Puntsagnorov Nyamdagva Key Qualification: Bridge Engineer
Total Page:16
File Type:pdf, Size:1020Kb
Puntsagnorov.N Name: Puntsagnorov Nyamdagva Key Qualification: Bridge engineer Professional education: Sep.1988 – June.1993 Master Degree in Civil engineering with specialization in Bridges and vehicular Traffic tunnels, Georgian Technical University Other training: 1996 Short term training in Materials and testing materials for road and bridges from NITHE, New Delhi, India Present position: Executive Director, PCDP LLC Employment record: Jan.2013 to present PCDP LLC Founder Feb.2012 to Jan.2013 MCS Property LLC, Mongolia QA/QC manager Dec.2009 to Feb.2012 MCS Property LLC, Mongolia Construction manager Dec.2009 to Apr.2010 PMANDCM LLC, Mongolia Chief engineer Jul.2009 to Dec.2009 MCS Property LLC, Mongolia Senior structural engineer Jan.2009 to May.2009 NBCC LLC, Mongolia Project leader/ Bridge engineer Apr.2004 to Oct.2008 ICT-SAIN Consulting LLC, Mongolia Bridge engineer Sep.2000 to Dec.2003 GBET Co.,Ltd Consulting Engineers, Mongolia Design engineer Aug.1997 to Aug.2000 ICT Pvt.L.td. India Bridge Construction Supervision Engineer Jul.1995 to Aug 1997 Road Maintenance Unit, Darkhan city, Mongolia Chief engineer Jun.1993 to Jun.1994 Road Maintenance Unit, Huvsgul aimag, Mongolia Chief engineer 32 Puntsagnorov.N Ministry of Road, Transport and Tourism – Ikh Tenger Bridge Company: “ICT-SAIN Consulting” LLC Position: Bridge-cum-Drainage Bridge Cost of the project: MNT 79.2 million Location: Ulaanbaatar Mongolia Plate Grider Bridge Company: “NBCC” LLC Position: Project leader/Bridge engineer Cost of the project: MNT 90.6 million Location: Tsagaan-Uur Huvsgul province, Mongolia GOK Extension project Company: “PCDP” LLC Position: Project Manager Cost of the project: USD 17.9 million Completed date: Substantial completion: July, 2015 Location: Erdenet mining Corporation, Orkhon province, Mongolia 33 Puntsagnorov.N Shangri-La Hotel Ulaanbaatar Company: “MCS Property” LLC Position: QA/QC Manager, Construction Manager Cost of the project: MNT 27.5 million Location: Ulaanbaatar, Mongolia CHPP Raft foundation work Company: MCS Property LLC Position: Senior structural engineer Cost of the project: ER LLC funded Completed date: December, 2009 Location: Tsogt tsetsii, Umnugobi, Mongolia Altain Khuder construction of asphalt concrete road Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: USD 232,161 Completed date: October, 2008 Location: Gobi Altai, Mongolia Ministry of Road, Transport and Tourism - Unt Moron road Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: 335,344 Completed date: August, 2008 Location: Ulaanbaatar, Mongolia Ministry of Road, Transport and Tourism – Construction supervision of 35th railway crossing to 18th well Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: USD 24 million by ADB funded Completed date: November, 2007 Location: Dornogobi, Mongolia 34 Puntsagnorov.N CHPP Raft foundation work Company: MCS Property LLC Position: Senior structural engineer Cost of the project: ER LLC funded Completed date: December, 2009 Location: Tsogt tsetsii, Umnugobi, Mongolia Altain Khuder construction of asphalt concrete road Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: USD 232,161 Completed date: October, 2008 Location: Gobi Altai, Mongolia Ministry of Road, Transport and Tourism - Unt Moron road Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: 335,344 Completed date: August, 2008 Location: Ulaanbaatar, Mongolia Ministry of Road, Transport and Tourism – Construction supervision of 35th railway crossing to 18th well Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: USD 24 million by ADB funded Completed date: November, 2007 Location: Dornogobi, Mongolia Department of roads – EBU road construction project Company: ICT-SAIN Consulting LLC Position: Bridge engineer Cost of the project: USD 19.7 million Completed date: August, 2005 Location: Orkhon, Bulgan, Mongolia Ministry of Road, Transport and Tourism – Open program of rehabilitation and spot improvements of regional transport infrastructure Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: EUR 1.09 million Completed date: November, 2006 Location: Zavkhan, Darkhan Uul, Selenge, Mongolia Roads Supervision and Research Centre MRTT – Choir Zamiin Uud road Company: ICT-SAIN Consulting LLC Position: CADD/Structural engineer Cost of the project: USD 0.77 million Completed date: April, 2005 Location: Gobi-Sumber, Dornogobi, Mongolian 35.