Waterproofing & Drainage

Total Page:16

File Type:pdf, Size:1020Kb

Waterproofing & Drainage Waterproofing & Drainage Products & Solutions Enhancing the Urban Experience The Vital Role of Waterproofing + Drainage Our Team Water seepage in buildings can cause damage to Elmich has a dedicated and dynamic team of professionals from the various building and building structures and finishing, as well as poor engineering disciplines. They possess comprehensive environment quality and health problems for inhabitants. appreciation of international and local standards, as Protection against water’s destructive forces is thus well as knowledge of different products and conditions vital in the design and construction of buildings. The in the markets in which we are present. effective approach is integration of good waterproofing and drainage systems – a simple concept of keeping water out and channeling water away quickly. While simple in concept, proper planning, design, selection and installation of every component is required to make sure that the systems work. A comprehensive system is an integrated combination of compatible products. It is critical that product suitability Our Products to the building environment and compatibility with other products and materials are properly evaluated. & Services This is necessary to achieve cost effectiveness, meet construction detail requirements and maximise product Our products range from traditional materials to state- advantages. of-the-art thermoplastics and polymeric products. These materials have excellent track records and a Ultimately, the system must stand the rigours of the comprehensive range of accessories. They provide complete waterproofing security and drainage weather and the test of time. It must work throughout efficiency for all types of residential, commercial, the life of the building. Such demanding performance institutional, industrial and infrastructure projects. We requirement is provided by Elmich, the proven specialist stock more than S$1m worth of products ready for for over 30 years in Singapore and Southeast Asia. delivery to our customers at short notice. Our technical design team provides waterproofing planning, specification, detailing and design services for architects and contractors. We use the latest Creating Cities BIM and CAD software to ensure that we are closely Where Urban Meets Nature integrated in the management of various projects. Our Approach At Elmich, we take pride in being a one-stop waterproofing and drainage specialist and ensuring successful completion of each project we are involved in. • We work closely with building consultants by advising • As an industry leader, we hold informational and on areas that require waterproofing and drainage, and educational seminars for building professionals recommending the most appropriate system for each area. concerning material selection and design details. • We provide customized, comprehensive specifications and • We continuously invest in the latest technology, installation details and on-site monitoring of installation works. product improvement system, equipment, CAD and BIM design capabilities to support our clients. • We understand that leaks are frequently caused by poor workmanship, incorrect system design or unsatisfactory • We have developed methods and details suitable for local detailing and not product failure itself. conditions, such as use of drainage sheeting and strip drainage in inverted roof design that are now standard details in the construction industry. Our Partners & Suppliers We source from only reliable and environmentally-conscious manufacturers, including Alwitra, Soprema, Isoltema, Dorken, Sealeco and Envirosystems. All our suppliers are certified to ISO 9001 and ISO 14000 standards. Our products are high-quality and proven, compliant with internationally recognized standards and/or certifications such as EN, DIN, BS, ASTM, BBA, FM, UEAtc, AS and PSB. Most of them are also certified to ISO 14025, Singapore Building Council and Singapore Green Label standards. We work closely with selected applicators who are suitably trained and qualified to install our products. To give customers peace of mind, we provide single product-installation warranty with our applicators Covering more than 27 countries across the world Elmich main offices & distributors worldwide ELMICH Waterproofing & Drainage Solutions Joint Sealing • Elmich Sealing Tape P50 Self-Adhesive Butyl Tape ................ 15 • Elmich Reinforcement Tape F100 Self-Adhesive Butyl Tape ... 15 • Flexjoint EP Waterproof Expansion Joint ............................... 15 Basement • Colphene BSW Blind-Side Bituminous Membrane ............. 07 • Bitulen® SK374 Self-Adhesive Bituminous Membrane ........ 08 • Eurathane® 1600 Spray Polyurea Membrane ...................... 09 • Delta® MS/Terraxx/PT Drainage Sheet ................................ 13 • Pluvex No.2 BS6398 Damp-Proof Course/Membrane ........ 14 Exposed/Concealed Roof • EVALON® EVA / PVC Membrane .................................. 05 • Polyflex® 180 APP-Modified Bituminous Membrane ...... 06 • Eurathane® 1200 SPE Spray-Applied Membrane ......... 09 • Eurathane® 1600 Spray-Applied Polyurea Membrane .... 09 • ALSAN RS PMMA Coating ........................................... 10 • Eurathane® 3000 PU Coating ....................................... 11 • VersiDrain® 6P Under-Screed Drainage ......................... 14 Green Roof • EVALON® EVA / PVC Membrane ......................... 05 • Eurathane® 1200 SPE Spray-Applied PU Membrane .............................. 09 Basement • Colphene BSW Blind-Side Bituminous Membrane ............. 07 • Bitulen® SK374 Self-Adhesive Bituminous Membrane ........ 08 • Eurathane® 1600 Spray Polyurea Membrane ...................... 09 Wet Areas, Swimming Pools, Tanks, etc. ® • Delta® MS/Terraxx/PT Drainage Sheet ................................ 13 • Eurathane 2000 PU Coating .......................... 11 ® • Pluvex No.2 BS6398 Damp-Proof Course/Membrane ........ 14 • Eurathane 2500 PU Coating .......................... 11 • Fleximent® 201 Cementitious Coating .............. 12 05 Preformed Membranes (Rooftop Application) PAGE FIVE EVALON® 042-019 EVA/PVC Membrane Marina Bay Sands Promenade NTU School of Art, Design & Media Esplanade, Theatres By The Bay EVALON® V membranes consist of a high polymer of EVA and PVC, a purpose-made homogeneous thermoplastic material manufactured according to DIN 18531-2 and DIN 18195-2 standards for single-ply waterproofing. Applicable Areas • Non-ventilated metal roof • Green roof • Inverted roof Features & Advantages • Homogeneous and easily installed with seamless joints • High solid content (>90%) and dimensionally stable • High solar reflectivity • Compatible with bitumen and polystyrene • Certified to minimum 30 years field life by British Board of Agrement (BBA) • Root- and rhizome-resistant certified to German FLL Green Roof standard • Environmental Product Declaration according to ISO 14025 • Singapore Green Label & Singapore Green Building Council certified • Complete integrated flat roof solution with Alwitra profiles and accessories • Available in self-adhesive coating for fully-bonded application ® Polyflex 180 APP Modified Bituminous Membrane Golden Shoe Carpark Polyflex® 180 is a non-woven polyester-reinforced atactic-polypropylene polymers (APP) modified bitumen waterproofing membrane, suited for use in climatic conditions with significantly high operating temperatures. Applicable Areas • Non trafficable and trafficable flat roofing • Inverted roofs • Vault and steel covering • Roof refurbishment • Foundation and underground structures Features & Advantages • Available in different coloured slated-coated surface • Conforms to Singapore Standard SS374:1994 • High temperature sealing capability • Dimensionally stable • UV resistant • High static puncture resistance 07 Preformed Membranes (Below Ground Application) PAGE SEVEN Colphene BSW Blind-side Waterproofing Membrane Colphene BSW is a fully reinforced pre-applied system membrane designed for horizontal and vertical external blind- side waterproofing applications. The system is composed of a select blend of high performance SBS modified bitumen combined with an ultra-high strength reinforcement and a specially formulated top surface. The sanded top face exhibits tenacious adhesion when concrete is poured against it and therefore provides a continuous and integral seal to the structure, preventing ingress or migration of water around the structure. Applicable Areas • Below ground blind-side waterproofing • Mud slabs • Underwork slabs • Shotcrete retention walls • Lagging Features & Advantages • Impermeable to moisture • Excellent adhesion to poured concrete • Fully adhered, watertight laps • Superior tensile strength and puncture resistance • Can be applied to permanent formwork • Easy to install • Minimum hydrostatic head resistance of 114 metres ® Bitulen SK374 Self-adhesive Bituminous Membrane Photo Courtesy of PUB, Singapore ‘s national water agency Convent of The Holy Infant Jesus Secondary School Marina Barrage Bitulen® SK374 is a SBS modified bituminous self-adhesive waterproofing membrane for below grade with concrete, brickwork and blockwork constructions to protect building against water. It comprises a cross-laminated polyethylene film coated with modified bitumen. Applicable Areas • Basement walls • Tunnels • Concrete structures Features & Advantages • Self-adhesive with easily removable silicone release sheet • Impermeable to moisture • Consistent thickness • Superior flexibility • Puncture resistant with high tensile
Recommended publications
  • HENG HARDWARE ENGINEERING PTE LTD LISTS of PROJECTS USING HENG LIGHTNING PROTECTION SYSTEM Project Type: Airbase
    HENG HARDWARE ENGINEERING PTE LTD LISTS OF PROJECTS USING HENG LIGHTNING PROTECTION SYSTEM Project Type: Airbase S/N PROJECT 1 600 WEST CAMP ROAD (SELETAR AEROSPACE) 2 A&A WORK TO 14NOS GATEWAY @ TERMINAL 2 3 AIR TRAFFIC CONTROL CENTRE AT BIGGN HILL ROAD 4 AIRCRAFT BLAST FENCE FOR CHANGI AIRPORT TERMINAL 3 5 AIRCRAFT HANGAR 6 & 7 6 AIRLINE HOUSE AT CHANGI 7 AIRMAIL TRANSIT CENTRE AT CHANGI AIRCARGO COMPLEX 8 BLK 113E SEMBAWANG AIRBASE 9 BUDGET TERMINAL 10 CAB WEST L3 11 CAFHI CHANGI AIRPORT 12 CARGO T4 13 CHANGI AIRBASE 14 CHANGI AIRPORT 2ND SOUTH CROSS TAXIWAY 15 CHANGI AIRPORT AT BUDGET TERMINAL 16 CHANGI AIRPORT LIGHTING SHELTE 17 CHANGI AIRPORT TERMINAL 1 18 CHANGI AIRPORT TERMINAL 1 COACH STAND 19 CHANGI AIRPORT TERMINAL 2 20 CHANGI AIRPORT TERMINAL 2 FIXED GATEWAY 21 CHANGI AIRPORT TERMINAL 3 22 CHANGI AIRPORT TERMINAL PHASE 2 23 CHANGI AIRPORT VIP COMPLEX 24 CHANGI CUSTOM CHECKPOINT 25 CHANGI EAST AIRBASE 26 CHANGI EAST RUNWAY 3 27 CHANGI T2 FIXED GANGWAY 28 HANGAR 800 29 INTAIL AEROSPACE AT 32 LOYANG DRIVE 30 NOSE SHELTER AT SIA 31 PAYA LEBAR AIR BASE 32 PAYA LEBAR AIR BASE (JET FUEL STATION 2) 33 PROPOSED ERECTION OF AIRCRAFT HANGER 6 AT 540 AIRPORT ROAD 34 SELETAR AEROSPACE 35 SELETAR AIRBASE 36 SELETAR AIRPORT SOUTH POINT 37 SELETAR CONTROLA TOWER @ SELETAR AIRBASE NO.7 YISHUN INDUSTRIAL STREET 1, #01-48 NORTH SPRING BIZHUB, S(768162) TEL:68464111 FAX:68464222 Web:www.heng.com.sg Email:[email protected] HENG HARDWARE ENGINEERING PTE LTD LISTS OF PROJECTS USING HENG LIGHTNING PROTECTION SYSTEM Project Type: Airbase 38 SELETAR
    [Show full text]
  • A Short Memo on Singapore
    FEATURE A Short Memo on Singapore By Roger Dong hy should we be so interested in The nation’s overall and military strategy Singapore? Most of us know very is diplomacy and deterrence. little about Singapore - a tiny city W As a former diplomat (Defense Attaché) state that plays a giant role in the modern world. in Asia, I would like to share some background Do you know that Singapore is one of about the significance of our military relationship America’s closest military, political and with the Singaporean. Nothing is classified in this economic allies? Few people realize how memo, but you will not read a lot of this important Singapore is to America and, information in our history books or tour books. especially to our military. First, a brief recent history about In Asia this small island nation (just 277 Singapore. square miles) is the transportation and business In 1965 (not 1865), Singapore’s first hub for more than a quadrant of the world, Premier Lee Kuan-yew began developing including Australia. Compare this size to Beijing, Singapore from a barren swamp into one of the which is 6,900 square miles? Singapore is most advanced and technically competent considered by many people as the freest, most countries in the world. innovative, most competitive, and most business friendly country in the world. But it is not a The island did not, and still does not democracy. Some would call it a benevolent have, any natural resources, and not enough fresh dictatorship. water to sustain even the small population even in 1965.
    [Show full text]
  • Change of Command for the Chief of Army and the Chief of Air Force
    Change of Command for the Chief of Army and the Chief of Air Force 30 Jun 1998 Today, 30 Jun 98, the Army and the Republic of Singapore Air Force (RSAF) held the Change of Command Parades for the Chief of Army and the Chief of Air Force. Both parades were witnessed by the Chief of Defence Force, Lieutenant-General (LT-GEN) Bey Soo Khiang and senior commanders from the Singapore Armed Forces (SAF). The Change of Command is part of the SAF's policy on leadership renewal, and to release talented SAF officers to serve in the public and private sectors. Major-General (MAJ-GEN) Han Eng Juan will join the Land Transport Authority while MAJ-GEN Goh Yong Siang will join Singapore Technologies Industrial Corporation, on 1Jul 98. At Paya Lebar Air Base this morning, the Chief of Air Force, MAJ-GEN Goh handed over the Air Force Command Symbol to Brigadier-General (BG) Raymund Ng Teck Heng. MAJ- GEN Goh reviewed a parade formed by the RSAF formations of Tengah Air Base, Paya Lebar Air Base, Sembawang Air Base, Changi Air Base, Air Defence Systems Division and Tactical Air Support Command. At the end of the parade, MAJ-GEN Goh boarded the Super Puma for a send-off flight. Over at Nee Soon Camp in the afternoon, the Chief of Army, MAJ-GEN Han handed over the Army Command Symbol to BG Lim Chuan Poh. MAJ-GEN Han reviewed a Guard of Honour mounted by 3 Singapore Infantry Regiment, the best combat unit for 1997 and 3rd Division, which was the last formation commanded by him.
    [Show full text]
  • Aviation Engineering
    AVIATION ENGINEERING “DTC IS THE SECRET-EDGE WEAPON OF THE SAF” DR NG ENG HEN MINISTER FOR DEFENCE The opinions and views expressed in this work are the authors’ and do not necessarily reflect II the official views of the Ministry of Defence TABLE OF CONTENTS Foreword Message Preface 1 CHAPTER 1 : Where We Were Section 1.1 How It All Started Section 1.2 Some History of the Early Engineering Work in Support of the RSAF 22 CHAPTER 2 : Pioneering Spirit Section 2.1 Maintenance, Repair and Overhaul Section 2.2 Engineering Development - Modifications and Upgrading Section 2.3 Service Life Extension Programme (SLEP) Section 2.4 Managing Technologies Section 2.5 “Commercialisation” Section 2.6 Values and Necessities 61 CHAPTER 3 : Some Major Milestones Section 3.1 The A-4 Crisis Section 3.2 Conversion Programmes 3.2.1 New Engine for the Skyhawk 3.2.2 A-4 Avionics Upgrade (1985) – First Major Avionics Upgrade Undertaken 3.2.3 F-5E/F WDNS Upgrade – Unleashing the Tiger 3.2.4 Giving the F-5 an Eye in the Sky – F-5E to RF-5E Conversion 3.2.5 Upgrade Capability Serving Overseas F-5 Users 3.2.6 Brazilian Air Force F-5E/F Upgrade 3.2.7 Upgrading of the Hercules C-130 3.2.8 F-16 3.2.9 F-15SG Capability Build-up Section 3.3 Surveillance Aircraft 3.3.1 E-2C 3.3.2 Fokker 50 Maritime Patrol Aircraft Conversion 3.3.3 G550 Section 3.4 Rotary Wing Evolution 3.4.1 Vertical Lift in the RSAF 3.4.2 The Super Puma Experience 3.4.3 Developing the Light Observation Helicopter and Light Attack Helicopter 3.4.4 Heavy-Lift Helicopter Evaluation – The Russian Experience
    [Show full text]
  • Integrating the Planning of Airports and the City: the Singapore Story 413858 1 78981 9
    Integrating the Planning of Airports and the City: The Singapore Story As a former British colony, Singapore had flourished as a trading port-of-call due to its strategic location along the shipping route between Asia and Europe. However, neither its STUDIES URBAN SYSTEMS past colonial links nor geography could guarantee its continued success in the oncoming jet age. For the newly independent government formed in 1965, there were several fundamental national priorities, such as housing, job creation, education and infrastructure. However, a strategic decision was taken to build a new commercial international airport at Changi—a hefty mega-infrastructure that carried both substantial costs and risks for a land-strapped island which already had four airports. Such a decision bore far-reaching consequences in terms of land use, transport, Story The Singapore the Planning of Airports and City: Integrating industrial planning, defence, residential and social spaces. Integrating the In this Urban Systems Study, readers will learn about the comprehensive planning that went into the development of Planning of Changi Airport, and the integrated manner in which it was carried out. It additionally explores Singapore’s experience in Airports and navigating the unique urban-planning constraints and trade- offs brought about by both civilian and military airports, and examines the systematic approach taken to capitalise the City: on airport developments to catalyse urban and economic development. The Singapore Story “ Changi Airport is our major investment to exploit our geographic location. Singapore must be prepared and ready to seize every opportunity that comes its way. Whether we have been extravagant in investing in an airport of this size and level of sophistication is a question worthy of a rhetorical rejoinder.
    [Show full text]
  • AIP Supplement for
    AIP Singapore AIP SUP 031/2018-1 ~~~eaip-amdt~~~22 JUN 2018 Contact AIP Supplement for AIP SUP 031/2018 Post: Singapore Effective from 31 JUL 2018 REPUBLIC OF SINGAPORE PERM AERONAUTICAL Published on 22 JUN 2018 INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE 918141 Tel: (65) 6595 6051 AFS: WSSSYNYX Fax: (65) 64410221 Email: [email protected] URL: www.caas.gov.sg URL: https://fpl-1.caasaim.gov.sg SINGAPORE CHANGI AIRPORT – UPDATED INFORMATION AND DATA FOR RUNWAY 02R/20L 1 INTRODUCTION 1.1 This AIP Supplement informs aircraft operators of the updated information and data for Runway 02R/20L. 1.2 With effect from 31 July 2018 2300 UTC, Runway 02R/20L will re-open for operations, solely for use by the Republic of Singapore Air Force (RSAF) unless with prior coordination. Please see Annex A for the location of Runway 02R/20L. 2 RUNWAY 02R/20L INFORMATION AND DATA 2.1 The updated information and data for Runway 02R/20L will be incorporated into AIP Singapore Part 3 – AERODROMES (AD), section AD 2 AERODROMES – WSSS as follows: WSSS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 6 AD Administration, address, telephone, telefax, AFS For RWY 02R/20L Republic of Singapore Air Force Headquarters, Changi Air Base 508A, Cranwell Road Singapore 509863 Tel: (65) 65864033 (Base Operations) 8 Remarks g. RWY 02R/20L is solely for use by the Republic of Singapore Air Force (RSAF) aircraft, unless with prior coordination. WSSS AD 2.3 OPERATIONAL HOURS 1 Aerodrome Administration: For RWY 02R/20L 2300- 1700 SUN/MON to TUE/WED.
    [Show full text]
  • Factsheet - RSAF Units to Be Housed at CAB (East)
    Factsheet - RSAF Units to be Housed at CAB (East) The main operational units located within CAB (East) are 145 Squadron (operating the F- 16D BLK 52+), the Flying Support Squadron (FSS-CAB), the Air Logistics Squadron (ALS- CAB) and the Airfield Maintenance Squadron (AMS-CAB). 145 SQUADRON The squadron motif depicts a valiant hornet in an attack posture to deter potential aggressors. The yellow and black strips represent speed and agility. Its blazed-green eyes and forward arching sting epitomise its readiness to strike in swift response to defend its nest, at day or night. Established on 1 st Apr 1984 at Tengah Air Base, the Squadron first started flying the A4 Skyhawks. In 1992, 145 Squadron was the first Squadron to fly the indigenously developed A4-SUs. It has since undertaken a wide spectrum of roles that focuses on RSAF operational requirements and converting new pilots from Flying Training School to operational fighter pilots. The professionalism and operational readiness of the crew in 145 Squadron were exemplified through the achievement of numerous awards which includes the coveted Best Fighter Squadron in 1998 and 2000, and RSAF Hot Shot Competitions. After nearly 2 decades, the squadron ended its A4-SU operations on 30 Apr 03 to prepare for 1 relocation and operation of the new F16D Blk 52 +. On 3 Jul 2004 , 145 Squadron began operating from Changi Air Base (East) with the induction of the F16D Blk 52 +, the latest in RSAF's inventory. The squadron will have a total of 20 F16D Blk 52 +. The F16D Blk 52 + is equipped with state-of-the-art Conformal Fuel Tanks, enhanced radar with greater detection range and improved ground mapping capabilities, and an advanced targeting pod, which will enable the Squadron to conduct precision day and night operations at a greater combat range and duration.
    [Show full text]
  • Wwii-Text.Pdf
    a heritage trail CONTENTS. » northwest » city 01 Sarimbun Beach Landing _________p.3 27 Sook Ching Screening Centre 02 Lim Chu Kang Landing Site ________p.3 (Hong Lim Complex) _____________p.23 03 Ama Keng Village _______________p.4 28 Fort Canning Command Centre ___p.24 04 Tengah Airfield _________________p.4 29 The Cathay _____________________p.25 05 Jurong-Kranji Defence Line _______p.5 30 Kempeitai Headquarters 06 Kranji Beach Battle ______________p.6 (YMCA) _______________________p.26 07 Causeway ______________________p.7 31 Raffles Library & Museum 08 Kranji War Cemetery ____________p.8 (National Museum of Singapore) __p.27 32 Former St. Joseph’s Institution (Singapore Art Museum) _________p.28 » northeast 33 Padang _________________________p.29 09 The Singapore Naval Base ________p.9 34 Municipal Building (City Hall) _____p.29 10 Sembawang Airfield _____________p.11 35 St. Andrew’s Cathedral __________p.29 11 Seletar Airfield__________________p.11 36 Lim Bo Seng Memorial ___________p.30 12 Punggol Beach Massacre Site _____p.12 37 Cenotaph ______________________p.30 13 Japanese Cemetery Park _________p.12 38 Indian National Army Monument _p.30 39 Civilian War Memorial ___________p.31 40 Singapore Volunteer Corps » central Headquarters (Beach Road Camp) p.32 14 Battle for Bukit Timah ____________p.13 41 Kallang Airfield _________________p.32 15 Ford Factory (Memories at Old Ford Factory) ___p.14 16 Bukit Batok Memorial ____________p.15 » east 17 Force 136 & 42. The Changi Museum _____________p.35 Grave of Lim Bo Seng _____________p.16 43. Changi Prison ___________________p.35 44. Johore Battery __________________p.36 45. India Barracks __________________p.37 » south 46. Selarang Barracks _______________p.37 18 Pasir Panjang Pillbox _____________p.17 47. Robert Barracks _________________p.37 19 Kent Ridge Park _________________p.17 48.
    [Show full text]
  • Yat Paper Apr 09
    Changi ite newsletter 48_Changi ite newsletter 43 01/03/2012 16:17 Page 1 Flying over Changi: The Venom fighter bomber (see Page 4) RAF CHANGI ASSOCIATION including HQ. FEAF Spring 2012 Issue No 48 Changi ite newsletter 48_Changi ite newsletter 43 01/03/2012 16:17 Page 2 Page 2 The aim of the RAF Changi Association is to bring together all those who were stationed at RAF Changi (including HQ FEAF) Singapore, so they can renew old friendships and make new ones RRAFAF Changi Asssociasociattionion ((IncludingIncluding HQ.FEAF) Fooundedunded M ay 1999696 The aim of the RAF Changi Association is to bring together all those who were stationed at RAF Changi (including HQ FEAF) Singapore, so they can renew old friendships and make new ones Our website: www.rafchangi.co.uk THE TEAM President -- To be appointed Chairman: Mike James 12, Shiners Elms, Yatton, Bristol, BS49 4BY. Tel. 01934 833170 Vice Chairman/Archivist/Webmaster John Dicks, 4 Langley Crescent, Kings Langley, Herts. WD4 8EW Tel. 01923 400221 Secretary: Pat Holt. 14, Burrowfields, Basingstoke, Hampshire, RG22 4XJ Tel..01256 477253 Treasurer Richard Collins, “Sandhurst Cottage” Corsley Heath, Warminster, Wilts. BA12 7PW Tel. 01373 832789 Newsletter Editor: Ken Dennis, 1 Warwick Close, St. Merryn, Cornwall. PL28 8LH Tel. 01841 521038 Membership Sec: Malcolm Flack, 14 Highfield Close, Amersham, Bucks. HP6 6HG Tel. 01494 728562 Publicity /PressOfficer Brian Lloyd 32, Redwood, Burnham, Bucks, SL1 8JN Tel: 01628 661005 Other Members Almoner/Medal Adviser: David Haylock, 37, Pierces Hill, Tilehurst, Reading, Berks. RG31 6RB Tel..01189 425753 Regalia Officer and ‘History of Changi’ Sales: Dolores James, 12, Shiners Elms, Yatton, Bristol, BS49 4BY Tel: 01934 833170 The Team’s E-mail Addresses Mike James (Chairman) [email protected] John Dicks (Vice Chairman/Archivist) [email protected] Past Holt.
    [Show full text]
  • Waterproofing & Insulation
    waterproofing PROJECT REFERENCES Condominiums & Apartments 1K GREEN LANE APARTMENTS DP Architects 1 MOULMEIN RISE WOHA Architects ALESSANDREA Cyril K H Seah Architects AALTO RDC Architects AVILA GARDENS Ong & Ong Architects AZALEA PARK Ong & Ong Architects BALLOTA PARK Ong & Ong Architects BINJAI CREST RSP Architects BISHAN 8 RSP Architects BUCKLEY 18 Axis Architects CAIRNHILL CREST DP Architects CARRISA PARK Ong & Ong Architects CENTENNIA SUITES DP Architects CHESTERVALE ST Architects CLEMENTI WOODS ADDP Architects DERBYSHIRE HEIGHTS Architects Group Associates DOMAIN 21 DP Architects DOUBLE BAY RESIDENCES DP Architects DUCHESS RESIDENCES MKPL Architects EASTSIDE LOFT eco.id architects EASTWOOD GREEN Lee Sian Teck Architects EDELWEISS PARK Ong & Ong Architects ESPARINA RESIDENCES ADDP Architects EVERGEEN PARK RSP Architects FERRELL RESIDENCES Architects 61 FLORIDIAN DP Architects FRASER SUITES P&T Consultants GALLERY 8 Suying Design Architects GLENTREES MKPL Architects GREENVALE TERRACES Design Link Architects WPSpec ver 9.11 waterproofing PROJECT REFERENCES Condominiums & Apartments (cont’d) HAZEL PARK APCO Architects & DP Architects HILLVIEW GREEN Team Design Architects LA MANSION (A & A) DP Architects LE REVE DP Architects MADISON RESIDENCES P&T Consultants MIRAGE TOWERS RSP Architects MT SOPHIA SUITES Ronnie Chin & Associates NEWTON EURO-ASIA ADT Architects Design Team PARKVIEW ECLAT Ong & Ong Architects PATERSON SUITES DP Architects PAVILION PARK RSP Architects PROSPER GARDENS BJ Architects RESIDENCES @ SOMME GAiA Architects RHAPSODY AT MOUNT ELIZABETH Atelier Group Architects RIVERDALE APARTMENTS HKF Partnership ROBERTSON WALK P&T Consultants ROCCA BALESTIER Architects Group Associates SAPPHIRE 99 APARTMENTS Acme Architects SCOTTS HIGHPARK MKPL Architects SHELFORD VIEW (A & A) Look Architects SEMBAWANG GREENVALE Design Link Architects SEVEN PALMS Kerry Hill Architects SILVERSEAS DP Architects SOLITAIRE Team Design Architects SOUTHBANK DP Architects SPRING GROVE CONDOMINIUM RSP Architects ST.
    [Show full text]
  • ACI World Airport Development News: Issue 02 – 2014
    Issue 02 / 2014 ACI World AIRPORT DEVELOPMENT NEWS A service provided by ACI World in cooperation with Momberger Airport Information www.mombergerairport.info Editor & Publisher: Martin Lamprecht [email protected] Founding Editor & Publisher: Manfred Momberger Focus on SOUTH-EAST ASIA BANGLADESH The Government will restart the process of constructing Bangabandhu International Airport initiated during its last term, but backtracked at the end of its tenure. The new airport, about 60 km from the capital Dhaka, could be an alternate for the city’s ‘Hazrat Shahjalal International Airport’ (DAC). "We will start afresh the proposed Bangabandhu Airport. I've already held a meeting and had discussions about it," said Civil Aviation & Tourism Minister Rashed Khan Menon after inaugurating the high-speed taxiway built under a project of the Danish International Development Assistance (Danida) at DAC. The high-speed taxiway will enable incoming aircraft to reach the terminal at DAC in a shorter time, requiring less fuel and saving time for passengers. Menon also said he would give top priority to upgrading the Cox's Bazar Airport to boost the tourism industry. To this end, he would complete all formalities in three months. The proposed Bangabandhu ‘Sheikh Mujib International Airport’ is to be built under a public- private partnership and is expected to cost up to USD 7.2 billion. Several sites are under study, with Char Janajat on the southern banks of the Padma river being the most likely. – Bangladesh has three international and five domestic airports, all of which are under-used for lack of proper management. On 12 May 2014, the Government approved a proposal to appoint an international conglomerate for implementation of the expansion work of Dhaka’s ‘Hazrat Shahjalal International Airport’, aiming to double its capacity.
    [Show full text]
  • Positioning Our Air Hub: Management Summary of the 2019 IPA Results
    Positioning our air hub Management summary of the 2019 IPA results Institute for Transport Planning and Systems Institute for Spatial and Landscape Development Institute of Construction & Infrastructure Master Spatial Development and Infrastructure Systems Singapore 2019: Positioning our air hub 3 Singapore 2019: Positioning our air hub Content Our trip to Singapore 5 Excursion program 6 Projects 7 SmartChangi CHANGE - A transformation strategy 10 Airport City Changi+ - Your Happiness, Our Passion 14 Positioning our air hub 18 Changi: A hub for exchange 22 Changi - a future business center of Singapore 26 Reference 29 4 Singapore 2019: Positioning our air hub Our trip to Singapore In each autumn term at ETH Zurich, Master in Spatial De- The strategy should also point out business opportunities, velopment and Infrastructure Systems students work on an while addressing the challenges of resource scarcity (e.g., interdisciplinary group assignment, called Interdisziplinäre food, energy, water) and negative externalities (e.g., con- Projektarbeit (IPA). In this class, students work within a de- gestion, environment). In the following six chapters, each fined project area – with a time horizon and with several of the six groups summarizes their strategy and proposed (political) constraints - on the spatial and transport planning measures to “position Changi air hub”. as well as infrastructure management issues interdiscipli- narily for a particular area. Usually, the course focuses on For more than ten years, a strong collaboration between an area within Switzerland’s lower density suburbia, provi- ETH Zurich and Singapore exists, most notably anchored in ding students a Swiss problem awareness, but surely not a the Singapore-ETH-Centre (SEC).
    [Show full text]