Tunisie Ministère De L'environnement Et Du Développement Durable

Total Page:16

File Type:pdf, Size:1020Kb

Tunisie Ministère De L'environnement Et Du Développement Durable Tunisie Ministère de l’Environnement et du Développement Durable Agence Nationale de GEstion des Déchets - ANGed KfW Bankengruppe GESTION INTEGREE DES DECHETS MUNICIPAUX DANS LA VALLEE DE LA MEDJERDA ETUDE DE FAISABILITE Marché n° : 20 736 RAPPORT PHASE 1 JUILLET 2010 Version finale / Original Tome 1 : Rapport Consulting Engineers Germany – www.igip.com Etude de Faisabilité : Gestion des Déchets Phase 1 – Diagnostic de la Situation Actuelle Municipaux de la Vallée de la Medjerda et Définition des Objectifs I TABLE DES MATIERES TABLE DES MATIERES I FIGURES IX TABLEAUX XI ANNEXES XVI ACRONYMES ET ABREVIATIONS XVII RESUME XX 1 INTRODUCTION 1 2 LA RÉGION DU PROJET 4 2.1 Localisation géographique 4 2.2 Topographie 6 2.3 Conditions climatiques 6 2.4 Organisation administrative et politique 7 2.4.1 Communes 7 2.4.2 Secteurs « communaux », « ruraux » et « mixtes » 8 2.5 Horizons du projet 9 2.6 Populations de la zone d’étude 9 2.6.1 Populations communales 10 2.6.2 Populations de l’étude 12 2.6.3 Les cas particuliers 14 2.7 Analphabétisme, chômage, Niveau de revenus et activités economiques 15 2.7.1 Analphabétisme et chômage 15 2.7.2 Activités économiques et niveau de revenus 16 2.8 Infrastructures existantes 16 2.8.1 Les industries 16 2.8.2 Les infrastructures sanitaires 17 2.8.3 Les hôtels 18 11849 - Rapport Phase 1 - final 16 07 2010 Préparation: AKr Date Juillet 2010 Nr. contrat: 11849 Vérification: PWi Version: Final Etude de Faisabilité : Gestion des Déchets Phase 1 – Diagnostic de la Situation Actuelle Municipaux de la Vallée de la Medjerda et Définition des Objectifs II 2.8.4 Le transport terrestre 18 2.8.5 Le secteur minier 18 2.9 Développements régionaux et urbains 18 2.9.1 Développement régional 18 2.9.2 Développements urbains 20 2.10 Etudes et documents existants 21 3 LA GESTION DES DECHETS MUNICIPAUX DANS LA REGION DU PROJET 23 3.1 Politique sectorielle 23 3.1.1 Le Programme National de Gestion des Déchets Solides 23 3.1.2 Le Programme National de Gestion Intégrée et Durable des Déchets solides 23 3.2 Cadre législatif 24 3.2.1 La Loi n° 96-41 du 10 juin 1996, relative aux déchets et au contrôle de leur gestion et de leur élimination 24 3.2.2 Les dispositions de la Loi Organique des Communes 26 3.2.3 La Normalisation : l'Institut National de la Normalisation et de la Propriété Industrielle (INNORPI) 26 3.3 Cadre institutionnel 26 3.3.1 Le Ministère de l'Environnement et du Développement Durable (MEDD) 26 3.3.1.1 La Direction Générale de l’Environnement et de la Qualité de la Vie 27 3.3.1.2 La Direction de l’Environnement industriel 27 3.3.1.3 La Direction de l’Environnement urbain 27 3.3.2 Le Ministère de l'Intérieur et du Développement Local (MIDL) 28 3.3.3 Le Ministère de la Santé Publique (MSP) 29 3.3.4 Le Ministère des Finances (MF) 30 3.3.5 L’Agence Nationale de Gestion des Déchets (ANGeD) 30 3.3.6 L’Agence Nationale de Protection de l'Environnement (ANPE) 31 3.3.7 Les Collectivités Locales 32 3.3.8 La Caisse des Prêts et Soutiens aux Collectivités Locales (CPSCL) 32 3.3.9 Les autres acteurs 33 3.3.10 Conclusions 33 3.4 Cadre économique et financier 35 3.4.1 Schéma financier et taux de recouvrement des coûts 35 3.4.1.1 Financement municipal de la gestion des déchets solides 35 3.4.1.2 Financement de l’élimination des déchets solides 37 3.4.2 Analyse du secteur privé 40 3.4.2.1 Etat des lieux 40 3.4.2.2 Cadre juridique 43 11849 - Rapport Phase 1 - final 16 07 2010 Préparation: AKr Date Juillet 2010 Nr. contrat: 11849 Vérification: PWi Version: Final Etude de Faisabilité : Gestion des Déchets Phase 1 – Diagnostic de la Situation Actuelle Municipaux de la Vallée de la Medjerda et Définition des Objectifs III 3.4.2.3 Contrôle et suivi 44 3.4.2.4 Réglementation : objectifs ou moyens de résultats ? 45 3.4.2.5 Questions concernant le recouvrement des coûts 45 3.4.2.6 Financement du secteur privé 46 3.4.2.7 Questions institutionnelles 46 3.4.2.8 Principale problématique posée par la participation du secteur privé 46 4 DECHETS MENAGERS ET ASSIMILES 49 4.1 Projections démographiques et populations du projet 49 4.1.1 Recensement 1994 - 2004 49 4.1.2 Projections 2004 – 2024 – 2034 49 4.1.3 Populations à considérer dans le cadre de l’étude 52 4.1.3.1 Populations communales, mixtes et des centres urbains des conseils ruraux 52 4.2 Méthodologie d’investigation 54 4.3 Quantité des déchets 56 4.4 Densité des déchets 59 4.5 Composition des déchets ménagers 59 4.5.1 Méthodologie pour la détermination de la composition de déchets 59 4.5.1.1 Introduction 59 4.5.1.2 Choix des lieux d’analyse 59 4.5.1.3 Echantillons représentatifs pour les municipalités 60 4.5.2 Détermination de la composition des déchets ménagers 61 4.5.2.1 Composition des déchets dans les villes analysées 61 4.5.2.2 Composition des déchets dans les zones rurales 64 4.5.2.3 Extrapolation pour la zone du projet 66 4.5.2.4 Conclusions 66 4.5.3 Analyse des déchets 68 4.5.3.1 Provenance des échantillons 68 4.5.3.2 Préparation des échantillons pour les analyses 68 4.5.3.3 Analyses et normes 68 4.5.3.4 Interprétation des résultats d’analyses 69 4.5.3.5 Commentaires 73 4.6 Pré-collecte, Collecte et transport 74 4.6.1 L’organisation générale des services de collecte 74 4.6.1.1 La collecte en porte à porte 74 4.6.1.2 La collecte en regroupement 75 4.6.1.3 La collecte en apport volontaire 75 4.6.1.4 La collecte dans les zones mixtes et les conseils ruraux 75 4.6.1.5 La collecte des déchets non ménagers 76 4.6.1.6 Comparaison multi-critères des différentes organisations de collecte 76 4.6.2 Les expériences de recours à la prestation de service dans la zone d’étude 79 4.6.3 Description des moyens affectés à la pré-collecte 81 11849 - Rapport Phase 1 - final 16 07 2010 Préparation: AKr Date Juillet 2010 Nr. contrat: 11849 Vérification: PWi Version: Final Etude de Faisabilité : Gestion des Déchets Phase 1 – Diagnostic de la Situation Actuelle Municipaux de la Vallée de la Medjerda et Définition des Objectifs IV 4.6.3.1 Les récipients de pré-collecte utilisés dans les municipalités 81 4.6.3.2 Les difficultés rencontrées sur la zone d’étude concernant la pré-collecte 83 4.6.4 Description des moyens affectés à la pré-collecte 89 4.6.4.1 Les véhicules de collecte utilisés dans les municipalités 89 4.6.4.2 Adéquation entre les types de véhicules et l’état des voiries 95 4.6.4.3 Les difficultés rencontrées sur la zone d’étude concernant les véhicules de collecte 96 4.6.5 Description des moyens humains affectés au service de collecte 100 4.6.5.1 Les effectifs en place dans les municipalités 100 4.6.5.2 Les difficultés rencontrées sur la zone d’étude concernant le personnel de collecte 102 4.6.6 Les ateliers (ou parcs) municipaux et la politique d’achat 105 4.7 Décharges et dépotoirs de la zone d’étude 105 4.8 Cadre économique et financier des municipalités 118 4.8.1 Analyse des recettes communales: cas de quelques communes 118 4.8.2 Analyse des dépenses communales: cas de quelques communes 120 4.8.3 Estimation du coût de la collecte des déchets municipaux 123 4.8.4 Synthèse 126 4.8.5 Conclusion 128 5 RECYCLAGE ET VALORISATION DES DECHETS MENAGERS 131 5.1 Potentialités 131 5.1.1 Valorisation énergétique 131 5.1.2 Valorisation biologique et matérielle 132 5.1.3 Potentiel de réduction 133 5.1.4 Résumé pour la zone de projet 135 5.1.4.1 Potentiel de valorisation 135 5.2 Matières secondaires valorisables – Eco-Lef 138 5.2.1 Capacités et structures de collecte 138 5.2.2 Quantités et zones de production 140 5.2.3 Performances de collecte 142 5.2.3.1 Secteur formel 142 5.2.3.2 Secteur informel 144 5.2.4 Coûts du système et recouvrements 145 5.2.5 Recyclage 146 5.2.5.1 Filières et industries du recyclage 146 5.2.5.2 Coûts du recyclage et recouvrements 146 5.2.5.3 Perspectives 147 5.2.5.4 Cimenteries 150 11849 - Rapport Phase 1 - final 16 07 2010 Préparation: AKr Date Juillet 2010 Nr. contrat: 11849 Vérification: PWi Version: Final Etude de Faisabilité : Gestion des Déchets Phase 1 – Diagnostic de la Situation Actuelle Municipaux de la Vallée de la Medjerda et Définition des Objectifs V 5.3 Déchets verts et de marché 150 5.4 Valorisation énergétique des déchets 150 5.4.1 Principaux éléments du cadre réglementaire relatif à la maîtrise de l’énergie en Tunisie 151 5.4.2 Incitations et avantages publics applicables à la valorisation énergétique des déchets 152 5.4.3 Système tarifaire applicable à l’électricité issue de la valorisation des déchets 152 5.4.4 Financements spécifiques des projets de valorisation énergétique des déchets153 5.4.5 Conclusion 153 6 PROJECTION DE LA PRODUCTION DE DECHETS MENAGERS ET ASSIMILES 155 7 BOUES DES STEP DE L’ONAS 160 7.1 Zones de production 160 7.2 Quantités et qualités 162 7.3 Elimination 167 7.3.1 Situation actuelle 167 7.3.2 Perspectives 168 7.4 Coûts et recouvrements 170 7.5 Projection de production 171 7.6 Déficits et risques 173 8 DECHETS DE SOIN 174 8.1 Cadrage réglementaire, institutionnel et technique de la gestion des déchets d’activités sanitaires 174 8.1.1 Cadrage juridique et réglementaire 174 8.1.2 Cadrage technique : les catégories de déchets d’activités sanitaires (DAS) 174 8.1.3 Cadrage technique : typologie des producteurs de DAS 175 8.2 Méthodologie du recueil de données 176 8.3 Inventaire des infractructures sanitaires recensées dans la zone du projet177 8.4 Quantités de déchets de soins dans la zone du projet 179 8.4.1 Hypothèses concernant les ratios de production des déchets 179 8.4.2 Evaluation du gisement de DASRI dans la zone d’étude 181 8.5 Modalités actuelles de gestion des déchets d’activités sanitaires 182 8.5.1 Tri et conditionnement des déchets à la source 182 8.5.2 Modalités et fréquence d’enlèvement des déchets 183 8.5.3 Transport et élimination des déchets 184 11849 - Rapport Phase 1 - final 16 07 2010 Préparation: AKr Date Juillet 2010 Nr.
Recommended publications
  • © Hachette Tourisme 2010
    © Hachette Tourisme2010 © Hachette Tourisme 2010 Jeradou 222 Monastir 318 Zriba haut 223 Mahdia 323 Sommaire Zaghouan et le jebel Zaghouan 224 El-Jem 330 Le Nord Sfax 338 Îles Kerkennah 348 Présentation 225 À travers les hautes steppes 350 Le Sahel bizertin 229 Tajerouine 350 Utique 331 Kalaat Khasba 350 Découvrir Comprendre Ghar el-Melh 234 Haïdra 350 Raf Raf 235 Thala 352 Les régions du guide 11 La Tunisie aujourd’hui 59 Rass Jebel et le cap Zebib 236 Thélepte 353 La Tunisie à la carte 13 La Tunisie dans l’histoire 86 Metline 236 Majel Bel Abbès 353 Propositions d’itinéraires 18 El-Alia 236 El-Ksour 353 Bizerte 237 Sbiba 353 Partir Visiter Cap Blanc 241 Kasserine 354 La côte Corail 242 Sbeïtla 355 Adresses utiles 25 Le golfe de Tunis et le cap Bon Parc national d’Ichkeul 243 Makthar 361 Quand partir 26 Teskraia Se documenter 26 Présentation 113 et la vallée de l’oued Sejnane 246 Aux portes du Sahara-: le Sud Formalités 27 Tunis 117 Cap Serrat 246 À emporter 29 Autour de Tunis 174 Sejnane 247 Présentation 367 Le voyage par avion 31 La Goulette 174 Cap Negro 247 Djerba 372 Le voyage par bateau 32 La Marsa 176 Plage de Sidi Mechrig 247 Houmt Souk 378 Le voyage organisé 32 Gammarth 177 Tabarka 248 Synagogue de la Ghriba 382 Hammam Lif 177 Île de la Galite 252 Mosquée el-Bessi 383 Séjourner Parc naturel du Jebel Bou Kornine 177 Le Tell intérieur 253 Mosquée el-Kébir 384 La Mohammedia 178 La Kroumirie 253 Borj Jellij 384 Se loger 37 Aqueduc de Zaghouan 178 Se restaurer 38 Babouch 254 Midoun 384 Oudna 178 Se déplacer 41 Hammam Bourguiba 254
    [Show full text]
  • Policy Notes for the Trump Notes Administration the Washington Institute for Near East Policy ■ 2018 ■ Pn55
    TRANSITION 2017 POLICYPOLICY NOTES FOR THE TRUMP NOTES ADMINISTRATION THE WASHINGTON INSTITUTE FOR NEAR EAST POLICY ■ 2018 ■ PN55 TUNISIAN FOREIGN FIGHTERS IN IRAQ AND SYRIA AARON Y. ZELIN Tunisia should really open its embassy in Raqqa, not Damascus. That’s where its people are. —ABU KHALED, AN ISLAMIC STATE SPY1 THE PAST FEW YEARS have seen rising interest in foreign fighting as a general phenomenon and in fighters joining jihadist groups in particular. Tunisians figure disproportionately among the foreign jihadist cohort, yet their ubiquity is somewhat confounding. Why Tunisians? This study aims to bring clarity to this question by examining Tunisia’s foreign fighter networks mobilized to Syria and Iraq since 2011, when insurgencies shook those two countries amid the broader Arab Spring uprisings. ©2018 THE WASHINGTON INSTITUTE FOR NEAR EAST POLICY. ALL RIGHTS RESERVED. THE WASHINGTON INSTITUTE FOR NEAR EAST POLICY ■ NO. 30 ■ JANUARY 2017 AARON Y. ZELIN Along with seeking to determine what motivated Evolution of Tunisian Participation these individuals, it endeavors to reconcile estimated in the Iraq Jihad numbers of Tunisians who actually traveled, who were killed in theater, and who returned home. The find- Although the involvement of Tunisians in foreign jihad ings are based on a wide range of sources in multiple campaigns predates the 2003 Iraq war, that conflict languages as well as data sets created by the author inspired a new generation of recruits whose effects since 2011. Another way of framing the discussion will lasted into the aftermath of the Tunisian revolution. center on Tunisians who participated in the jihad fol- These individuals fought in groups such as Abu Musab lowing the 2003 U.S.
    [Show full text]
  • Quelques Aspects Problematiques Dans La Transcription Des Toponymes Tunisiens
    QUELQUES ASPECTS PROBLEMATIQUES DANS LA TRANSCRIPTION DES TOPONYMES TUNISIENS Mohsen DHIEB Professeur de géographie (cartographie) Laboratoire SYFACTE FLSH de Sfax TUNISIE [email protected] Introduction Quelle que soit le pays ou la langue d’usage, la transcription toponymique des noms de lieux géographiques sur un atlas ou un autre document cartographique en particulier ou tout autre document d’une façon générale pose problème notamment dans des pays où il n’y a pas de tradition ou de « politique » toponymique. Il en est de même pour les contrées « ouvertes » à l’extérieur et par conséquent ayant subi ou subissant encore les influences linguistiques étrangères ou alors dans des régions caractérisées par la complexité de leur situation linguistique. C’est particulièrement le cas de la Tunisie, pays méditerranéen bien « ancré » dans l’histoire, mais aussi bien ouvert à l’étranger et subissant les soubresauts de la mondialisation, et manquant par ailleurs cruellement de politique toponymique. Tout ceci malgré l’intérêt que certains acteurs aux profils différents y prêtent depuis peu, intérêt matérialisé, entre autres manifestations scientifiques, par l’organisation de deux rencontres scientifiques par la Commission du GENUING en 2005 et d’une autre août 2008 à Tunis, lors du 35ème Congrès de l’UGI. Aussi, il s’agit dans le cadre de cette présentation générale de la situation de la transcription toponymique en Tunisie, dans un premier temps, de dresser l’état des lieux, de mettre en valeur les principales difficultés rencontrées en manipulant les noms géographiques dans leurs différentes transcriptions dans un second temps. En troisième lieu, il s’agit de proposer à l’officialisation, une liste-type de toponymes (exonymes et endonymes) que l’on est en droit d’avoir par exemple sur une carte générale de Tunisie à moyenne échelle.
    [Show full text]
  • Analysis of the Tunisian Tax Incentives Regime
    Analysis of the Tunisian Tax Incentives Regime March 2013 OECD Paris, France Analysis of the Tunisian Tax Incentives Regime OECD mission, 5-9 November 2012 “…We are working with Tunisia, who joined the Convention on Mutual Administrative Assistance in Tax Matters in July 2012, to review its tax incentives regime and to support its efforts to develop a new investment law.” Remarks by Angel Gurría, OECD Secretary-General, delivered at the Deauville Partnership Meeting of the Finance Ministers in Tokyo, 12 October 2012 1. Executive Summary This analysis of the Tunisian tax incentives regime was conducted by the OECD Tax and Development Programme1 at the request of the Tunisian Ministry of Finance. Following discussions with the government, the OECD agreed to conduct a review of the Tunisian tax incentive system within the framework of the Principles to Enhance the Transparency and Governance of Tax Incentives for Investment in Developing Countries.2 As requested by the Tunisian authorities, the objective of this review was to understand the current system’s bottlenecks and to propose changes to improve efficiency of the system in terms of its ability to mobilise revenue on the one hand and to attract the right kind of investment on the other. The key findings are based on five days of intensive consultations and analysis. Key Findings and Recommendations A comprehensive tax reform effort, including tax policy and tax administration, is critical in the near term to mobilize domestic resources more effectively. The tax reform programme should include, but not be limited to, the development of a new Investment Incentives Code, aimed at transforming the incentives scheme.
    [Show full text]
  • Memoire Abir
    Centre National Des Sciences Université De Tunis El Manar Et technologies Nucléaires Faculté Des Sciences De Tunis Département De Géologie MEMOIRE Présenté en vue de l’obtention du MASTERE DE RECHERCHE EN SCIENCES DE LA TERRE Parcours : Géologie Appliquée à l’Environnement Réalisé par RABOUDI Abir MODELISAION DE L’EROSION HYDRIQUE DANS LE BASSIN VERSANT DU SILIANA PAR LE MODELE KINEROS2 Soutenu le 23/01/2016 devant le jury d’examen composé de : Mr. Moncef GUEDDARI : Professeur FST Président Mme. Lilia BEN CHIKHA : Maître Assistante CNSTN Encadreur 1 Dédicaces En témoignage de ma gratitude et mon amour Je dédie ce travail A mes parents pour leurs protections, leurs générosités, leur patience et leurs encouragements. J’espère avoir été digne de leurs affectations et de leur confiance A mon frère et mes sœurs qui me souhaitent toujours la réussite. Que dieu les protège A Toute ma famille A mes amies Afef, Chayma, Imen, Meriem, Oumayma et Takoua pour leur soutien moral À tous ceux que j’aime et je respecte Abir 2 Remerciement Il est agréable de présenter mes sincères remerciements et ma profonde reconnaissance à tous ceux qui m’ont aidé à accomplir mon projet dans des conditions optimales. Je tiens tout d’abord à exprimer toute la gratitude que je porte au Professeur Moncef GUEDDERI de m’avoir accepté dans l’unité de recherche de Géochimie et de Géologie de l’environnement. J’adresse mes sincères remerciements à Mme Lilia BENBEN CHEIKHA maitre assistante au Centre National des Sciences et Technologies Nucléaires de Sidi Thabet pour m’avoir accordée sa confiance en acceptant d’encadrer ce travail, pour la finesse de ses attitudes sur le plan aussi bien humain que scientifique, la qualité de son suivie, son soutient durant toute la période de mon stage et pour m’avoir accompagné sur terrain me permettant ainsi à améliorer la qualité de ce projet.
    [Show full text]
  • MPLS VPN Service
    MPLS VPN Service PCCW Global’s MPLS VPN Service provides reliable and secure access to your network from anywhere in the world. This technology-independent solution enables you to handle a multitude of tasks ranging from mission-critical Enterprise Resource Planning (ERP), Customer Relationship Management (CRM), quality videoconferencing and Voice-over-IP (VoIP) to convenient email and web-based applications while addressing traditional network problems relating to speed, scalability, Quality of Service (QoS) management and traffic engineering. MPLS VPN enables routers to tag and forward incoming packets based on their class of service specification and allows you to run voice communications, video, and IT applications separately via a single connection and create faster and smoother pathways by simplifying traffic flow. Independent of other VPNs, your network enjoys a level of security equivalent to that provided by frame relay and ATM. Network diagram Database Customer Portal 24/7 online customer portal CE Router Voice Voice Regional LAN Headquarters Headquarters Data LAN Data LAN Country A LAN Country B PE CE Customer Router Service Portal PE Router Router • Router report IPSec • Traffic report Backup • QoS report PCCW Global • Application report MPLS Core Network Internet IPSec MPLS Gateway Partner Network PE Router CE Remote Router Site Access PE Router Voice CE Voice LAN Router Branch Office CE Data Branch Router Office LAN Country D Data LAN Country C Key benefits to your business n A fully-scalable solution requiring minimal investment
    [Show full text]
  • Supplementary Information
    1 Supplementary information 2 A. Available temperature data from INM and NASA sources, GPS coordinates of 3 meteorological stations and sites of egg sampling. 4 5 Table SM1. Coordinates of sampling sites. Field egg masses sampling sites Latitude (°N) Longitude (°E) Chaambi 35.200000 8.700000 El Ayoun 35.557653 8.879097 Mghila 35.333333 9.200000 Thélepte 34.960611 8.583472 Bir Lahfay 34.944697 9.156361 El Fej 34.701582 9.043508 Jebel Motlag 34.954417 9.707389 Jebel Rihane 34.823708 9.636170 cité Ettahrir 36.821750 10.135778 Dar Chichou 36.965594 10.964017 Korbous 36.833333 10.583333 Sejnane 37.183333 9.183333 Oued Laabid 36.816542 10.711303 El Menzeh 36.837850 10.184692 Manouba 36.814722 10.108361 Ain Jamala 36.503839 9.301167 Testour 36.544944 9.377444 Henchir Naam 36.216667 9.166667 Jebel Kbouch (Kef) 36.210000 8.930000 El Krib (Siliana) 36.332544 9.063128 Kesra (Siliana) 35.871833 9.366583 Jebel Sidi Aich (Gafsa) 34.783292 8.865861 6 1 7 Table SM2. Temperature datasets (combination of data from the Institut National de Météorologie, 8 INM, and the NASA data in corresponding 8 km × 8 km grid) and coordinates of meteorological 9 stations. INM meteorological station Latitude (°N) Longitude (°E) Available data (INM) Data from NASA used to complete the INM datasets Kélibia 36.844855 11.082701 2001-2011 1990-2000 2012-2019 Carthage 36.846081 10.219053 1990-2014 2015-2019 Béja 36.723338 9.184013 1990-1997 1998-2000 2001-2011 2012-2019 Siliana 35.851853 9.595147 1990-1997 1998-2019 Kef 36.120862 8.720267 1990-1997 1998-2000 2001-2011 2012-2019 Kasserine 34.948369 8.569550 2001-2011 1990-2000 2012-1019 Sidi Bouzid 35.025685 9.498840 1990-2014 2015-2019 Gafsa 34.427352 8.820959 1990-2014 2015-2019 10 2 11 Figure SM3.
    [Show full text]
  • Sidi Bou Zid Provinces
    71 DEPARTMENT OF STATE AGENCY FOR INTERNATIONAL DEVELOPMENT WASHINGTON. D.C. 2053 UNCLASSIFIED AID-DLC/P-2237 August 23, 1977 MEMORANDUM FOR THE DEVELOPMENT LOAN COMMITTEE SUBJECT: TUNISIA - Rural Community Health Attached for your review are the recommendations for authorization of a loan/grant to the Government of Portugal ("Borrower") of, not to exceed Four Million Dollars ($4,000,000) - Loan in the amount of Three Mill.lon Dollars ($3,000,000) and Grant In the amount of One Million Dollars ($1,000,000) to enhance the quality and coverage of health services in two rural provinces. No meeting has been scheduled for consideration by the Development Loan Staff Committee; however, your concurrence or objection is requested by close of business on Tuesday, August 30, 1977. Ifyou are a voting member, a poll sheet has been enclosed for your response. -Development Loan Comittee Office of Development Program Review Attachments: Summary and Recommendations Project Analysis Annexes A-G I. TRANSACTION Coot AGENCY Owa SMERNATN& OEVwILn @4iNT I.A R00 pp PROJECT PAPER FACESHEET C c . Docu-CI CODE 3. O tJNrRY / N TITy CUNISIA 3 TUNISIA 4.OOCUMENT REVISION NUMMER MOROJECT MUiMER (I dl4s) Si. 8UR[AU/OrprIlC E 7.PROJECT TITLE (Maimum 40 characters) 564-0296 A80. 0UO. CODE NE 4 FURAL COMMUNITY HEALTH S.ESTIMATED IFY Olt PROJECT COMPmLTION *.ESTIMATED OATE OF OULIOATI0N A. INITIA,,oQUARTERVV ° .. C.C1 FINAL. IFY (enter 1. 2. or 10. ESTIMATED J, 4) COSTS (S00. OR'EQUIVALENT SI - A. FUNOING SOURCE FIRST FY LIFE OF PROJECT . C. t.'C 0. TOTAL. wx III L.G.
    [Show full text]
  • Project on Regional Development Planning of the Southern Region In
    Project on Regional Development Planning of the Southern Region in the Republic of Tunisia on Regional Development Planning of the Southern Region in Republic Project Republic of Tunisia Ministry of Development, Investment, and International Cooperation (MDICI), South Development Office (ODS) Project on Regional Development Planning of the Southern Region in the Republic of Tunisia Final Report Part 1 Current Status of Tunisia and the Southern Region Final Report Part 1 November, 2015 JICA (Japan International Cooperation Agency) Yachiyo Engineering Co., Ltd. Kaihatsu Management Consulting, Inc. INGÉROSEC Corporation EI JR 15 - 201 Project on Regional Development Planning of the Southern Region in the Republic of Tunisia on Regional Development Planning of the Southern Region in Republic Project Republic of Tunisia Ministry of Development, Investment, and International Cooperation (MDICI), South Development Office (ODS) Project on Regional Development Planning of the Southern Region in the Republic of Tunisia Final Report Part 1 Current Status of Tunisia and the Southern Region Final Report Part 1 November, 2015 JICA (Japan International Cooperation Agency) Yachiyo Engineering Co., Ltd. Kaihatsu Management Consulting, Inc. INGÉROSEC Corporation Italy Tunisia Location of Tunisia Algeria Libya Tunisia and surrounding countries Legend Gafsa – Ksar International Airport Airport Gabes Djerba–Zarzis Seaport Tozeur–Nefta Seaport International Airport International Airport Railway Highway Zarzis Seaport Target Area (Six Governorates in the Southern
    [Show full text]
  • Direction Régionale Bureau De Poste Code Postal Direction Régionale
    Liste des bureaux de poste assurant la souscription à l’emprunt obligataire national (684 bureaux) Direction Code Direction Code Bureau de poste Bureau de poste Régionale postal Régionale postal Ariana Cité Ennasr Ariana 2001 Kairouan Chebika 3121 Ariana Géant 2002 Kairouan Cité Hajjem 3129 Ariana Sidi Thabet 2020 Kairouan Haffouz 3130 Ariana Kalaat El Andalous 2022 Kairouan Kairouan Sud 3131 Ariana Borj Baccouche 2027 Kairouan Sisseb 3132 Ariana Cebelet Ben Ammar 2032 Kairouan Karma 3133 Ariana Tunis Carthage 2035 Kairouan Kairouan Okba 3140 Ariana Soukra 2036 Kairouan El Ala 3150 Ariana Menzah 8 2037 Kairouan Hajeb Laayoune 3160 Ariana Cité Ettadhamen 2041 Kairouan Nasrallah 3170 Ariana Raoued 2056 Kairouan bouhajla 3180 Ariana Chorfech 2057 Kairouan Cite ennasr kairouan 3182 Ariana Riadh El Andalos 2058 Kairouan Rakada 3191 Ariana Borj Louzir 2073 Kairouan borji 3198 Ariana Ariana 2080 Kairouan Cité Ibn Jazzar 3199 Ariana Borj Touil 2081 Kef Kef 7100 Ariana Cité La Gazelle 2083 Kef Enneber 7110 Ariana Complexe technologique 2088 Kef Touiref 7112 Ariana Menzah 6 2091 Kef El Kalaa Khasba 7113 Ariana Mnihla 2094 Kef Jrissa 7114 Ariana Ettadhamen 2 2095 Kef Kef Ouest 7117 Kasserine Kasserine 1200 Kef Essakia 7120 Kasserine Tela 1210 Kef Borj Elaifa 7122 Kasserine BOUCHEBKA 1213 Kef Kalaat Snen 7130 Kasserine Majel Belabbès 1214 Kef Tejerouin 7150 Kasserine TLABET 1215 Kef Menzel Salem 7151 Kasserine Elaayoune 1216 Kef El Ksour 7160 Kasserine Foussana 1220 Kef Dahmani 7170 Kasserine HIDRA 1221 Kef Sers 7180 Kasserine Kasserine Nour 1230
    [Show full text]
  • Synthèse De L'étude Sur Les Usages De L'amiante Et La Gestion Des Déchets
    Synthèse de l’étude sur les usages de l’amiante et la gestion des déchets amiantés en Tunisie DGEQV‐2013 COMETE Engineering/PLINIOS SA 1 Synthèse de l’étude sur les usages de l’amiante et la gestion des déchets amiantés en Tunisie DGEQV‐2013 TABLE DES MATIERES Note de Synthèse 1 Introduction .......................................................................................................................... 21 1.1 Cadre de l’étude .................................................................................................................... 21 1.2 Organigramme d’étude ......................................................................................................... 21 1.3 Objectifs de l’étude ............................................................................................................... 22 1.4 Organismes et pays de référence .......................................................................................... 23 2 Usages de l’amiante, conséquences et raisons de son éradication ......................................... 24 2.1 Epidémiologie et conséquences de l’exposition à l’amiante ................................................ 24 2.2 Eradication de l’amiante ....................................................................................................... 25 2.3 Produits de substitution de l’amiante ................................................................................... 26 2.4 L’amiante en Tunisie.............................................................................................................
    [Show full text]
  • Mr EL AYADI AMOR Rue Hédi Chaker AGAREB SF Mr CHAHED
    Mr EL AYADI AMOR Rue Hédi Chaker AGAREB SF Mr CHAHED MOHAMED BECHIR 37,Avenue Habib Bourguiba AKOUDA SS Mr EL GHEZAL FREDJ Avenue de la République AKOUDA SS Mme NOUREDDINE NAHLA 9, Bd de l'Environnement AKOUDA SS Mr ABDELMOULA AHMED 71, Avenue Habib Bourguiba ARIANA AR Mme BEN YAHMED EP.BELHADJ WASSILA 35, Avenue Fathi Zouhir-Rte Raoued KmARIANA AR Mr BOUAZIZ HAMADI Rue 18 Janvier - Place Salé ARIANA AR Mr BOUDEN TAOUFIK Avenue Ahmed Khabthani ARIANA AR Mme DRIDI EP.CHERIF LEILA 144, Avenue de l'UMA -La Soukra ARIANA AR Mme FARZA LEILA 66, Avenue Ali Belhaouane ARIANA AR Mr GHEZAIEL MONCEF 20, Avenue de Carthage ARIANA AR Mme JAIT EP.ELLOUMI RAJA Rue A.Belhaouane-Résd.les Rose ARIANA AR Mr KOTRANE RIADH 49,Avenue Fethi Zouhir ARIANA AR Mr KRIAA NABIL 33bis, Avenue Aristote-C.El Ghazala ARIANA AR Mr OUESLATI NEJIB Jaafar - Route de Raoued Km 5 ARIANA AR Mme REZGUI CHARNINE LEILA 27bis, Rue de Beyrouth ARIANA AR Mr FEKI MOHAMED HABIB 10,place El Quods Cité Milaha ARIANA SUPERIEU AR Mr ZOUAIDI HOUCINE Bloc 1 N°4 BARDO CENTER TN Mr OURIR FATHI Avenue Habib Bourguiba BARGOU SS Mr BEN SALEM SALAH Avenue Mohamed V BARRAKET ESSAHEL AR Mr NAAS ALI Rte de Bir Bouragba BARRAKET ESSAHEL AR Mr AMIRA NAOUFEL Angle F.Hached et Kheireddine BEJA BJ Mr BEN OTHMAN RIADH Avenue de la Liberté BEJA BJ Mr BOUJNAH ABDELLATIF Avenue Mongi Slim BEJA BJ Mr BOULAKBECHE BECHIR 67, Avenue Farhat Hached BEJA BJ Mr MANKAI NOUREDDINE Avenue Habib Bourguiba BEJA BJ Mme RAHOUI EP.RABAII SAMIA 34, Avenue de la République BEJA BJ Mme JEMLI MOUFIDA Avenue Habib Bourguiba BEKALTA SS Mr M'BAREK ABDELAZIZ Avenue Habib Bourguiba BEMBLA SS Mme BEL HADJ YAHIA NAJET 18, Avenue Habib Thameur BEN AROUS AR Mr BEN ABDALLAH HAFEDH 8, Avenue de France BEN AROUS AR Mr CHERIF MONGI Ang.rue Rabat-Bizerte-Palestin BEN AROUS AR Page 1 Mme EL KATEB EP.MEHIRI RAFIKA Rue du 1er Mai BEN AROUS AR Mr NAIMI TAHAR 9,Avenue Farhat Hached BEN AROUS AR Mr RIAHI MOHAMED TAOUFIK 38,Avenue Habib Bourguiba BEN AROUS AR Mr SETTARI TAIEB 53bis, Avenue de France BEN AROUS AR Mr TRIMECHE RACHED 26, Av.
    [Show full text]