Puntsagnorov Nyamdagva Key Qualification: Bridge Engineer

Total Page:16

File Type:pdf, Size:1020Kb

Puntsagnorov Nyamdagva Key Qualification: Bridge Engineer Puntsagnorov.N Name: Puntsagnorov Nyamdagva Key Qualification: Bridge engineer Professional education: Sep.1988 – June.1993 Master Degree in Civil engineering with specialization in Bridges and vehicular Traffic tunnels, Georgian Technical University Other training: 1996 Short term training in Materials and testing materials for road and bridges from NITHE, New Delhi, India Present position: Executive Director, PCDP LLC Employment record: Jan.2013 to present PCDP LLC Founder Feb.2012 to Jan.2013 MCS Property LLC, Mongolia QA/QC manager Dec.2009 to Feb.2012 MCS Property LLC, Mongolia Construction manager Dec.2009 to Apr.2010 PMANDCM LLC, Mongolia Chief engineer Jul.2009 to Dec.2009 MCS Property LLC, Mongolia Senior structural engineer Jan.2009 to May.2009 NBCC LLC, Mongolia Project leader/ Bridge engineer Apr.2004 to Oct.2008 ICT-SAIN Consulting LLC, Mongolia Bridge engineer Sep.2000 to Dec.2003 GBET Co.,Ltd Consulting Engineers, Mongolia Design engineer Aug.1997 to Aug.2000 ICT Pvt.L.td. India Bridge Construction Supervision Engineer Jul.1995 to Aug 1997 Road Maintenance Unit, Darkhan city, Mongolia Chief engineer Jun.1993 to Jun.1994 Road Maintenance Unit, Huvsgul aimag, Mongolia Chief engineer 32 Puntsagnorov.N Ministry of Road, Transport and Tourism – Ikh Tenger Bridge Company: “ICT-SAIN Consulting” LLC Position: Bridge-cum-Drainage Bridge Cost of the project: MNT 79.2 million Location: Ulaanbaatar Mongolia Plate Grider Bridge Company: “NBCC” LLC Position: Project leader/Bridge engineer Cost of the project: MNT 90.6 million Location: Tsagaan-Uur Huvsgul province, Mongolia GOK Extension project Company: “PCDP” LLC Position: Project Manager Cost of the project: USD 17.9 million Completed date: Substantial completion: July, 2015 Location: Erdenet mining Corporation, Orkhon province, Mongolia 33 Puntsagnorov.N Shangri-La Hotel Ulaanbaatar Company: “MCS Property” LLC Position: QA/QC Manager, Construction Manager Cost of the project: MNT 27.5 million Location: Ulaanbaatar, Mongolia CHPP Raft foundation work Company: MCS Property LLC Position: Senior structural engineer Cost of the project: ER LLC funded Completed date: December, 2009 Location: Tsogt tsetsii, Umnugobi, Mongolia Altain Khuder construction of asphalt concrete road Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: USD 232,161 Completed date: October, 2008 Location: Gobi Altai, Mongolia Ministry of Road, Transport and Tourism - Unt Moron road Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: 335,344 Completed date: August, 2008 Location: Ulaanbaatar, Mongolia Ministry of Road, Transport and Tourism – Construction supervision of 35th railway crossing to 18th well Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: USD 24 million by ADB funded Completed date: November, 2007 Location: Dornogobi, Mongolia 34 Puntsagnorov.N CHPP Raft foundation work Company: MCS Property LLC Position: Senior structural engineer Cost of the project: ER LLC funded Completed date: December, 2009 Location: Tsogt tsetsii, Umnugobi, Mongolia Altain Khuder construction of asphalt concrete road Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: USD 232,161 Completed date: October, 2008 Location: Gobi Altai, Mongolia Ministry of Road, Transport and Tourism - Unt Moron road Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: 335,344 Completed date: August, 2008 Location: Ulaanbaatar, Mongolia Ministry of Road, Transport and Tourism – Construction supervision of 35th railway crossing to 18th well Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: USD 24 million by ADB funded Completed date: November, 2007 Location: Dornogobi, Mongolia Department of roads – EBU road construction project Company: ICT-SAIN Consulting LLC Position: Bridge engineer Cost of the project: USD 19.7 million Completed date: August, 2005 Location: Orkhon, Bulgan, Mongolia Ministry of Road, Transport and Tourism – Open program of rehabilitation and spot improvements of regional transport infrastructure Company: ICT-SAIN Consulting LLC Position: Bridge-cum drainage engineer Cost of the project: EUR 1.09 million Completed date: November, 2006 Location: Zavkhan, Darkhan Uul, Selenge, Mongolia Roads Supervision and Research Centre MRTT – Choir Zamiin Uud road Company: ICT-SAIN Consulting LLC Position: CADD/Structural engineer Cost of the project: USD 0.77 million Completed date: April, 2005 Location: Gobi-Sumber, Dornogobi, Mongolian 35.
Recommended publications
  • [Mongolia CO] COVID-19 UNFPA Mongolia CO Sitrep #6
    R E P O R T I N G P E R I O D : 1 6 - 3 0 , N O V E M B E R , 2 0 2 0 UNFPA MONGOLIA Situation Report #6 on COVID-19 response SITUATION OVERVIEW SITUATION IN NUMBERS Since 15 November, the State Emergency Commission (SEC) has 791 confirmed cases identified a total of eight clusters of COVID-19 transmission: two in Ulaanbaatar City and one in Selenge, Darkhan-Uul, Gobisumber, 383 cases among repatriates Orkhon, Dornogobi and Arkhangai provinces respectively. The clusters are linked with close and secondary contacts of an index case cases from local clusters of COVID-19. The government has taken swift action including 408 contact tracing, the immediate testing of identified contacts, the Ulaanbaatar city isolation of contacts, quarantine, and treatment of positive cases. 77 179 Selenge province A state of all-out readiness, with lockdown measures, was in place 44 Darkhan-Uul province until 6am, 1 December. Movements were controlled in the city and only employees in 13 priority sectors were allowed to travel to and 3 Gobisumber province from their place of work. 22 Orkhon province 21 Dornogobi province To mitigate the spread of the virus, the government has organized random and targeted surveillance testing at various sites to determine 2 Arkhangai province whether there is wider community transmission; it has concluded that Quarantine cluster Mongolia is dealing with cluster transmission. 60 patients recovered The Prime Minister addressed citizens requesting that they follow the 354 government and SEC’s directives and urged everyone to stay at home, wear masks, maintain physical distancing if going outside for essential 428 patients being treated services, and to wash their hands.
    [Show full text]
  • MONGOLIA: Systematic Country Diagnostic Public Disclosure Authorized
    MONGOLIA: Systematic Country Diagnostic Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Acknowledgements This Mongolia Strategic Country Diagnostic was led by Samuel Freije-Rodríguez (lead economist, GPV02) and Tuyen Nguyen (resident representative, IFC Mongolia). The following World Bank Group experts participated in different stages of the production of this diagnostics by providing data, analytical briefs, revisions to several versions of the document, as well as participating in several internal and external seminars: Rabia Ali (senior economist, GED02), Anar Aliyev (corporate governance officer, CESEA), Indra Baatarkhuu (communications associate, EAPEC), Erdene Badarch (operations officer, GSU02), Julie M. Bayking (investment officer, CASPE), Davaadalai Batsuuri (economist, GMTP1), Batmunkh Batbold (senior financial sector specialist, GFCP1), Eileen Burke (senior water resources management specialist, GWA02), Burmaa Chadraaval (investment officer, CM4P4), Yang Chen (urban transport specialist, GTD10), Tungalag Chuluun (senior social protection specialist, GSP02), Badamchimeg Dondog (public sector specialist, GGOEA), Jigjidmaa Dugeree (senior private sector specialist, GMTIP), Bolormaa Enkhbat (WBG analyst, GCCSO), Nicolaus von der Goltz (senior country officer, EACCF), Peter Johansen (senior energy specialist, GEE09), Julian Latimer (senior economist, GMTP1), Ulle Lohmus (senior financial sector specialist, GFCPN), Sitaramachandra Machiraju (senior agribusiness specialist,
    [Show full text]
  • Current Situation and Future Trends in Mongolian Construction and Urban Development Sector
    MINISTRY OF CONSTRUCTION AND URBAN DEVELOPMENT MONGOLIA Current Situation and Future Trends in Mongolian Construction and Urban Development Sector Warsaw, Poland, 21Jan 2013 Ms.BAIGALMAA Gochoosuren Vice Minister Content • Current Situation • Specific Legal Framework and Policy Areas • Planned Projects • Cooperation opportunities Organizational Chart of the Ministry Current Situation of the Population Settlements URBAN POPULATION Aimag centers and urbanized settlements 30% Ulaanbaata Darkhan r andErdenet city Current Status of Housing Supply cities 60% 10% 1.10% 8064 people 21.3% 152,338 people Population 45.20% 0.5% 322,836 people 3839 people concentration 29.4% 209,931 people 2.40% 16700 people Public housing Single-family adequate housing Ditached houses Dormitory Ger Non-residential purpose dwellings “New Development” Medium-Term Target Program Demolishing old buildings that are non-resistant to earthquake and redeveloping with new buildings – Residential areas with 6,100 housing units. In three locations, new construction work started /in green/. 1. XIX Sub-district,Khan-Uul District 4,350units-1,500units 2. Along the Narnii Zam Street 3,760units-1,000units 3. Area of Dund Gol 4,500units-1,000units 4. Chingeltei District 4,600units-1,000units 5. Sukhbaatar District 3,454units-1,100units 6. Khan-Uul District 3,600units-500units Government Policy Agenda for Growth and Development The government has approved a series of urban development and housing projects and plans, aimed at supporting sustainable development and long-term growth.
    [Show full text]
  • BANKING COMPETITION REVIEW 2018 – Ⅳ Quarter
    Economic Policy and Competitiveness Research Center BANKING COMPETITION REVIEW 2018 – Ⅳ Quarter Banking system news in Mongolia 10.03 – XacBank’s President, Mr. Amartuvshin, signed a 11.23 – 9th anniversary of the State Bank. statebank.mn contract extension with Oyu Tolgoi to continue partnership and support Oyu Tolgoi suppliers.. xacbank.mn 11.27 – National Electronic Transaction Centre (NETC) of the Bank of Mongolia raised the daily limit for digital 10.13 – S&P Global Ratings upgrades Foreign Currency transaction to MNT 3 million, from previous limit of MNT 1 LT credit rating of Golomt Bank to "B" from "B-"; outlook million. montsame.mn stable. golomtbank.com 11.27 – At the unscheduled meeting, the Monetary Policy 10.19 – 28th anniversary of the Trade and Development Committee decided to increase the Policy rate by 1.0 Bank of Mongolia. tdbm.mn percentage point to 11 percent. mongolbank.mn 10.23 – How to make a secure online purchase? 11.28 – For the first time in Mongolia, TDB and Shoppy.mn golomtbank.com (online shop) introduced new online loan service which enables people to buy products. tdbm.mn 10.25 – Golomt Bank signed “Framework Agreement on Regular Cooperation Mechanism under the Belt and Road 11.28 – XacBank appoints Tsevegjav Gumenjav as Initiative” with Industrial and Commercial Bank of China President of Retail banking. xacbank.mn (ICBC). golomtbank.com 11.30 – “Transport and Development Bank” LLC has 10.26 – Capitron bank and Bank of Inner Mongolia signed received its professional underwriting license pursuant to foreign trade financing and interbank credit line Financial Regulatory Commission Resolution No.
    [Show full text]
  • Ìîíãîë Íóòàã Äàõü Ò¯¯Õ, Ñî¨Ëûí ¯Ë Õªäëªõ Äóðñãàë
    ÃÎÂÜѯÌÁÝÐ ÀÉÌÃÈÉÍ ÍÓÒÀà ÄÀÕÜ Ò¯¯Õ, ÑΨËÛÍ ¯Ë ÕªÄËªÕ ÄÓÐÑÃÀË ISBN 978-99929-61-98-8 Ñî¨ëûí ªâèéí òªâ ÌÎÍÃÎË ÍÓÒÀà ÄÀÕÜ Ò¯¯Õ, ÑΨËÛÍ ¯Ë ÕªÄËªÕ ÄÓÐÑÃÀË Historical and cultural immovable ProPerties in monGolia YII ÄÝâòÝÐ ÃîâÜѯÌÁÝÐ, ÄÀÐÕÀí-ÓÓë, îÐÕîí ÀéÌÀà 1 ÃÎÂÜѯÌÁÝÐ ÀÉÌÃÈÉÍ ÍÓÒÀà ÄÀÕÜ Ò¯¯Õ, ÑΨËÛÍ ¯Ë ÕªÄËªÕ ÄÓÐÑÃÀË ÌÎíãÎë íóòàã äàõü ò¯¯õ, ñΨëûí ¯ë õªäëªõ äóðñãàë yII äýâòýð ÃÎâÜѯÌÁÝÐ, äÀðÕÀÍ-ÓÓË, ÎðÕÎÍ Àéìàã 1 ÃÎÂÜѯÌÁÝÐ ÀÉÌÃÈÉÍ ÍÓÒÀà ÄÀÕÜ Ò¯¯Õ, ÑΨËÛÍ ¯Ë ÕªÄËªÕ ÄÓÐÑÃÀË DDC 306 Ý-66 Зохиогч: Г.Энхбат б.ДаваацЭрЭн Гэрэл зургийг: б.ДаваацЭрЭн П.Чинбат Гар зургийг: б.ДаваацЭрЭн Дизайнер: б.аЛТАНСҮх Орчуулагч: ц.цОЛМОн Зохиогчийн эрх хамгаалагдсан. © 2012, Copyrigth © 2012 by the Center of Cultural Соёлын өвийн төв, Улаанбаатар, Монгол улс Heritage, Ulaanbaatar, Mongolia Энэхүү цомгийг Соёлын өвийн төвийн зөвшөөрөлгүйгээр бүтнээр нь буюу хэсэгчлэн хувилан олшруулахыг хориглоно. Монгол улс Улаанбаатар хот - 211238 Сүхбаатар дүүрэг Сүхбаатарын талбай 3 Соёлын төв өргөө б хэсэг Соёлын өвийн төв Шуудангийн хайрцаг 223 веб сайт: www.monheritage.mn и-мэйл: [email protected] Утас: 976-11-312735 ISBN 978-99929-61-98-8 боловсрол, Соёл, Соёлын өвийн төв Говьсүмбэр аймгийн Дархан-Уул аймгийн Орхон аймгийн Шинжлэх ухааны яам ЗДтГазар ЗДтГазар ЗДтГазар 2 ÃÎÂÜѯÌÁÝÐ ÀÉÌÃÈÉÍ ÍÓÒÀà ÄÀÕÜ Ò¯¯Õ, ÑΨËÛÍ ¯Ë ÕªÄËªÕ ÄÓÐÑÃÀË ÃÀÐ×Èà Өмнөх үг 4 Удиртгал 5 Говьсүмбэр аймгийн нутаг дахь түүх, соёлын үл хөдлөх дурсгалын тухай 19 Говьсүмбэр аймгийн нутаг дахь түүх, соёлын үл хөдлөх дурсгалын байршил 23 Говьсүмбэр аймгийн нутаг дахь түүх, соёлын үл хөдлөх дурсгалууд
    [Show full text]
  • Mongolia: 2020
    MONGOLIA: PROVINCIAL COMPETITIVENESS REPORT 2020 (based on the statistics of 2019) www.aimagindex.mn The publication of this report was funded by the Konrad-Adenauer-Stiftung th ECONOMIC POLICY AND COMPETITIVENESS RESEARCH CENTER ÝÄÈÉÍ ÇÀÑÃÈÉÍ ÁÎÄËÎÃÎ, ªÐѪËÄªÕ ×ÀÄÂÀÐÛÍ ÑÓÄÀËÃÀÀÍÛ ÒªÂ ННА 65 ДАА 330 М-81 THE PROVINCIAL COMPETITIVENESS REPORT ULAANBAATAR 2020 ECONOMIC POLICY AND COMPETITIVENESS RESEARCH CENTER San Business Center, 9th floor, Prime Minister Amar street 29, Sukhbaatar duureg, Ulaanbaatar, Mongolia Tel: 976-11-321927 Fax: 976-11-321926 Provincial competitiveness report website: www.aimagindex.mn E-mail: [email protected] Website: www.ecrc.mn www.nogoonhutuch.mn Facebook page: https://www.facebook.com/Ursulduhchadvar Twitter page: http://twitter.com/ursulduhchadvar ISBN 978-9919-24-104-9 © All rights reserved. No part of this publication may be transmitted in any form or by any means, including photocopying and recording, or by any information storage and retrieval system. Nor may any part of this publication be included as a reference in any other work without authorization. FOREWORD Greetings! Many pressing events took place in the world as well as in Mongolia throughout 2020. As the COVID-19 pandemic had spread around the world and the scientific community raced against time to develop vaccines against this challenge to humanity, regular parliamentary and local elections were held in Mongolia and the central and local administrations appointed their executives who would lead the country, provinces, cities and implement development policies for the next 4 years. Concurrently, we are pleased to announce the 10th anniversary of the Economic Policy and Competitiveness Research Center (EPCRC).
    [Show full text]
  • Prevalence and Risk Factors of Infertility in a Mongolian Population
    Prevalence and Risk factors of Infertility in a Mongolian Population Tuvshinbayar Negdel ( [email protected] ) Mongolian National University of Medical Sciences Dornogobi Medical College https://orcid.org/0000- 0002-7702-4583 Khishigjargal Ulziisaikhan Mongolian National University of Medical Sciences Davaakhuu Sengebaljir Mongolian National University of Medical Sciences Arigbukh Enkhbat Mongolian National University of Medical Sciences Badrakh Munkhbayar Mongolian National University of Medical Sciences Khantushig Bilegsuren Mongolian National University of Medical Sciences School of Medicine Ariunaa Ganbold Regenerative Medical Center IVF Ulaanbaatar, Mongolia Khuderchuluun Nanjid Mongolian National University of Medical Sciences Carol W. Readhead California Institute of Technology Lkhagva-Ochir Erkhembaatar First Maternity Hospital of Mongolia Ekhembaatar Tuduvdorj Mongolian National University of Medical Sciences Munkhzol Malchinkhuu Mongolian National University of Medical Sciences Odkhuu Enkhtaivan Mongolian National University of Medical Sciences Research Keywords: Epidemiology, Infertility, Mongolia, Prevalence, Risk factor, Treatment-seeking, Population survey Page 1/16 Posted Date: May 11th, 2020 DOI: https://doi.org/10.21203/rs.3.rs-26781/v1 License: This work is licensed under a Creative Commons Attribution 4.0 International License. Read Full License Page 2/16 Abstract Background: Worldwide, the median prevalence of infertility is 9%, but rates in different countries vary from 3.5% to 16.7%. Infertility, which is dened by the World Health Organization (WHO) as the failure to conceive after 12 months of unprotected regular sexual intercourse, is not considered a medical condition but carries a social stigma and can greatly impact a couple’s self-esteem and wellbeing. There are a number of risk factors associated with infertility such as: genetic background, age, socio-economic factors, and health care including treatment of sexually transmitted diseases.
    [Show full text]
  • Capturing the Sun in the Land of the Blue Sky Providing Portable Solar Power to Nomadic Herders in Mongolia
    Capturing the Sun in the Land of the Blue Sky Providing Portable Solar Power to Nomadic Herders in Mongolia Migara S. Jayawardena, A. Salvador Rivera and Chrisantha Ratnayake SUMMARY The Renewable Energy and Rural Electricity per year, with income amongst herders even Access Project (REAP) helped the Government lower. At the time, herders had limited or no of Mongolia (GoM) successfully complete its access to modern electricity services. ambitious, National 100,000 Solar Ger Electrification Program. The Program In 2000, the Government of Mongolia (GOM) provided a vast, dispersed community of over began the National 100,000 Solar Ger half a million nomadic herders with access to Electrification Program, an ambitious initiative modern forms of electricity through portable to improve the lives of about half a million solar home systems (SHS). The REAP was herders by providing modern electricity services. funded by the World Bank including grants from The program provided photovoltaic solar home the International Development Association systems (SHS) that were portable in design (IDA), Global Environment Facility (GEF) and making the systems adaptable to the nomadic the Government of the Netherlands. lifestyle of herders and complementing their traditional way of life. Through grants from Mongolia is a geographically vast country several donor nations, the GoM had provided covering over 600,000 square miles but has a over 30,000 herder families with SHSs by 2005. relatively small population of less than three Despite this progress, the herder electrification million people. About 1.2 million of effort was beginning to stagnate. The GoM Mongolia’s citizens live in the urban capital of recognized that considerably more effort was Ulaanbaatar, while the remaining population is necessary not only to keep the program on track widely dispersed throughout the country with a but to scale-up implementation in order to large number residing in sparsely populated, achieve the National 100,000 Solar Ger rural areas.
    [Show full text]
  • Aspire Mining Limited
    Aspire Mining Limited Establishing New Infrastructure to Support Mine Development For personal use only Coaltrans World Anthracite Conference, St Petersburg, June 2014 1 Important information •Nature of this document: This document has been prepared by Aspire Mining Limited (“Aspire”, “AKM”, or the “Company”) and contains summary information about the Company and its subsidiaries as at the date of release of this document. The information in this document does not summarise all information that an investor should consider when making an investment decision. It should be read in conjunction with the Company’s other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange (“ASX”), which are available at www.asx.com.au or www.aspiremininglimited.com. In attending this presentation or viewing this document you agree to be bound by the following terms and conditions. •Not an offer: This document is for information purposes only and does not constitute or form part of any offer for sale or issue for any securities or an offer or invitation to purchase or subscribe for any such securities. This document and its contents must not be distributed, transmitted or viewed by any person in any jurisdiction where the distribution, transmission or viewing of this document would be unlawful under the securities or other laws of that or any other jurisdiction. •Not financial product advice: The information contained in this document is not intended to be relied upon as financial product advice or investment advice nor is it a recommendation to acquire Aspire securities and has been prepared without taking into account the objectives, financial situation or needs of individuals.
    [Show full text]
  • The Green Economy Barometer 2018 Mongolia
    The Green Economy Barometer 2018 Mongolia Ulaanbaatar, Mongolia 2018 www.greeneconomycoalition.org Funded by the European Union Green Economy Barometer 2018 Mongolia May 2018 Economic Policy & Competitiveness Research Centre 29 Prime Minister A.Amar St, Ulaanbaatar, Mongolia Twitter: @UrsulduhChadvar Facebook: ECRC Mongolia www.ecrc.mn Green Economy Coalition 80-86 Grays Inn Rd, London, WC1X 8NH, United Kingdom Twitter: @GECoalition Facebook: GreenEconomyCoalition www.greeneconomycoalition.org This publication has been produced with the assistance of the European Union, DCI- ENV/2016/372-847. The contents of this publication are the sole responsibility of the authors and can in no way be taken to reflect the views of the European Union. Photo: Bayar Balgantseren About the organisations This report has been produced for the Green The Green Economy Coalition (GEC) is the Economy Coalition by the Economic Policy and world’s largest civil society movement for Competitiveness Research Centre (EPCRC). green and fair economies. Our 50+ members represent poor people, workers, environmental Contents As a national think tank the Economic Policy organisations, faith groups and small businesses and Competitiveness Research Center (EPCRC) as well as international institutions. Together, we aims to conduct in-depth research and reporting are inspiring a movement for change from the Executive Summary: A golden opportunity for green economy 4 that help build a competitive and sustainable ground. Overview of the Mongolian Economy 5 Mongolia using globally-accepted research methodologies. The EPCRC is committed For more information, please see Geography 5 to delivering factual knowledge about the greeneconomycoalition.org, or contact Stuart Population 5 Mongolian economy and competitiveness both Worsley: stuart.worsley@greeneconomycoalition.
    [Show full text]
  • Mongolian Subnational PPD Council
    Subnational PPD Council in Mongolia by SARANDAVAA Myanganbuu, Mongolian National Chamber of Commerce and Industry, Deputy CEO; Presented at the Public-Private Dialogue 2015 Workshop (Copenhagen, March 10-13, 2015) 1- Background and Context Mongolian National Chamber of Commerce (MNCCI) and Industry has been acting as a major party to represent and deliver members’ voice to government, encourage businesses in nationwide and implement policy advocacy. MNCCI first initiated PPD in Mongolia and still plays a main role in its processes for further development. It has been proactively engaged in intensifying operation of PPD council since 2010 and ensuring private sector’s participation and voices on policy development and implementation processes. MNCCI has branches in 21 local provinces of Mongolia and seeks conducting similar operation of PPD council in the provincial levels. 2- Partnership, Structure and Processes With the assistances of GTZ\Regional Economic Development Program (REDP) a voluntary based structure of the PPD council was set up and run in the program regions including Darkhan-uul, Orkhon and Zavkhan provincesin 2008. PPD council consisted of representatives of Non- Government Organizations and international organizations that equally ensured public and private sectors’ participation. The structure of PPD council in the afore mentioned three local areas was changed to more official-operated form or fully-employed through the assistance from GIZ\REDP, which is headed by the governor of the province and a chairman of local Chamber of Commerce and Industry, consisting of Development Policy department, Legal department, Department of Finance of the local government office, Taxation office, Customs office and Inspection office representatives from the public sector and Employers’ federation, Cooperative Training and Information center, banks and private sector’s representatives from private sector and GIZ\REDP and World Vision Mongolia were as advisory members in 2010.
    [Show full text]
  • 2015 Annual Report
    ANNUAL REPORT 2015 1 Annual Report of Mongolian Family Welfare Association for 2015 Vision: Mongolian Family Welfare Association shall be the pioneering independent non- governmental organization on delivering comprehensive, quality and accessible care services of sexual and reproductive health. Mission: To provide information and care services vis-à-vis sexual and reproductive health in collaboration with both government and non-governmental organizations in order to strengthen Mongolian tradition of healthy living. Operational Strategy: Adolescents and the youth: To reduce cases of sexually transmittes infections, unwanted pregnancy and unsafe abortion among adolescents and the youth in Mongolia. Accessibility: To increase accessibility and provision of sexual and reproductive health care and family planning services. HIV, AIDS and STIs: To decrease the prevalence of sexually transmitted infections among general population. Abortion: To reduce the frequency and complications of abortion. Advocacy: To advance a human rights-based approach on sexual and reproductive health both at rural and national level and to establish a favorable political and socio-economic environment. Supportive strategies: Governance: To ensure equal, just and efficient governance at all administrative levels of the association. Resource accrual: To advance associaion’s financial and human resource capacity necessary for running quality operations. Capacity building: To improve the association’s capacity. Knowledge management and organization: To be an association that utilizes its resources properly by improving its operation constantly and shares its best practice with other organizations and learns from their best practice. 2 BOARD MEMBERS: 1. Ganbold B, President, Dornod province. 2. Oyun-Erdene B, Vice president, Dornogobi province. 3. Undarmaa B, Treshureer, Darkhan-Uul province.
    [Show full text]