The National Rail Penalty Fare Guidelines
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Making Rail Accessible: Helping Older and Disabled Customers
TfL Rail Making rail accessible: Helping older and disabled customers May 2016 MAYOR OF LONDON Contents Our commitment to you page 3 Commitments page 5 Assistance for passengers page 6 Alternative accessible transport page 9 Passenger information page 10 Fares and tickets page 12 At the station page 16 On the train page 17 Making connections page 19 Accessible onward transport page 20 Disruption to facilities and services page 21 Contact us page 23 Station accessibility information page 24 Contact information back page 2 Our commitment to you TfL Rail is managed by Transport for London (TfL) and operated by MTR Crossrail. We operate rail services between Liverpool Street and Shenfield. At TfL Rail, we are committed to providing you with a safe, reliable and friendly service. We want to make sure that you can use our services safely and in comfort. 3 Our commitment to you (continued) We recognise that our passengers may have different requirements when they travel with us and we are committed to making your journey as easy as possible. This applies not only to wheelchair users, but also: • Passengers with visual or auditory impairment or learning disabilities • Passengers whose mobility is impaired through arthritis or other temporary or long term conditions • Older people • Passengers accompanying disabled children in pushchairs • Disabled passengers requiring assistance with luggage We welcome your feedback on the service we provide and any suggestions you may have for improvements. Our contact details are shown on the back page of this -
National Rail Conditions of Travel
i National Rail Conditions of Travel From 5 August 2018 NATIONAL RAIL CONDITIONS OF TRAVEL TABLE OF CONTENTS NATIONAL RAIL CONDITIONS OF TRAVEL Part A: A summary of the Conditions 3 Part B: Introduction 4 Conditions 5 Part C: Planning your journey and buying your Ticket 5 Part D: Using your Ticket 11 Part E: Making your Train Journey 15 Part F: Your refund and compensation rights 21 Part G: Special Conditions applying to Season Tickets 26 Part H: Lost Property 29 Appendix A: List of Train Companies to which the National Rail Conditions of Travel apply as at 5 August 2018 30 Appendix B: Definitions 31 Appendix C: Code of Practice: Arrangements for interview meetings with applicants in connection with duplicate season tickets 33 These National Rail Conditions of Travel apply from 5 August 2018. Any reference to the National Rail Conditions of Carriage on websites, Tickets, publications etc. refers to these National Rail Conditions of Travel. Part A: A summary of the Conditions The terms and conditions of these National Rail Conditions of Travel are set out below in Part C to Part H (the “Conditions”). They comprise the binding contract that comes into effect between you and the Train Companies1 that provide scheduled rail services on the National Rail Network, when you purchase a Ticket. This summary provides a quick overview of the key responsibilities of Train Companies and passengers contained in the contract. It is important, however, that you read the Conditions if you want a full understanding of the responsibilities of Train Companies and passengers. -
Surface Access Integrated Ticketing Report May 2018 1
SURFACE ACCESS INTEGRATED TICKETING REPORT MAY 2018 1. Contents 1. Executive Summary 3 1.1. Introduction 3 1.2. Methodology 3 1.3. Current Practice 4 1.4. Appetite and Desire 5 1.5. Barriers 5 1.6. Conclusions 6 2. Introduction 7 3. Methodology 8 4. Current Practice 9 4.1. Current Practice within the Aviation Sector in the UK 11 4.2. Experience from Other Modes in the UK 15 4.3. International Comparisons 20 5. Appetite and Desire 25 5.1. Industry Appetite Findings 25 5.2. Passenger Appetite Findings 26 5.3. Passenger Appetite Summary 30 6. Barriers 31 6.1. Commercial 32 6.2. Technological 33 6.3. Regulatory 34 6.4. Awareness 35 6.5. Cultural/Behavioural 36 7. Conclusions 37 8. Appendix 1 – About the Authors 39 9. Appendix 2 – Bibliography 40 10. Appendix 3 – Distribution & Integration Methods 43 PAGE 2 1. Executive Summary 1.1. Introduction This report examines air-to-surface access integrated ticketing in support of one of the Department for Transport’s (DfT) six policy objectives in the proposed new avia- tion strategy – “Helping the aviation industry work for its customers”. Integrated Ticketing is defined as the incorporation of one ticket that includes sur- face access to/from an airport and the airplane ticket itself using one transaction. Integrated ticketing may consider surface access journeys both to the origin airport and from the destination airport. We recognise that some of the methods of inte- grated ticketing might not be truly integrated (such as selling rail or coach tickets on board the flight), but such examples were included in the report to reflect that these exist and that the customer experience in purchasing is relatively seamless. -
Hampton Court to Berrylands / Oct 2015
Crossrail 2 factsheet: Services between Berrylands and Hampton Court New Crossrail 2 services are proposed to serve all stations between Berrylands and Hampton Court, with 4 trains per hour in each direction operating directly to, and across central London. What is Crossrail 2? Crossrail 2 in this area Crossrail 2 is a proposed new railway serving London and the wider South East that could be open by 2030. It would connect the existing National Rail networks in Surrey and Hertfordshire with trains running through a new tunnel from Wimbledon to Tottenham Hale and New Southgate. Crossrail 2 will connect directly with National Rail, London Underground, London Overground, Crossrail 1, High Speed 1 international and domestic and High Speed 2 services, meaning passengers will be one change away from over 800 destinations nationwide. Why do we need Crossrail 2? The South West Main Line is one of the busiest and most congested routes in the country. It already faces capacity constraints and demand for National Rail services into Waterloo is forecast to increase by at least 40% by 2043. This means the severe crowding on the network will nearly double, and would likely lead to passengers being unable to board trains at some stations. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce congestion, and would enable us to run more local services to central London that bypass the most congested stations. Transport improvements already underway will help offset the pressure in the short term. But we need Crossrail 2 to cope with longer term growth. -
Eighth Annual Market Monitoring Working Document March 2020
Eighth Annual Market Monitoring Working Document March 2020 List of contents List of country abbreviations and regulatory bodies .................................................. 6 List of figures ............................................................................................................ 7 1. Introduction .............................................................................................. 9 2. Network characteristics of the railway market ........................................ 11 2.1. Total route length ..................................................................................................... 12 2.2. Electrified route length ............................................................................................. 12 2.3. High-speed route length ........................................................................................... 13 2.4. Main infrastructure manager’s share of route length .............................................. 14 2.5. Network usage intensity ........................................................................................... 15 3. Track access charges paid by railway undertakings for the Minimum Access Package .................................................................................................. 17 4. Railway undertakings and global rail traffic ............................................. 23 4.1. Railway undertakings ................................................................................................ 24 4.2. Total rail traffic ......................................................................................................... -
What Light Rail Can Do for Cities
WHAT LIGHT RAIL CAN DO FOR CITIES A Review of the Evidence Final Report: Appendices January 2005 Prepared for: Prepared by: Steer Davies Gleave 28-32 Upper Ground London SE1 9PD [t] +44 (0)20 7919 8500 [i] www.steerdaviesgleave.com Passenger Transport Executive Group Wellington House 40-50 Wellington Street Leeds LS1 2DE What Light Rail Can Do For Cities: A Review of the Evidence Contents Page APPENDICES A Operation and Use of Light Rail Schemes in the UK B Overseas Experience C People Interviewed During the Study D Full Bibliography P:\projects\5700s\5748\Outputs\Reports\Final\What Light Rail Can Do for Cities - Appendices _ 01-05.doc Appendix What Light Rail Can Do For Cities: A Review Of The Evidence P:\projects\5700s\5748\Outputs\Reports\Final\What Light Rail Can Do for Cities - Appendices _ 01-05.doc Appendix What Light Rail Can Do For Cities: A Review of the Evidence APPENDIX A Operation and Use of Light Rail Schemes in the UK P:\projects\5700s\5748\Outputs\Reports\Final\What Light Rail Can Do for Cities - Appendices _ 01-05.doc Appendix What Light Rail Can Do For Cities: A Review Of The Evidence A1. TYNE & WEAR METRO A1.1 The Tyne and Wear Metro was the first modern light rail scheme opened in the UK, coming into service between 1980 and 1984. At a cost of £284 million, the scheme comprised the connection of former suburban rail alignments with new railway construction in tunnel under central Newcastle and over the Tyne. Further extensions to the system were opened to Newcastle Airport in 1991 and to Sunderland, sharing 14 km of existing Network Rail track, in March 2002. -
The Liberalization of the EU Passenger Rail Market Growth Opportunities and New Competition
The liberalization of the EU passenger rail market Growth opportunities and new competition Contents Introduction and key messages 5 01 Key aspects of the EU rail market and its liberalization 8 1.1 Characteristics of the EU commercial long distance rail market and its competitive situation 10 1.2 Overview of the evolution of the EU’s regulatory framework for the rail market 11 02 The fourth railway package can be expected to substantially impact the EU’s passenger rail service markets 14 2.1 Liberalization effects in the airline industry 16 2.2 Liberalization effects in Italy’s high-speed rail market 18 2.3 Incumbent rail operators’ interest in entering new rail markets – in particular with a low-cost (disruptive) strategy 19 03 The strategic implications of the fourth railway package 22 3.1 Risks and strategic options for rail operators intending to enter new national rail markets 24 3.2 Key success factors for entering a new rail market 25 3.3 Strategic options for rail operators that are incumbents in a national rail market 27 Outlook: getting started with navigating the EU’s changing the long-distance rail market 30 Authors and contacts 32 The liberalization of the EU passenger rail market 3 Introduction and key messages Over the last 10 to 20 years, various In our attempt to answer the above liberalization plans and initiatives have questions and drawing on the latest periodically emerged in the EU’s rail McKinsey research (see Textbox 1), market landscape. The EU’s fourth we distilled three key messages railway package is a systematic, large- regarding the imminent commercial LD scale approach for liberalizing the rail market liberalization in the EU and commercial long-distance (LD) rail defined the strategic implications for market in the EU. -
Buy Before You Board
Further information Great Western Railway Buy before you board GWR.com 03457 000 125* (0600 to 2300 daily) Buy before Find us on Facebook Messenger Search for Great Western Railway you board Follow us @GWRHelp Download our app Search GWR in your app store Earn Nectar points When you buy our train tickets online at GWR.com Don’t miss out on our latest offers, special deals and news from GWR. Register your email address now at GWR.com/enews * Standard network charges apply. Calls from mobiles may be higher. Advice on ticket purchasing and how to avoid Penalty Fares Information correct at time of print. Valid from November 2015 486762/02 Buy before you board Penalty Fares are something that most people who travel with us never experience. Please ensure you avoid the consequences of inadvertently travelling without a valid ticket. You must always have a valid ticket to travel on GWR trains. If you board any of our trains without a valid ticket, at a station where ticket buying facilities are available, you may be charged the full Single or Return fare relevant to your journey, be reported for prosecution, or receive a Penalty Fare if travelling from a station within the Penalty Fares Zones (see maps overleaf). You will not be eligible to use a Railcard or receive other discounts. How to buy a ticket There are several methods available to purchase tickets. Ticket Office We have ticket offices at many of our stations. Tickets can be bought for any journey, including one starting from a different station, and those that include London Underground stations. -
Croatian Logistics Opportunities for Sustainable Competitiveness Public Disclosure Authorized Public Disclosure Authorized
Croatian Logistics Opportunities for Sustainable Competitiveness Public Disclosure Authorized Public Disclosure Authorized Croatian Logistics Public Disclosure Authorized Opportunities for Sustainable Competitiveness Luis C. Blancas Public Disclosure Authorized Ana Božičević Kristijan Rogić Ivona Bajor Luka Novačko 1 Croatian Logistics Opportunities for Sustainable Competitiveness © 2021 The World Bank 1818 H Street NW, Washington DC 20433 Telephone: 202-473-1000; Internet: www.worldbank.org Some rights reserved This work is a product of the staff of The World Bank. The findings, interpretations, and con- clusions expressed in this work do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this work is subject to copyright. Because The World Bank encourages dissem- ination of its knowledge, this work may be reproduced, in whole or in part, for noncommercial purposes as long as full attribution to this work is given. Attribution—Please cite the work as follows: “World Bank (2021). Croatian Logistics: Oppor- tunities for Sustainable Competitiveness. © World Bank.” All queries on rights and licenses, including subsidiary rights, should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2625; e-mail: [email protected]. -
Buy Before You Board
More information Buy before [email protected] you board GWR.com/contact Follow us: @GWRHelp Important information regarding your responsibilities Like us: facebook.com/GWRUK as a passenger on our trains. 03457 000 125* (open 0600-2300 daily) Earn Nectar points Buy your train tickets online at GWR.com Don’t miss out on our latest offers, special deals and news. Register at GWR.com/signup *Standard network charges apply. Calls from mobiles may be higher. Buy before you board If you do not buy before you board: You must have a valid ticket to travel on GWR trains. Where you can, you must buy a ticket before you begin your journey with us. If you board any of our trains without a valid ticket and there was an opportunity to buy one, you may: • Have to pay the full, non-discounted single or return fare for your journey (discounts including Railcards, will not be available). • Be issued with a Penalty Fare if you are travelling within our Penalty Fare area - see map inside the back cover. • Be reported for consideration of prosecution. How to buy a ticket: Ticket office We have ticket offices at many of our stations. Tickets can be bought for any journey, including one starting from a different station, and those that include London Underground stations. You can pay for your ticket with cash, debit or credit card, Apple Pay, Google Pay, and Solo or Electron cards. Please allow enough time to buy your ticket. Ticket machines These are available at many of our stations and accept cash or credit/debit cards. -
The Rail Sector in Numbers
Williams Rail Review The rail sector in numbers March 2019 Williams Rail Review The rail sector in numbers Contents Section 1 Rail in the wider transport system Page 5 Section 2 Passengers Page 10 Section 3 Freight Page 15 Section 4 The GB rail industry structure Page 16 Section 5 Rail infrastructure Page 19 Section 6 International comparisons Page 22 Section 7 Rail workforce Page 24 Section 8 Source references Page 25 Data refers to Great Britain unless otherwise stated. PAGE 4 Rail in the wider transport system Demand for rail travel has increased whilst demand for buses and coaches has fallen But usage of cars, vans and taxis continues to dominate Modal demand over time Note that these three graphs have different scales. (billion passenger kilometres) 70 60 50 40 30 20 10 Billion passenger kilometres66 0 Rail 1952 1960 1968 1976 1984 1992 2000 2008 2017 100 90 80 70 60 50 40 30 20 Billion passenger kilometres38 Buses and 10 0 coaches 1952 1960 1968 1976 1984 1992 2000 2008 2017 700 600 500 400 300 200 670 Cars, vans 100 Billion passenger kilometres 0 and taxis 1952 1960 1968 1976 1984 1992 2000 2008 2017 PAGE 5 Rail in the wider transport system Most rail journeys are made on London and South East services Total journeys (including to/from other region and within region journeys) Scotland (102m) North East (16m) Yorkshire & The Humber (74m) North West (134m) East Midlands Wales (36m) (31m) East of England (189m) West Midlands (94m) London (927m) South West (52m) South East (304m) PAGE 6 Rail in the wider transport system Rail demand -
Newsletter No. 78 March 2019
SARPA Newsletter No.78 Page 1 Shrewsbury Aberystwyth Rail Passengers’ Association Newsletter No. 78 March 2019 NEW ROLLING STOCK – MORE QUESTIONS EMERGING THAN ANSWERS? Transport for Wales honeymoon period on taking over the franchise was very brief indeed: suffice to say the failure to address long standing and well-known issues that had been repeatedly flagged up by SARPA (and others) to the Welsh Government before the end of the ATW franchise underpinned the problems in late autumn. Having not addressed issues pre-October 2018 we then got a new franchise that wasn’t addressing issues in October 2018, instead we have some wonderful plans for the future. It’s Jam tomorrow says the Welsh Government. Let’s look at one aspect of that: the new rolling stock being acquired for our line. It all looked rather impressive. The new DMU’s from the Civity range (see artists impression above) are to be built by Spanish Manufacturer CAF. There will be a mix of 51 x 2 car and 26 x 3 car units to run all long distance DMU services away from the South Wales Metro area. Initial comments and focus were on the door positions @ 1/3 and 2/3 instead of the ends of carriages, and on concerns over the internal layout. Would it be appropriate for long distance travelers, with plenty of luggage racks, views out of windows and plenty of tables? People were worried they would be getting an outer suburban train rather than an appropriate vehicle for the Cambrian. We flagged this up very early with contacts at TfW Rail Services, and had verbal reassurances that the internal layout would be appropriate for our line, and that the fleet of 77 DMU’s would be go anywhere units - all fitted with ETCS, and services would be flexible and tailored to demand flows with 2,3,4,5,6 car formations appearing as appropriate.