Federal Register/Vol. 85, No. 85/Friday, May 1, 2020/Notices

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register/Vol. 85, No. 85/Friday, May 1, 2020/Notices 25504 Federal Register / Vol. 85, No. 85 / Friday, May 1, 2020 / Notices Primary Counties: Dickey, Emmons. SUPPLEMENTARY INFORMATION: Effective has been refined to have the ramp from All other information in the original January 17, 2017, FHWA assigned to southbound West Davis Corridor to declaration remains unchanged. UDOT certain responsibilities of FHWA southbound I–15 parallel Legacy (Catalog of Federal Domestic Assistance for environmental review, consultation, Parkway for approximately 0.3 mile and Number 59008) and other actions required by applicable then cross Legacy Parkway and the Federal environmental laws and Union Pacific Railroad tracks before Cynthia Pitts, regulations for highway projects in merging onto I–15 near 1800 North in Acting Associate Administrator for Disaster Utah, pursuant to 23 U.S.C. 327. FHWA Centerville (approximately 0.7 mile Assistance. maintained responsibility of the south of the EIS Selected Alternative’s [FR Doc. 2020–09340 Filed 4–30–20; 8:45 am] environmental review process of the southbound I–15 merge). The design of BILLING CODE 8026–03–P West Davis Corridor project until its the Legacy Parkway Trail in the area of issuance of a Record of Decision (ROD). the system interchange has also been UDOT is responsible for conducting any refined. DEPARTMENT OF TRANSPORTATION additional environmental reviews These changes to the Selected (including re-evaluations) that are Alternative are referred to as the Refined Federal Highway Administration required for the West Davis Corridor Selected Alternative and are the subject project following the issuance of the of, and are described in more detail in, Notice of Final Federal Agency Actions ROD. Actions taken by UDOT on UDOT’s April 8, 2020 EIS re-evaluation on Proposed Highway in Utah FHWA’s behalf pursuant to 23 U.S.C. (UDOT Project Number S–0067(14)0, AGENCY: Utah Department of 327 constitute Federal agency actions S.R. 67, West Davis Corridor; WDC/I– Transportation (UDOT); Federal for purposes of Federal law. Notice is 15/Legacy Parkway System Interchange Highway Administration (FHWA), hereby given that UDOT has taken final in Davis County, Utah (PIN 7176) Department of Transportation. agency actions subject to 23 U.S.C. Environmental Impact Statement Re- 139(l)(1) by issuing licenses, permits, evaluation #13)(EIS Re-evaluation). ACTION: Notice of limitations on claims and approvals for a modification of the The actions by UDOT, and the laws for judicial review of actions by UDOT West Davis Corridor project in the State under which such actions were taken, and other Federal agencies. of Utah. are described in the EIS Re-evaluation SUMMARY: The FHWA, on behalf of On June 23, 2017, FHWA approved and other documents in the UDOT UDOT, is issuing this notice to the Final Environmental Impact project records. The EIS Re-evaluation is announce actions taken by UDOT that Statement and Section 4(f) Evaluation available for review by contacting are final Federal agency actions. The (EIS) for the West Davis Corridor UDOT at the address provided above. final agency actions relate to design Project, and on September 29, 2017 This notice applies to the EIS Re- modifications to a planned and FHWA issued a ROD approving the evaluation, the Section 4(f) approved highway project, the West project. On October 6, 2017, FHWA determination, the NHPA Section 106 Davis Corridor project in Davis County, published notice of the EIS and ROD in review, the Endangered Species Act Utah, and more specifically to UDOT’s the Federal Register triggering the 150- determination, the noise review and re-evaluation of the Environmental day statute of limitations under 23 noise abatement determination, and all Impact Statement and Section 4(f) U.S.C. 139(l)(1) for the project. The other UDOT and federal agency Evaluation for the project in light of project is included in UDOT’s adopted decisions and other actions with respect design modifications to the system 2020–2025 State Transportation to the EIS Re-evaluation and the Refined interchange by which the West Davis Improvement Plan (STIP) as project Selected Alternative as of the issuance Corridor project (State Route 67) will number 11268 and is scheduled for right date of this notice and all laws under connect with Interstate 15 (I–15) and of way acquisition and construction to which such actions were taken, Legacy Parkway. Those actions grant begin in fiscal year 2020, being let as a including but not limited to the licenses, permits and/or approvals for design-build contract. The project is following laws (including their the project. also included in the Wasatch Front implementing regulations): Regional Council’s 2019—2050 Regional 1. General: National Environmental DATES: By this notice, FHWA, on behalf Transportation Plan. Policy Act [42 U.S.C. 4321–4351]; of UDOT, is advising the public of final UDOT has now updated the design of Federal-Aid Highway Act [23 U.S.C. 109 agency actions subject to 23 U.S.C. the system interchange at the south end and 23 U.S.C. 128]; MAP–21, the 139(l)(1). A claim seeking judicial of the project by which the West Davis Moving Ahead for Progress in the 21st review of these Federal agency actions Corridor project (State Route 67) will Century Act [Pub. L. 112–141]. on the highway project will be barred interconnect with I–15 and Legacy 2. Air: Clean Air Act [42 U.S.C. 7401– unless the claim is filed on or before Parkway to accommodate a planned 7671(q)]. September 28, 2020. If the Federal law widening of I–15 by one lane in each 3. Land: Section 4(f) of the that authorizes judicial review of a direction. With the planned widening of Department of Transportation Act of claim provides a time period of less I–15, it was not possible to have the 1966 [49 U.S.C. 303]; Landscaping and than 150 days for filing such claim, then ramp connections as identified in the Scenic Enhancement (Wildflowers) [23 that shorter time period still applies. Selected Alternative in the EIS and ROD U.S.C. 319]. FOR FURTHER INFORMATION CONTACT: without either 1) having substantial 4. Wildlife: Endangered Species Act Elisa Albury, Environmental Program impacts to the residential areas of [16 U.S.C. 1531–1544 and Section Manager, UDOT Environmental Farmington and Centerville east of the 1536], Fish and Wildlife Coordination Services, P.O. Box 143600, Salt Lake Frontage Road or 2) relocating the Act [16 U.S.C. 661–667(d)]; Migratory City, UT 84114; (801)–965–4000; email: Union Pacific Railroad tracks. To Bird Treaty Act [16 U.S.C. 703–712]; [email protected]. UDOT’s normal minimize costs and impacts while The Bald and Golden Eagle Protection business hours are 8 a.m. to 5 p.m. accommodating a planned additional Act [16 U.S.C. 668]. (Mountain Time Zone), Monday through lane in each direction on I–15, the 5. Historic and Cultural Resources: Friday, except State and Federal design of the system interchange Section 106 of the National Historic holidays. described in the Selected Alternative Preservation Act of 1966, as amended VerDate Sep<11>2014 08:07 May 01, 2020 Jkt 250001 PO 00000 Frm 00122 Fmt 4703 Sfmt 4703 E:\FR\FM\01MYN1.SGM 01MYN1 Federal Register / Vol. 85, No. 85 / Friday, May 1, 2020 / Notices 25505 [16 U.S.C. 470(f) et seq.]; Archeological DEPARTMENT OF TRANSPORTATION environmental review that is required Resources Protection Act of 1977 [16 for projects that were approved by U.S.C. 470(aa)–470(ll)]; Archeological Federal Highway Administration FHWA prior to execution of the MOU. and Historic Preservation Act [16 U.S.C. The Revised ROD was processed in 469–469(c)]; Native American Grave Notice of Availability of the Revised accordance with the MOU, and UDOT is Protection and Repatriation Act Record of Decision for the Mountain the agency responsible for approving the (NAGPRA) [25 U.S.C. 3001–3013]. View Corridor Project in Utah and Final Revised ROD. Actions taken by UDOT 6. Social and Economic: Civil Rights Federal Agency Actions on FHWA’s behalf pursuant to 23 U.S.C. Act of 1964 [42 U.S.C. 2000(d)– AGENCY: Utah Department of 327 and the MOU constitute Federal 2000(d)(1)]; American Indian Religious Transportation (UDOT), Federal agency actions for purposes of Federal Freedom Act [42 U.S.C. 1996]; Farmland Highway Administration (FHWA), law. Notice is hereby given that UDOT Protection Policy Act (FPPA) [7 U.S.C. Department of Transportation. has taken final agency actions subject to 4201–4209]. 23 U.S.C. 139(l)(1) by issuing licenses, ACTION: 7. Wetlands and Water Resources: Notice of availability and notice permits, and/or approvals for the Clean Water Act (Section 404, Section of limitations on claims for judicial Mountain View Corridor Project in the 401, Section 319) [33 U.S.C. 1251– review of actions by UDOT and other State of Utah. 1377]; Coastal Barrier Resources Act [16 Federal agencies. A Final Environmental Impact Statement (EIS) and Section 4(f) U.S.C. 3501–3510]; Coastal Zone SUMMARY: The FHWA, on behalf of Evaluation for the Mountain View Management Act [16 U.S.C. 1451–1465]; UDOT, is issuing this notice to Corridor Project was completed in Land and Water Conservation Fund announce the availability of the Revised September 2008 and approved through (LWCF) [16 U.S.C. 4601–4604]; Safe Record of Decision (ROD) for the the issuance of a ROD on November 17, Drinking Water Act (SDWA) [42 U.S.C. Mountain View Corridor Project in Salt 2008, by the FHWA.
Recommended publications
  • Glovers Interchange Design Selection
    Technical Memorandum 23: Glovers Interchange Design Selection in support of the Environmental Impact Statement West Davis Corridor Project Federal Highway Administration Utah Department of Transportation UDOT Project No. S-0067(14)0 Prepared by Horrocks Engineers 2162 W. Grove Parkway Pleasant Grove, UT 84062 November 2016 Contents 1.0 INTRODUCTION ........................................................................................................... 1 2.0 CONCEPT DEVELOPMENT .......................................................................................... 2 2.1 Design Criteria ........................................................................................................................... 2 2.2 Design Variables ........................................................................................................................ 3 2.3 Concept Development ................................................................................................................ 3 3.0 CONCEPTS SELECTED FOR COMPARISON ................................................................. 4 3.1 Northbound Concepts ................................................................................................................ 4 3.2 Southbound Concepts ................................................................................................................ 5 4.0 CONCEPT COMPARISON ............................................................................................. 5 4.1 Level of Service Pre-screening Evaluation ...............................................................................
    [Show full text]
  • Farmington Active Transportation Plan Connecting Our Community Through Safe Walking & Bicycling
    Farmington Active Transportation Plan Connecting Our Community Through Safe Walking & Bicycling MARCH 2016 This Plan was prepared for Farmington City by Alta Planning + Design and Ensign Engineering, with funding and planning assistance from the Wasatch Front Regional Council. PROJECT STEERING COMMITTEE & CONSULTANT TEAM: FARMINGTON RESIDENTS, BUSINESS OWNERS Amy Shumway, Farmington Trails Committee Jeff Hepworth, Owner, Loyal Cycle Co. Table of Contents Chad Stone 1: Introduction . 1 About the Plan .....................................................................1 Why Walking & Bicycling? .................................................1 FARMINGTON CITY Eric Anderson, Project Manager & Associate Planner Local Walking & Bicycling Trends ...................................4 David Petersen, Community Development Director National Walking & Bicycling Trends .............................6 Connectivity To Transit ......................................................6 FARMINGTON CITY COUNCIL Existing Plans & Studies ....................................................8 Doug Anderson, Councilmember Existing Codes & Policies ................................................13 Existing Programs & Events ...........................................15 2: Public Involvement . 17 KAYSVILLE RESIDENTS, BUSINESS OWNERS Zach Chatelain, Owner, Biker’s Edge Field Investigation Bike Ride ..........................................17 Brady Edwards, Owners, Bountiful Bicycle Interactive Online Mapping Tool ..................................17 Russell Lindberg,
    [Show full text]
  • Prepared for the Utah Department of Transportation and the Wasatch Front Regional Council
    NORTH LEGACY TRANSPORTATION CORRIDOR SUPPLEMENTAL STUDY Prepared for the Utah Department of Transportation and the Wasatch Front Regional Council October 2009 North Legacy Transportation Corridor Supplemental Study Prepared for the Utah Department of Transportation (UDOT) and the Wasatch Front Regional Council (WFRC) Prepared by InterPlan Co. In cooperation with Wilkinson Ferrari & Company and HDR Engineering, Inc. Vern Keeslar InterPlan Thomas McMurtry InterPlan Matt Riffkin InterPlan Dana Holmes HDR Susan Lee HDR Mimi Charles Wilkinson Ferrari & Company Bethany Matsumori Wilkinson Ferrari & Company Amy Steinbrech Wilkinson Ferrari & Company October 2009 Table of Contents Executive Summary .....................................................................................1 Summary of Study Purpose.................................................................................. 1 North Legacy Draft Purpose and Need................................................................. 1 North Legacy Alignment to be Preserved ............................................................. 2 Chapter 1 Introduction..................................................................................5 Study Overview .................................................................................................... 5 Benefits and Principles of Corridor Preservation .................................................. 6 Benefits......................................................................................................................................6
    [Show full text]
  • Comments and Responses for the Final EIS
    Comments and Responses for the Final EIS in support of the Environmental Impact Statement West Davis Corridor Project Federal Highway Administration Utah Department of Transportation in cooperation with U.S. Army Corps of Engineers U.S. Environmental Protection Agency U.S. Fish and Wildlife Service Utah Reclamation, Mitigation, and Conservation Commission Project No. F-0067(14)0 Prepared by HDR Engineering, Inc. 2825 E. Cottonwood Parkway, Suite 200 Salt Lake City, UT 84121-7077 September 29, 2017 This page is intentionally blank. Contents 1.0 RESPONSE TO COMMENTS .......................................................................................... 1 1.1 Chapter 1 – Purpose of and Need for Action ............................................................................. 3 1.1.1 Section 1.2 – Description of the Needs Assessment Study Area ................................. 3 1.1.2 Section 1.4 – Summary of Purpose and Need.............................................................. 5 1.2 Chapter 2 – Alternatives ............................................................................................................ 7 1.2.1 Section 2.1 – Background of the Alternatives-Development Process ......................... 7 1.2.2 Section 2.2 – Alternatives-Development Process for the Final EIS ............................ 7 1.2.3 Section 2.3 – WDC Roadway Design Elements ........................................................ 20 1.2.4 Section 2.4 – Description of Alternatives Carried Forward for Detailed Study .........................................................................................................................
    [Show full text]
  • Weber County to Salt Lake Commuter Rail Project; Salt Lake City, Utah
    FrontRunner North Rail Project Before-and-After Study (2013) Salt Lake City, Utah Learn more: www.transit.dot.gov/before-and-after-studies Weber County to Salt Lake Commuter Rail Project; Salt Lake City, Utah The Weber County to Salt Lake Commuter Rail Project, known as FrontRunner North, is a 44- mile commuter rail line extending north from downtown Salt Lake City through Ogden to the northern end of Weber County at Pleasant View, Utah. The project was planned, developed, and built by the Utah Transit Authority (UTA). FrontRunner North is the first commuter rail service in the Salt Lake City metropolitan area. UTA operates the commuter rail line as part of a region- wide transit system that includes local and express buses, bus rapid transit, and light rail. In early 2013, UTA opened FrontRunner South, a 40-mile extension of the commuter rail line extending south from downtown Salt Lake City to Orem, Utah. In September 2001, an alternatives analysis identified commuter rail in the north-south corridor as the preferred alternative for transit improvements in the corridor. The project entered preliminary engineering (PE) in December 2003, and advanced into final design (FD) in June 2005. UTA and FTA executed a Full Funding Grant Agreement (FFGA) for the project in June 2006. The project opened to service in May 2008. The accompanying figure is a map of FrontRunner North and the corridor it serves. Physical scope of the project The project extends over 44 miles from the Salt Lake Intermodal Center just west of downtown Salt Lake City to the northern terminus at the Pleasant View Station.
    [Show full text]
  • Great Salt Lake LEGACY PARKWAY SCENIC BYWAY I 2008 Acknowledgements
    CORRIDOR MANAGEMENT PLAN CORRIDOR MANAGEMENT GREAT SALT LAKE LEGACY PARKWAY SCENIC BYWAY I 2008 table of contents 1 introduction 5 2 the parkway 9 CORRIDOR MANAGEMENT PLAN CORRIDOR MANAGEMENT 3 intrinsic qualities 15 4 vision 21 5 byway issues and goals 23 6 protecting the byway 27 7 interpretation 35 8 marketing opportunities 37 9 partnerships 39 10 strategic plan 41 11 appendix 45 12 letters of support 55 GREAT SALT LAKE LEGACY PARKWAY SCENIC BYWAY I 2008 acknowledgements Scenic Byway Committee : Farmington City Dave Peterson Centerville City Cory Snyder Woods Cross City Gary Uresk West Bountiful City Wendell Wild City of North Salt Lake Blaine Gehring Bountiful City Aric Jensen Davis County Economic Development Neka Roundy Davis County Trails Scott Hess North Davis County - West Point Mayor John Petroff Wasatch Front Regional Council LaNiece Dustman South Davis Sewer District Dal Wayment Rocky Mountain Power (....) Utah Department of Transportation Pete Jager Cory Pope Utah Travel Council Gael Hill Davis County Chamber of Commerce John Pitt Davis County Convention & Visitor Bureau Barbara Riddle Legacy Nature Preserve Lenora Sullivan Farmington Bay Waterfowl Mgt. Area Rich Hansen Friends of Great Salt Lake Lynne deFrietas Great Salt Lake Audubon Society Bruce Heath Consultants: MGB+A Sharen Hauri, Land Planner Acknowledgements: Photography By Sharen Hauri except as credited. Cover photo: Allysia Angus Quotes Friends of Great Salt Lake Graphic Design Items for the Legacy Parkway project completed by Carter-Burgess 1 introduction Artist’s vision for a parkway design. Great Salt Lake Legacy Parkway began as the Legacy Highway, a vision for a 150-mile long road along Utah’s urbanized Wasatch Front.
    [Show full text]
  • Southern Connection to I-15 and Legacy Parkway Section 404(B)(1) Practicability Analysis
    Technical Memorandum 30: Southern Connection to I-15 and Legacy Parkway Section 404(b)(1) Practicability Analysis in support of the Environmental Impact Statement and Clean Water Act Section 404 Permit West Davis Corridor Project Federal Highway Administration Utah Department of Transportation UDOT Project No. S-0067(14)0 Prepared by HDR, Inc. 2825 E. Cottonwood Parkway, Suite 200 Salt Lake City, UT 84121 April 25, 2017 ii April 25, 2017 Executive Summary Introduction The Utah Department of Transportation (UDOT) and the Federal Highway Administration (FHWA) are proposing a project (the West Davis Corridor) to improve regional mobility in Davis and Weber Counties, Utah. These lead agencies, together called the West Davis Corridor (WDC) team, are preparing the West Davis Corridor Environmental Impact Statement (EIS), which will evaluate different alternatives for meeting the purpose of the project. All of the WDC action alternatives advanced in the EIS that propose a new roadway facility have a southern interchange with Interstate 15 (I-15) and Legacy Parkway. Since the start of the EIS process, the WDC Team has received numerous comments regarding potential alternative connections in Farmington and Kaysville (referred to in this document as southern alignment options). The WDC Team considered these various southern alignment options as part of the alternatives-evaluation process for the Draft EIS. At that time, the WDC Team concluded that only the Shepard Lane and Glovers Lane Options were reasonable and practicable. After the Draft EIS was published in May 2013, the WDC Team updated the EIS traffic analysis according to the Wasatch Front Regional Council’s (WFRC) 2015–2040 Regional Transportation Plan (RTP) and the associated 2016 travel demand model (version 8.1).
    [Show full text]
  • Volume V Contents
    Volume V Chapters and Chapter Appendices Chapter 32: Response to Comments Appendix 32A: Commenter and Response Matrix Appendix 32B: Reproductions of Comments on the Draft EIS List of Tables Chapter 32: Response to Comments Table 32.1-1. Locations of Projected Delay and Congestion in Davis and Weber Counties in 2040 .................... 32-10 Table 32.1-2. Projected Benefits in the WDC Study Area from Transportation Improvements West and East of I-15 in 2040 ......................................................................................................................................... 32-11 Table 32.1-3. Building Permits in the WDC Study Area ....................................................................................... 32-17 Table 32.1-4. Comparison of Elasticities from Travel Demand Model Versions 7.0 and 8.1 and the Cambridge Report ................................................................................................................................... 32-25 Table 32.1-5. Farmington City Comments on Specific Transportation Projects ................................................... 32-27 Table 32.7-1. Daily Traffic Volumes on I-15 and Legacy Parkway ...................................................................... 32-98 Contents of Volume V i List of Acronyms and Abbreviations µg/m3 micrograms per cubic meter AADT annual average daily traffic AASHTO American Association of State Highway and Transportation Officials ac acres ACHP Advisory Council on Historic Preservation ADR antidegradation reviews ADT
    [Show full text]
  • David L. Buhler SUBJECT
    TAB I State Board of Regents Phone 801.321.7101 Board of Regents Building, The Gateway Fax 801.321.7199 60 South 400 West TDD 801.321.7130 Salt Lake City, Utah 84101-1284 www.higheredutah.org July 9, 2014 MEMORANDUM TO: State Board of Regents FROM: David L. Buhler SUBJECT: Weber State University – Approval of Station Park Property Lease in Farmington, Utah Issue Weber State University (WSU) is requesting authorization to lease 10,992 sq. ft. in Farmington, Utah to establish a Professional Education Center for expansion of its Continuing Education programs. Background The location of the space is in Station Park, a new mixed-use development in Farmington, Utah. It is located in the rapidly growing area of Farmington/Kaysville/Centerville and is a site where WSU has been looking for an opportunity to establish an instructional presence. It is conveniently located where I-15, Utah Highway 89, Legacy Parkway, and mass transit converge (Station Park is adjacent to a Frontrunner Station that is also served by multiple UTA bus routes). The space will be used by WSU Continuing Education (WSUCE) for instructional purposes. The $263,808 annual lease payment will be paid from WSUCE operating income, and under the terms of the lease, 10 months of the base lease will be waived. Other major terms of the lease are summarized in the attached letter from WSU. Also attached are a map showing the location of the property, and a WSUCE document describing the instructional program and pro forma financial provisions of the proposal. A copy of the lease is on file in the Office of the Commissioner.
    [Show full text]
  • Davis County Staycation Guide
    DAVIS COUNTY STAYCATION GUIDE A GUIDE TO FREE AND LOW-COST PHYSICAL ACTIVITIES IN DAVIS COUNTY bit.ly/staycationguidedavis 2 DAVIS COUNTY LINKS Davis County Resource Locator davis4health.org Davis County Tourism & Events 801-451-3237 playindavis.com Davis County Fair 151 S. 1100 W., Farmington 801-451-4080 daviscountyutah.gov/fair Legacy Events Center 151 S. 1100 W., Farmington 801-451-3080 daviscountyutah.gov/legacyeventscenter Davis County Trails Map daviscountyutah.gov/trails/ *bit.ly/staycationguidedavis *bit.ly/freshfoodfinder Updated December 2020 For questions concerning the information contained in this brochure please contact (801) 525-5070 Table of Contents Activity Pages Batting Cages 1 Bowling 2 Camping 3 Canoeing/Kayaking 4 Community Gardens 5 Disc Golf 6 Dog Parks 7 Farmers Markets/Produce Stands 8-10 Fishing 11-12 Miniature Golf 13 Mountain Bike/BMX 14 Nature Preserves 15 Parks: North Davis County 16-22 Parks: South Davis County 23-26 Pickle Ball Courts 27 Ponds, Lakes, Reservoirs 28 Recreation Centers 29 Roller Skating & Ice Skating 30 Skate Parks 31 Splash Pads 32 Swimming Pools 33 Tennis Courts 34-36 Trails 37-47 Volleyball Courts 48-49 BATTING CAGES KAYSVILLE Boondocks 525 Deseret Drive 801-660-6800 boondocks.com SYRACUSE The Rush Funplex 1806 S. 2000 W. 801-779-2695 therushfunplex.com 1 BOWLING BOUNTIFUL NORTH SALT LAKE Bountiful Place Orchard Lanes 409 S. 500 W. 30 S. 130 E. 801-292-2444 801 - 936 - 8700 bountiful-bowl.com orchardlanes.com KAYSVILLE SYRACUSE Boondocks The Rush Funplex 525 Deseret Drive 1806 S. 2000 W. 801-660-6800 801 - 779 - 2695 boondocks.com therushfunplex.com LAYTON Classic Fun Center 867 N.
    [Show full text]
  • Legacy Parkway Trail - Davis County
    LEGACY PARKWAY TRAIL - DAVIS COUNTY Rating: Easy hiking Length: Up to 14 miles Gear: Standard Hiking Gear Maps: SALT LAKE CITY NORTH, UT; FARMINGTON, UT Water: Bring all you need. Season: Any Waypoints: Center Street Trailhead 12T 420596mE 4521629mN N40° 50' 31" W111° 56' 31" 2425 South Trailhead 12T 420596mE 4524103mN N40° 51' 51" W111° 56' 32" Mountain View Park Trailhead 12T 421050mE 4525504mN N40° 52' 37" W111° 56' 13" Mill Creek Trailhead 12T 422161mE 4528239mN N40° 54' 06" W111° 55' 27" Pages Lane Trailhead 12T 422865mE 4528874mN N40° 54' 26" W111° 54' 57" Birnam Woods Trailhead 12T 424028mE 4529944mN N40° 55' 01" W111° 54' 08" Farmington Trailhead 12T 424452mE 4536476mN N40° 58' 33" W111° 53' 53" Farmington Station 12T 423789mE 4537843mN N40° 59' 18" W111° 54' 22" Hype Built as part of the Legacy Parkway in 2008, the paved Legacy Parkway Trail follows the Legacy Parkway from North Salt Lake to Farmington. The trail is a gem, offering easy access for bikers, walkers, runners, and others. For most of its length, the trail is within a stone's throw of the highway, which detracts a bit from the ambiance, but views of the Wasatch Mountains, Antelope Island, and wetlands around the Great Salt Lake make up for the highway noise. The trail, on its southern end, connects to the Jordan Parkway Trail, providing over 50 miles of continuous trail to enjoy. The trail does not receive winter maintenance, but melts out fairly quickly, making it a good winter outing, especially for runners needing a long path to stretch their legs on.
    [Show full text]
  • Shepard Lane Interchange Section 404(B)(1) Practicability and NEPA Reasonable Alternative Analysis
    Technical Memorandum 29: Shepard Lane Interchange Section 404(b)(1) Practicability and NEPA Reasonable Alternative Analysis in support of the Environmental Impact Statement and Clean Water Act Section 404 Permit West Davis Corridor Project Federal Highway Administration Utah Department of Transportation UDOT Project No. S-0067(14)0 Prepared by HDR, Inc. 2825 E. Cottonwood Parkway, Suite 200 Salt Lake City, UT 84121 February 20, 2017 ii February 20, 2017 Executive Summary Introduction The Utah Department of Transportation (UDOT) and the What is the purpose of this Federal Highway Administration (FHWA) are proposing practicability analysis? a project (the West Davis Corridor) to improve regional mobility in Davis and Weber Counties, Utah. These lead The purpose of this analysis is to ensure that the least environmentally agencies, together called the West Davis Corridor (WDC) damaging practicable alternative— team, are preparing the West Davis Corridor Final the only project alternative that can Environmental Impact Statement (EIS), which will be permitted by the Corps of evaluate different alternatives for meeting the purpose of Engineers—is evaluated in detail in the Environmental Impact Statement the project. At the end of the EIS process, FHWA and for the West Davis Corridor Project. UDOT will select a preferred WDC alternative As part of the EIS process, the WDC team is preparing this practicability and National Environmental Policy Act (NEPA) reasonable alternative analysis for the Shepard Lane interchange option to provide information to FHWA and the U.S. Army Corps of Engineers (USACE). For FHWA, this analysis will help FHWA determine whether the Shepard Lane interchange option is a reasonable option to be carried forward for detailed study in the Final EIS.
    [Show full text]