25504 Federal Register / Vol. 85, No. 85 / Friday, May 1, 2020 / Notices

Primary Counties: Dickey, Emmons. SUPPLEMENTARY INFORMATION: Effective has been refined to have the ramp from All other information in the original January 17, 2017, FHWA assigned to southbound to declaration remains unchanged. UDOT certain responsibilities of FHWA southbound I–15 parallel Legacy (Catalog of Federal Domestic Assistance for environmental review, consultation, Parkway for approximately 0.3 mile and Number 59008) and other actions required by applicable then cross and the Federal environmental laws and Union Pacific Railroad tracks before Cynthia Pitts, regulations for highway projects in merging onto I–15 near 1800 North in Acting Associate Administrator for Disaster , pursuant to 23 U.S.C. 327. FHWA Centerville (approximately 0.7 mile Assistance. maintained responsibility of the south of the EIS Selected Alternative’s [FR Doc. 2020–09340 Filed 4–30–20; 8:45 am] environmental review process of the southbound I–15 merge). The design of BILLING CODE 8026–03–P West Davis Corridor project until its the Legacy Parkway Trail in the area of issuance of a Record of Decision (ROD). the system has also been UDOT is responsible for conducting any refined. DEPARTMENT OF TRANSPORTATION additional environmental reviews These changes to the Selected (including re-evaluations) that are Alternative are referred to as the Refined Federal Highway Administration required for the West Davis Corridor Selected Alternative and are the subject project following the issuance of the of, and are described in more detail in, Notice of Final Federal Agency Actions ROD. Actions taken by UDOT on UDOT’s April 8, 2020 EIS re-evaluation on Proposed Highway in Utah FHWA’s behalf pursuant to 23 U.S.C. (UDOT Project Number S–0067(14)0, AGENCY: Utah Department of 327 constitute Federal agency actions S.R. 67, West Davis Corridor; WDC/I– Transportation (UDOT); Federal for purposes of Federal law. Notice is 15/Legacy Parkway System Interchange Highway Administration (FHWA), hereby given that UDOT has taken final in Davis County, Utah (PIN 7176) Department of Transportation. agency actions subject to 23 U.S.C. Environmental Impact Statement Re- 139(l)(1) by issuing licenses, permits, evaluation #13)(EIS Re-evaluation). ACTION: Notice of limitations on claims and approvals for a modification of the The actions by UDOT, and the laws for judicial review of actions by UDOT West Davis Corridor project in the State under which such actions were taken, and other Federal agencies. of Utah. are described in the EIS Re-evaluation SUMMARY: The FHWA, on behalf of On June 23, 2017, FHWA approved and other documents in the UDOT UDOT, is issuing this notice to the Final Environmental Impact project records. The EIS Re-evaluation is announce actions taken by UDOT that Statement and Section 4(f) Evaluation available for review by contacting are final Federal agency actions. The (EIS) for the West Davis Corridor UDOT at the address provided above. final agency actions relate to design Project, and on September 29, 2017 This notice applies to the EIS Re- modifications to a planned and FHWA issued a ROD approving the evaluation, the Section 4(f) approved highway project, the West project. On October 6, 2017, FHWA determination, the NHPA Section 106 Davis Corridor project in Davis County, published notice of the EIS and ROD in review, the Endangered Species Act Utah, and more specifically to UDOT’s the Federal Register triggering the 150- determination, the noise review and re-evaluation of the Environmental day statute of limitations under 23 noise abatement determination, and all Impact Statement and Section 4(f) U.S.C. 139(l)(1) for the project. The other UDOT and federal agency Evaluation for the project in light of project is included in UDOT’s adopted decisions and other actions with respect design modifications to the system 2020–2025 State Transportation to the EIS Re-evaluation and the Refined interchange by which the West Davis Improvement Plan (STIP) as project Selected Alternative as of the issuance Corridor project (State Route 67) will number 11268 and is scheduled for right date of this notice and all laws under connect with Interstate 15 (I–15) and of way acquisition and construction to which such actions were taken, Legacy Parkway. Those actions grant begin in fiscal year 2020, being let as a including but not limited to the licenses, permits and/or approvals for design-build contract. The project is following laws (including their the project. also included in the implementing regulations): Regional Council’s 2019—2050 Regional 1. General: National Environmental DATES: By this notice, FHWA, on behalf Transportation Plan. Policy Act [42 U.S.C. 4321–4351]; of UDOT, is advising the public of final UDOT has now updated the design of Federal-Aid Highway Act [23 U.S.C. 109 agency actions subject to 23 U.S.C. the system interchange at the south end and 23 U.S.C. 128]; MAP–21, the 139(l)(1). A claim seeking judicial of the project by which the West Davis Moving Ahead for Progress in the 21st review of these Federal agency actions Corridor project (State Route 67) will Century Act [Pub. L. 112–141]. on the highway project will be barred interconnect with I–15 and Legacy 2. Air: Clean Air Act [42 U.S.C. 7401– unless the claim is filed on or before Parkway to accommodate a planned 7671(q)]. September 28, 2020. If the Federal law widening of I–15 by one lane in each 3. Land: Section 4(f) of the that authorizes judicial review of a direction. With the planned widening of Department of Transportation Act of claim provides a time period of less I–15, it was not possible to have the 1966 [49 U.S.C. 303]; Landscaping and than 150 days for filing such claim, then ramp connections as identified in the Scenic Enhancement (Wildflowers) [23 that shorter time period still applies. Selected Alternative in the EIS and ROD U.S.C. 319]. FOR FURTHER INFORMATION CONTACT: without either 1) having substantial 4. Wildlife: Endangered Species Act Elisa Albury, Environmental Program impacts to the residential areas of [16 U.S.C. 1531–1544 and Section Manager, UDOT Environmental Farmington and Centerville east of the 1536], Fish and Wildlife Coordination Services, P.O. Box 143600, Salt Lake Frontage Road or 2) relocating the Act [16 U.S.C. 661–667(d)]; Migratory City, UT 84114; (801)–965–4000; email: Union Pacific Railroad tracks. To Bird Treaty Act [16 U.S.C. 703–712]; [email protected]. UDOT’s normal minimize costs and impacts while The Bald and Golden Eagle Protection business hours are 8 a.m. to 5 p.m. accommodating a planned additional Act [16 U.S.C. 668]. (Mountain Time Zone), Monday through lane in each direction on I–15, the 5. Historic and Cultural Resources: Friday, except State and Federal design of the system interchange Section 106 of the National Historic holidays. described in the Selected Alternative Preservation Act of 1966, as amended

VerDate Sep<11>2014 08:07 May 01, 2020 Jkt 250001 PO 00000 Frm 00122 Fmt 4703 Sfmt 4703 E:\FR\FM\01MYN1.SGM 01MYN1 Federal Register / Vol. 85, No. 85 / Friday, May 1, 2020 / Notices 25505

[16 U.S.C. 470(f) et seq.]; Archeological DEPARTMENT OF TRANSPORTATION environmental review that is required Resources Protection Act of 1977 [16 for projects that were approved by U.S.C. 470(aa)–470(ll)]; Archeological Federal Highway Administration FHWA prior to execution of the MOU. and Historic Preservation Act [16 U.S.C. The Revised ROD was processed in 469–469(c)]; Native American Grave Notice of Availability of the Revised accordance with the MOU, and UDOT is Protection and Repatriation Act Record of Decision for the Mountain the agency responsible for approving the (NAGPRA) [25 U.S.C. 3001–3013]. View Corridor Project in Utah and Final Revised ROD. Actions taken by UDOT 6. Social and Economic: Civil Rights Federal Agency Actions on FHWA’s behalf pursuant to 23 U.S.C. Act of 1964 [42 U.S.C. 2000(d)– AGENCY: Utah Department of 327 and the MOU constitute Federal 2000(d)(1)]; American Indian Religious Transportation (UDOT), Federal agency actions for purposes of Federal Freedom Act [42 U.S.C. 1996]; Farmland Highway Administration (FHWA), law. Notice is hereby given that UDOT Protection Policy Act (FPPA) [7 U.S.C. Department of Transportation. has taken final agency actions subject to 4201–4209]. 23 U.S.C. 139(l)(1) by issuing licenses, ACTION: 7. Wetlands and Water Resources: Notice of availability and notice permits, and/or approvals for the Clean Water Act (Section 404, Section of limitations on claims for judicial Project in the 401, Section 319) [33 U.S.C. 1251– review of actions by UDOT and other State of Utah. 1377]; Coastal Barrier Resources Act [16 Federal agencies. A Final Environmental Impact Statement (EIS) and Section 4(f) U.S.C. 3501–3510]; Coastal Zone SUMMARY: The FHWA, on behalf of Evaluation for the Mountain View Management Act [16 U.S.C. 1451–1465]; UDOT, is issuing this notice to Corridor Project was completed in Land and Water Conservation Fund announce the availability of the Revised September 2008 and approved through (LWCF) [16 U.S.C. 4601–4604]; Safe Record of Decision (ROD) for the the issuance of a ROD on November 17, Drinking Water Act (SDWA) [42 U.S.C. Mountain View Corridor Project in Salt 2008, by the FHWA. The overall 300(f) –300(j)(6)]; Rivers and Harbors Lake and Utah counties, Utah. In Selected Alternative in the 2008 ROD Act of 1899 [33 U.S.C. 401–406]; Wild addition, this notice is being issued to included both a roadway alternative (the and Scenic Rivers Act [16 U.S.C. 1271– announce actions taken by UDOT that 5800 West Freeway Alternative) and a 1287]; Emergency Wetlands Resources are final Federal agency actions related transit alternative (the 5600 West Act [16 U.S.C. 3921, 3931]; TEA–21 to the project referenced above. Those Transit Alternative with Dedicated Wetlands Mitigation [23 U.S.C. actions grant licenses, permits and/or 103(b)(6)(M, 133(b)(11)]; Flood Disaster Right-of-Way Option). Since the original approvals for the project. The Revised ROD was issued, this overall Selected Protection Act [42 U.S.C. 4001–4128]. ROD provides details on the Selected 8. Hazardous Materials: Alternative has been refined and is Alternative for the proposed referred to as the Refined Selected Comprehensive Environmental improvements. Response, Compensation, and Liability Alternative. Act [42 U.S.C. 9601–9675]; Superfund DATES: This decision became operative The 2008 ROD committed to a phased Amendments and Reauthorization Act on January 15, 2020. By this notice, implementation approach for Selected of 1986; Resource Conservation and FHWA, on behalf of UDOT, is advising Alternative. The roadway component Recovery Act [42 U.S.C. 6901–6992(k)]. the public of final agency actions and the transit component of the 9. Noise: Federal-Aid Highway Act of subject to 23 U.S.C. 139(l)(1). A claim Selected Alternative each consisted of 1970, Public Law 91–605 [84 Stat. seeking judicial review of the Federal three phases. Under the phased 1713]; [23 U.S.C. 109(h) & (i)]. agency actions on the highway project implementation approach as defined in 10. Executive Orders: E.O. 11990 will be barred unless the claim is filed the 2008 ROD, UDOT committed that it Protection of Wetlands; E.O. 11988 on or before September 28, 2020. If the would not proceed with Phase 2 of the Floodplain Management; E.O. 12898, Federal law that authorizes judicial roadway component (except in a few Federal Actions to Address review of a claim provides a time period defined areas) until Phase 1 of the Environmental Justice in Minority of less than 150 days for filing such transit component was complete and in Populations and Low-Income claim, then that shorter time period still revenue operation. As described in the Populations; E.O. 11593 Protection and applies. Final EIS and the 2008 ROD, the transit system would have started as Bus Rapid Enhancement of Cultural Resources; FOR FURTHER INFORMATION CONTACT: E.O. 13287 Preserve America; E.O. Elisa Albury, Environmental Program Transit (BRT) in Phase 1 and would 13175 Consultation and Coordination Manager, UDOT Environmental have been converted to rail transit in with Indian Tribal Governments; E.O. Services, PO Box 143600, , Phase 3. The Refined Selected Alternative 11514 Protection and Enhancement of UT 84114; (801) 834–5284; email: modifies Phase 1 of the transit Environmental Quality; E.O. 13112 [email protected]. UDOT’s normal component of the 2008 Selected Invasive Species. business hours are 8 a.m. to 5 p.m. Alternative (5600 West Transit (Catalog of Federal Domestic Assistance (Mountain Time Zone), Monday through Alternative with Dedicated Right-of- Program Number 20.205, Highway Planning Friday, except State and Federal Way Option). Instead of BRT service, and Construction. The regulations holidays. the Phase 1 transit service would implementing Executive Order 12372 SUPPLEMENTARY INFORMATION: The include construction of Express Bus regarding intergovernmental consultation on Federal programs and activities apply to this environmental review, consultation, and transit service over a longer (29-mile) program.) other actions required by applicable corridor from the Old Bingham Highway (Authority: 23 U.S.C. 139 (l)(1)) Federal environmental laws for this TRAX station following 5600 West to action are being, or have been, carried downtown Salt Lake City including Dated: April 24, 2020. out by UDOT pursuant to 23 U.S.C. 327 service to the Salt Lake City Ivan Marrero, and a Memorandum of Understanding International Airport. The service would Division Administrator, Federal Highway (MOU) dated January 17, 2017, and include operational improvements as Administration, Salt Lake City, Utah. executed by FHWA and UDOT. Under well as enhanced stops with associated [FR Doc. 2020–09283 Filed 4–30–20; 8:45 am] the MOU, UDOT is responsible for park-and-ride lots. UDOT would acquire BILLING CODE 4910–RY–P conducting any additional the necessary right-of-way for the

VerDate Sep<11>2014 08:07 May 01, 2020 Jkt 250001 PO 00000 Frm 00123 Fmt 4703 Sfmt 4703 E:\FR\FM\01MYN1.SGM 01MYN1