PROJECT FILE October 11 Dublin: Jan 2008 to 2011 ITV: Sep 2011 to 2013

Location: Dublin Airport/ ITV Clients: Dublin Airport Authority and ITV Property Main Contractor: Laing O’Rourke/Mace Group System: K-K Ultraspan Duration: 5 years

2008: The first hoarding takes shape at Dublin 2011: The new Terminal 2 building is unveiled

This 5-year, two-part project is a sustainability exemplar project because the majority of the Kwik-Klik Ultraspan panels installed at the ITV Granada Studios site in were previously used for over 3 years at the site of Dublin Airport's Terminal 2 building.

Over 1.5 linear kilometres of hoarding panels were needed to establish a secure perimeter around the construction site of Dublin’s Terminal 2 from January 2008. When the Dublin project was complete in the summer of 2011, the hoardings were dismantled and 810 linear metres was transported to Salford Quays to create the site perimeter for the new ITV Granada Studios development at MediaCityUK.

2011: The same hoardings are installed in Salford October 2011: Vibrant new graphics are added

NO PAINT. NO TIMBER. NO DAMAGE. NO DELAY. NO DUST. NO HASSLE.

contact Tony Doherty tel. 08450 584 999 email: [email protected] www.kwik-klik.co.uk 1 PROJECT FILE October 11 PART 1: DUBLIN

Location: Dublin Airport/ ITV Manchester Clients: Dublin Airport Authority and ITV Property Main Contractor: Laing O’Rourke/Mace Group System: K-K Ultraspan Duration: 5 years

Part of the 1.5 km hoarding viewed from Terminal 1 Frames with concrete counterweights are installed

Graphics are added to inform airport users A high security robust hoarding is established

The hoarding provided safe pedestrian and road access to the airport during a major construction programme which involved laying new roads as well as building the spectacular new terminal buildings.

NO PAINT. NO TIMBER. NO DAMAGE. NO DELAY. NO DUST. NO HASSLE.

contact Tony Doherty tel. 08450 584 999 email: [email protected] www.kwik-klik.co.uk 2 PROJECT FILE October 11 PART 2: ITV

Location: Dublin Airport/ ITV Manchester Clients: Dublin Airport Authority and ITV Property Main Contractor: Laing O’Rourke/Mace Group System: K-K Ultraspan Duration: 5 years

An aerial view of the site that will include the new set and a view of Trafford Wharf Road

A view from inside the extensive 810m perimeter and vehicular entry gates—also made from recycled plastic

ITV Property (Developments) Ltd engaged Kwik Klik to install second-use recycled hoardings. The new site will employ 500 staff and become part of the prestigious MediaCity UK complex. It is next door to the Imperial War Museum North and across the water from the BBC's North West headquarters and The Lowry.

NO PAINT. NO TIMBER. NO DAMAGE. NO DELAY. NO DUST. NO HASSLE.

contact Tony Doherty tel. 08450 584 999 email: [email protected] www.kwik-klik.co.uk 3