Completing the 10-Year Vision for Metro Vancouver Transit & Transportation

Total Page:16

File Type:pdf, Size:1020Kb

Completing the 10-Year Vision for Metro Vancouver Transit & Transportation Completing the 10-Year Vision for Metro Vancouver Transit & Transportation APPROVED/UNDERWAY REMAINING INVESTMENTS ENTIRE 10-YEAR VISION FUNDED UNFUNDED Phase One Phase Two Phase Three • 25% increase • 10% increase • 8% increase • 7% increase BUS • 12 B-Lines • 5 new B-Lines • 2 new B-Lines • 5 new B-Lines SERVICE • 10 new service areas • 5 new service areas • New service areas • Any remaining to be confirmed new service areas • 1 new SeaBus • 1 new SeaBus SEABUS • 10-minute peak frequency; • 10 minute peak SERVICE 15-minute all day frequency; 15-minute all day • 30% increase • 15% increase • 7% increase • 8% increase HANDYDART SERVICE • 164 Expo/Millennium Line cars • 56 Expo/Millennium Line • 108 Expo/Millennium • Upgrades to Expo/Millennium & SKYTRAIN & • 24 Canada Line cars cars Line cars (including Canada Line Stations Broadway Extension) WEST COAST • 10 WCE cars + new locomotive • 24 Canada Line cars • 10 WCE cars • Upgrades to Expo/ EXPRESS • Upgrades of power and control • 2 new + 6 refurbished • Upgrades to Canada Line Stations WCE locomotives Millennium Stations and systems (WCE) systems, stations and systems • Upgrades to Expo/ Millennium & Canada Line Stations and stations • Millennium Line • Pre-construction of • Construction of • Construction of Stage 2 of SOFRT MAJOR Broadway Extension Broadway Extension Broadway Extension (Surrey-Langley Line) PROJECTS • South of Fraser Rapid Transit • Pre-construction of Stage • Construction of Stage (SOFRT) 1 of SOFRT (Surrey- 1 of SOFRT (Surrey- Newton-Guildford LRT) Newton-Guildford LRT) • Pattullo Bridge Replacement • Design for Pattullo Bridge • Construction of replacement Pattullo Bridge replacement (by the province) • Planning for Stage 2 of SOFRT (Surrey-Langley Line) • MRN upgrades: $200M • $50M (25% of Vision) • $40M (20% of Vision) • $110M MAJOR ROADS (55% of Vision) NETWORK • MRN seismic: $130M • $32.5M (25% of Vision) • $26M (20% of Vision) • $71.5M (MRN) (55% of Vision) • MRN expansion: 1% annual • MRN expansion: 1% increase + one-time 10% annual increase increase + one-time 10% increase • Regional Cycling: • $30M (31% of Vision) • $24M (25% of Vision) • $43M (44% of Vision) WALKING & $97M CYCLING • TransLink-owned Cycling: • $12M (35% of Vision) • $9M (27% of Vision) • $13M (38% of Vision) $34M • Walking Access to Transit: • $12.5M (36% of Vision) • $10M (29% of Vision) • $12.5M $35M (36% of Vision) • 13 new or expanded transit • 4 updated transit • 9 upgraded transit exchanges TRANSIT exchanges exchanges EXCHANGES • Integrated travel planning • Vanpool pilot • Mobility pricing • Mobility pricing implementation MOBILITY and payment • Innovation Lab to explore development INNOVATION • New technologies mobility concepts and services tenyearvision.translink.ca.
Recommended publications
  • 2017 05 11 Translink Increases Seabus Frequency
    MEDIA RELEASE TransLink increases SeaBus frequency 15-minute sailings will now run until 9 p.m. May 11, 2017 NEW WESTMINSTER, BC — Starting May 19, customers will benefit from another SeaBus service increase as part of TransLink’s continued roll out of Phase One of the 10-Year Mayors’ Vision for Metro Vancouver Transportation. This service increase means 15-minute sailings will start earlier on weekends and run until 9 p.m. every day, making it even easier to travel to or from the North Shore. SeaBus service increases include: 15-minute sailings starting at 6 a.m. on weekdays, 7 a.m. on Saturdays and 8 a.m. on Sundays and most holidays. 15-minute service will also extend later into the evening. This will allow customers to enjoy peak-hour service for departures until 9:02 p.m. from Lonsdale Quay and 9:16 from Waterfront Station every day. As part of Phase One of the 10-Year Vision, TransLink increased SeaBus service in January by doubling service on Sundays and holidays from 10 a.m. to 7 p.m. With the May 19 increase, SeaBus joins the Frequent Transit Network (FTN), a network of corridors where transit service runs at least every 15 minutes in both directions through the day and into the evening, every day of the week. People traveling along Frequent Transit Network corridors can expect convenient, reliable, easy-to-use services that are frequent enough that they do not need to refer to a schedule. Other TransLink services that are part of the FTN include the Expo, Millennium and Canada lines, and B-Line bus service.
    [Show full text]
  • SUNWOOD SQUARE Coquitlam, BC
    SUNWOOD SQUARE Coquitlam, BC BentallGreenOak (Canada) Limited Partnership, Brokerage bentallgreenoak.com SUNWOOD SQUARE Coquitlam, BC LOCATION: 3025 Lougheed Highway, Coquitlam, BC MAJOR INTERSECTION: Lougheed Highway & Westwood Street TYPE: Open Community Centre (grocery anchored) RENOVATION: 2009 TOTAL GLA: 198,965 square feet MAJOR TENANTS: Shoppers Drug Mart 20,767 square feet Jysk 17,053 square feet ANCILLARY: 76,643 square feet (36 stores) DEMOGRAPHICS (2022 PROJECTIONS): MARKET SUMMARY: 1 km 3 km 5 km Sunwood Square is the dominant open community centre in the Coquitlam Town Centre trade area. Bisected Total Population 13,046 103,499 190,884 by two civic thoroughfares in addition to its proximity to the Lougheed Highway and Westwood Street arteries, Total Households 5,547 40,079 68,744 Sunwood Square offers superior access and parking availability in this affluent, established, yet still growing, Average trade area. Sunwood Square was extensively renovated in 2009. Household Income $83,443 $107,494 $124,993 Translink’s completion of the Millennium Line Evergreen Extension, which opened at the end of 2016, brought an increase in demand on the residential front. The Evergreen Extension connects Coquitlam City Centre through Port Moody to Lougheed Town Centre and onwards to Vancouver. In addition a significant number of residential condominium towers have been built within the vicinity with several others currently in the planning stages or under construction. Sunwood Square is well positioned at the heart of the growth within Coquitlam Town Centre. SUNWOOD SQUARE Coquitlam, BC UNIT TENANT SQ FT UNIT TENANT SQ FT 100 76,900 460 Sunwood Veterinary 220 Bloomin’ Buds Florist 613 Clinic 1,146 230 Dr.
    [Show full text]
  • For Transit Information, Including Real-Time Next Bus, Please Call 604.953.3333 Or Visit Translink.Ca
    Metro Vancouver Transit Map Effective Until Dec. 19, 2016 259 to Lions Bay Ferries to Vancouver Island, C12 to Brunswick Beach Bowen Island and Sunshine Coast Downtown Vancouver Transit Services £ m C Grouse Mountain Skyride minute walk SkyTrain Horseshoe Bay COAL HARBOUR C West End Coal Harbour C WEST Community Community High frequency rail service. Canada Line Centre Centre Waterfront END Early morning to late Vancouver Convention evening. £ Centre C Canada Expo Line Burrard Tourism Place Vancouver Millennium Line C Capilano Salmon Millennium Line Hatchery C Evergreen Extension Caulfeild ROBSON C SFU Harbour Evelyne Capilano Buses Vancouver Centre Suspension GASTOWN Saller City Centre BCIT Centre Bridge Vancouver £ Lynn Canyon Frequent bus service, with SFU Ecology Centre Art Gallery B-Line Woodward's limited stops. UBC Robson Sq £ VFS £ C Regular Bus Service Library Municipal St Paul's Vancouver Carnegie Service at least once an hour Law Edgemont Hall Community Centre CHINATOWN Lynn Hospital Courts during the daytime (or College Village Westview Valley Queen
    [Show full text]
  • Phase Two of the 10-Year Vision 2018 – 2027 INVESTMENT PLAN
    Phase Two of the 10-Year Vision 2018 – 2027 INVESTMENT PLAN APPROVED JUNE 28, 2018 tenyearvision.translink.ca TRANSLINK MAYORS’ COUNCIL BOARD OF DIRECTORS ON REGIONAL TRANSPORTATION Lorraine Cunningham, Chair Derek Corrigan, Chair Lois Jackson Mayor, City of Burnaby Mayor, City of Delta Larry Beasley Richard Walton, Vice-chair Greg Moore Jim Chu Mayor, District of North Vancouver Mayor, City of Port Coquitlam Sarah Clark Wayne Baldwin John McEwen Derek Corrigan Mayor, City of White Rock Mayor, Village of Anmore Mayor, City of Burnaby John Becker Darrell Mussatto Murray Dinwoodie Mayor, City of Pitt Meadows Mayor, City of North Vancouver Anne Giardini Malcom Brodie Nicole Read Mayor, City of Richmond Mayor, District of Maple Ridge Tony Gugliotta Karl Buhr Gregor Robertson Karen Horcher Mayor, Village of Lions Bay Mayor, City of Vancouver Marcella Szel Mike Clay Ted Schaffer Mayor, City of Port Moody Mayor, City of Langley Richard Walton Mayor, District of Jonathan Coté Murray Skeels North Vancouver Mayor, City of New Westminster Mayor, Bowen Island Municipality Ralph Drew Michael Smith Mayor, Village of Belcarra Mayor, District of West Vancouver Jack Froese Richard Stewart Mayor, Township of Langley Mayor, City of Coquitlam Maria Harris Bryce Williams Director, Electoral Area ‘A’ Chief, Tsawwassen First Nation Linda Hepner Mayor, City of Surrey For the purpose of the South Coast British Columbia Transportation Authority Act, this document constitutes the investment plan prepared in 2017 and 2018 for the 2018-27 period. This document will serve as TransLink’s strategic and financial plan beginning July 1, 2018, until a replacement investment plan is approved.
    [Show full text]
  • Planning for RAV: Achieving Public Objectives in the Context of a PPP Project
    Planning for RAV: Achieving Public Objectives in the Context of a PPP Project Lon LaClaire, Transportation Engineer Anita Molaro, Development Planner CITY OF VANCOUVER CITY OF VANCOUVER Presentation Outline Vancouver and the Region The RAV Line Vancouver Stations Waterfront Station Robson Station Broadway Station Marine Drive Portal CITY OF VANCOUVER City of Vancouver Population of Vancouver:CITY OF VANCOUVER 550, 000 Constrained Region Population of Greater Vancouver Regional CITYDistrict: OF VANCOUVER 2.4 million Context: Greater Vancouver CITY OF VANCOUVER Dense Metropolitan Core CITY OF VANCOUVER Vancouver Transit Strategy Transit systems layers: local, city-wide, and regional CITY OF VANCOUVER Vancouver transit strategy The RAV Line CITY OF VANCOUVER Context - Regional RAV is one of three rapid transit lines that are cornerstones of Regional Land use and transportation plans – LRSP, Transport 2021. CITY OF VANCOUVER Regional Transit Network SeaBus Skytrain West Coast Express commuter rail RAV CITY OF VANCOUVER Context – Vancouver City of Vancouver land use and transportation plans support the regional plans: CityPlan Central Area Plan Transportation Plan Downtown Transportation Plan CITY OF VANCOUVER Rail Transit Is Needed Buses alone will not attract sufficient ridership to achieve the City’s transportation targets and land use goals Buses alone can not carry the number of transit trips needed to achieve the targets Rail is more compatible with the City’s livability goals CITY OF VANCOUVER 19991999 TransitTransit
    [Show full text]
  • Corporate Report
    CORPORATE REPORT NO: R120 COUNCIL DATE: June 24, 2019 REGULAR COUNCIL TO: Mayor & Council DATE: June 20, 2019 FROM: Acting General Manager, Engineering FILE: 8740-01 SUBJECT: Future of Rapid Transit in Surrey RECOMMENDATION The Engineering Department recommends that Council: 1. Receive this report for information; 2. Endorse the principles attached as Appendix “I” to this report; and 3. Authorize staff to develop a Long-Range Rapid Transit Vision for input into TransLink’s Transport 2050 plan. INTENT The intent of this report is to inform Council on TransLink’s update of the Regional Transportation Strategy (now called Transport 2050), outline recommended principles for future rapid transit expansion in Surrey, and request support from Council for the development of a long-range rapid transit vision for Surrey’s submission to TransLink for inclusion in the Transport 2050 plan development process. BACKGROUND The Success of Previous Regional Transportation Plans Transportation and land use are integrally linked, as demonstrated by Metro Vancouver’s long history of coordinating land use and transportation investments. Many of the first coordinated efforts to integrate transit and land use were identified as part of Metro Vancouver’s (at that time known as Greater Vancouver Regional District or “GVRD”) first “Livable Region Plan” that, in 1975, established an urban land use pattern aimed at focusing growth and development in compact urban centres supported by an integrated, multi-modal transportation network. In 1993, prior to the creation of TransLink, the GVRD prepared “A Long-Range Transportation Plan for Greater Vancouver”, known as Transport 2021. This plan was instrumental in identifying an end-state vision for transportation that included policies and capital improvements aligned with regional land use goals.
    [Show full text]
  • Millennium Line Broadway Extension (MLBE) Project Strategic Options
    Millennium Line Broadway Extension (MLBE) Project Strategic Options Whitepaper March 2018 Millennium Line Broadway Extension Strategic Options Analysis March 2018 Page 1 TABLE OF CONTENTS SUMMARY .................................................................................................................................................... 4 Purpose of Document ............................................................................................................................ 4 Recommendation .................................................................................................................................. 4 1 INTRODUCTION ................................................................................................................................... 5 1.1 Strategic Options Analysis Document Overview ........................................................................ 5 2 REQUIREMENTS AND CONSIDERATIONS FOR THE STRATEGIC OPTIONS ANALYSIS ........... 7 2.1 CAMF Requirements for Multiple Account Evaluations .............................................................. 7 2.2 MOTI Transit Business Case Template ...................................................................................... 7 2.3 Integration of MOTI template into Business Case MAE ............................................................. 8 2.4 Project Objectives and Requirements ........................................................................................ 8 3 PROJECT BACKGROUND ...............................................................................................................
    [Show full text]
  • PER Template
    VANCOUVER FRASER PORT AUTHORI TY PROJECT AND ENVI RONMENTAL REVI EW REPORT AND PERMI T PER No.: 18-044 TransLink South Coast British Columbia Transportation Tenant: Authority Nanaimo Vancouver Passenger Only Ferry Service South Project: SeaBus Terminal Project Location: South SeaBus Terminal, 609 Waterfront Road, Vancouver VFPA SI D No.: VAN042 Land Use Designation: Special Study AreaSpecial Study AreaSpecial Study Area South Coast British Columbia Transportation Authority Applicant/Permit Holder: (“TransLink”) Category of Review: B Date of Approval: August 24, 2018 Date of Expiry: August 31, 2019 1 I NTRODUCTI ON The Vancouver Fraser Port Authority (VFPA), a federal port authority, manages lands under the purview of the Canada Marine Act, which imparts responsibilities for environmental protection. VFPA accordingly conducts project and environmental reviews of works and activities undertaken on these lands to ensure that the works and activities will not likely cause significant adverse environmental effects. This project and environmental review report and project permit (the Permit) documents VFPA’s project and environmental review of PER No. 18-044: Nanaimo Vancouver Passenger Only Ferry Service South SeaBus Terminal (the Project) proposed by Island Ferry Services Ltd. (the Operator) on behalf of the South Coast British Columbia Transportation Authority (“TransLink”) (the Applicant). This project and environmental review was carried out to address VFPA’s responsibilities under the Canada Marine Act, and to meet the requirements of the Canadian Environmental Assessment Act, 2012 (CEAA 2012), as applicable. The proposed Project is not a CEAA 2012 “designated project” and an environmental assessment as described in CEAA 2012 is not required. However, VFPA authorization is required for the proposed Project to proceed and in such circumstances, where applicable, Section 67 of CEAA 2012 requires federal authorities to assure themselves that projects will not likely cause significant adverse environmental effects.
    [Show full text]
  • One-Way Carsharing As a First and Last Mile Solution For
    ONE-WAY CARSHARING AS A FIRST AND LAST MILE SOLUTION FOR TRANSIT Lessons from BCAA Evo Carshare in Vancouver Prepared by: Neha Sharma | UBC Sustainability Scholar | 2019 Prepared for: Mirtha Gamiz | Planner, New Mobility | TransLink Lindsay Wyant | Business Insights Analyst | BCAA Evo June 2020 This report was produced as part of the UBC Sustainability Scholars Program, a partnership between the University of British Columbia and various local governments and organisations in support of providing graduate students with opportunities to do applied research on projects that advance sustainability across the region. This project was conducted under the mentorship of TransLink and BCAA Evo staff. The opinions and recommendations in this report and any errors are those of the author and do not necessarily reflect the views of TransLink, BCAA Evo or the University of British Columbia. Acknowledgements The author would like to thank the following individuals for their feedback and support throughout this project: Lindsay Wyant | Business Insights Analyst | BCAA Evo Mirtha Gamiz | Planner, New Mobility, Strategic Planning and Policy | TransLink Eve Hou | Manager, Policy Development, Strategic Planning and Policy | TransLink ii T ABLE OF C ONTENTS List of Figures ............................................................................................................................................. v Introduction ..............................................................................................................................................
    [Show full text]
  • Millennium Line Broadway Extension Project Risk Report
    Millennium Line Broadway Extension Project Risk Report March 2018 Millennium Line Broadway Extension Project Business Case Risk Report March 2018 Page i TABLE OF CONTENTS 1 INTRODUCTION ................................................................................................................................... 3 1.1 Purpose ....................................................................................................................................... 3 1.2 Scope and Context ..................................................................................................................... 3 1.3 Project Background ..................................................................................................................... 3 2 RISK MANAGEMENT METHODOLOGY ............................................................................................. 5 2.1 Partnerships BC Guidance ......................................................................................................... 5 2.2 Risk Assessment ........................................................................................................................ 7 2.3 Risk Quantification .................................................................................................................... 10 3 PROJECT RISK PROCESS ............................................................................................................... 13 3.1 Risk Workshops .......................................................................................................................
    [Show full text]
  • Vancouver Canada Public Transportation
    Harbour N Lions Bay V B Eagle I P L E 2 A L A 5 A R C Scale 0 0 K G H P Legend Academy of E HandyDART Bus, SeaBus, SkyTrain Lost Property Customer Service Coast Express West Customer Information 604-488-8906 604-953-3333 o Vancouver TO HORSESHOE BAY E n Local Bus Routes Downtown Vancouver 123 123 123 i CHESTNUT g English Bay n l Stanley Park Music i AND LIONS BAY s t H & Vancouver Museum & Vancouver h L Anthropology Beach IONS B A A W BURRARD L Y AV BURRARD Park Museum of E B t A W Y 500 H 9.16.17. W 9 k 9 P Y a Lighthouse H.R.MacMillan G i 1 AVE E Vanier n Space Centre y r 3 AVE F N 1 44 Park O e s a B D o C E Park Link Transportation Major Road Network Limited Service Expo Line SkyTrain Exchange Transit Central Valley Greenway Central Valley Travel InfoCentre Travel Regular Route c Hospital Point of Interest Bike Locker Park & Ride Lot Peak Hour Route B-Line Route & Stop Bus/HOV Lane Bus Route Coast Express (WCE) West Millennium Line SkyTrain Shared Station SeaBus Route 4.7.84 A O E n Park 4 AVE 4 AVE l k C R N s H Observatory A E V E N O T 2 e S B University R L Caulfeild Columbia ta Of British Southam E 5 L e C C n CAULFEILD Gordon Memorial D 25 Park Morton L Gardens 9 T l a PINE 253.C12 .
    [Show full text]
  • Arbutus Station
    Station Design Open House #1 Arbutus Station Artist’s rendering of station entrance in the daytime Artist’s rendering of station entrance at night Canada Line CVG Main St VCC–Clark Great Northern Way Connects to South Great 99 B-Line Arbutus Granville Northern Way–Emily Arbutus St An extension of W Broadway Granville St Oak St Cambie St Carr Greenway Arbutus the Millennium Line Arbutus Greenway Oak–VGH Broadway– Mount Clark Dr City Hall Pleasant 38 Station Design Open House #1 Arbutus Station: Community Integration Arbutus Station and the bus loop will be located at the northeast corner of Broadway and Arbutus Street, and will be adjacent to the Arbutus Greenway. This station and bus loop will connect passengers with B-Line bus service between Arbutus and UBC, as well as serve the residents, retail, services, schools and jobs in this area of Kitsilano. Street-level view Canada Line CVG Main St VCC–Clark Great Northern Way Connects to South Great 99 B-Line Arbutus Granville Northern Way–Emily Arbutus St An extension of W Broadway Granville St Oak St Cambie St Carr Greenway Arbutus the Millennium Line Arbutus Greenway Oak–VGH Broadway– Mount Clark Dr City Hall Pleasant 39 Station Design Open House #1 Arbutus Station: Community Integration Key station-specific features include: h Prominent standalone building entrance on opening day with no surrounding buildings h Generous use of glass on three sides provides a full view of activity inside this station and bus activity outside the station h Area around the station provides convenient access
    [Show full text]