PROJECT FILE October 11 Dublin: Jan 2008 to 2011 ITV: Sep 2011 to 2013

PROJECT FILE October 11 Dublin: Jan 2008 to 2011 ITV: Sep 2011 to 2013

PROJECT FILE October 11 Dublin: Jan 2008 to 2011 ITV: Sep 2011 to 2013 Location: Dublin Airport/ ITV Manchester Clients: Dublin Airport Authority and ITV Property Main Contractor: Laing O’Rourke/Mace Group System: K-K Ultraspan Duration: 5 years 2008: The first hoarding takes shape at Dublin 2011: The new Terminal 2 building is unveiled This 5-year, two-part project is a sustainability exemplar project because the majority of the Kwik-Klik Ultraspan panels now installed at the ITV Granada Studios site in Salford Quays were previously used for over 3 years at the site of Dublin Airport's Terminal 2 building. Over 1.5 linear kilometres of hoarding panels were needed to establish a secure perimeter around the construction site of Dublin’s Terminal 2 from January 2008. When the Dublin project was complete in the summer of 2011, the hoardings were dismantled and 810 linear metres was transported to Salford Quays to create the site perimeter for the new ITV Granada Studios development at MediaCityUK. 2011: The same hoardings are installed in Salford October 2011: Vibrant new graphics are added NO PAINT. NO TIMBER. NO DAMAGE. NO DELAY. NO DUST. NO HASSLE. contact Tony Doherty tel. 08450 584 999 email: [email protected] www.kwik-klik.co.uk 1 PROJECT FILE October 11 PART 1: DUBLIN Location: Dublin Airport/ ITV Manchester Clients: Dublin Airport Authority and ITV Property Main Contractor: Laing O’Rourke/Mace Group System: K-K Ultraspan Duration: 5 years Part of the 1.5 km hoarding viewed from Terminal 1 Frames with concrete counterweights are installed Graphics are added to inform airport users A high security robust hoarding is established The hoarding provided safe pedestrian and road access to the airport during a major construction programme which involved laying new roads as well as building the spectacular new terminal buildings. NO PAINT. NO TIMBER. NO DAMAGE. NO DELAY. NO DUST. NO HASSLE. contact Tony Doherty tel. 08450 584 999 email: [email protected] www.kwik-klik.co.uk 2 PROJECT FILE October 11 PART 2: ITV Location: Dublin Airport/ ITV Manchester Clients: Dublin Airport Authority and ITV Property Main Contractor: Laing O’Rourke/Mace Group System: K-K Ultraspan Duration: 5 years An aerial view of the site that will include the new Coronation Street set and a view of Trafford Wharf Road A view from inside the extensive 810m perimeter and vehicular entry gates—also made from recycled plastic ITV Property (Developments) Ltd engaged Kwik Klik to install second-use recycled hoardings. The new site will employ 500 staff and become part of the prestigious MediaCity UK complex. It is next door to the Imperial War Museum North and across the water from the BBC's North West headquarters and The Lowry. NO PAINT. NO TIMBER. NO DAMAGE. NO DELAY. NO DUST. NO HASSLE. contact Tony Doherty tel. 08450 584 999 email: [email protected] www.kwik-klik.co.uk 3 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us