh Community Implementation Safeguard Safeguard Contractor Arrangements Supervision (WB) Supervision (PIU) (Name and contacts) Darejan Karen Torosyan Gharabaghcyanshin” Kapanadze Alice Savadyan LTD PROJECT NAME AND SITE DESCRIPTION Description of the Project The main purpose of the project is providing sufficient water supply for 898 bovine cattle and 1628 small cattle directly in the pasture. Proposed sub-project envisages improvement of pastures watering network in Gusanagyugh community. The following construction activities will be implemented under the proposed sub-project: Installation of 1 concrete springs collection point/ water catchment, Installation of 2 water way main waterways with total length of 3560 m, 1566 m length (PE 50 mm) waterways will be connected to Krasar- Maralik water main, operated by Shirak Jur CJSC 1994 m length ( PE 90 mm ) waterway will be connected to Krasar- Maralik water main, operated by Shirak Jur CJSC too Construction of two 30 long metallic troughs- semi-pipes installed on concrete - cobblestone platform. The design for pastures watering network has been developed by the ANUSHIK JRER design company under the contract concluded with Agricultural Project Implementation Unit. Project implementation area, Republic of Armenia, community Shirak marz, Gusanaghyugh community Project site location Project implementation area is located at a distance of 120 km from Yerevan city and 3 km from Gusanaghyugh community. Community Agricultural Resource Management and Competitiveness Project Environmental Management Plan 2 The one waterway will be connected to Krasar- Maralik water main, operated by Shirak Jur CJSC, and Technical Conditions for connection have been provided by mentioned company director to community mayor. Second waterway will be connected to the same water main. Land ownership Land required for the project implementation belongs to community. Letter on land ownership from the Gusanagyugh community Head is attached. Description of geographic, physical, The sub-project site is located in Shirak marz, in Gusanaghyugh biological, geological, hydrographic community area. It is situated on Akhuryan river left side at the and socio-economic context elevation of 1500 m above sea level. From climatic perspective, the area is located in a cold zone and is characterized with warm and humid summers (average air temperature in July comprises +16.oC, relative humidity is about 45-60% and cold winters (average air temperature in January varied from -5oC to -12oC, relative humidity is 70%). Locations and distance for material Water for construction works will be provided by water cistern sourcing, especially aggregates, water, track. Aggregates and machinery will be obtained from the stones licensed providers within the project area. Contractor may choose to extract equipment himself, in which case contractor must obtain an extraction license prior to commencement of extraction. Metallic and PE pipes as well as all fittings will be purchased from an official supplier. LEGISLATION Indentify national and local legislation Permits required for accomplishing the works envisaged by the and permits that apply to project project: activity Construction license to be possessed by Construction Contractor, Construction permit to be obtained by the Construction Contractor from Gusanaghyugh municipality Agreement for connection to water main to be obtained by Design Company from the Shirak Jur CJSC Written consent for disposal of construction waste to be obtained by Construction Contractor from the Head of Gusanaghyugh Community. Land ownership letter possessed by the Gusanaghyugh Community. PUBLIC CONSULTATION Identify when/where the public Public consultations on the sub-project will be carried out in consultation took place Gusanaghyugh community. Minutes of meeting as well as list of participants will be attached to the EMMP. ATTACHMENTS 1. Site plan 2. Letter from Gusanaghyugh community head on the land plot ownership 3. Minutes of public consultation meeting 4. Construction permit 5. Agreement with Gusanagyugh community for connection to water main. 6. Agreement for construction waste disposal, obtained from Gusanaghyugh community Head Community Agricultural Resource Management and Competitiveness Project Environmental Management Plan 3 B. SAFEGUARDS INFORMATION ENVIRONMENTAL/SOCIAL SCREENING Will the site activity include any of the following? Activity/Issue Status Triggered Actions A. Infrastructure rehabilitation [x] Yes [ ] No Section C Part A B. New construction [x] Yes [ ] No Section C Part A C. Individual wastewater treatment system [ ] Yes [x] No Section C Part B D. Historic building(s) and districts [ ] Yes [x] No Section C Part C E. Acquisition of land [ ] Yes [x] No Section C Part D F. Hazardous or toxic materials [ ] Yes [x] No Section C Part E G. Impacts on forests and/or protected areas [ ] Yes [x] No Section C Part F H. Handling/management of medical waste [ ] Yes [x] No Section C Part G I. Traffic and Pedestrian Safety [ ] Yes [x] No Section C Part H Community Agricultural Resource Management and Competitiveness Project Environmental Management Plan 4 C.MITIGATION MEASURES ACTIVITY PARAMETER MITIGATION MEASURES CHECKLIST 0. General conditions Notification and Worker Safety (a) The local construction and environment inspectorates and communities have been notified of upcoming activities (b) The public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works) (c) All legally required permits have been acquired for construction and/or rehabilitation (d) The Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment. (e) Workers’ PPE will comply with international good practice (hardhats, as needed masks and safety glasses, harnesses and safety boots). (f) Appropriate signposting of the sites will inform workers of key rules and regulations to follow. A. General Rehabilitation and / or Air Quality (a) The surrounding environment shall be kept free of debris Construction Activities (b) There will be no open burning of construction / waste material at the site (c) There will be no excessive idling of construction vehicles at sites Noise (a) Construction noise will be limited to day-time hours (b) During operations the engine covers of generators, air compressors and other powered mechanical equipment shall be closed, and equipment placed as far away from residential areas as possible Waste management (a) Waste collection and disposal pathways and sites will be identified for all major waste types expected from construction activities. (b) Construction waste will be collected and disposed at the agreed site (c) Whenever feasible the contractor will reuse and recycle appropriate and viable materials (except asbestos) Community Agricultural Resource Management and Competitiveness Project Environmental Management Plan 5 D. MONITORING PLAN Activity What Where How When Why Who (is the parameter to be monitored?) (is the parameter to be (is the parameter to (define the frequency or (is the parameter to (is responsible for monitored?) be monitored?) continuous?) be monitored?) monitoring?) CONSTRUCTION PHASE Community Community has been notified on Gusanaghyugh Interviews with First month of Ensure community PIU notification upcoming activities settlement local residents construction works awareness and consent Clearly established grievance Gusanaghyugh Interviews with Monthly Ensure that local PIU redress mechanism is in place and settlement municipal community can accessible for local community authorities and voice concerns and local residents ask questions Legal compliance All required permits and Gusanaghyugh Review of files Before and during Comply with legal PIU agreements are acquired municipality and first month of requirements Contractor’s construction works administration Provision of Personal safety gear is provided to Construction site Inspection monthly Prevent trauma and PIU workers’ health and used by workers casualty among and safety workers Operation of The surrounding environment is Construction site Inspection monthly visits during Minimize dust PIU construction kept free of debris to minimize construction emission machinery dust There is no open burning of Construction site Inspection monthly visits during Prevent air PIU construction / waste material at the construction pollution with site hazardous emissions There is no excessive idling of Construction site Inspection monthly visits during Minimize exhaust PIU construction vehicles at site construction Community Agricultural Resource Management and
Recommended publications
  • Agricultural Value-Chains Assessment Report April 2020.Pdf

    Agricultural Value-Chains Assessment Report April 2020.Pdf

    1 2 ABOUT THE EUROPEAN UNION The Member States of the European Union have decided to link together their know-how, resources and destinies. Together, they have built a zone of stability, democracy and sustainable development whilst maintaining cultural diversity, tolerance and individual freedoms. The European Union is committed to sharing its achievements and its values with countries and peoples beyond its borders. ABOUT THE PUBLICATION: This publication was produced within the framework of the EU Green Agriculture Initiative in Armenia (EU-GAIA) project, which is funded by the European Union (EU) and the Austrian Development Cooperation (ADC), and implemented by the Austrian Development Agency (ADA) and the United Nations Development Programme (UNDP) in Armenia. In the framework of the European Union-funded EU-GAIA project, the Austrian Development Agency (ADA) hereby agrees that the reader uses this manual solely for non-commercial purposes. Prepared by: EV Consulting CJSC © 2020 Austrian Development Agency. All rights reserved. Licensed to the European Union under conditions. Yerevan, 2020 3 CONTENTS LIST OF ABBREVIATIONS ................................................................................................................................ 5 1. INTRODUCTION AND BACKGROUND ..................................................................................................... 6 2. OVERVIEW OF DEVELOPMENT DYNAMICS OF AGRICULTURE IN ARMENIA AND GOVERNMENT PRIORITIES.....................................................................................................................................................
  • Development Project Ideas Goris, Tegh, Gorhayk, Meghri, Vayk

    Development Project Ideas Goris, Tegh, Gorhayk, Meghri, Vayk

    Ministry of Territorial Administration and Development of the Republic of Armenia DEVELOPMENT PROJECT IDEAS GORIS, TEGH, GORHAYK, MEGHRI, VAYK, JERMUK, ZARITAP, URTSADZOR, NOYEMBERYAN, KOGHB, AYRUM, SARAPAT, AMASIA, ASHOTSK, ARPI Expert Team Varazdat Karapetyan Artyom Grigoryan Artak Dadoyan Gagik Muradyan GIZ Coordinator Armen Keshishyan September 2016 List of Acronyms MTAD Ministry of Territorial Administration and Development ATDF Armenian Territorial Development Fund GIZ German Technical Cooperation LoGoPro GIZ Local Government Programme LSG Local Self-government (bodies) (FY)MDP Five-year Municipal Development Plan PACA Participatory Assessment of Competitive Advantages RDF «Regional Development Foundation» Company LED Local economic development 2 Contents List of Acronyms ........................................................................................................................ 2 Contents ..................................................................................................................................... 3 Structure of the Report .............................................................................................................. 5 Preamble ..................................................................................................................................... 7 Introduction ................................................................................................................................ 9 Approaches to Project Implementation ..................................................................................
  • Shirak Guidebook

    Shirak Guidebook

    Wuthering Heights of Shirak -the Land of Steppe and Sky YYerevanerevan 22013013 1 Facts About Shirak FOREWORD Mix up the vast open spaces of the Shirak steppe, the wuthering wind that sweeps through its heights, the snowcapped tops of Mt. Aragats and the dramatic gorges and sparkling lakes of Akhurian River. Sprinkle in the white sheep fl ocks and the cry of an eagle. Add churches, mysterious Urartian ruins, abundant wildlife and unique architecture. Th en top it all off with a turbulent history, Gyumri’s joi de vivre and Gurdjieff ’s mystical teaching, revealing a truly magnifi cent region fi lled with experi- ences to last you a lifetime. However, don’t be deceived that merely seeing all these highlights will give you a complete picture of what Shirak really is. Dig deeper and you’ll be surprised to fi nd that your fondest memories will most likely lie with the locals themselves. You’ll eas- ily be touched by these proud, witt y, and legendarily hospitable people, even if you cannot speak their language. Only when you meet its remarkable people will you understand this land and its powerful energy which emanates from their sculptures, paintings, music and poetry. Visiting the province takes creativity and imagination, as the tourist industry is at best ‘nascent’. A great deal of the current tourist fl ow consists of Diasporan Armenians seeking the opportunity to make personal contributions to their historic homeland, along with a few scatt ered independent travelers. Although there are some rural “rest- places” and picnic areas, they cater mainly to locals who want to unwind with hearty feasts and family chats, thus rarely providing any activities.
  • Ra Shirak Marz

    Ra Shirak Marz

    RA SHIRAK MARZ 251 RA SHIRAK MARZ Marz center – Gyumri town Territories - Artik, Akhuryan, Ani, Amasia and Ashotsk Towns - Gyumri, Artik, Maralik RA Shirak marz is situated in the north-west of the republic. In the West it borders with Turkey, in the North it borders with Georgia, in the East – RA Lori marz and in the South – RA Aragatsotn marz. Territory 2681 square km. Territory share of the marz in the territory of RA 9 % Urban communities 3 Rural communities 116 Towns 3 Villages 128 Population number as of January 1, 2006 281.4 ths. persons including urban 171.4 ths. persons rural 110.0 ths. persons Share of urban population size 60.9 % Share of marz population size in RA population size, 2005 39.1 % Agricultural land 165737 ha including - arable land 84530 ha Being at the height of 1500-2000 m above sea level (52 villages of the marz are at the height of 1500-1700 m above sea level and 55 villages - 2000 m), the marz is the coldest region 0 of Armenia, where the air temperature sometimes reaches -46 C in winter. The main railway and automobile highway connecting Armenia with Georgia pass through the marz territory. The railway and motor-road networks of Armenia and Turkey are connected here. On the Akhuryan river frontier with Turkey the Akhuryan reservoir was built that is the biggest in the country by its volume of 526 mln. m3. Marzes of the Republic of Armenia in figures, 1998-2002 252 The leading branches of industry of RA Shirak marz are production of food, including beverages and production of other non-metal mineral products.
  • Stocktaking Exercise to Identify Legal, Institutional, Vulnerability Assessment and Adaptation Gaps and Barriers in Water Resour

    Stocktaking Exercise to Identify Legal, Institutional, Vulnerability Assessment and Adaptation Gaps and Barriers in Water Resour

    “National Adaptation Plan to advance medium and long-term adaptation planning in Armenia” UNDP-GCF Project Stocktaking exercise to identify legal, institutional, vulnerability assessment and adaptation gaps and barriers in water resources management under climate change conditions Prepared by “Geoinfo” LLC Contract Number: RFP 088/2019 YEREVAN 2020 Produced by GeoInfo, Ltd., Charents 1, Yerevan, Armenia Action coordinated by Vahagn Tonoyan Date 11.06.2020 Version Final Produced for UNDP Climate Change Program Financed by: GCF-UNDP “National Adaptation Plan to advance medium and long-term adaptation planning in Armenia” project Authors National experts: Liana Margaryan, Aleksandr Arakelyan, Edgar Misakyan, Olympia Geghamyan, Davit Zakaryan, Zara Ohanjanyan International consultant: Soroosh Sorooshian 2 Content List of Abbreviations ............................................................................................................................... 7 Executive Summary ............................................................................................................................... 12 CHAPTER 1. ANALYSIS OF POLICY, LEGAL AND INSTITUTIONAL FRAMEWORK OF WATER SECTOR AND IDENTIFICATION OF GAPS AND BARRIERS IN THE CONTEXT OF CLIMATE CHANGE ............................. 19 Summary of Chapter 1 .......................................................................................................................... 19 1.1 The concept and criteria of water resources adaptation to climate change .................................
  • Genocide and Deportation of Azerbaijanis

    Genocide and Deportation of Azerbaijanis

    GENOCIDE AND DEPORTATION OF AZERBAIJANIS C O N T E N T S General information........................................................................................................................... 3 Resettlement of Armenians to Azerbaijani lands and its grave consequences ................................ 5 Resettlement of Armenians from Iran ........................................................................................ 5 Resettlement of Armenians from Turkey ................................................................................... 8 Massacre and deportation of Azerbaijanis at the beginning of the 20th century .......................... 10 The massacres of 1905-1906. ..................................................................................................... 10 General information ................................................................................................................... 10 Genocide of Moslem Turks through 1905-1906 in Karabagh ...................................................... 13 Genocide of 1918-1920 ............................................................................................................... 15 Genocide over Azerbaijani nation in March of 1918 ................................................................... 15 Massacres in Baku. March 1918................................................................................................. 20 Massacres in Erivan Province (1918-1920) ...............................................................................
  • Armenian Tourist Attraction

    Armenian Tourist Attraction

    Armenian Tourist Attractions: Rediscover Armenia Guide http://mapy.mk.cvut.cz/data/Armenie-Armenia/all/Rediscover%20Arme... rediscover armenia guide armenia > tourism > rediscover armenia guide about cilicia | feedback | chat | © REDISCOVERING ARMENIA An Archaeological/Touristic Gazetteer and Map Set for the Historical Monuments of Armenia Brady Kiesling July 1999 Yerevan This document is for the benefit of all persons interested in Armenia; no restriction is placed on duplication for personal or professional use. The author would appreciate acknowledgment of the source of any substantial quotations from this work. 1 von 71 13.01.2009 23:05 Armenian Tourist Attractions: Rediscover Armenia Guide http://mapy.mk.cvut.cz/data/Armenie-Armenia/all/Rediscover%20Arme... REDISCOVERING ARMENIA Author’s Preface Sources and Methods Armenian Terms Useful for Getting Lost With Note on Monasteries (Vank) Bibliography EXPLORING ARAGATSOTN MARZ South from Ashtarak (Maps A, D) The South Slopes of Aragats (Map A) Climbing Mt. Aragats (Map A) North and West Around Aragats (Maps A, B) West/South from Talin (Map B) North from Ashtarak (Map A) EXPLORING ARARAT MARZ West of Yerevan (Maps C, D) South from Yerevan (Map C) To Ancient Dvin (Map C) Khor Virap and Artaxiasata (Map C Vedi and Eastward (Map C, inset) East from Yeraskh (Map C inset) St. Karapet Monastery* (Map C inset) EXPLORING ARMAVIR MARZ Echmiatsin and Environs (Map D) The Northeast Corner (Map D) Metsamor and Environs (Map D) Sardarapat and Ancient Armavir (Map D) Southwestern Armavir (advance permission
  • Armenian Acts of Cultural Terrorism

    Armenian Acts of Cultural Terrorism

    Iğdır Azerbaijani‐Turkish Cultural Association ARMENIAN ACTS OF CULTURAL TERRORISM History remembers, while Names changed Cafer Qiyasi, İbrahim Bozyel Kitab Klubu www.kitabklubu.org Baku – 2007 PREFACE It is a fact that the most important factor which enables nations to last out, is their cultural identity. It goes down in history that a nationʹs failure to hold on to its cultural values tenaciously would lead to a total frustration. As pointed out by one writer, ʹIf we shoot bullets through our past, a cannonade by our future gen‐ erations is next to come.ʹ Therefore, in order to succeed in living up to standards of a dignified life, one has to protect, maintain, and transmit his cultural heritage, which in turn builds a bridge between the past and the future. Regrettably, even around the turn of the century, terrorism remains a grim fact. It is excruciating to witness innocent people falling victims to terrorism. How‐ ever, what is more dangerous and utterly unpardonable is cultural terrorism. Fighting, plundering and arson have long been canonized as glorifying forms of action by some nations therefore it has been highly pertinent, in their view, to obliterate the cultural artifacts belonging to their adversaries which survived over centuries. Most probably, history will not excuse those nations that are committed to prove their dignity by destroying the cultural monuments of other civilizations. Dear readers, in its attempt to shed light on the question What is cultural terrorism?, this book constitutes a striking piece of document presented to the world public. You will be petrified to read about the cultural genocide exercised vigorously over Azerbaijani Turks by Armenian propagandists who unjustly misinform the world by spreading erroneous claims of ethnic genocide ‐alleged mass killings of Arme‐ nians in Ottoman Turkey in 1915.
  • Press Release 15.06.2020 Austria and Armenia Together Against The

    Press Release 15.06.2020 Austria and Armenia Together Against The

    Press release 15․06․2020 Austria and Armenia together against the pandemic Austrian Development Agency is providing support to medical institutions and 180 vulnerable families of Children of Armenia Fund’s (COAF) seven beneficiary villages of the Shirak region. The € 10,000 grant will help prevent the spread of COVID-19 and provide food and basic necessities to families in need. “Cooperation with international partners is more than important these days. The support of the Austrian Development Agency provides an opportunity to continue to actively support our beneficiaries of the Shirak region not only financially, but also through efforts in capacity-building and raising awareness,” mentioned Korioun Khatchadourian, the Managing Director of COAF. The provided packages include educational booklets on the pandemic, general safety rules, and self-isolation. The packages will be handed over by COAF’s social workers and doctors who will raise awareness among the population on the spot. In the process of family selection, the database developed by COAF social workers, the data of the village administrations, coaf.org [email protected] +374 10 502076 Shirak regional administration, and the Ministry of Labor and Social Affairs were taken into account. The family support packages of Beniamin, Gusanagyugh, Horom, Lanjik, Meghrashen, Sarnaghbyur, and Vardakar communities include rice, wheat, lentils, noodles, oil, household products: liquid soap, disinfectant, gloves, masks, as well as stationery: pencils, a book, and a board game. About COAF The “Children of Armenia” Charitable Fund (COAF) is a non-profit, non-governmental organization that employs community-led approaches aimed at improving the quality of life in rural Armenia, with a particular focus on children and youth.
  • Հավելված N 1 Հհ Կառավարության 2011 Թվականի Մարտի 3-Ի N 220 - Ն Որոշման

    Հավելված N 1 Հհ Կառավարության 2011 Թվականի Մարտի 3-Ի N 220 - Ն Որոշման

    Հավելված N 1 ՀՀ կառավարության 2011 թվականի մարտի 3-ի N 220 - Ն որոշման Կ Ա Ր Գ ՀԱՅԱՍՏԱՆԻ ՀԱՆՐԱՊԵՏՈՒԹՅԱՆ ԱՇԽԱՐՀԱԳՐԱԿԱՆ ԱՆՎԱՆՈՒՄՆԵՐԻ ՌՈՒՍԵՐԵՆ ԵՎ ԱՆԳԼԵՐԵՆ ՏԱՌԱԴԱՐՁՈՒԹՅԱՆ I. ԸՆԴՀԱՆՈՒՐ ԴՐՈՒՅԹՆԵՐ 1. Սույն կարգով կանոնակարգվում են այն հիմնական դրույթները, որոնք անհրա- ժեշտ են մեկ միասնական համակարգում Հայաստանի Հանրապետության աշխարհագրական անվանումների անգլերեն և ռուսերեն հրատարակման և օգտագործման ժամանակ։ 2. Յուրաքանչյուր լեզվի համար մշակվել է մեկ մասնակի կարգ, որը հիմնականում անհրաժեշտ կլինի Հայաստանի Հանրապետության աշխարհագրական անվանումներով ռուսերեն և անգլերեն քարտեզներ, ատլասներ, գրական և տեղեկատվական նյութեր հրատարակելիս, ինչպես նաև ճանապարհային, վարչական շենքերի և այլ նպատակների համար նախատեսված ցուցանակներ տեղադրելիս։ 3. Յուրաքանչյուր լեզվով անվանման ճիշտ ձևն ամրագրվում է` համադրելով մի քանի սկզբնաղբյուր։ 4. Հայերեն աշխարհագրական անվանումները պետք է տառադարձվեն այլ լեզուներով` հիմք ընդունելով տվյալ լեզվի արտահայտման առանձնահատկությունները, առավելագույնս մոտեցնելով դրանց գրելաձևերը հայերենի արտասանության հնչողությանը։ Առանձին դեպքերում ընդունված ավանդական գրելաձևերը հասցվել են նվազագույնի։ 5. Աշխարհագրական անվանումների տառադարձությունը, որպես կանոն, կատար- վում է հայերենի ժամանակակից գրելաձևից՝ հաստատված «Հայաստանի Հանրապետության վարչատարածքային բաժանման մասինե Հայաստանի Հանրապետության օրենքով և տերմի- 11_0220 2 նաբանական կոմիտեի 1956 թվականի սեպտեմբերի, 1958 թվականի փետրվարի և 1978 թվականի փետրվարի համապատասխան որոշումներով։ Հայերենի այն հնչյունները, որոնք չունեն ռուսերեն և անգլերեն համարժեքներ, տառադարձվում են հնարավորինս ավելի մոտ
  • English Were Elaborated and Submitted on a Regular Basis to the World Bank Team

    English Were Elaborated and Submitted on a Regular Basis to the World Bank Team

    Public Disclosure Authorized CONNECTING THE DOTS: TRANSPORT, POVERTY, AND SOCIAL Public Disclosure Authorized INCLUSION - EVIDENCE FROM ARMENIA December 2017 Transport and ICT Global Pracce EUROPE Public Disclosure Authorized Public Disclosure Authorized Connecting the Dots: Transport, Poverty, and Social Inclusion - Evidence from Armenia December 2017 Transport and ICT Global Practice EUROPE CURRENCY EQUIVALENTS (Exchange Rate Effective November 1, 2017) Currency Unit = Armenian Dram (AMD) AMD 486,671 = US$1 US$ 0,00021 = AR$ 1 FISCAL YEAR January 1 - December 31 Regional Vice President: Regional Vice President:Cyril Muller Country Director: Country Director:Mercy Miyang Tembon Senior Global Practice Director: Senior Global Practice Director:Jose Luis Irigoyen Practice Manager: Practice Manager:Juan Gaviria Task Team Leader(s): Task Team Leader(s):Steven Farji Weiss Standard Disclaimer: This volume is a product of the staff of the International Bank for Reconstruction and Development/ The World Bank. The findings, interpretations, and conclusions expressed in this paper do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Copyright Statement: The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development/ The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly.
  • Government of the Republic of Armenia

    Government of the Republic of Armenia

    E2203 Public Disclosure Authorized Government of the Republic of Armenia MCA-Armenia Team Proposal for Public Disclosure Authorized Millennium Challenge Account Assistance Public Disclosure Authorized Environmental Impact Assessment of the Concept Paper Public Disclosure Authorized September 2005 Government of the Republic of Armenia Proposal for Millennium Challenge Account Assistance Environmental Impact Assessment CONTENTS 1. INTRODUCTION........................................................................................3 2. DESCRIPTION OF THE PROPOSAL ..........................................................4 2.1. Proposed Investment Areas.......................................................................4 2.2. Current Situation of Irrigation Infrastructure and Proposed Investments...4 2.3. Current Situation of Rural Roads and Proposed Investments.................36 3. ENVIRONMENTAL MANAGEMENT SYSTEM IN ARMENIA...................50 3.1. Legal Framework......................................................................................50 3.2. International Agreements .........................................................................53 3.3. Institutional Framework ............................................................................57 4. ENVIRONMENTAL IMPACTS....................................................................60 4.1. “No Action” Alternative .............................................................................61 4.2. Potential Positive Impacts ........................................................................62