Public Interest Assessment
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
City of Bayswater) Cr Catherine Ehrhardt (Local Government Member, City of Bayswater)
Metro Central Joint Development Assessment Panel Agenda Meeting Date and Time: 18 September 2019, 9:00 AM Meeting Number: MCJDAP/366 Meeting Venue: Department of Planning, Lands and Heritage 140 William Street Perth Attendance DAP Members Ms Megan Adair (Presiding Member) Ms Rachel Chapman (Deputy Presiding Member) Mr Michael Hardy (Specialist Member) Cr Chris Cornish (Local Government Member, City of Bayswater) Cr Catherine Ehrhardt (Local Government Member, City of Bayswater) Officers in attendance Mr Remajee Narroo (City of Bayswater) – via teleconference Mr Steven De Piazzi (City of Bayswater) – via teleconference Minute Secretary Ms Ashlee Kelly (DAP Secretariat) Applicants and Submitters Mr Nik Hidding (Peter Webb & Associates) Mr Brendan Foley (Thomson Geer) Members of the Public / Media Nil 1. Declaration of Opening The Presiding Member declares the meeting open and acknowledges the traditional owners and pay respects to Elders past and present of the land on which the meeting is being held. 2. Apologies Nil 3. Members on Leave of Absence Nil Version: 2 Page 1 4. Noting of Minutes Signed minutes of previous meetings are available on the DAP website. 5. Declarations of Due Consideration Any member who is not familiar with the substance of any report or other information provided for consideration at the DAP meeting must declare that fact before the meeting considers the matter. 6. Disclosure of Interests Nil 7. Deputations and Presentations 7.1 Mr Brendan Foley (Thomson Geer) presenting in support of the application at Item 9.1. The presentation will address legal submission regarding the application. The City of Bayswater may be provided with the opportunity to respond to questions of the panel, as invited by the Presiding Member. -
Street Name Origins in the Town of Bassendean
Street Name Origins in the Town Of Bassendean. P622- Railway Avenue looking towards Lord Street, 2 June 1923 Image in the Local Studies Collection, Bassendean Memorial Library. Disclaimer All effort has been made to ensure the information is accurate at the time of publication, but in many cases, there are no records uncovered as to why a particular road or locality was given its name. In some instances a reasonably likely explanation can be determined, particularly where the name commemorates a known local identity or family. The Local Studies Librarian would be very grateful for any further information about these road names so please be in contact if details should be added or amended. Contents Introduction ............................................................................................................................................ 7 Local street names ................................................................................................................................. 7 Alice Street ......................................................................................................................................... 7 Anstey Road ........................................................................................................................................ 7 Anzac Terrace ..................................................................................................................................... 7 Ashfield Parade ................................................................................................................................. -
Northlink WA – Southern Section: Guildford Road to Reid Highway
MAIN ROADS WESTERN AUSTRALIA MAY 2017 Construction Update NorthLink WA – Southern Section: Guildford Road to Reid Highway John Holland is working in Upcoming: road closures and traffic changes partnership with Main Roads Over the next month there will be a number of road closures and changes to to deliver the upgraded Tonkin traffic including: Highway on NorthLink WA’s LONG WEEKEND CLOSURES 7pm Friday 2 June – 5am Tuesday 6 June Southern Section. • Benara Road closed at Tonkin Highway: To construct the Benara Road flyover, we need to install bridge beams. Large cranes will be positioned on As we reach the end of Autumn, Tonkin Highway near Benara Road requiring lane closures on Tonkin Highway construction is progressing at a and the closure of Benara Road between Beechboro Road North and Crimea fast rate. We are working along Street. Local resident access to the closed section of Benara Road will be maintained. the full length of Tonkin Highway between Guildford Road and • Guildford Road on-ramp to Tonkin Highway northbound closed: The Benara Road with a strong focus on-ramp to Tonkin Highway northbound at Guildford Road will be closed so on building the bridges at Collier that newly constructed traffic lanes can be connected with the existing traffic Road, Morley Drive and Benara lanes. Tonkin Highway will remain open with a single lane available in each direction. Road. June/July • Cul-de-sac at Spencer Street: As part of the final road design Spencer Street will be closed to become a cul-de-sac on both sides of Collier Road. -
CITY of BAYSWATER Local Housing Strategy
CITY OF BAYSWATER Local Housing Strategy May 2012 TABLE OF CONTENTS Page No. EXECUTIVE SUMMARY v PART 1: INTRODUCTION 1 1. Introduction 3 1.1 Role of the Housing Strategy 3 1.2 Document Structure 4 1.3 Strategy Objectives 5 2. Key Principles 6 3. Context 10 3.1 Key Demographic and Housing Trends 10 3.2 Metropolitan Planning Context 13 3.3 Local Planning Context 16 PART 2: FOCUS AREAS FOR CHANGE 19 4. Focus Areas for Change 21 4.1 Locations 21 4.2 Dwelling Targets 29 4.3 Quality of Development 30 5. Suburban Residential Areas 34 PART 3 : GENERAL POLICIES 37 6. Housing Choice and Affordability 39 7. Quality of Design and Streetscape 42 7.1 Streetscape Policy and Design Guidelines 42 7.2 Streetscape Improvements 45 8. Heritage 48 9. Character 50 10. Sustainability and Environment 55 10.1 Sustainable Residential Design 56 PART 4: ACTIONS AND IMPLEMENTATION 61 11. Local Housing Strategy Actions 63 12. Implementation and Monitoring 69 CONCLUSION 77 Background Study 79 CITY OF BAYSWATER LOCAL HOUSING STRATEGY i LIST OF FIGURES Figure 1 Focus Areas for Change Figure 2 Location of the City of Bayswater Figure 3 Suburbs of the City of Bayswater Figure 4 Residents per dwelling in the City of Bayswater 1996-2006 Figure 5 Number of bedrooms per dwelling in the City of Bayswater 2006 Figure 6 Change in the number of bedrooms per dwelling in the City of Bayswater 1996-2006 Figure 7 City of Bayswater change in age of population 1996-2006 Figure 8 City of Bayswater age/sex profile 2006 Figure 9 Central Perth Metropolitan Sub-region Figure 10 Areas covered -
Main Roads Tonkin Highway Guildford Road to Hepburn Avenue
Main Roads Tonkin Highway Guildford Road to Hepburn Avenue Environmental Protection Act Referral Supporting Document Don Aitken Centre Waterloo Crescent, East Perth, 6004 31 July 2019 56957/R001 (Rev 1) JBS&G Australia Pty Ltd T/A Strategen-JBS&G Main Roads Tonkin Highway Guildford Road to Hepburn Avenue Environmental Protection Act Referral Supporting Document Don Aitken Centre Waterloo Crescent, East Perth, 6004 31 July 2019 56957/R001 (Rev 1) JBS&G Australia Pty Ltd T/A Strategen-JBS&G Table of Contents 1. Summary ........................................................................................................................ 1 1.1 Project Information ............................................................................................. 1 1.2 Impacts to key environmental aspects ................................................................ 2 1.3 Key Environmental Management Actions ........................................................... 2 1.4 Summary of Regulatory Approvals ...................................................................... 3 2. INTRODUCTION .............................................................................................................. 4 2.1 Purpose of this document ................................................................................... 4 3. PROJECT DESCRIPTION .................................................................................................. 5 3.1 Proposal Location ............................................................................................... -
Western Australia Police
WESTERN AUSTRALIA POLICE SPEED CAMERA LOCATIONS FOLLOWING ARE THE SPEED CAMERA LOCATIONS FOR THE PERIOD OF MONDAY 24/03/2008 TO SUNDAY 30/03/2008 Locations Marked ' ' relate to a Road Death in recent years MONDAY 24/03/2008 LOCATION SUBURB ALBANY HIGHWAY KELMSCOTT ALBANY HIGHWAY MOUNT RICHON ALBANY HIGHWAY MADDINGTON ALBANY HIGHWAY CANNINGTON ALEXANDER DRIVE DIANELLA CANNING HIGHWAY ATTADALE CANNING HIGHWAY SOUTH PERTH GRAND PROMENADE DIANELLA GREAT EASTERN HIGHWAY CLACKLINE GREAT EASTERN HIGHWAY SAWYERS VALLEY GREAT EASTERN HIGHWAY WOODBRIDGE GREAT EASTERN HIGHWAY GREENMOUNT GREAT NORTHERN HIGHWAY MIDDLE SWAN KENWICK LINK KENWICK KWINANA FREEWAY BALDIVIS LAKE MONGER DRIVE WEMBLEY LEACH HIGHWAY WINTHROP MANDURAH ROAD PORT KENNEDY MANDURAH ROAD GOLDEN BAY MANDURAH ROAD EAST ROCKINGHAM MANNING ROAD MANNING MARMION AVENUE CLARKSON MARMION AVENUE CURRAMBINE MITCHELL FREEWAY INNALOO MITCHELL FREEWAY GWELUP MITCHELL FREEWAY GLENDALOUGH MITCHELL FREEWAY WOODVALE MITCHELL FREEWAY BALCATTA MITCHELL FREEWAY HAMERSLEY MOUNTS BAY ROAD PERTH ROCKINGHAM ROAD WATTLEUP ROE HIGHWAY LANGFORD SAFETY BAY ROAD BALDIVIS STIRLING HIGHWAY NEDLANDS THOMAS STREET SUBIACO TONKIN HIGHWAY MARTIN TONKIN HIGHWAY REDCLIFFE WANNEROO ROAD CARABOODA WANNEROO ROAD NEERABUP WANNEROO ROAD GREENWOOD WANNEROO ROAD WANNEROO WEST COAST HIGHWAY TRIGG TUESDAY 25/03/2008 LOCATION SUBURB ALEXANDER DRIVE YOKINE ALEXANDER DRIVE ALEXANDER HEIGHTS BEACH ROAD DUNCRAIG BERRIGAN DRIVE SOUTH LAKE BRIXTON STREET BECKENHAM BULWER STREET PERTH -
Morley Report 3.Indd
This report is a fi nal draft. It will be endorsed by the City of Bayswater following council review. August 2010 Part 1 - The Master Plan 1. Introduction 4. 6 Aspects of the Master Executive Summary 5 Plan Introduction 6 Masterplan Parts and Processes 8 Governance, Planning and Policy 33 Opportunities and Challenges 10 Accessibility 34 Liveability 36 Prosperity 39 2. 4 Themes for Morley Environmental Quality 42 Built Character and Placemaking 44 Imagine Morley in 2031 13 4 Morley Themes 14 Civic Morley 16 5. Vision Live Morley 18 Green Morley 20 Imagine Morley in 2031 48 Link Morley 22 The Indicative Development Plan 50 Comparing the Themes 24 6. 6 Urban Design 3. Consultation Principles 52 contents Discussing the Themes 29 Key Issues 30 Preferred Masterplan - A Direction 31 2 Contents 7. Delivery Part 2 - Background Delivering Design Quality 62 Metropolitan Strategic Planning Context 76 6 Key Projects 62 Historical Context 78 6 Key Actions 63 Movement and Access 80 Delivery, and Design Quality 64 Social Context 81 Delivery Model 65 Economic Context 84 Environmental Context 88 Consultation 89 8. Implementation References 98 Timeline Short Term Actions 0-5 years 66 Medium Term Actions 5-10 years 69 Long Term Actions 10+ years 69 9. Measuring Success Governance, Planning and Policy 70 Accessibility 71 contents Liveability 72 Prosperity 72 Environmental Quality 73 Built Character and Placemaking 73 3 4 01 Introduction Progress Street lookingtowardsCoventryMarkets EXECUTIVE SUMMARY Who has been involved in the preparation? What is a Masterplan? Hames Sharley has prepared this Masterplan for the City of Bayswater in association with Karen Gregory (Communications) and Pracsys (Economic planning). -
Town of Bassendean Minutes Ordinary Council Meeting
TOWN OF BASSENDEAN MINUTES ORDINARY COUNCIL MEETING HELD IN THE COUNCIL CHAMBER, 48 OLD PERTH ROAD, BASSENDEAN ON TUESDAY 22 AUGUST 2017 AT 7.00PM 1.0 DECLARATION OF OPENING/ANNOUNCEMENT OF VISITORS The Presiding Member declared the meeting open, welcomed all those in attendance and acknowledged the past and present traditional owners and custodians of the land on which the meeting was held. 2.0 PUBLIC QUESTION TIME & ADDRESS BY MEMBERS OF THE PUBLIC 2.1 Questions Taken on Notice Ms Nonie Jekabsons, 6 Barton Parade, Bassendean The following response has been provided to Ms Jekabsons on 9 August 2017: “At the 2017 June Ordinary Council meeting, your question regarding water associated with the proposed concrete batching plant at Nos. 2-8 Clune Street, Bassendean, was taken on notice. I subsequently provided you with a written response by way of a letter dated 17 July 2017. This letter quoted advice provided by both the Department of Water and the Department of Environment Regulation. At the 2017 July Ordinary Council meeting, you asked a follow up question seeking clarification with respect to the advice provided to you. In response to this further request, the Town has liaised further with the newly established Department of Water and Environment Regulation who have provided the following further advice: Ordinary Council Meeting Minutes 22/08/17 Page 2 of 29 ‘Process wastewater is generally water that has been used in the process and left over. Storm water is water that comes from rain and may be of two types: Storm water that may have come into contact with the process and materials storage, and Storm water that has not come into the contact with the process or materials storage. -
Delegated Authority
APPLICANT / PROPERTY PROPOSAL DATE / COMMENT Ceffra Domazetovski & Emily C Domazetovski Two Two Storey Grouped 04/09/2019 Lot 504 , 9 Mercer Place Dwellings Approved NORANDA WA 6062 Novena A Davidson & Alexis A Davidson- Retrospective Retaining 05/09/2019 Johnstone Walls and Associated Approved Lot 801, 509 Morley Drive Earthworks to Single MORLEY WA 6062 House Beric D Thomas & Colin J Jamieson Residential Development 05/09/2019 Strata Lot 2, 33A Cooper Road Proposed Single Storey Approved MORLEY WA 6062 Grouped Dwelling Vasilios Ntoumenopoulos Two Two-Storey Grouped 05/09/2019 Lot 200 , 1 Callaghan Way Dwellings Approved NORANDA WA 6062 Caryn L Earnshaw & John W Earnshaw Alterations and additions to 06/09/2019 Strata Lot 1, 63 Birkett Street Single Storey Grouped Approved BEDFORD WA 6052 Dwelling Liam A Plummer Alterations And Additions 06/09/2019 Lot 9 , 343 Guildford Road To Single Storey Single Approved BAYSWATER WA 6053 House Roberto Guerrini Two Storey Single House 09/09/2019 Lot 28 , 86 Halvorson Road And Alterations To Existing Approved MORLEY WA 6062 Single House Dunmont Pty Ltd Two Single-Storey Grouped 09/09/2019 Lot 63 , 23 Montfort Place Dwellings Approved MORLEY WA 6062 Callum L Taylor Retaining Wall and Fence 09/09/2019 Strata Lot 1, 1/41-45 Avenell Road To Grouped Dwellings Approved BAYSWATER WA 6053 Renae S Pearce Home Occupation (Beauty 09/09/2019 Strata Lot 1, 4 Kanimbla Way Salon) Approved MORLEY WA 6062 Giannas Pty Ltd Change Of Use To Health 10/09/2019 Lot 47 , 67 Eighth Avenue Studio (Pilates) Approved MAYLANDS WA -
Road Fatalities in Perth's Eastern Region Between 2011 and 2015
Perth’s Eastern Region Road Safety Report Card Killed or Seriously Injured Crashes 320 302 290 300 287 280 244 * 260 NUMBER * 240 220 220 2011 2012 2013 2014 2015 YEAR * Provisional 2015 Statistics Vehicle Type Crash Type Road Feature 266 Motor Vehicle 36% 24% Rear End 46% involved a of crashes 40 vulnerable road user occurred at intersections. Motorcycle Of these 23 21% Right Angle Bicycle 24% did not involve 28% 21 another vehicle did not have Truck any stop signs or traffic light controls 15 30% 15% Hit Object Pedestrian of motorcycle crashes were 2 single vehicle Bus Source: Main Roads Western Australia, Crash Analysis Reporting System accessed 9 January 2017. In Perth’s Eastern Region between 2011 and 2015 there were: were vulnerable Road 42 road users (pedestrian, bicycle, 107 fatalities Of these motorcycle) fatalities BLACK SPOTS Major roads Hospitalisations Fatalities Legend INTERSECTIONS # ROADS # Tonkin Highway / Guildford Rd (eastern intersection) 9 Great Eastern Highway from Roe Highway to region border 67 Tonkin Highway / Benara Road 9 • Roe Highway to Scott Street (10) Orrong Road / Francisco Street 7 • After Scott Street to Bilgoman Road (10) Reid Highway / Beechboro Road North 7 • After Bilgoman Road to Stoneville Road (14) Roe Highway / Kalamunda Road 7 • After Stoneville Road to Eastern border (33) Tonkin Highway / Hale Road 6 Toodyay Road from Roe Highway to region border 32 Reid Highway / West Swan Road 6 Orrong Road between Great Eastern Highway and Leach Highway 30 Guildford Road / Garratt Road 6 Great Eastern Highway between Lloyd Street and Roe Highway 20 Roe Highway / Great Northern Highway 5 Great Eastern Highway between Tonkin Highway and Fauntleroy Ave 16 Broun Avenue / Collier Road 5 Abernethy Road between Campbell Street and Leach Highway 16 Guildford Road / Eighth Avenue 5 Abernethy Road between Leach Highway and Tonkin Highway 14 Tonkin Highway between Guildford Road and Great Eastern Highway 10 Note: The 2014 and 2015 data are considered provisional as all ‘hospitalisations’ may not have been available at the time of analysis. -
Tonkin Gap Project (And Enabling Works for Morley-Ellenbrook Line)
PROJECT UPDATE OCTOBER 2019 Tonkin Gap Project (and enabling works for Morley-Ellenbrook Line) Jointly funded by the Australian ($232 million) and Western Australian ($58 million) governments. The Tonkin Gap Main Roads is upgrading Tonkin Highway, for the Tonkin Gap Project are already Project will improve safety and between Collier Road and Dunreath underway. The outcomes of these will efficiency, allieviate pressure on Drive, to improve traffic flow and safety inform a preliminary design concept that the transport network and reduce and enhance facilities for cyclists and includes: travel times. pedestrians. • additional traffic lanes in each direction The Tonkin Gap Project will eliminate the between Collier Road and Dunreath current bottleneck for highway traffic Drive ensure adjacent landowners are aware of by increasing the number of lanes and • new bridges over the Swan River, this information as the project develops. upgrading interchanges. As part of the Guildford Road, Railway Parade same works contract, Main Roads will be and the Midland Line railway, and Morley-Ellenbrook Line rail undertaking enabling works to support Dunstone Road enabling works delivery of the METRONET Morley- • upgrades to the Guildford Road and The rail enabling works for the Morley- Ellenbrook Line. These works will help Great Eastern Highway interchanges Ellenbrook Line are separately funded and reduce impacts on the Tonkin Highway • a Principal Shared Path (PSP), will be delivered by Main Roads on behalf when the main railway construction with bridges, underpasses and of PTA. begins. local connections for cyclists and The full extent of the rail enabling works Together, these projects will make it easier pedestrians scope is subject to ongoing development, for people living and working in Perth’s • noise walls, lighting and amenity but is likely to include: north-eastern suburbs to travel around improvements • construction of an underpass and dive Perth. -
PROJECT UPDATE Northlink WA MARCH 2016
MAIN ROADS WESTERN AUSTRALIA PROJECT UPDATE NorthLink WA MARCH 2016 FIRST CONTRACT AWARD BEGINS NEW ERA FOR NORTHLINK WA The vision for NorthLink WA has moved one step closer with the first contract awarded to John Holland to design and construct the Southern Section: Guildford Road to Reid Highway. The award marks the finalisation of 18 months of development work influenced by input from more than 1000 community and stakeholder representatives. “We want to sincerely Contract signing NorthLink WA Southern Section thank all of those who have helped to shape and define NorthLink WA by taking part in reference groups, working parties and information sessions,” Main Roads Senior Project Director NorthLink WA, Rob Arnott said. Community engagement during development phase • reduce urban congestion, now and “These individuals generously gave up into the future their time to share their local and expert • improve road safety, in line with the $1.12b knowledge, which has helped to shape State’s ‘Towards Zero’ strategy NorthLink WA and ensure that the The combined value of • maximise sustainability through project will achieve its objectives.” economic, social and environmental NorthLink WA funded As a result of the development work, we responsibility by both the are confident that NorthLink WA will: • improve amenity for the community, Australian ($894 million) • improve freight capacity, efficiency tourists and road users and productivity • create value through the provision of and State ($223 million) affordable infrastructure Governments. NorthLink WA will be constructed Southern Section in three sections This section includes a freeway-standard, free-flowing link along Tonkin Highway, through to Reid Highway.