THE CORPORATION OF THE TOWNSHIP OF KING

COUNCIL MEETING AGENDA #5

MONDAY, FEBRUARY 26, 2018 - 6:00 P.M.

COUNCIL CHAMBERS

Page

1. CALL TO ORDER

2. INTRODUCTION OF ADDENDUM ITEMS Any additional items not listed on the agenda would be identified for approval.

3. APPROVAL OF AGENDA

4. DECLARATIONS OF PECUNIARY INTEREST

5. MAYOR'S COMMENTS

6. PUBLIC MEETING(S) 5-37 6.1 Planning Department Report Number P-2018-13 Re: Functional Servicing/Development Area Study, FSDAS-2017-01 Subject Lands: King City East – Phase 2 (North); Part of Lots 5 - 10, Conc. 3 Applicant: King City East Landowners Group Date of Notice: February 6, 2018

A. That Planning Report No. P-2018-13 be received;

B. That the matter of the King City North East Functional Servicing/Development Area Study (FSDAS), File No. FSDAS-2017-01, submitted by the King City East landowners group, in relation to the development of the north-east quadrant of King City, for residential uses, be referred back to staff, together with all agency, Applicant, Township department and public comments, for a further report following the completion of the Planning Department’s review;

C. That staff continue to work and meet with the Applicant to review and address the comments expressed by Council, the public, the Applicant, Township departments and other public agencies, and the Applicant provide revisions and/or further supporting information for the FSDAS in this regard;

D. That the processing and review of the related applications for draft plan of subdivision approval and zoning by-law amendment within the King City North East FSDAS study area be held in abeyance until the review of the FSDAS

Page 1 of 95 Council Agenda - Mon., Feb. 26, 2018 Page

6. PUBLIC MEETING(S) has been further advanced and Planning staff has prepared a further report for Council’s consideration in this regard.

38-71 6.2 Planning Department Report Number P-2018-14 Re: Draft Plan of Subdivision 19T-17K01; Zoning By-law Amendment Z-2017-03 Subject Lands: 13330 Dufferin Street; Part of Lots 8, Conc. 3; King City Applicant/Owner: 632025 Ltd. Date of Notice: February 6, 2018

A. That Planning Report No. P-2018-14 be received;

B. That the applications for Draft Plan of Subdivision 19T-17K01 and Zoning By-law Amendment Z-2017-03, submitted by 632025 Ontario Ltd. to allow the residential development of the lands described as 13330 Dufferin Street, Part of Lot 8, Conc. 3, consisting of a range of lot sizes for 34 residential dwellings comprised of single detached units/lots fronting on to common element private roads, be received and referred back to staff together with all agency, applicant, Township departments, Council and public comments for a further report following the receipt of the same and completion of the Planning Department’s review;

C. That Planning staff’s review and consideration of the subject applications be carried out in conjunction and coordination with the FSDAS submitted by the King City East Landowners Group, FSDAS-2017-01, to ensure that common and related issues with respect to potential pedestrian connections, trails/paths, servicing connections and other similar development considerations have been appropriately addressed, and that the landowners be encouraged to cooperatively participate in this regard.

D. That staff continue to work and meet with the applicant to review and address the issues expressed by Council, the public, the applicant, Township departments and other public agencies and report back to Committee of the Whole.

7. ADOPTION OF MINUTES OF COUNCIL MEETINGS AND COMMITTEE REPORTS

7.1. COUNCIL MINUTES 72-80 7.1.1 Minutes of the Council Meeting of February 5, 2018

7.2. COMMITTEE REPORTS

Page 2 of 95 Council Agenda - Mon., Feb. 26, 2018 Page

7.2. COMMITTEE REPORTS 81-89 7.2.1 Committee of the Whole Reports of February 5, 2018

90-91 7.2.2 Committee of the Whole Closed Session Reports of February 5, 2018

8. NOTICE OF MOTION

9. MOTION TO RECESS INTO COMMITTEE OF THE WHOLE

10. RE-CONVENE COUNCIL MEETING

11. ADOPTION OF COMMITTEE OF THE WHOLE RECOMMENDATIONS

12. MOTION TO RECESS INTO COMMITTEE OF THE WHOLE, CLOSED SESSION TO CONSIDER: 12.1 Section 2.7(b), Subsections 5 and 6: Litigation or Potential Litigation Affecting the Municipality

Engineering, Public Works and Building Department Report Re: Litigation Matter Update on Nobleton Inflow and Infiltration Issues

12.2 Approval of Closed Session, Confidential Reports

Committee Closed Session Confidential Report of February 5th, 2018

13. RE-CONVENE COUNCIL MEETING

14. BUSINESS ARISING FROM CLOSED SESSION

15. BY-LAWS 92 By-law #2018-14

A BY-LAW TO AUTHORIZE THE MAYOR AND CLERK TO ENTER INTO A SHARED USE AGREEMENT BETWEEN THE YORK REGION DISTRICT SCHOOL BOARD AND THE CORPORATION OF THE TOWNSHIP OF KING (Ref. Parks, Recreation and Culture Department Report No. PRC-2018-04, C.O.W. Feb. 26/18)

Page 3 of 95 Council Agenda - Mon., Feb. 26, 2018 Page

15. BY-LAWS 93 By-law #2018-15

A BY-LAW TO AUTHORIZE THE MAYOR AND CLERK TO ENTER INTO A RECYCLING BIN LICENCE AGREEMENT AND TEXTILE RECYCLING AGREEMENT BETWEEN THE NATIONAL DIABETES TRUST AND THE CORPORATION OF THE TOWNSHIP OF KING (Ref. Parks, Recreation and Culture Department Report No. PRC-2018-05, C.O.W. Feb. 26/18)

94 By-law #2018-18

A BY-LAW TO AUTHORIZE THE MAYOR AND CLERK TO EXECUTE A BOUNDARY ROAD AGREEMENT BETWEEN THE TOWN OF EAST GWILLIMBURY AND THE CORPORATION OF THE TOWNSHIP OF KING (Ref. Engineering, Public Works and Building Department Report No.EPW- 2018-04, C.O.W. Feb. 26/18, Road Boundary Agreement)

16. CONFIRMATION OF PROCEEDINGS BY-LAW 95 By-law #2018-19

A BY-LAW TO CONFIRM THE PROCEEDINGS OF COUNCIL AT ITS MEETING HELD ON FEBRUARY 26, 2018

17. ADJOURNMENT

Page 4 of 95 KING THE CORPORATION OF THE TOWNSHIP OF KING REPORT TO COUNCIL

Monday, February 26, 2018

Planning Department Planning Report No. P-2018-13

RE: Public Meeting Functional Servicing/DevelopmentArea Study, FSDAS-2017-01 Subject Lands: King City East - Phase 2 (North); Part ofLots 5 - 10, Cone. 3 Applicant: King City East Landowners Group

1. RECOMMENDATIONS

The Planning Department respectfully submits the following recommendations:

A. That Planning Report No. P-2018-13 be received;

B. That the matter of the King City North East Functional Servicing/Development Area Study (FSDAS), File No. FSDAS-2017-01, submitted by the King City East landowners group, in relation to the development of the north-east quadrant of King City, for residential uses, be referred back to staff, together with all agency. Applicant, Township department and public comments, for a further report following the completion of the Planning Department's review;

C. That staff continue to work and meet with the Applicant to review and address the comments expressed by Council, the public, the Applicant, Township departments and other public agencies, and the Applicant provide revisions and/or further supporting information for the FSDAS in this regard;

D. That the processing and review of the related applications for draft plan of subdivison approval and zoning by-law amendment within the King City North East FSDAS study area be held in abeyance until the review of the FSDAS has been further advanced and Planning staff has prepared a further report for Council's consideration in this regard;

2. PURPOSE AND BACKGROUND

The purpose of this report is to provide information with respect to the King City North East Functional Servicing/Development Area Study (FSDAS) and the related public meeting.

The King City Community Plan (KCCP) requires a Functional Servicing/Development Area Study (FSDAS), including various component studies, to be submitted as a basis for the evaluation of the development of the subject lands. The FSDAS provides the foundation for the integration of the development of the new community area with the existing community and natural environment, and is based on a broader planning area.

Planning Department Report Page 5 of 95 Number P-2018-13 Planning Department Report P-2018-13 Page 2

A land owners group has assembled for the purpose of completing the FSDAS. The King City East land owners group (the "Applicant'VKCELG) is comprised of various participating property owners in the study area, as illustrated on Appendix A. At this time, several properties within the study area are not participating in a direct manner, however, these non-participating lands are still required to be considered by the FSDAS.

The King City North-East FSDAS for the subject lands had been previously submitted, however, requires revisions, updates, and further review. In consultation with the Township and other public agencies, the Applicant commenced work on the FSDAS in 2005. The FSDAS was completed and submitted to the Township in February 2006. As the review proceeded, the review and approval of the FSDAS was scoped to address the lands south of the railway corridor only (Phase 1). The FSDAS for the south-east quadrant was approved by the Township in 2007 for the first phase, i.e. the properties known as King North, King Dufferin, Zancor Homes (King South)/Kingshire Estates, Hickory Hills/Great Gulf, and Osmington (Aspen Ridge). The FSDAS for the subject lands, i.e. phase 2/northern portion of study area was deferred at that time. As the phase 1 lands have approached build out the KCELG have proceeded with the phase 2 FSDAS at this time. The FSDAS is to be approved in advance of the approval of individual subdivision/development applications.

The subject lands are also subject to the policies of Official Plan Amendment no. 89 (CPA 89). CPA 89 amended the KCCP to, amongst other amendments, increase the permitted residential density within the Low Density Residential 5 Area (LDR 5) to an average gross density of 7 units per hectare (3 units per acre) and provide minor reductions to the environmental buffers/vegetation protection zones in limited and isolated "pinch point" locations. Planning staff is currently reviewing the proposed development in relation to the broader development area within the LDR 5 area to ensure conformity with CPA 89.

3. PROPOSAL

The completion of FSDAS is effectively the first step towards the implementation of the residential development contemplated by OPA 89. The FSDAS has been submitted to the Township to facilitate subsequent and future related applications for approval of Draft Plans of Subdivision and Zoning By-law Amendments. More specifically, the FSDAS proposes a range of uses including residential of varying forms and lot sizes, parks, school, environmental protection lands, and stormwater management. The total residential unit count by type and property is outlined in more detail below.

Planning Department Report Page 6 of 95 Number P-2018-13 Planning Department Report P-2018-13 Page 3

RESIDENTIAL UNITS

unnsa Kopuiaoon Loidowner Gross Single Family Lots (by Frontage) «> «/> Developable 7uph& TOTAL Aroaft) 12.8m 13.7m 15.24m 1&3m 21.3m llppu UNITS (421 (451 (501 (601 (701

Kingsfieid Estates Ud 5.79 41 126 41 1 1 0 0 0 43

King GreenDevelopments CR he. 9.69 68 210 22 22 46 0 0 0 90

King Rocks Developments CR Inc. 19.63 137 426 0 31 40 3 0 77 151

BracorDevelopments he. 15.27 107 331 0 21 23 55 5 0 104

Remcor-King he. 64.88 454 1,408 0 SB 198 112 57 47 472

ScouliDevelopments (BT)he 13.99 98 304 0 24 51 23 1 0 99

TheAcomDevelopment Corporation 11.12 78 241 0 0 48 7 0 0 55

Supco Construction Limifed 0.74 5 16 0 0 6 1 0 0 7

Total Participating Lands 141.11 988 3,062 63 157 413 201 63 124 1,021

Non-Partidpating Lands 11 IB 79 244 9 .ykln/nbinolx'' (Jihrmvixl.viinh\ 79 TOTAL ofALL L»)downers 152.29 1,067 3,307 aJcuyrpncnr 1,100

Unit Type as apercent of total units (Partic^ting Lands Onlj^ | 6.2% 15.4% 4as% ia7% 6.2% 12.1% 100.0%

Notes

1. Mostfeatutts have be«flsuked byTKCA orUNR. TheGrossDevelopable area exicudesthe Regcnal Roadarrienhg,the ita&iral featuresmlessotherwBe shown^edand ncbides environmerSal buffers tobe placed rpi^ovrrership as perOPA 540. Fetal Devebp^le Area wi be deterrtihed through dteFS/DAS approval process

2.Gross Dettsily tsan average of7uphappled toitdwidual properties artdfulimits areshown for each Therefore, thetot^ number oflaiiis maybe off dueto roundhg 3.OevelopaUe Area for Nort-Particpatvtg bndsisbasedontheKngCiy Communcy Plan Schedule 4 andtssubject tochange

Source: Malone Given Parsons Ltd.. 2017

4. PROPERTY DESCRIPTION Townhou The study area of the FSDAS (refer to Figure 1) applies to lands generally describedUnits as the north-east quadrant of King City, north of the railway corridor, south of the 15'^ Sideroad, west of Dufferin Street, and east of the existing community boundary. The study area is approximately 239 hectares, of which the KCELG controls approximately 205 ha (86%). The lands are generally undeveloped and characterized by mixed topography and traversed by various natural heritage features (eg. watercourses, wetlands, valleylands). The surrounding lands are located within the existing community or outside of the Community Plan boundary of the King City Community Plan and are not designated for future development.

5. PUBLIC NOTICE/COMMENTS

On January 18, 2018, a public information session was held to introduce the proposal to the community and to provide information and receive and respond to comments from the public. Notice of the Public Meeting of Council was mailed to surrounding property owners and other interested parties and agencies. The notice has aiso been published in the local newspaper. At the time of the writing of this report. Planning staff has received comments from the solicitors for 632025 Ontario Ltd. (13330 Dufferin Street) with respect to matters of coordination between

Planning Department Report Page 7 of 95 Number P-2018-13 Planning Department Report P-2018-13 Page 4 the development proposed for 13330 Dufferin Street and the subject lands. A copy of the submission is attached as Appendix 2.

6. AGENCY COMMENTS

The FSDAS has been circulated for comment to internal Township Departments, as well as the and Region Conservation Authority, the Region of York, the public School Board, the Catholic School Board, and the Provincial Ministry of Natural Resources.

At the time of the writing of this report, only the comments of the Region of York have been received. The Region's comments (Appendix 1) address a range of matters including servicing allocation, traffic and roads matters.

7. DISCUSSION AND ANALYSIS

7.1 King City Community Plan (KCCP)

As shown on Figure 2, the subject lands are designated as Low Density Residential 5. The policies of CPA 89 include permission for a range of housing types including single detached, semi-detached, townhouses, or other similar dwelling types not exceeding 3 storeys, and seniors housing not exceeding 3 storeys, at an average gross density of 7 units per hectare. Other lands within the study area are designated Environmental Protection Area.

Prior to any new development and draft plan approval of subdivisions outside the "existing community", CPA 89 requires a comprehensive development plan to be approved by the Township, together with other public agencies, and address all lands within the study area. The FSDAS has been submitted by the KCELG for this purpose. The FSDAS will comprehensively coordinate and layout the major components (roads/street pattern, open space, areas for environmental protection, parks, schools, servicing, etc.) of the future new development, amongst the various land ownerships within the study area to ensure that future plans of subdivision are properly integrated between themselves and with the existing community. The framework provided by the FSDAS is intended to be refined and designed in more detail through its implementation at the draft plan of subdivision stage, following the approval of the FSDAS.

7.2 King City East Functionai Servicing/Development Area Study

The FSDAS is comprised of various components to address the policies of the Community Plan and the Township's terms of reference. Several of the components are addressed in more detail below. Township staff's review of each component is under review and detailed comments will be provided to the Applicant with respect to any required revisions and/or additional information.

Land Use Concept/Preliminarv Development Plan

The land use concept of the FSDAS is based upon the land use designations of the King City Community Plan/CPA 89. The FSDAS lays out the basic land use pattern which lays the foundation for the overall development of the study area. The general land use

Planning Department Report Page 8 of 95 Number P-2018-13 Planning Department Report P-2018-13 Page 5 concept/preliminary development layout is shown on Figure 4 of this report. The FS/DAS proposes the development of the study area for:

• primarily low density residential, approximately 897 single detached dwellings;

• 47 townhouses and 77 lifestyle condominium townhouses;

• a network of open space and environmentally protected lands;

• 1 community scale park, 2 neighbourhood parks, and a future elementary school site;

• a road network which most notably includes a bridge crossing of the environmental lands in the central portion of the study area in order to link the eastern and western portions of the community;

• a network of environmentally protected lands comprised of various key natural heritage features such as wetlands, valleylands, and woodlands;

• a pedestrian and cycling trail and path network.

While staffs review remains on-going, staff has identified several preliminary comments:

• the number of cul-de-sac roads should be minimized in order to enhance neighbourhood connectivity and the pedestrian and transit orientation of the new neighbourhoods;

• a need to re-design the development pattern to avoid reverse frontage lotting (i.e. lots which have double frontage and back on to roads) due to design, aesthetic, engineering and maintenance concerns of noise mitigation features. The plan currently proposes a significant amountof reverse frontage lotting along Dufferin Street and 15^ Sideroad;

• potential to increase the amount of townhouses or semi-detached units (OPA 89 permits up to 15% of the units to be townhouses or semi-detached, while the current concept plan proposes approximately 12%), and to further distribute these units throughout the study area;

• further detail required in regard to the overall phasing of the development relative to the timing of the east-west collector road and bridge crossing, and the provision of a temporary emergency access route to the 15^ sideroad and adjacent to the park and school blocks in order so that the overall phasing of development is more flexible relative to the timing of the construction of the bridge crossing;

• staff notes that some lands currently within the study area but not within the KCELG as a participating owner merit further consideration to be included within the landowners group in order to most effectively and efficiently provide for the development of such lands with respect to coordination of external services and other matters. In particular, staff notes that the review of the development proposed for the lands located at 13330 Dufferin Street should be considered in conjunction with the KCELG development concept. Planning staff has and will continue to encourgage cooperation between these land owners;

Planning Department Report Page 9 of 95 Number P-2018-13 Planning Department Report P-2018-13 Page 6

• Planning staff notes that some properties within the subject area may be less appropriate and/or capable of supporting the density permitted by OPA 89 while some sites may be more appropriate for higher density, thereby achieving the average of 7 units per hectare as permitted by OPA 89. For example, the Acorn property and portions of the King Rocks property have significant access limitations which may present a challenge to achieve a design with multiple access points and, therefore, more difficult to rationalize a higher number of units within those areas. The Township's typical standard for the number of units allowed on a single access is approximately 40 units. OPA 89 includes specific policies which require consideration of these factors when determining the appropriate density/yield for that area. Conversely, areas in close proximity to Regional/arterial roads, future transit routes, community amenities such as parks and schools, may be more well suited to higher densities;

• the Parks, Recreation and Culture Department has been working with the applicant to identify parkland and facility needs and the size, location and distribution of such parks throughout the future development. Based upon the identification of the land/park requirements in the Parks, Recreation and Culture Master Plan 2013 a requirement for both a Community Park and associated neighbourhood parks has been identified. Comments on the approximate sizing and location of these parks have been provided;

• As an element of the review process for OPA 89, the York Region District School Board (YRDSB) advised that they will require a future school site within the development area. The FSDAS has included a future school site. Planning staff has not yet received the comments of YRDSB with respect to the FSDAS and the siting and sizing of the proposed school site.

It is important to note that, although illustrated on the concept plan, the FSDAS does not specifically address or provide approval for the overall lot pattern and/or density of development. These matters are typically addressed at the subsequent draft plan of subdivision stage.

Environment

The environmental analysis component of the FSDAS includes a natural heritage evaluation Significant Woodlands Assessment, Restoration Strategy, and Wetland Compensation plan. The study area contains several environmental features including wetlands, watercourses, woodlands, valley and stream corridors. The FSDAS identifies the boundaries of these features including buffers, and provides an assessment for their protection and for avoiding and mitigating any impacts of development. The boundaries of the environmental features were established in the field in accordance with the policies of the Community Plan, the Conservation Plan and in consultation with Planning, Ministry of Natural Resources, and TRCA staff. These policies generally require 30 metre (+/- ICQ ft.) buffers adjacent to the environmental features. The FSDAS incorporates these buffers and maintains the future development/lots outside their limits, with the exception of several isolated "pinch points" as permitted by OPA 89.

The review of these components of the FSDAS is underway by the TRCA. Township staff requires the TRCA's comments in order to further evaluate these elements of the FSDAS. The TRCA's comments have not yet been received by Planning staff.

Planning Department Report Page 10 of 95 Number P-2018-13 Planning Department Report 9-2018-13 Page 7

Design: Urban Design/Landscape and Architecture

The design component of the FSDAS is to be guided by the community design strategy of the King City Community Plan. The purpose of the design strategy is to establish a clear set of urban design principles that provide direction for high quality neighbourhoods within the study area and guide the visual character of the new development. The design strategy includes a:

• Urban design/landscape plan: the urban design plan provides for the integrated design of the public and private realms by addressing elements such as streetscape design, landscape buffers, gateways and nodes. This includes street trees, street lights, fencing, etc..

• Architecture design guidelines: the architecture design guidelines establish architectural design principles intended to harmonize the natural and built environments and provide a general overview of the intended visual character for the built-form by addressing various architectural elements, such as site planning, building entrances, windows, garages, etc.. The guidelines are intended to provide the framework for more detailed site specific guidelines to be implemented through individual subdivisions.

Staffs review of the urban design/landscape plan remains on-going, however, the following preliminary comments are identified:

• In general, staff notes that the FSDAS provides a significant amount of connectivity throughout the different sections of the study area as well as between the study area and the existing neighbourhoods. In particular, pedestrian connections are proposed to Tawes Trail, as well as a pedestrian crossing of the East Number River through the Acorn lands and ultimately connecting to the lands south of the railway. Overall, through a network of sidewalks, trails, and bike/muiti use paths, the FSDAS proposes a high level of pedestrian connectivity;

• the primary location for the trail network will be within the environmental buffers. Staff is generally satisfied in this regard, however, some potential revisions to the trail layout and linkages/connections and additional information regarding the trail design, may be required;

• the review of the parkland area calculation details is underway to ensure that the amount of parkland provided is appropriate relative to the parkland requirements of the Planning Act. Any shortfall will be addressed through a cash-in-lieu payment and a related Parkland Dedication Agreement between the KDELG and the Township as a condition of draft plan approval;

• The review of the proposed park sizes, locations, facilities is under review by Township Parks, Recreation and Culture staff;

• stormwater management facilities have been sited together with other open space/environmental lands and serve to provide additional public open/"green" road frontage and vistas. Staff is supportive of this approach.

Staffs review of the architectural design guidelines component remains on-going and further comments will be provided at a later date.

Planning Department Report Page 11 of 95 Number P-2018-13 Planning Department Report P-2018-13 Page 8

Transportation/Traffic Impacts

The FSDAS also includes a transportation/traffiG analysis which makes detaiied recommendations with respect to projected traffic impacts to the existing and proposed roads and necessary improvements to roads and intersections to accommodate the proposed development. This component of the FSDAS is currently under review by the Township's Engineering and Pubiic Works Department and additional comments will be provided upon completion of their review. Preliminary comments have noted the following:

• a requirement for additional information with respect to the proposed cross-section of the collector and local roads in the study area. In particular, concerns have been expressed with respect to the incorporation of multi-use paths rather than dedicated side-walks and bicycle paths;

• a need to minimize the number and length of cul-de-sac roads to facilitate continuity of the local and collector road network between neighbourhoods, efficient roads maintenance, as weli as accommodate appropriate servicing; there is also a concern with respect to the length of some of the cul-de-sacs which would result in a significant stretch being served by a singie access point;

as noted above there is a need to re-design the development pattern to avoid reverse- lotting. This will likely require revisions to the road pattern. This comment has also been provided and reinforced by the Region of York;

the development includes a proposed road connection into the existing community at the easterly terminus of East Number Drive. As noted above, a continuous road network between neighbourhoods is considered appropriate. However, staff also notes the extent of development served by a single access point should be minimized. Staff has expressed a concern with respect to the length and number of units proposed to be served by a single access by the extension of East Number Drive and has requested the Applicant to explore possible revisions in this regard;

Staff also notes the need to address construction access with respect to the Acorn lands to ensure construction access is not proposed or provided via East Number Drive. It is staffs understanding that the Applicant has been pursuing this matter with the TRCA to ensure that a viable construction access route from Dufferin Street can be achieved. Preliminary comments provided to date indicate that such a route will be viable subject to certain design and construction requirements of the TRCA. However, Planning staff continues to await receipt of the TRCA's comments;

the alternatives for the main east-west collector road route and location of the bridge crossing of the valley/stream corridor have been considered through a concurrent Environmental Assessment (EA) process together with the FSDAS and planning approval process. Public consultation has taken place as an element of the EA process. The FSDAS has incorporated the outcome of that process.

Planning Department Report Page 12 of 95 Number P-2018-13 Planning Department Report P-201d-13 Page 9

The Region of York has carried out a review of the transportation analysis and provided comments and requested additional information to be provided by the KCELG. The Region's comments area attached as Appendix 1.

Water and Sanitarv Servicino and Stormwater Manaoement

New development is required by the Community Plan to be serviced by full municipal services. The existing municipal water supply and distribution system is proposed to be extended to service the development contemplated by the FSDAS. The proposed development will also be serviced by the municipal sanitary sewer system. The Township's Engineering and Public Works Department is reviewing the servicing analysis submitted with the FSDAS and will be providing detail technical comments in this regard.

The Region has confirmed that there is adequate capacity in the existing water supply system for King City to accommodate the proposed growth including the development proposed by the FSDAS.

The Region has also noted that the increase in the overall population of King City as provided by CPA 89 may require upgrades to the Regional sanitary system infrastructure, in particular, the main King City Sewage Pumping Station located south of King Road and west of Keele Street.

Planning staff is undertaking a review of the FSDAS with respect to overall phasing which will, amongst other matters, identify the priority and phasing of the developments relative to the availabiilty of servicing capacity allocation. The specific allocation of capacity to the individual developments will take place at the draft plan of subdivision approval stage.

The FSDAS also includes an overall drainage and stormwater management plan. In general, the stormwater management scheme is based upon a series of stormwater management ponds dispersed throughout the study area. The FSDAS provides the advantage of a broader study area which allows for the most appropriate and efficient locations for these facilities and their shared use amongst multiple properties, thereby minimizing the number of these facilities which will ultimately be assumed by the Township. The FSDAS also proposes the stormwater management blocks to partially extend into the environmental buffers, but not within the environmental feature itself. The policies of the Community Plan permit this approach subject to the need and no negative impacts to the environmental feature being demonstrated by the FSDAS. Staff and TRCA have indicated general acceptance of this approach, however. Planning staff has not yet received the TRCA's comprehensive comments on the FSDAS.

Timino/Phasino

The FS/DAS is also required to address the phasing and staging of the development to detail the location, rate and timing of new development to ensure that growth contemplated occurs in a comprehensive and orderly manner. The phasing must address broad considerations such as the servicing capacity allocation, road network and access constraints, and servicing infrastructure connections. Staff is continuing to review the FSDAS in this regard and will be providing further comments.

Planning Department Report Page 13 of 95 Number P-2018-13 Planning Department Report P-2018-13 Page 10

Noise and Vibration

The FS/DAS also addresses noise and vibration impacts. Most notable with respect to this component of the FS/DAS is the identification that the reverse frontage lotting proposed by the development results in a need for noise and vibration mitigation measures (sound barrier/fencing, berming, etc.). Staff has concerns with respect to the design and aesthetic impacts, engineering and maintenance of these measures. The Community Plan includes specific policies to prohibit reverse frontage lotting and, as such, the FSDAS must be revised.

Planning staff also awaits the comments of Metrolinx with respect to noise and vibration impacts related to the railway corridor and necessary mitigation measures.

7.3 Applications for Draft Plan of Subdivision and Zoning By-law Amendment

The FSDAS provides the overall framework for the submission and evaluation of future draft plans of subdivision on the individual properties within the study area. Some of the participating landowners have recently submitted applications for draft plan of subdivision and zoning amendment for their respective properties. However, the processing of these applications has not advanced since the FSDAS has not yet been finalized and approved. As discussed above, the FSDAS will establish the framework for the layout and evaluation of the future subdivisions. Since further comments and revisions to the FSDAS are anticipated, it would be premature for the review of the related applications for draft plan of subdivision and zoning by-law amendment to proceed at this time.

7.2 Region of York Official Plan and Provincial Policy/Plans

The subject lands are designated "Towns and Villages" and "Regional Greenlands System" as shown on Maps 1 and 2 of the York Region Official Plan (2010), and are within the "Settlement Area" designation as per the Oak Ridges Moraine Conservation Plan.

The Regional Plan indicates that the Township is required to plan for population growth from 20,300 people in 2006 to 34,900 people in 2031, an increase of 14,600 people. This additional population is to be provided by a combination of development within the existing built up areas (intensification) and development within designated greenfield areas. CPA 89 which provides for the residential development contemplated by the FSDAS was approved by the Region on the basis of these population targets.

The Province's "Places to Grow" Plan promotes intensification and sets specific targets for residential intensification. It should be noted that the targets set by the Growth Plan are to be considered in a broader community and regional context. The Growth Plan recognizes that one size does not fit all and that municipalities are to develop their own policies and phasing strategies to achieve the targets in a manner that respects and compliments the community's character. The development proposed by the FSDAS will assist in achieving the above noted growth targets set by the Growth plan and the Region of York Official Plan.

The subject lands are also located within the Greenbelt area. However, they are located within a designated settlement area of the Oak Ridges Moraine Conservation Plan (ORMCP) and, therefore, not subject to the Greenbelt Plan, but rather are to be govemed by the King City Community Plan and the ORMCP. The subject lands are also designated "settlement" by the ORMCP and, therefore, their development for residential purposes, in accordance with the King

Planning Department Report Page 14 of 95 Number P-2018-13 Planning Department Report P-2018-13 Page 11

City Community Plan Is permitted. The FSDAS is currently under review by both the Township and the TRCA with respect to the detailed technical requirements of the ORMCP.

8. INTEGRATED SUSTAINABILITY PLAN LINKAGE

The recommendations of this report support the land use planning objectives of the Environmental Pillar, of the Township's Sustainability Plan. However, further analysis in regard to the Township's Sustainability Plan will be addressed in the subsequent recommendation report from Planning staff to Committee on this matter.

9. FINANCIAL IMPLICATIONS

Any external costs (peer-review architect, legal, engineering, etc.) incurred by the Township through the processing and review of this application will be recovered from the applicant.

Security deposits, ievies, development charges, and cash-in-lieu of parkland, if required, wiii be collected at later stages in the development review process. Further financial implications, if any, will be assessed as the review proceeds.

10. CONCLUSION

The review of the FSDAS remains on-going by the Planning Department and other Township Departments and external agencies. Planning staff requires further opportunity to continue to review the FSDAS, provide comments, and work with the applicant to review and address the various issues raised in this report as well as by the public and Council. In addition, comments have not yet been received from ail departments and agencies. As the review proceeds. Planning staff will report back to Committee of the Whole. It is recommended that this report be received and referred back to staff, together with any public and Council comments, for a future report.

Prepare9~afl4R^ommended by: Reviewed by:

Gaspare Ritacca, MClP, RPP Silrsafi Plamondon Manager of Planning and Development Chief Administrative Officer

ATTACHMENTS

Figures 1. Location Map/Study Area (source: Maione Given Parsons Planning Report) 2. CPA 89 Land Use Schedule 3. King City North East Participating Owners 4. King City North East Development Concept Appendices 1. Region of York comments, February 15, 2018 2. Loopstra Nixon, February 14, 2018

Planning Department Report Page 15 of 95 Number P-2018-13 i

c

figure 1

Planning Department Report Page 16 of 95 Number P-2018-13 Figure 2 Township of

Number P Planning Department Report Redesignate to Low Density King Residential 5 Area

- Schedule 4 2018 Land Use and Transportation Strategy - 13 King City Community Plan

Community Plan Boundary Existing Community OAK RIDGES MORAINE PLAN AREA [ I Amendment Boundary Oak Rides Moraine Settlement Area Hm Oak Rides Moraine Natural Core Area NATURAL ENVIRONMENT Environmental Protection Area Special Study Area OPEN SPACE AND INSTITUTIONAL Cemetery e Community or Neighbourhood Park Site ElementarySchool Site Institutional Community Park Area RESIDENTIAL Existing Low Density Residential Area Estate Residential 1 Area Estate Residential 2 Area

Estate Residential 3 Area Low Density Residential 1 Area Low Density Residential 2 Area

Page 17 of 95 mm Low Density Residential 3Area ^mi Density Residential 4 Area Low Density Residential 5 Area Low Density Residential 6 Area Tl • Medium Density Residential Area MIXED USE S Core Area C ^mm Station Area Mixed Use Area 7^ gum O^omatics Prestige Employment Area m 1000m Existing Commercial Area R^L N Rural Area ism SIDEROAO

Fandor Esta?^EHP^tel®""h-Bevel

retmctton

5WM1 RWK1 213h8 I.ieha 3.7Sha //Si Remcor King Inc. j

SCHCXX U SITE W 2.60 na. r^-xS

1 tirfeJ COUNTRY DAY SCHOOL SWM2 blocks Development '"-•eRinc.

SWM3 -X'

OuffeiltVLtd.

TheAcorn DevelDRm^-Ccrporatlon

fMhi

LAND OWNERSHIP t-anri IJko

Study Area Boundary Participating Lands Non-Participating Lands

FIGURE 3

Planning Department Report Page 18 of 95 Number P-2018-13

13 - 2018 - P Number

Page 19 of 95 of 19 Page Planning Department Report Report Department Planning

SENECA COLLEGE - KING CAMPUS

15th SIDEROAD

Fandor

«ii -^: k^ ' :k

SWM1 2,t3>w.

poffiSTWL \\ —SGHok'. \i y -'-"VHH sftfISITE • \\ ; A • .'• '. "lOTrt. I

RMfojAEl" cii." S-%>\ \ -*rv\ 5\?n*-2 )l. 1\• V'v^i-, V ••. •Steiyj.'pe nte

oodomtmume 3330 >Dufferl Ml aj^V > : -, , •: .. • ••k. ' swjis j Deveiopmetit ^ ^#5"^ Corporation

•>« •>;. 50 O" 50 100 150 "2Q01I1f | 'T' • .-wm' -9

TATTON CT

RMldontuI UMta ^ 7 unSa pof gma hoctara 979 Unl KING CITY EAST CONCEPT PLAN FOR NORTHERN LANDS A 21]niUn PopiMtton Q 3,1 p«rMn» par ynn (ppv) 9,036 OcACllM Units Basad on Popuiabcn EquivalaRl: a lateiun Land Use by Partlclpaling Owner Norr. DAeM Stagia DalacAad Q a.i p|iu Pardelpating t tS2* Stormwater Management Faclllllea 0.5 3.0 1.5 3.2 0.6 8.6 Potential Local CycNng RoulaAluU U*i Path > MVPZ Minlnium VegetsticnProlKtionZones 3.0 1.0 3.2 9.0 2.2 5.5 4.6 28.5 PtilMlrun Tram tnd Villtv CroMlnfli Gross Developable Area 6.8 9,7 16.3 63.7 14.0 19.6 11.1 0.7 139.9 TBO Caislmg Trail i PropestO Trail i Natural Heritage Features 4.4 0.1 1.0 17,1 7.8 9.7 23.7 0.0 63.8 :::l SWMCennaetien i Arterial Road WIdenlngs 0.0 0.2 0.3 0.7 0:1 1,3 Propoeed Padaathan Cretalrtg Exisbng PedaHrial Cro»»tng Total Area 21.8 29.3 34.9 0.7 34.1 10.2 10.0 16.6 81.6 206.0 Puflipirm Station

FIGURE 4 YorkRegion Corporate Services

File No. FSDAS-2017-01/ BLK.17.K.001 Refer To: Sara Brockman

February 15, 2018

Mr. Gaspare Ritacca, MClP, RPP Manager of Planning and Development Township of King 2075 King Road King City, ON L7B lAl

Dear Mr. Ritacca:

Re: Request for Comments - Functional Servicing/ Development Area Study (1^^ Submission) King City East - North Lands The King City East Landowners' Group Township of King

Thank you for the opportunity to review and provide comments on the Functional Servicing/ Development Area Study King City East - North Lands, prepared for the King City East Landowners' Group, dated November 2017. The King City East (KCE) - North Lands are approximately 205 hectares (506 acres) in size and are generally located south of 15^^ Sideroad, north of the railway line, east of Keele Street and west of Dufferin Street in the Community of King City.

Prior to submitting new and revised subdivision and zoning applications for the various properties on the KCE North lands, King Township required the submission of an updated Functional Servicing/ Development Area Plan (FSDAS). We understand the purpose of the FSDAS is to provide the basis for the successful integration of this development area with the surrounding existing community and natural/ environmental systems and to set out facility and infrastructure, servicing, drainage, design, open space, heritage, and transportation requirements, as well as implementation, phasing and monitoring requirements. The FSDAS will form the basis of evaluation of future development proposals and plans of subdivision on the KCE North lands. The content of the FSDAS will also tie into the Joint Class 'C Environmental Assessment for the crossing of the Creek and/ or Tawes Trail currently in progress.

APPENDIX T The Regional Municipality of York, 17250 Yonge Street, Newmarket, Ontario L3Y 6Z1 Tel: 905-830-4444,1-877-464-YORK (1-877-464-9675) Internet: www.york.ca

Planning Department Report Page 20 of 95 Number P-2018-13 FunctionalServicing/DevelopmentArea Study King CityEast - North Lands(FSDAS-2017-01) 2

Proposed Concept The KCE North lands are proposed to be developed as a predominately residential neighbourhood with a focus on environmental protection, the incorporation of public parks and trails, and a potential school site. The Plan consists of primarily single detached lots (863 units) with some townhouse units (47 units) and lifestyle seniors' units (55 units) on a condominium site, totalling approximately 1020 units. Approximately 91 hectares (225 acres) or 44% of the participating Landowners' lands consists of natural heritage features and minimum vegetation protection zones (vpz).

Planning Policy Context The subject lands are within the "Settlement Area" designation as perthe Oak Ridges Moraine Conservation Plan and are designated 'Towns and Villages" on Map 1 of the York Region Official Plan - 2010 (yROP-2010). The lands are generally undeveloped or "greenfield" and are outside the existing built-up area. Map 2 shows a portion of the subject lands within the Regional Greenlands System. Watercourses, Provincially Significant Wetlands and wetlands are located the subject site (Map 4), along with woodlands (Map 5) and valley lands. Habitat for several Species at Risk, including Redside Dace, an endangeredspecies, has also been identified onthe subject lands. The site is within Wellhead Protection Area D(WHPA-D) (Map 6), an Area of High Aquifer Vulnerability (Map 7), a Significant Groundwater Recharge Area (Map 13), a Highly Vulnerable Aquifer (Map 14), and within Recharge Management Area (WHPA-Q) based on current mapping. IS^** Sideroad, Keele Street and Dufferin Street are Regional Roads with planned street widths of up to 36 metres (Map 12).

York Region has reviewed the FADAS and provides the following comments:

Regional Planning 1. Recently approved OPA 89 permits a density of 7 units per hectare (uph) on the subject lands. While OPA 89 allows a small increase in densityup to 15% of the unitsto be semi- detatched or townhouses to meet the equivalent population of 7 uph. Page viii. of the Planning Opinion Report indicates that approximately 3,060 persons and 1,020 residential units are proposed resulting in a density of 7.2 uph on the King City East North Lands. The density proposed appears to be in keeping with the persons equivalent; however, should the proposed concept exceed the density requirements of OPA 89, an Official PlanAmendment may be required.

2. OPA 89 also permits the reduction ofthe 30m buffer in5 areas on the plan of up to 20% (or 6m) of the 30m, if supported by an environmental study. Based on the concept provided, reductions are proposed in 2 of the 5 areas identified. A Natural Heritage Evaluation (NHE), Natural Heritage Assessment, and Significant Woodland Assessment was submitted in support of the FSDAS, along with studies prepared by North-South Environmental addressing the site alteration, compensation strategy and ecological function associated with the previous removal a 0.2 hectare area of a PSW located on the Kingsfield property.York Region relieson the TRCA to review and provide comment

Planning Department Report Page 21 of 95 Number P-2018-13 Functional Servicing/ Development Area Study King CityEast - North Lands (FSDAS-2017-01)

on natural heritage matters related to the Regional Greenlands System and associated applicable provincial plans. We understand that TRCA is still in the process on conducting their review of this submission. We defer to the TRCA and their review of the studies addressing Natural Heritage, the determination of the appropriateness of the VPZ intrusions, and the proposed compensation/ wetland restoration. York Region requests that a copy of TRCA comments be provided for our review and further comment.

3. With respect to water and sanitary servicing for the KCR North lands, page 44 of the Planning Opinion Report states that, "York Region had confirmed that there is sufficient water and sanitary allocation to support the proposed densities". As reflected in comment #4 below, servicing allocation is assigned by the local municipality. Please refer to the infrastructure Asset Management Section for full detailed comments.

4. Please confirm and provide the density target calculation for this development area (i.e. • of persons & jobs per hectare). A number of density calculations are shown in the Planning Opinions Report but it is unclear where this calculation is documented.

Infrastructure Asset Management (lAM) lAM has reviewed the King City East North Lands Development Area Plan in conjunction with the FSDAS dated November 10,2017 and providethe following comments:

Servicing Allocation 5. All residential development requires servicing capacity allocation from the Township of King prior to the final approval of the developments proposed within the Development Plan area. Ifthe Township of King does not grant allocation from the existing capacity assignments to date, the build out of the Development Plan area may require additional Regional infrastructure based on conditions of future capacity assignment, which may include:

• Duffin CreekWPCP Outfall Modification —2021pendingthe outcome of the Class EA currently underway • Other projects as may be identified in future studies. Thetiming of the above infrastructure isthe current estimate and maychange as each infrastructure project progresses and isprovided for information purposes only.

Potential Impact on Regional Water and Wastewater Svstems 6. King City is connected to York Region's York Water System with Lake Ontario based supply from Peel and Toronto. There is adequate capacity in the system to service the

Planning Department Report Page 22 of 95 Number P-2018-13 FunctionalServicing/Development AreaStudy King CityEast - North Lands (FSDAS-2017-01) 4

planned growth, including the proposed development subjectto the availability of local municipal infrastructure.

7. King City is part of the Regional York Durham Sanitary System (YDSS). York Region's King City Sanitary Pumping Station (SPS) located near Keele St. and King Road was originally designed to service the Community Plan residential population of 12,000 persons and associated employment. The additional increase in population from the ongoingOPAs in King City, including the subject development, will have a potential impact on the capacity of the King City Pump Station and associated linear infrastructure. Although minor impacts may be manageable through the ongoing water conservation programs and Infiltration and Inflow Reduction Strategy, significant increase in population beyond 12,000 persons may require an upgrade of the King City Sewage PumpingStation.

Transportation Planning/ Traffic Signals Operations 8. ATransportation/Traffic Road Pattern Study was prepared in July 2016 to support the related CPA application (CPA 89) for this development area. York Region has reviewed and determined that this Study must be updated to be consistentwith the York Region Transportation Mobility Plan Guidelines for Development Applications (November 2016).

9. The studyshall alsoinclude a comprehensive Transportation Demand Management plan to support active transportation and transit, and to minimize the number of single- occupant-vehicle trips to/from the proposed development.

10. Comments were provided on the Transportation/Traffic Road Pattern Studyat the OPA stage in our letter dated July 6, 2016. These comments must be addressed in the updated study.

Upon receipt of the updated Transportation Mobility Plan, we will continue our review and provide further comment. Additional preliminary comments have also been provided to assist with subsequent development applications (i.e. future draft plans of subdivision) in the attached memorandum.

Development Engineering 11. Section 5.2 should identify the opportunities for urbanization along King Road and Dufferin Street.

12. Page 18 of Section 5.3.2 discusses sub trunk watermains on 15^^ Sideroad and Dufferin Street. However, figures for the proposed servicing plan 5.10, 5.11, 5.12 and 5.14 did not include these proposals of boundary watermain on 15*^ Sideroad and Dufferin Street.

Planning Department Report Page 23 of 95 Number P-2018-13 Functional Servicing/Development Area Study King City East - North Lands (FSDAS-2017-01) 5

13. Page 19 of Section 5.3.4discusses adequate capacity in the water distribution systemto supply water to non-participating lands; however the report did not elaborate on how the water connection to non-participating lands will be achieved.

14. Page 86 of Section 9.1 the construction phasing plan only addresses the schedule of spine services. However, the plan should also include the infrastructure required to adequately service all phases of the development including Street C, Street E, IS^"^ Sideroad and Dufferin Street road works. The phasing plan should also address the impact of non-participating landowners on the overall servicing of the FSDAS area, and what interim servicingmeasures will be required.

15.The Transportation / Traffic / Road Pattern Study (July 2016) recommends that the collector road intersection with Dufferin Street be controlled by a traffic signal. However, the detailed signal warrant and need justification will need to be brought forth during the preparation of the detailed Traffic Study for the King City East lands. Regional Council has recently approved the signalization of access. It is recommended that an interconnection from the King City East lands to the south lands (non-participating) be protected such that ifa signal is not warranted at the proposed collector road and Dufferin Street intersection the development traffic from the King City East lands will have access to a signalized intersection. Additionally, should the Non-Participating Landowners opposite to the Country Day School become part of the King City East Landowners Group, opportunities should be explored to align an access with the existing Country DaySchool access on the east side of DufferinStreet. 16.15^^ Sideroad between Keele Street and Dufferin Street is a year round load restricted. Evaluation ofthe pavement condition of IS^'^ Sideroad is required by the Landowners' group and anytemporary improvements, ifnecessary, provided.

17. The SWM section 5.5ofthe reportdoes not discuss the condition ofthe existing culverts that convey drainage under the Regional road or their capacities. The report needs to Include a condition survey and capacity of each cross culverts. Depending on timing of build out, the Landowners' group may be required to replace the culverts that are in poor condition.

18. Any proposed tree removal in the Region's right-of-way is subject to the York Region Tree Removal Policy. Notree removal is permitted without Regional approval.

19. Based on Figure 27: Noise Barrier Locations of the Planning Opinion Report, 1.8m high barriers are proposed along the 15^^ Sideroad, save and except for the identified environmental areas, and a 2.2m high barrier is proposed along the entire frontage of Dufferin Street to facilitate the reverse frontage lots proposed. Policy 9.2.4.2 v) of the King City Community Plan generally prohibits reverse lotting on all streets. York Region supports this policy given the extent of Noise Barrier proposed along both Regional

Planning Department Report Page 24 of 95 Number P-2018-13 FunctionalServicing/Development Area Study King CityEast - North Lands(FSDAS-2017-01) 6

Roads. As such, York Region requests KCE to re-examine alternative lot layouts and/ or other opportunities in an effortto reduce the amount of noise barriers necessary. This approach is consistent with Section 3 of the York Region Traffic Noise Mitigation Policy for Regional Roads (March 23, 2016) which states that noise barriers are only to be used as a last resort where no other noise mitigation measures are feasible. Alternative methods of reducing the noise impact shall be considered prior to considering noise barriers (i.e. alternate alignments, landscapeberms etc.).

20. The Noise and Vibration Impact Feasibility Study prepared by J. E. Coulter Associates Limited dated November 10, 2017 has referred to the Newmarket subdivision throughout the document, this should be King City. Please revise the document accordingly.

Water Resources 21. As the property iswithin a Wellhead Protection Area and within the Oak Ridges Moraine Conservation Plan Boundary, under the YROP-2010 please note that there is a prohibition on the following activities, listed below, on the site associated with the storage, manufacture or use of: • Petroleum-based fuels and or solvents; • Pesticides, herbicides, fungicides or fertilizers; • construction equipment; • Inorganic chemicals; • Road salt and contaminants as Identified bythe Province; • Thegeneration and storage of hazardous waste or liquid industrial waste, and waste disposal sites and facilities; • Organic soilconditioning sites and the storage and application of agricultural and non-agriculturalsource organic materials; and, • Snow storage and disposal facilities.

22. The property ispartially located within a Significant Groundwater Recharge Area (SGRA) andentirely within the WHPA-Q. As such the CTC Source Protection Plan waterquantity recharge maintenance policy will apply. The proponent will be required to maintain recharge as demonstrated through a hydrogeological study that shows the existing (i.e. pre proposed development) water balance can be maintained in the future (i.e. post proposed development). The CTC Source Protection Plan Water Balance Requirements document and TRSPA Water Balance Tool fhttDs://trca.ca/conservation/drinklng-water- source-protection/trspa-water-balance-tool/) should be consulted. The contact person forthe scoping and review ofthe water balance forSource Protection Plan conformity is Don Ford at Toronto Region Conservation Authority.

23. The owner is to be advised that Low Impact Development (LID) measures are encouraged to be applied to the site. As per YROP-2010 policy 2.3.37, developments

Planning Department Report Page 25 of 95 Number P-2018-13 FunctionalServicing/Development AreaStudy King CityEast- North Lands(FSDAS-2017-01) 7

should maximize infiltration through integrated treatment approach techniques to minimize stormwater volume and contaminant loads. This should include, but not be limited to, techniques such as rainwater harvesting, phosphorus reduction, constructed wetlands, bioretention swales, green roofs, permeable surfaces, clean water collection systems, and the preservation and enhancement of native vegetation cover. The use of the following resource is encouraged: Low Impact Development Stormwater Management Planning and Design Guide and is available using the following link: http://www.creditvallevca.ca/low-impact-develoDment/low-imDact-development- support/stormwater-management-lid-guidance-documents/low-impact-development- stormwater-management-plannine-and-desien-guide/.

24. The site is on the Oak Ridges Moraine (CRM), and the prohibition policy takes precedence, the Highly Vulnerable Aquifer policy requiring a Contaminant Management Plan should there be bulk fuel or chemicals onsite will not be triggered.

25. Should significant dewatering be required, a Dewatering Plan shall be prepared by a qualified person and submitted by the proponent to York Region for approval prior to excavation.

Summary Upon receiving the requested information outlined in this letter, we will continue our review and provide further comment on this application. York Region staff is available to provide assistance throughout this application processshould it be required.

Should you have any questions or comments, please do not hesitate to contact myself or Sara Brockman, Senior Planner, at 1-877-464-9675, ext. 75750 or at [email protected].

Sincerely,

Karen Whitney, MClP, RPP Director, Community Planning and Development Services

/sb c. Ms. Coreena Smith, TRCA - by e-mail only

Attachments (2) 1. York Region Comment Letter, July 6, 2016 2. York Region Memorandum, Preliminary Comments for Subsequent Development Applications YORK-#8173377

Planning Department Report Page 26 of 95 Number P-2018-13 York Region Corporate Services

File No.: OP-2015-02 Refer To: Jason Ezer

July 6,2016

Mr. Stephen Kitchen Directorof Planning Township of King 2075 King Road King City, ON L7B lAl

Attention: Gaspare Ritacca. Manager. Planning & Development

Re: UPDATED Preliminary Regional Planning Comments King City East - Phase 2 (North); Part ofLots 7-10, Concession 3 S/W Quadrant of Dufferin Street and 15*^ Sideroad (King City East Landowners Group) Township File No. OP-2015-02

In response to updated transportation analysis provided by the applicant's consultant, we have revised ourTransportation Planning comments that were previously included inour letter dated June 22, 2016. As recommended in the updated "KCE Transportation Assessment andJnstification Report" by Poulos and Chung Limited, dated July, 2016, the densities being proposed at 7 units per hectare can be satisfactorily accommodated by the available and feasible roadway network. As such, the capof 450 dwelling units that were subject to a Holding Provision "H" and tied to a new east/west collector road, and King Road/Keele Street intersection improvements, will no longer benecessary. Transportation and engineering staff has no objection to the proposed OPA application. Updated detailed comments have been provided ina memo dated July 5, 2016 (attached), which also provide preliminary comments for subsequent development applications for thissite. Please note that, in addition to the revised comments above, all othercomments provided inourletter dated June 22,2016 remain unchanged.

Please contact Jason Ezer, Senior Planner, at 905-830-4444 ext. 71533 or by email at [email protected]. should you have any questions.

Sincerely,

The Regional Municipality of York, 17250 Yonge Street, Newmarket, Ontario L3Y 6Z1 Tel: 905-830-4444,1-877-464-YORK (1-877-464-9675) Internet: www.york.ca

Planning Department Report Page 27 of 95 Number P-2018-13 UPDATED: Regional Pfellminary Comments Page 2 Townshipof King OP-2015^2

: Karen Whitney, MCIP, RPP Director of Community Planning and Development Services

Jlv Altachmcnls (2) 1. UPDATED Memorandum, Transportation Planning, dated July 5,2016

Copy to: Don Given, MCIP, RPP, Malone Given Parsons - by e-mail only Joan Maclntyre, MCIP, RPP, Malone Given Parsons - bye-mail only

Y()RK-W>HiS.'\|').v|.UI'l)A'IT.I)_Rc|;iimjil_('iirametih_OI''2l)l5-(l2

Planning Department Report Page 28 of 95 Number P-2018-13 Transportation Services Infrastructure Management and Project Management Office York Reg^n Fax #305-895-0191

MEMORANDUM

TO: Jason Ezcr, Community Planning and Development Services

FROM: Shahid Matioob, Transportation Planning

DATE: July 5, 2016

RE: Proposed Official Plan Amendment Application - OP-2015-02 King City East Landowners Group King City East - Phase 2 (North) Part ofLots 7-10, Concession 3 South west quadrant of Dufferin Street and 15th Sideroad Township of King

As requested, Regional staff has reviewed the proposed OPAapplication alongwith the updated supporting Transportation/Traffic/Road Patterning Study (TPS) report dated July2016 prepared by Poulos & Chung. The proposed OPA application is for the KingCity East(KCE) Lands-Phase 2 development. The proposed OPA application is to increase the density from 3.0dwellings units to 7 dwelling units per hectare resulting in an increase from 450approved dwelling units to 989 dwelling units in the area. The KCE lands are bounded by 1S"' Sideroad on the North, Dufferin Street on the East, existing development and Keele Streeton the west and existing development and King Road on the south side.

The following updated consolidated comments are provided in coordination with staff from Transportation Planning, Trafllc Signal Operations, Development Engineering and YRT/Viva.

A. OPA Comments

York Region staff has no objection to the approval of the Official PlanAmendment application.

B. Preliminary Comments for Subsequent Development Applications for this site

1. Providea basic36 metre right-of-way for this section of Dufferin Street. As such, all municipal setbacks shall be referenced from a point 18.0 metre from the centerline ofconstruction of Dufferin Street and any additional lands required for turn lanes at the intersections will also be conveyed to York Region for public highway purposes, free ofall costs and encumbrances, to the satisfaction ofthe York Region Solicitor. 2. Provide a basic 36 metre right-of-way for this section of 1S'** Sideroad. As such, all municipal setbacks shall be referenced from a point 18.0 metre from the centerline of construction of 15"' Sideroad and any additional lands required for turn lanes at the intersections will also be

eOocs# 6725239'V2

Planning Department Report Page 29 of 95 Number P-2018-13 conveyed to York Region for public highway purposes, free ofall costs and encumbrances, to the satisfaction ofthe York Region Solicitor.

3. Access should be provided via local roads where possible. If accesses are proposed onto Regional Roads, it shall meet the Region's Access Guidelines and appropriate analysis must be provided for review at the site plan stages for the developmentapplications in the KCE lands.

4. Directshared pedestrian and cyclingconnections shall be provided to the boundary roadways and adjacentdevelopments to support publictransitand active transportation. A pedestrian and cyclingconnection shall be provided connecting TawesTrail with the proposed development.

5. Address all commentsdetailed in Section C on the supporting updated Transportation/Traflic/Road Patterning Study (TPS) report, dated July 2016, prepared by Poulos & Chung.

6. Comprehensive transportation demand management implementation plansshall be provided by the individualdevelopmentapplicationsat the site plan stages to support active transportation and transit, and also to reduce the number ofauto trips to/from the proposed developments. However,the detailed Transportation/Traffic/Road PatterningStudy preparedin support of the KCE Lands shall also include a comprehensive Transportation Demand Management(TDM) Plan. The TDM Plan shall include:

i. Strategies and incentives that could be implemented given it will be a car-dependent neighborhood; ii. Tangible transit route suggestions; iii. Pedestrian and cycling facilities to encourage walking and cycling; iv. Provide carefully planned, safe, illuminated and convenient pedestrian walkways and sidewalks linking the building to bus stops and transit stations/ terminals; V. Where appropriate, adequate signage for pedestrians, including directions to nearest transit stops and terminals; and vi. High quality pedestrian amenities such as benches and garbage receptacles, where appropriate. vii. A TDM communication strategy, to assist the Region and the Township of King to effectively deliver the Information Packages and pre-loaded PRESTO Cards to residents. This strategy shall also include a physical location for distribution of the Information Packages and pre-loaded PRESTO Cards.

C. Comments on the Transportation/Traffic/Road Patterning Study

Transportation Planning No comments

Traffic Signal Operations I) Section 12 ofthe TPS report concludes that with the proposed development density increases on the subject lands, all the intersections are able to provide very good operating conditions with very acceptable levels ofservice and minimal vehicle delay in the future. However, our review indicates that this conclusion is not consistent with the analysis results illustrated in Figure 21. Particularly the Keele Street and King Road intersection operating at LOS 'F' and v/c ratio being significantly over 1.0. As such, clarification is required as to how the acceptable level of

f'a^e 2 oj 5

Planning Department Report Page 30 of 95 Number P-2018-13 servicewill be achievedand what infrastructure improvements are required to achieve the acceptable level ofservice.

2) Thestudy applies a horizon yearof 2031. However, it is notclearwhen the proposed development is to be fully built-out by 2031. The Study should include theanticipated build-out horizon.

3) Therearc somediscrepancies and errorsin the figures of the TPS report, suchas: a) Lane configurations shown in Figure 6 at the King Road and Keele Street intersection and if the incorrect lane configuration is used in the Synchroanalysis; and b) Posted speed limits in Figure6 including King Road, just cast of Keele Streetand Keele Street north of 1S''' Sideroad;

Theseerrorsand discrepancies shouldbe checked and the report be revised accordingly.

Development Engineering No Comments

YRTA^iva This Official Plan Amendment application should bedeveloped to "put pedestrians andtransit first". Wehave reviewed the Plan referenced above and have the following transit conditions/comments:

Existinu & Future Transit Routes Theexisting and future transit roadways within the study area are listed below. The following indicate roadway(s) with existing YRT/Vivaservices:

• Sideroad 15 (limited service)

Future transit services will be implemented in a phased approach based on development, providing transportation opportunities in thisarea. Implementation of transit should beat an earlystage in the development in order to encourage a high modal split.

Transit Routing Standards Transit routes arc located so that 90% of all residences, employment, secondary and elementary schools,shopping centresand public facilities in an urban area are within a walking distance of no more than 500 metresof a bus stop duringdaytimeservice(from Monday to Saturday) and 1000 metres ofa bus stop for Sunday and holiday service. In lower density or rural areas, walking distances may be greater than 500 metres.

Roadway Considerations The following conditions are required for the study area:

1. Road Network - The street network shall form a grid network and have appropriate lighting and sidewalks/connections. Collector roads shall be continuous in order to permit the linking of several adjacent developments with direct transit routes. Strcctscaping shall be designed to encourage walking, cycling and transit use.

2. Roadways - Roads shall be designed to accommodate transit vehicles to the satisfaction ofthe area municipality and YRT/Viva. Transit-supportive roadways shall be designed with a

I'age 3 of5

Planning Department Report Page 31 of 95 Number P-2018-13 minimum pavement width of3.5 metres and a minimum curb radius of 15 metres. These standards are according to the Canadian Transit Handbook and the Ontario Urban Transit Association.

3. Sidewalks - Sidewalks are required on bothsides of roadways with transitservices unless only one side of the street lies within the limits ofthe subject lands. The sidewalks shall meet the local municipality'sstandards. Sidewalk plansshall considerthe pedestrian connections to transit stops. Concrete pedestrian accessconnections shall be seamless and at-grade(i.e. no steps).

4. Illumination - Illumination to be installed in accordance with the local municipality's design standards along all street[s] which have or will have transit services. Provide continuous lightingat pedestrian scale along sidewalk, bus stop locations and at pedestrian cross-walks (i.e. not exclusively illuminating the street).

5. On-Street Parking - On-strect parking along roadways with transit shall not interfere with bus stop locations and turning movements ofbuses.

6. TrafficCalming - YRT/Viva supports municipal introduction of well-planned traffic calming measures into the municipal landscape. It is, however, necessary to continue to provide bus services whilemaintaining a safe and comfortable environment for the general public, transit customers and busoperators. YRTA^'iva needsto ensurethat buses can negotiate traffic calming schemes in a satisfactory manner without damaging the buses.

7. YRTA^iva opposes the installation ofvertical traffic calming devices on roads with transit services. YRTA^iva acceptsthe installation of horizontal obstacles wheretheir design takesinto accountbus type used on that route, including their length, width, and turning radius.

Development 1. TransitOriented Development - Transitoriented development (TOD) is an approach to planning and design that recognizes the relationship between howwe grow and our ability to provide efficient and effective transitservices. The goalof TOD is to shapedevelopment in a way that responds to the needs oftransit users and the transit service itself.

2. To be a transitsupportive development, it requires a mix of land uses including higherdensity housing, business and commercial development. Mixed use and higher densities are encouraged along key arterial/collector roads where public transit will operate.

3. If there will be rear elevation lots along roads with transit then there needs to be walkway connections to these roads in order to reduce walking distance to transit. There need to be breaks in the fencing to allow pedestrian movement between the residential areas and streets that have transit services.

Transit Facilities Considerations The following transit facilities considerations are required:

1. Bus Stops and Passenger Standing Area - Bus stops are placed at most intersections, trip generators and transfer points with spacing ofapproximately 250 metres on roadways where transit will operate.

Page 4 of5

Planning Department Report Page 32 of 95 Number P-2018-13 2. Bus stops and the area leading to the stop should consist with Ontario Disability Act standards in order to provide universal access.

3. Sightlincs to traffic lights should be freeofinterference from posts and columns related to bus stop facilities.

4. Passenger standing areas/shelter pads identified shall be installed to the satisfaction ofthe local municipality and York Region Transit. The Region confirmsthat all passenger standing areas/shelter padsshall be ownedand maintained by the Regionand that the local municipality shall have no responsibility.

5. The passenger standing areas/shelter pads (as per YRT/Viva Accessibility Standards) shall be provided concurrentlywith constructionof necessary sidewalks and need to be incorporated into the urbanstreetscape, publicsidewalks and walkway connections to buildings.

6. The locations of the passenger standing areas and shelter pads will be determined during the plan ofsubdivision phase.

If you have any furtherquestionsor concerns in regards to YRT/Vivaplease contact Erica Springate at 905-762-1282, x75628.

If you have any furtherquestions or concerns in regards to Transportation Planning or Traffic Signal Operations comments, please contact me at 1-877-464-9675 ext. 75080.

Page 5 oj 5

Planning Department Report Page 33 of 95 Number P-2018-13 Functional Servicing/Development AreaStudy King City East - North Lands (FSDAS-2017-01)

York legion

MEMORANDUM - PRELIMINARY COMMENTS FOR SUBSEQUENT DEVELOPMENT APPLICATIONS

RE: Functional Servicing/ Development Area Study (FSDAS) (1^Submission) King City East - North Lands The King City East Landowners' Group Township of King

Regional Staff have reviewed the above noted FSDAS application, as well as the supporting documents offer the following preliminary comments for subsequent development applications. These comments are not an approval and are subject to modification. It is intended to provide information to the applicant regarding the Regional requirements that have been identified to date. More detailed comments will be provided through the Draft Plan ofSubdivision application and/or at the subsequent Site Plan application.

Transportation Planning

1. Provide a basic 36 metre right-of-way for these sections of DufferinStreet and 15^'' Sideroad. All municipal setbacksshall be referenced from a point 18.0metre from the centerline ofconstruction of Dufferin Streetand any additional lands required for turn lanes at the intersections will also be conveyed to York Region for public highway purposes, free of all costsand encumbrances, to the satisfaction ofthe York Region Solicitor.

2. Based on the Regional Official Plan Policy 7.2.53, accessto Regional roads should be minimized and accessshould be provided via local roads. Ifaccesses are proposed onto Regional Roads, it shall meet the Region's Access Guidelines and appropriate operational and safety analysis must be provided for review.

3. Direct shared pedestrian and cycling connectionsshall be provided to the boundary roadways and adjacent developments to support public transit and active transportation. A pedestrian and cyclingconnection shall be provided connecting Tawes Trail with the proposed development.

Planning Department Report Page 34 of 95 Number P-2018-13 Functional Servicing/ Development Area Study King City East - North Lands (FSDAS-2017-01) 9

4. Address all comments provided In the Comments section on the supporting updated Transportation/Traffic/Road Patterning Study (TPS) report, dated July 2016, prepared by Poulos & Chung.

5. An updated and comprehensive Transportation Demand Management (TDM) implementation plans shall be provided at the subdivision/site plan stage to support activetransportation and transit, and alsoto reduce the number of single-occupant- vehicle trips to/from the proposed developments. The TDM Planshall include but not limited to; • Strategies and incentives that could be implemented given it will be a car- dependent neighborhood; • Tangible transit route suggestions; • Pedestrian and cycling facilities to encourage walking and cycling; • Provide carefully planned,safe, illuminated and convenientpedestrian walkways and sidewalks linking the building to busstops and transit stations/ terminals; • Where appropriate, adequate signage for pedestrians, including directions to nearest transit stops and terminals; • High quality pedestrian amenitiessuchas benchesand garbagereceptacles, where appropriate; and, •ATDM communicationstrategy, to assist the Region and the Township of King to effectively deliverthe Information Packages and pre-loaded PRESTO Cards to residents. Thisstrategy shall also include a physical location for distribution of the Information Packages and pre-loaded PRESTO Cards.

Planning Department Report Page 35 of 95 Number P-2018-13 LOOPSTRA NIXON up

BARRISTERS AND SOLICITORS

Qulnto M. Annibale* 'Quinto M. Annibale Professional Corporation Direct Line: (416) 748-4757 E-mail: qannlbale(^loonix.com

By E-Mail

February 14, 2018

Mayor Steve Pellegrini and Members of Council Township of King 2075 King Road King City, Ontario L7B 1A1

Dear Mayor and Members of Council,

Re: Comment on King City East Landowners Group's Functional Servicing/Development Area Study ("FS/DAS")

We are the solicitors for 632025 Ontario Ltd., the owner of 13330 Dufferin Street, generally located on the west side of Dufferin Street, north of King Road, in King City. Our client submitted applications for a zoning by-law amendment and draft plan of subdivision in May 2017 and the applications were deemed complete in July 2017. Our client's lands are located within the area studied by the FS/DAS, although our client is not at this time a member of the King City East Landowner's Group {"KCELG") that prepared the FS/DAS.

We are writing to provide preliminary comments on the FS/DAS submitted by the KCELG. The FS/DAS is a requirement under section 10.3.2 of the King City Community Plan and requires a comprehensive study of the different quadrants of King City. This study's purpose is to address matters of stormwater management, water and sanitary servicing, transportation connections, trail connectivity, the design and layout of public open space, connections, integration and transition and the overall land use concept.

Early in the process, we were advised that the KCELG was undertaking the FS/DAS and that the Township encouraged coordination between our client and the KCELG. Throughout the process, the Township has indicated a requirement that the FS/DAS be a comprehensive document addressing all of the lands in the study area, including the non-participating landowners. Our client is in agreement with and supports the Township's requirement in this regard.

We have had two meetings with Malone Given Parson ("MGP") (the "KCELG Planner") and certain members of the KCELG in an effort to coordinate our development with theirs. These

APPENDIX 2

(L09942641} Woodbine Place, 135 Queens Plate Drive, Suite 600, Toronto, Ontario, Canada M9W 6V7 LawE^Change Tel: 416.746.4710 Fax: 416.746.8319 loopstranlxen.cem Planning Department Report Page 36 of 95 Number P-2018-13 LOOPSTRA NIXON

BARRISTERS AND SOLICITORS

meetings occurred on Friday. February 3"^, 2017 and Monday,July 24'", 2017. Our client provided their plans for their property to MGP in an effort to ensure the FS/DAS Is a comprehensive plan.

The FS/DAS shows our client's proposed lotting fabric on the east side of the watercourse, as submitted in their draft plan of subdivision application. We have no concern with this depiction, however, on the west side of the watercourse, no lotting or development Is shown as proposed on 13330 Dufferin Street and therefore, the development pattern shown in the FS/DAS landlocks the western portion of our client's lands. Since a bridge crossing of the watercourse connecting the east and west parts of our client's property would not likely be acceptable to the TRCA, our client's western part of the property must be integrated with the planning for the adjacent lands to the west. The landlocking of otherwise developable parcels does not constitute proper block planning nor proper land use planning. In addition, in our preliminary review of the FS/DAS, no accommodation appears to have been made for the servicing of 13330 Dufferin Street, or of the other non-participating owner's lands. Our client submits that these two matters should be addressed in the FS/DAS.

We will likely provide additional comments on the FS/DAS once we have done a detailed review of the copy provided to us by Township staff.

We respectfully request the Township's Involvement in facilitating coordination with the landowner's group.

Yours truly,

LOOPSTRA NIXON LLP

Per:

Quinto M. Annibale QMA/rg

cc Township Clerk cc Gaspare Ritacca, Manager of Planning and Development, Township of King cc King City East Landowner's Group do Joan Mactntyre cc York Region Clerk cc Paul Lowes, SGL

(lo994:m i) Page 2 of2

Planning Department Report Page 37 of 95 Number P-2018-13 THE CORPORATION OF THE TOWNSHIP OF KING KING REPORT TO COUNCIL

Monday, February 26, 2018

Planning Department Planning Report No. P-2018-14 RE: Public Meeting Draft Plan ofSubdivision 19T-17K01; Zoning By-law Amendment Z-2017-03 Subject Lands: 13330 Dufferin Street; Part ofLots 8, Cone. 3; King City Applicant/Owner: 632025 Ontario Ltd.

1. RECOMMENDATIONS

The Planning Department respectfully submits the following recommendations:

A. That Planning Report No. P-2018-14 be received;

B. That the applications for Draft Plan of Subdivision 19T-17K01 and Zoning By-law Amendment Z-2017-03, submitted by 632025 Ontario Ltd. to allow the residential development of the lands described as 13330 Dufferin Street, Part of Lot 8, Cone. 3, consisting of a range of lot sizes for 34 residential dwellings comprised of single detached units/lots fronting on to common element private roads, be received and referred back to staff together with all agency, applicant, Township departments, Council and public comments for a further report following the receipt of the same and completion of the Planning Department's review;

C. That Planning staff's review and consideration of the subject applications be carried out In conjunction and coordination with the FSDAS submitted by the King City East Landowners Group, FSDAS-2017-01, to ensure that common and related issues with respect to potential pedestrian connections, trails/paths, servicing connections and other similar development considerations have been appropriately addressed, and that the landowners be encouraged to cooperatively participate in this regard.

D. That staff continue to work and meet with the applicant to review and address the issues expressed by Council, the public, the applicant. Township departments and other public agencies and report back to Committee of the Whole.

2. PURPOSE AND BACKGROUND

The purpose of this report is to provide information with respect to the subject applications and the related public meeting. The subject applications propose to amend the Township's zoning by-law and seek approval for a related application for Draft Plan of Subdivision. More specifically, the subject applications propose to permit the development of 34 residential dwellings comprised of single detached units/lots fronting on to common element private roads.

A pre-consultation meeting with Township staff with respect to these applications was held and a pre-consultation meeting letter prepared by Township Planning staff, dated October 28, 2016 was provided to the applicant. The subject applications were initially received by the Township in May 2017. However, the review of the applications was held while Planning staff and the

Planning Department Report Page 38 of 95 Number P-2018-14 Planning Department Report P-2018-14 Page 2 applicant considered the need for the submission of a related Functional Servicing/Development Area Study (FSDAS). The applications were considered in terms of their relationship between the subject lands and the adjacent development lands (King City North East Landowners Group) and the scope of work which has been completed to address connections and common issues, i.e. FSDAS/Block Plan level analysis. The FSDAS prepared by the King City North East Landowners Group (KCELG) was submitted in late November 2017.

3. PROPOSAL

The subject applications have been submitted to the Township in accordance with sections 34 and 51 of the Planning Act and seek approval of a Draft Plan of Subdivision, and Zoning By-law Amendment. The subject applications propose to amend the Township's zoning by-law and seek approval for a related application for Draft Plan of Subdivision to permit the development of 34 residential dwellings comprised of single detached units/lots fronting on to common element private roads.

4. PROPERTY DESCRIPTION

The subject applications apply to the lands shown on Figure 1, and are located on the west side of Dufferin Street, north of King Road. The subject lands are currently used for agricultural purposes, and contain environmentaily sensitive areas and related buffers^egetation protection zones associated which runs through the central portion of the subject lands.

5. PUBLIC NOTICE/COMMENTS

Notice of the February 26, 2018 public meeting was mailed and circulated to the surrounding property owners, interested parties and agencies. In addition, the Township published a notice of application and public meeting in the local newspaper.

In accordance with the Township's protocol for draft plan of subdivision applications, the applicant hosted a public open house on November 6, 2017. While such an open house is not a statutory or mandatory requirement, the Township encourages such open houses in an effort to provide as much opportunity as possible for public input and participation and to enable the sharing of information.

At the time of the writing of this report. Planning staff has not received any public comments in response to the notice of the public meeting or in regard to the subject applications.

6. AGENCY COMMENTS

The application has been circulated to various external agencies and internal Township departments. At the time of the writing of this report, comments have not yet been received from all agencies, including the Region of York and the Toronto and Region Conservation Authority (TRCA). The Comments received to date are summarized below.

Planning Department Report Page 39 of 95 Number P-2018-14 Planning Department Report P-2018-14 Page 3

Agency/Department General Summary of Comments Engineering & Public Works Department / RJ. Comments on servicing, traffic/transportation, Burnside & Associates stormwater management, and other engineering related aspects of the development. Recommend against support for the draft plan in its current form and concerns with respect to the lack of coordination with the proposed development to the west (KCELG). Refer to Appendix 2 of this report. Parks, Recreation & Culture Department Any trees removed are to be replaced at a 3:1 ratio or cash-in-lieu compensation. The proponent must coordinate with surrounding developments with respect to any proposed trails or multi-use paths, specifically along Dufferin Street to ensure continuity to the Township proposed network. The proponent should consider a trail connection, inclusive of required crossings through the easement for the sanitary forcemain. Building Department No comments received to date. Pendin Fire and Emergency Services Department No comments received to date. Pendin Accessibility Advisory Committee and Clerks Various comments regarding accessibility Department desiqn considerations for the future homes. York Region District School Board (YRDSB) No obiections. York Catholic District School Board (YCDSB) No comments received to date. Pendin Conseil scolaire Viamonde (French public district The Conseil scolaire Viamonde has advised school board) that they do not have any comments. Canada Post No objections. Comments with respect to community mailbox requirements have been provided. Enbridge No obiections. Hydro One No comments or concerns. Rogers Communications No comments or concerns. Bell Canada No comments received to date. Pendin York Regional Police No comments received to date. Pendin Heritage Coordinator/Heritage Advisory Committee No objections. Confirmation that the recommendations of the Archaeological and Cultural Heritage Assessments submitted by the Applicant are appropriate, and no further information required.

DISCUSSION AND ANALYSIS

7.1 King City Community Plan (KCCP)/Offlcial Plan Amendment 89 (OPA 89)

The subject lands are designated as "Low Density Residential 5 Area" and "Environmental Protection Area" by the KCCP.

Planning Department Report Page 40 of 95 Number P-2018-14 Planning Department Report P-2018-14 Page 4

The subject lands are located within the area addressed by OPA 89. OPA 89 amended the KCCP to, amongst other amendments, increase the permitted residential density within the Low Density Residential 5 Area (LOR 5) to an average gross density of 7 units per hectare (3 units per acre). Planning staff is currently reviewing the proposed development in relation to the broader development area within the LDR 5 area to ensure conformity with the permitted density. Planning staff also notes that the draft plan does not provide separate blocks and associated land area for the environmental buffers/vegetation protection zones. As a result, it is difficult to carry out density yield calculation for the subject lands since environmental features are to be excluded from the calculation but buffers are to be included. Planning staff will seek clarification from the applicant in this regard.

The Environmental Protection Area (EPA) designation applies to the environmentally sensitive areas on the subject lands, the boundaries of which have been established on site in consultation with the TRCA. It is important to note that the environmental buffers/minimum vegetation protection zone (MVPZ) component of the environmental areas are included within the EPA designation. In general, the KCCP policies, in accordance with the Oak Ridges Moraine Conservation Plan, require a minimum vegetation protection zone/buffer of 30 metres from the environmental features to be incorporated into the draft plan of subdivision and no development and/or lots are permitted to encroach into that buffer area. The draft plan of subdivision is not proposing reductions to these buffers, however. Planning staff has not yet received the comments of the TRCA. The TRCA's comments will assist staff in confirming the extent of the environmental boundaries within the draft plan and that they have been respected by the proposed development.

7.2 Comprehensive Development Pfan/FSDAS

Planning staff notes that the King City Community Plan and OPA 89 requires a Functional Servicing/Development Area Study (FSDAS) and Comprehensive Development Plan to be completed as a basis for the evaluation of the development of the subject lands. The purpose of the FS/DAS is to comprehensively coordinate and lay out the major components of the future new development amongst the various land ownerships within the study area. The FSDAS for the north-east quadrant of King City is currently underway and has been submitted by the King City East Landowners Group for submission to the Township for review and approval. Regard for and coordination between the proposed development and the FSDAS is required.

It is Planning staffs understanding that discussions and meetings between the applicant and the KCELG have taken place. However, to date, these efforts between the landowners have not led to a landowners' group arrangement and/or joint submission.

As a result, the development proposed by the subject applications and the King City East FSDAS are not coordinated and are inconsistent in terms of the development concept, lot fabric, and connectivity.

The FSDAS is required to be approved in advance of the approval of individual subdivision/ development applications. Planning staff has raised concerns with the applicant with respect to this requirement for the broader based FSDAS and lack of coordination with the subject applications. The FSDAS is to address the coordination of matters such as stormwater management, water and sanitary servicing, transportation connections, trail connectivity, the design and layout of public open space, connections, integration and transition between the subject lands and neighbouring future and existing residential lands, and the overall land use

Planning Department Report Page 41 of 95 Number P-2018-14 Planning Department Report P-2018-14 Page 5 concept in this area, particularly in accordance with the policies of Official Plan Amendment No.89 (CPA 89) which provide for the permitted densities to be considered in terms of an average for the broader area to which CPA 89 applies.

Itis Planning staff's opinion that the review of the subject applications would benefitsignificantly from cooperation between the landowners within the broader FSDAS process in order to most effectively and efficiently provide for the development with respect to coordination of external services and other matters. Planning staff has and will continue to encourgage cooperation between these land owners.

7.3 Region of York Official Plan and Provincial Policy/Plans

The proposed development area is designated "Towns and Villages" by the York Region Official Plan (2010), and are within the "Settlement Area" designation as per the Oak Ridges Moraine Conservation Plan. These designations defer to the local official plan (KCCP/OPA 89) with respect to guiding proposed development.

The Province's "Places to Grow" Plan promotes intensification and sets specific targets for residential intensification. It should be noted that the targets set by the Growth Plan are to be considered in a broader community and regional context. The Growth Plan recognizes that one size does not fit all and that municipalities are to develop their own policies and phasing strategies to achieve the targets in a manner that respects and compliments the community's character.

The subject lands are also located within the Greenbelt area. However, they are located within a designated settlement area of the Oak Ridges Moraine Conservation Plan (ORMCP) and, therefore, not subject to the Greenbelt Plan, but rather are to be govemed by the King City Community Plan and the ORMCP. The subject lands are also designated "settlement" by the ORMCP and, therefore, their development for residential purposes, in accordance with the King City Community Plan is permitted. The applications are currently under review by both the Township and the TRCA with respect to the detailed requirements of the ORMCP.

7.4 Draft Plan of Subdivision and Zoning By-law Amendment

The subject applications include the submission of a draft plan of subdivision which identifies the layout of the residential development which would be enabled by the zoning by-law amendment. The more detailed review associated with the draft plan process remains on going, however, the following generally identifies matters noted to date:

The lot fabric proposed by the draft plan of subdivision is not consistent or coordinated with the lot fabric proposed for the adjacent lands to the west. Further coordination is required, particularly in regard to servicing connections;

The draft plan proposes to obtain sanitary servicing by way of an easement and connection to the proposed development on the external lands to the west. Further coordination with respect to the alignment and overall phasing and timing of the respective developments is required.

The drat plan includes lots with reverse frontage on Dufferin Street. The policies of the KCCP prohibit reverse frontage lotting. Revisions to the draft plan will be required.

Planning Department Report Page 42 of 95 Number P-2018-14 Planning Department Report P-2018-14 Page 6

Generally, Planning staff notes that the proposed development concept of single detached homes/lots is constrained by the overall size, layout, and location of environmental features of the subject lands, which has resulted in a proposed common element road being proposed due to its smaller road allowance dimensions. The challenges faced by the subject lands suggest that alternative development concepts for the subject lands may be appropriate. Planning staff notes that OPA 89 permits other residential forms in addition to single detached dwellings, including "townhouses, semi-detached dwellings or other similar dwelling types, with a maximum height of three storeys, and seniors housing development, with a maximum height of three storeys";

Planning staffs review of the draft zoning by-law and proposed development standards is on-going and staff will report back to Committee in more detaii in this regard in the subsequent recommendation report.

8. INTEGRATED SUSTAINABILITY PLAN LINKAGE

Further analysis in regard to the Township's Sustainability Plan will be addressed in the subsequent recommendation report from Planning staff to Committee on this matter.

9. FINANCIAL IMPLICATIONS

The required application fee has been submitted. In addition, any external costs (peer-review architect, legal, engineering, etc.) incurred by the Township through the processing and review of this application will be recovered from the applicant in accordance with the Township's standard practice and owner's acknowledgement through the application form. Security deposits, ievies, development charges, and cash-in-lieu of parkland, if required, wili be collected at later stages in the development review process. Further financial implications, if any, will be assessed as the review proceeds.

10. CONCLUSION

The review of the applications remain on-going by the Planning Department and other Township Departments and external agencies. Planning staff requires further opportunity to continue to review the applications, provide comments, and work with the applicant to review and address the various issues raised in this report as well as by the public and Council. In addition, comments have not yet been received from all agencies. As the review proceeds. Planning staff will report back to Committee of the Whole with respect to a decision on the application. It is recommended that this report be received and that the applications be referred back to staff, together with any public and Council comments, for a future report. Planning staff, in consultation with the various commenting agencies and departments, will be working with the applicant to continue to identify and address any comments and the various other matters highlighted by this report.

Planning Department Report Page 43 of 95 Number P-2018-14 Planning Department Report P-2018-14 Page 7

Prepared and Recommended by: Reviewed by:

./J7.n !J&mrJ/. Gaspare Ritacca, MGIP, RPP Plamondon Manager of Planning and Development Chief Administrative Officer

ATTACHMENTS

Figures 1. Location Map 2. CPA 89 Land Use Schedule 3. Draft Plan of Subdivision

Appendices 1. Draft Zoning By-law Amendment 2. R.J. Burnside & Associates. January 26, 2018

Planning Department Report Page 44 of 95 Number P-2018-14 Figure 1: Site Context

1 - School 2 - Rural Residential Uses 3 - Farmland 4 - Contractor's Yard 5 - Lumber Mill 6 - Commercial Uses 7 - Residential Uses

m r.

(Source; Base map from Google Maps. 2017)

figure 1

Planning Department Report Page 45 of 95 Number P-2018-14 Figure 2 Township of

Number P Planning Department Report Redesignate to Low Density Residential 5 m Area

- Schedule 4 2018 Land Use and Transportation Strategy - 14 King City Community Plan

Community Plan Boundary Existing Community OAK RIDGES MORAINE PLAN AREA I I AmendmentBoundary • Oak Rides Moraine Settlement Area Oak Rides Moraine Natural Core Area NATURAL ENVIRONMENT Environmental Protection Area Special Study Area OPEN SPACE AND INSTITUTIONAL Cemetery • Community or Neighbourhood Park Site ElementarySchool Site Institutional Community Park Area RESIDENTIAL Existing Low Density Residential Area Estate Residential 1 Area iS Estate Residential 2 Area Estate Residential 3 Area Low Density Residential 1 Area Low Density Residential 2 Area

Page 46 of 95 Low Density Residential 3 Area Low Density Residential 4 Area Low Density Residential 5 Area Low Density Residential 6 Area # MediumDensity Residential Area MIXED USE

Core Area GO Station Area Mixed Use Area Oeomat

- REGIONAL MUNICIPALITY OF YORK 2018 - 14 Natural Heritage System

Owner's Certificate

Cerpweepn

Sunreyor's Certificate I hatwy cai«(y el IM to to suMbWM H •hewntoe piwvindriwniwetotoe wd eton.

m

MdittonsI InRxmetion Raqulred Under Section 51(17) of the Ptannlng AdR.S.0.199Q.C.P.13 A.ASSHCNVH P AS SHOWN B. AS SHOWN O. AS SHOWN C.ASSHOWH H. MUNiaPAL WATER SUPPlY.

Page 47 of95 0. RE81D6NTUJ. L SiVT 4 SILTY CLAV £ ASSHPM4 AASSHOWej K Aa SERVICES AS REOURED LAS SHOWN THE CORPORATION OF THE TOWNSHIP OF KING

BY-LAW NUMBER - 2017-XX

A BY-LAW TO AMEND ZONING BY-LAW NUMBER 74-53, AS AMENDED

WHEREAS Zoning By-law Number 74-53, being a By-lawto regulate the use of land and the character, location and use of buildings and structures in the Township of King, was passed on the 7th day of October, 1974;

AND WHEREAS it is deemed necessary to further amend By-law Number 74-53, as amended, where such amendment conforms to the King City Community Plan of the Township of King;

AND WHEREAS authority is granted pursuant to Sections 34 and 36 of the Planning Act, R.S.0.1990, Chapter P.13, to the Council of the Corporation of the Township of King to exercise such powers;

NOW THEREFORE the Council of the Corporation of the Township of King HEREBY ENACTS AS FOLLOWS;

1. That the land subject to this By-law consist of Part of Lot 8, Concession 3, as more particularly shown on Schedule 1 attached hereto.

2. That Schedules 1 and 2 inclusive attached hereto form part of this By-law.

3. That the following Section be added after Section 7B of Zoning By-law 74- 53, as amended:

Section XX-RESIDENTIAL URBAN (KING CITY) ONE (R1K-1) Zone

7C.1 Uses Permitted

No person shall within the Residential Urban (King City) One (R1K-1) zone use any lot, or erect, alter or use any building or structure for any purpose except one or more than the following uses:

- a single detached dwelling; and - home occupation.

appendix

Planning Department Report Page 48 of 95 Number P-2018-14 7C.2 Zone Requirements

No person shall within the Residential Urban (King City) one (R1K-1) zone use any lot or erect, alter or use any building or structure except in accordance with the following provisions:

(i) the Lot Area Minimum shall be 345 square metres;

(ii) the Lot Frontage Minimum shall be 12 meters;

(iii) the Front Yard Minimum shall be 4.0 metres, provided that a Minimum Setback to a garage where vehicle access to the garage faces the Front Lot Line shall be 6.0 metres

(iv) the Rear Yard Minimum shall be 7.5 metres;

(v) notwithstanding Section 6.3 of this By-law, the Side Yard Minimum shall be 0.6 meters to one side lot line and 1.2 metres for the other side lot line;

(vi) notwithstanding Section 6.12 of this By-law, the Exterior Side Yard Minimum shall be 3.0 metres, provided that a Minimum Setback to a garage where vehicle access to the garage faces the Exterior Side Lot Line shall be 6.0 metres;

(vii) notwithstanding Section 6.27 of this By-law, the Lot Depth Minimum shall be 27.0 metres, except for Lot 17 which shall have a Lot Depth Minimum of 22.5 metres;

(viii) notwithstanding Section 6.34 (iii)(c) of this By-law, the minimum distance between a driveway and intersection of a street line measured along the street line intersected by such driveway shall be 1.2 metres;

(ix) the Lot Coverage Maximum shall be 45%; and

(x) the Height Maximum shall be 11.0 metres.

70.3 General Provisions All Zone

Unless othenwise specified in Section 70.2, all special provisions of Section 6 "General Provisions All Zones" where applicable to any land, lot, building, structure or use within the Residential Urban (King City) One (R1K-1) zone shall apply.

70.4 Notwithstanding Section 3.81, the lot shall mean a parcel or tract of land capable of being conveyed as a separate parcel.

Planning Department Report Page 49 of 95 Number P-2018-14 That Zoning By-law 74-53, Schedule 'C*. Map 2, as amended, is hereby further amended by changing the zone symbol from Residential Urban One (RU1) to Residential Urban (King City) One (R1K-1) and Environmental Protection (EP), a$ shown on Schedule 2 attached hereto.

4. And that this By-law shall come into force on the day it was passed where no notice of appeal has been filed with the Township clerk in accordance with the requirements and with the time prescribed under Section 34(19) of the Planning Act.

Read a First and Second time this XXth day of . 2017.

Read a Third time and FINALLY PASSED this XXth day of , 2017.

Steve Pellegrini, Mayor

Kathryn Moyle, Clerk

Planning Department Report Page 50 of 95 Number P-2018-14 Number P Planning Department Report Schedule 1; Site Location

Township of PART OF PART OF CONCESSION III SEE MAP 9 CONCESSION I CONCESSION IV 15th Sideroad - 2018 KING - 14

Schedule 'C MAP 2

hiiiiiiiiMS e

Map Location Lands Subject i to this By-law

ly

LOT 6 R Page 51 of 95 SEE MAP 3 0 100 300 500

Produced by QeofflADc*Onrrsten, PUr)rw>geoQ Development Seivicet Depvtment Copyright, Th« Regk)r>alMievcipebty of York Fetfuery 200S

{Source: Oak Ridge Moraine Zoning By-law 2005-23, Schedule 'C, Map 2) Number P Planning Department Report Schedule 2: Changes to Zoning By-law 74-53 Map 2 - 2018 - 14

Change the zone Change the zone from RUl to EP fromRUlto RlK-1

Change the zone from RUl to RlK-1 Page 52 of 95

(Source: Oak Ridge Moraine Zoning By-law 2005-23, Schedule 'C, Map 2) THE CORPORATION OF THE TOWNSHIP OF KING

BY-LAW NUMBER - 2017-XX

A BY-LAW TO AMEND ZONING BY-LAW NUMBER 2017-XX, AS AMENDED

WHEREAS Zoning By-law Number 2017-XX, being a By-lawto regulate the use of land and the character, location and use of buildings and structures in the Township of King, was passed on the Xth day of , 2017;

AND WHEREAS it is deemed necessary to further amend By-law Number 2017- XX, as amended, where such amendment conforms to the King City Community Plan of the Township of King;

AND WHEREAS authority is granted pursuant to Sections 34 and 36 of the Planning Act, R.S.0.1990, Chapter P.I 3, to the Council of the Corporation of the Township of King to exercise such powers;

NOW THEREFORE the Council of the Corporation of the Township of King HEREBY ENACTS AS FOLLOWS:

1. That the land subject to this By-law consist of Part of Lot 8, Concession 3, as more particularly shown on Schedule 1 attached hereto.

2. That Schedules 1 and 2 inclusive attached hereto form part of this By-law.

3. That Zoning By-law 2017-XX, Schedule 'X'. Map X, as amended, is hereby further amended by changing the zone symbol from Future Use (F) to Residential - Single Detached "H" (R1H-1) and Environmental Protection (EP), as shown on Schedule 2 attached hereto.

4. That the table in Section 6.5 Residential Zone Exceptions be amended to add Row 9.5.9.X with the following information:

6.5.9.x R1H-X 2017-XX King City a) The minimum lot area shall be 345 square metres; b) The minimum front yard shall be 4.0 m, provided that a minimum setback io a garage where vehicle access to the garage faces the Front Lot Line shall be 6.0 metres c) The minimum interior side yard shall be 0.6 m to one side lot line and 1.2 m on the other side lot line; d) The minimum exterior side yard shall be 3.0 m; and e) Section 4.4.2 f) shall not apply. f) Notwithstanding Section 3.81, the lot shall mean a parcel or tract of land capable of being conveyed as a separate parcel.

Planning Department Report Page 53 of 95 Number P-2018-14 5. And that this By-law shall come into force on the day itwas passed where no notice of appeal has been filed with the Township clerk in accordance with the requirements and with the time prescribed under Section 34(19) of the Planning Act.

Read a First and Second time this XXth day of April, 2017.

Read a Third time and FiNALLY PASSED this XXth day of April, 2017.

Steve Pellegrini, Mayor

Kathryn Moyle, Clerk

Planning Department Report Page 54 of 95 Number P-2018-14 Number P Planning Department Report Schedule 1: Site Location

SURROUNDING LANDS SUBJECTTO ZONING BY-LAW74-S3. ASAMENDED Zoning By-law for the - 2018 Urban Areas •••SrlTs'EieRWB" Schedule "A8"-Zoning Map (King City) By-law No. • -

14 Legend ail D«fin»{t Aral (Rifer to Seclton 1 2) •• A Toronto and Region Corsofvetlon AuO>orty

• RanidafW^ i iivbl iSafarlA \ lAl

R1 -Residondat SmgleOetacticd R1A • Re«>donbal SMgle Detached *A* RIB • Resadeniiel Single Detechod RIG^T'T-^ iR1C • RoiidonttalSingle Delachod*C* IRID•Residential Single Detached H' \R1E •Rosidenhaf Single Detached 'E' ! R1F - Reaklential Single Detached T* 'RIG-ReaidenlkalSin^ Detached '6* R1H - Restdcntial Single Detached "H*

RE • Rovdentiat Estate L IR2 • Residondal Seml-Oetached

SEE SCHEDULE : ' i R3 • Rosidendal Townhouse R4 • Reaidenflal Apaftmeni A7 SURROUNDING LANDS Cemmerciel Zone* SUBJECT TO ZONING BY-LAW74-53, ~ CAK •CoreArea(Kmg Crty} ASAMENDED C1 -ConvrwroiiJ General ||||^§ C2 •Cammorcial Highway 03 • Con^rticfcral Shoppng Centra Empteymanl Zonaa Lands Subject ; El • Empioyrnant Rasincted E2 'Employment General

to this By-law Other Zonee

I £P • EnvironmentalProtection Page 55 of 95

SEESCHEDULEAIO Final Draft for Stalutory Public Mealing (March 14, 3017) ^WSP /JCCl, {Source: Township of King Final Draft Zoning By-lawSchedule A8) Number P Planning Department Report Schedule 2: Changes to Final Draft Zoning By-law 2017-XX Schedule A8 - 2018 - 14

Change the zone from F to RIH-X

Change the zone fromPtoRlH-X Page 56 of 95

m

(Source: Township of King Final Draft Zoning By-lawSchedule A8) R.J. Burnside &Associates Limited 17345 LeslieStreet, Suite 200 Newmarket ON L3Y0A4 CANADA telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnslde.com

Burnside [ Yiic |j 11 f tiU-t; sa. IU 1! r, Ei; I i:

January 26, 2018

Via: Email

Mr. Gaspare Ritacca Manager of Planning and Development Township of King 2075 King Road King City ON L7B 1A1

Dear Mr. Ritacca:

Re: Application for Approval for Draft Plan of Subdivision and Amendment ofZoning By-law 13330 Dufferin Street, King City 632025 Ontario Ltd. (Gougoulias) First Submission Township File Nos.: 19T-17K01, Z-2017-03 Project No.: 300042067.0000

We have reviewed the following material relating to the above noted subdivision.

No. Description Issued Received 1. Circulation Memo, prepared by Township of King Dec.20, 2017 Dec. 22, 2017 2. Draft Plan of Subdivision May 8, 2017 Dec. 22, 2017

3. Proposed Zoning By-law Amendment - Dec. 22, 2017 4. Property Survey prepared by J.D. Barnes Dec. 18, 2008 Dec. 22, 2017 5. Planning Justification Report, prepared by SGL May 2017 Dec. 22, 2017 Planning & Design 6. Stage 1 Archaeological Assessment, prepared May 10, 2017 Dec. 22, 2017 byASI 7. Functional Servicing & Preliminary Stormwater May 2017 Dec. 22, 2017 Management Report, prepared by Crozier & Associates 8. Geotechnical Investigation, prepared by May 10, 2017 Dec. 22, 2017 Terraprobe 9. Traffic Brief, prepared by Crozier &Associates May 2017 Dec. 22, 2017 10. Hydrogeological Assessment Report, prepared Mar. 20, 2017 Dec. 22, 2017 byGHD

APPENDIX 2

Planning Department Report Page 57 of 95 Number P-2018-14 Mr.Gaspare Ritacca Page 2 of5 January 26,2018 Project No.: 300042067.0000

No. Descriptlori Issued Received 11. Noise Feasibility Study, prepared by HGG May 10, 2017 Dec. 22, 2017 Engineering 12. Phase One Environmental Site Assessment Feb. 16, 2017 Dec. 22, 2017 Report, prepared by GHD The following were provided for Informationalpurposes only: 13. National Heritage Evaluation, prepared by May 2017 Dec. 22, 2017 Savanta Inc. 14. Cultural Heritage Resource Assessment: Built May 2017 Dec. 22, 2017 Heritage Resources and Cultural Heritage Landscapes, prepared by ASI 15. Source Water Protection Risk Assessment, Apr. 20. 2017 Dec. 22, 2017 prepared by GHD 16. Urban Design &Architectural Strategy, prepared May 2017 Dec. 22, 2017 by SGL Planning & Design 17. Meander Belt Width Assessment Eaton Hall Apr. 17, 2017 Dec. 22. 2017 Creek, prepared by Geomorphlx 18. Landscape Plans, prepared by Budrevics Apr. 2017 Dec. 22, 2017 19. Tree Inventory and Preservation Plan, prepared May 2017 Dec. 22, 2017 by Savanta Inc.

This site is located on the west side of Dufferin Street between King Road and 15^*^ Sideroad. The lands are withinthe King City East (Official Plan) area, but are not participants in the associated landowners group. The subject applications propose to amend the Township's zoning by-lawand seek approval for a related application for DraftPlan of Subdivision to permit the development of 34 residential dwellings (comprised of single detached units/lots fronting on to common element private roads). The lots are all detached dwellings but the roads and services are proposed as private, common elements for purposes of this development.

We provide the general observation that much of the material providedfor this application assumes a connectivity with the development of the King Rocks site. Infact, at this time the plans are not congruent (given that the layouts are very different). Itis difficult to provide a meaningful review and detailed comments on the application, given the apparent lack of coordination. Accordingly, some of the comments provided are quite general in nature.

Our comments based on a review of the current submission materials are as follows;

General Comments

1.1 The plans for the westerlysection ofthe plan do not coincidewith plans provided through the King City East LandownersGroup. Therefore, we cannot support the layout shown. Itwould be preferable to obtain an acknowledgement from King Rocks regarding the integration of the proposed development plans. 1.2 itappears all roads and services are being contemplated as private services, internal to the site. Itshould be confirmed that the Township will not be responsible for said

Planning Department Report Page 58 of 95 Number P-2018-14 Mr. Gaspare Ritacca Page3 of6 January 26,2018 Project No.: 300042067.0000

services, and that appropriate demarcation points will be determined at the limitsof the site. (Requires valve chambers and backflowprevention.)

1.3 The servicing options indicatedfor all services (storm, water and sanitary) are premised on connectivity of portions or all the services through the King Rocks lands. Atthis time, the King Rocks site is proposed as a privately held development. It is not deemed appropriate to located municipal works withinthese private lands. Therefore, an agreement should be arranged between the two distinct ownerships for the provision of, and ongoing maintenance of, the affected services.

1.4 Draft Plan - see attached red-lined plan:

a. it is recommended that the northerly leg of the Condo Road be terminated with a cul-de-sac, with possible emergency access only to Dufferin.

b. Ifthe valley lands are transferred to the Township, and ifthe stormwater controls are permitted to intrude into the buffer areas, then an easement should be placed to give access to the Condo for future maintenance of these private facilities.

c. Documentation should be provided indicating the ownership/rights regarding the right-of-wayalong the north limit of the site. It is desirable to utilize this existing access as an emergency access route for the future development of the King Rocks lands and to provide a secondary watermain connection, (see 1.16)

d. The lands at the west side cannot be subdivided pending the approval of the site for the lands west of the development. (It is expected these may be in the form of a privately held condominium concept with a common roadway, not detached lots.) The lands should be indicated as blocks for purposed of this Draft Plan approval (subject to concurrence from Planning staff).

e. The site will require a buffer block along Dufferin Street frontage to accommodate a noise barrier, ifthey are to be Installed as proposed.

Environmental Report(s), Natural Environment, Tree Inventory

1.5 The Township should confirm ifproposed compensation is satisfactory regarding tree removals. The Savanta report notes there are 46 "candidate compensation trees" to be removed. Said compensation should be quantified by a Landscape Architect or Arborist priorto final approval. (Note - we did not reviewthis report forfurther commentary and would defer this to the Township's arborist.)

Preliminary Environmental Noise Report (Kristlna Zeromsklene, Ph.D.)

1.6 See attached comments from Kristlna Zeromsklene. We note the proposal requires excessively high barriers (over 3 metres) to mitigate the noise impacts on the rear yard amenity areas for the proposed lots. This would not complywith Township or Region standards.

Planning Department Report Page 59 of 95 Number P-2018-14 Mr. Gaspare Ritacca Page4 of5 January 26,2018 Project No.: 300042067.0000

Geotechnical and Hydrogeology Investigations/Reports

1.7 The geotechnical report appears to be generally acceptable, however, there Is no discussion of the requirements pertaining to deep services (sewers, etc). This should be addressed prior to final approval.

1.8 See attached comments from Kim Hawkes.

Phase One Envlronmenfal Site Assessment

1.9 No issues were identified by the consultant that require further investigation. We have no further comment.

Transportation Impact Assessment (Henry Centen, P.Eng. and Cody Raposo, EIT)

1.10 Comments are required from York Region regarding the two intersection points on Dufferin Street. We note the northerly access is proposed as with right-in/right-out only movements. It is preferable to close this access and present the road as a cul-de-sac.

1.11 The proponent will be required to coordinate for the provision of sidewalks along the frontage of the site (in conjunction with all sidewalks for King City East area).

1.12 See attached comments from Henry Centen.

Servicing

1.13 The proposed sanitary system includes a private collection and pumping system which directs wastewater to the west. This system would extend through private (King Rocks) lands. The system would not reach a municipal road allowance for approx. 700 m. We suggest the proponent should also explore alternatives such as a connection to the south which would be shorter. (Tatton Court is approximately 500 m south, which is not noted in Section 5.1.) The report should indicate all alternatives and Justifythe selected solution.

1.14 Stormwater quality is proposed to be addressed through various Low Impact Development (LID) techniques. The FSR contains only general references to the various techniques that may be utilized. The report should contain specific details regarding the use and location of LID features.

1.15 Stormwater Management (comments from Harold Faulkner)

a. The eastern naturalized SWM facility is proposed to "leak" through the berm to eliminate concentrated discharge, however, this outlet may not provide the required controlied release rate. The outlet configuration is to be revised to provide a quantifiable release rate.

b. Groundwater and soil may not provide reiiable infiltration conditions. Infiltration storage should not be considered part of the quantity controlvolume.

Planning Department Report Page 60 of 95 Number P-2018-14 Mr. Gaspare Ritacca Page 5 of5 January 26, 2018 Project No.: 300042067.0000

c. The reportshould contain specific details regarding the quantity control of the run-off from the rear lots ofthe westerly block. Alternatively, overcontrol may be provided in the eastern development to off-set the additional flow from the westerly rear lots. d. Stormwater managementforthe western portion of development is proposed to be providedwithin the adjacent King Rocks development, however, this is not consistent withthe current King CityEast Functional FS/DAS. Similarly, western external drainage is assumed to drain west, whichmay not be part ofthe King Rocks plan. Further co-ordination with the King CityEast development is required.

e. Encroachment intothe wetlandand fioodiine setbacks are subject to approval bythe TRCA.

Miscellaneous 1.16 The lots on the west side of the watercourse, includingthe adjacent King Rocks site, would benefit from the provision of an emergency access route in the event of a problem on the proposed access road. We recommend the solution Includes a linkalong the existing farm lane located at the north side of the subject lands. The access route could also be utilized for the provision of a secondary watermain connection. This matter requires further review and coordination with the King City East Landowners Group.

We do not support approval of this Draft Plan application pending further review of the transportation and servicing issues as outlined above.

Should you have any questions in this regard, please contact the undersigned.

Yours truly,

R.J. Burnslde & Associates Limited

Michael 8. Dutschek, C.E.T. MD:bs

Enclosure(s) cc: Mr. Mike Cole Township Via: Email

042067_Ritacca_1st Submission_180126.docx 26/01/201811:41 AM

Planning Department Report Page 61 of 95 Number P-2018-14 RJ. Bumside &Associates Limited 17345 LeslieStreet, Suite 200 Newmarket ON L3Y0A4 CANADA telephone (905)953-8967 fax (905) 953-8945 web www.rjbumsidexom ® BURNSiDE [The Difference is our People]

Memorandum

Date: January 19,2018 Project No.: 300042067.0000 Project Name: Residential Development-13330 Dufferln Street, King City Client Name: The Township of King

To: Michael Dutschek, C.E.T.

From: Kristina Zeromskiene, Ph.D.

A Noise Feasibility Study for a proposed Residential Development at 13330 Dufferin Street, King City prepared by HOC Engineering, dated May 10, 2017, was reviewed as part of the Draft Plan of Subdivision application process for this development. The numbered comments are summarized below.

The assessment was performed following Ministryof the Environment and Climate Change (MOECC) publication NPC-300'' as appropriate. Sound levels were predicted using prediction method for road traffic noise ORNAMENT as recommended by MOECC and compared to the applicable criteria. Several items, as noted below, require further clarification.

1. The Noise Feasibility Study recommends acoustic barriers for several lots along the Dufferin Street. The recommended barriers heights vary from 3.2 m to 5.7 m. These acoustic barriers are expected to reduce sound levels to the required levels between 55 dBA and 60 dBA.

Dufferin Street is a regional road and according to York Region SOP's for Traffic Noise Mitigation on Regional Roads^, "The Commissioner of Transportation Services can approve noise attenuation barrierfences up to a maximum height ofup to 3.0 meters in situations where deemed appropriate and where approved by the iocai municipaiity." Please confirm whether there was any communication with the Region, considering the recommended barrier height along this road is above 3 m.

2. Please confirm whether proposed site grading was used in the acoustic barrier assessments.

^ MOECC (2013) Environmental Noise Guideline, Stationary and Transportation Sources - Approval and Planning (Publication NPC-300). 2Transportation Services - York Region (2010) Capital Delivery- Roads. Standard Operating Procedures (SOP's) for TrafficNoise Mitigation on Regional Roads.

Planning Department Report Page 62 of 95 Number P-2018-14 Memorandum Page 2of 2 300042067.0000 January 19,2018

Basedon the provided sample model printout, an absorptive ground surface option was utilized in the calculations. Consideringthe distance between the source and receiver and the future width of the road, it looks like more than 50% of the area between the receiver and the centre line of the northbound lane will be road surface which is considered to be reflective. According to the Technical documentfor ORNAMENT^, If more than half of the ground surface between the centre line of the traffic lanes under consideration and the point of reception is sound reflective, the ground absorption coefficient is assumed to be zero. Please justify using an absorptiveground surface or revise calculations.

Two different speed limits were used at the same location for northbound (60 km/h) and southbound (70 km/h) traffic. Please confirm that speed limit is different in both directions and is expected to stay that way in the future.

The acoustical performance of the building components should be confirmed once detailed floor plans are available as recommended in the report.

KZ:mb

042067_Memo_Noise Feasibility Study Review 180119.docx 1/19/2018 10:37 AM

®Ontario Road Noise Analysis Methodfor Environmentand Transportation (ORNAMENT), Technical Document. PIBS 1527e,

Planning Department Report Page 63 of 95 Number P-2018-14 RJ. Burnside & Associates Limited 17345 LeslieStreet, Suite 200 Newmarket ON L3Y0A4 CANADA telephone (905) 953-8967 fax (905)953-8945 web www.rjbumside.com

Burnside [Tiie Difference is our People]

Technical Memorandum

Date: January 23,2018 Project No.: 300042067

Project Name: 13330 Dufferin (Gougoulias) - Hydrogeology Review

Client Name: King Township

Submitted To: Michael Dutschek

Submitted By: Kim Hawkes

Reviewed By: Jim Walls

This Memorandum summarizes the review of Hydrogeological Assessment report, Proposed Residential Subdivision, 13330 Dufferin Street, King City, Ontario, prepared by the GHD Limited, dated March 20, 2017 for 632025 Ontario Limited. Section 1 of this memorandum outlines the general site conditions and reported study findings while Section 2 provides comments on the report as it relates to this draft plan of subdivision application submission.

1.0 Summary of Reported Site Conditions

1. The Site is situated on the Oak Ridges Moraine and is part of a settlement area [King City]. 2. The surficial soil is primarily comprised of fine textured glaciolacustrine-derived deposits (Halton Till) of silt and clay. Alluvial deposits are present in the iow-lying areas/creek valley. 3. In-situ hydraulic conductivity testing in the on-Site monitoring wells confirms that the soils are moderate to low permeability with Kvalues inthe order of 10"® to 10"^ m/s for the sandy siltat BH3 and 10"® m/s for the sand at BH6. 4. Groundwater at the Site follows surface topography with flowtowards Eaton Hall Creek with an overall SE component towards the East Number River. 5. The water table is inferred to be 1.8 m to 4.6 m below ground surface based on soil moisture and groundwater conditions encountered during drilling. 6. Water level measurements in the monitoring wells are recorded at 0.12 m (BH4) to 1.93 (BH3) In the borehole logs.The consultantsuggests that the water levelsin the wells

Planning Department Report Page 64 of 95 Number P-2018-14 Technical Memorandum Page 2 of 4 Project No.; 300042067 January 23,2018

reflectthe potentlometricsurface forthe underlying sand deposits with water levels closer to ground surface than the water table. 7. The development will be fully serviced therefore potential Impactson nearby water supply wells are limited to those beyond the serviced areas of King City. The well records are summarized in Appendix E of the report. 8. The Site is not within a known municipal wellhead protection area. 9. Water Balance findings: a) The water balance was completed using the Thornthwalte Method. The overall approach is reasonable. b) The post development water balance demonstrates a high loss of infiltration with development. In developed portions of the site, pre development infiltration is reduced by half post development if no mitigation strategies are implemented. c) The mitigation strategies, proposed to compensate for the infiltration losses, rely on diversion of roof water to pervious areas to enhance infiltration. Other low-impact development strategies will reportedly be presented at the detailed design stage. d) Evaporation from impervious areas was assumed to be 20% of precipitation. e) The Infiltrationfactors increase from predevelopment to post development without mitigation then increase again with post development mitigation as shown below.

Scenario Infiltration coefficients (1 factor)

East Block West Block Natural Heritage

Pre Development 0.5 0.45 0.6 (Table G.2)

Post Development 0.55 0.5 0.65 (No Mitigation) (Table G.3)

Post Development 0.6 0.55 0.65 (With Mitigation) (Table G.4)

Change in 1factor +0.1 +0.1 +0.05

Planning Department Report Page 65 of 95 Number P-2018-14 Technical Memorandum Page3 of4 Project No.: 300042067 January 23, 2018

2.0 Burnside Comments

1. The general description and interpretation of site conditions is reasonable. There are hydrogeological constraints that will make it difficult to maintain pre-development (existing) infiltration. The proponent must demonstrate that all reasonable efforts are made to maintain Infiltration and that the proposed techniques be implemented in a manner that best suits site specific conditions.

2. Due to the reliance on LID (low impact development) techniques to achieve a post- development infiltration water balance, including collection of roof water, infiltration trenches and swales, the applicant must demonstrate that these techniques are feasible given the soil and groundwater conditions in the proposed locations of these features. The soil conditions, final grade elevation, base of feature elevation and seasonal high groundwater elevation must be determined. The potential infiltration capability of each feature must be estimated.

3. Information is required for any long term groundwater control as proposed around buildings and basements that will generate additional flow into the storm water system. Groundwater contributions into the storm water system must be based on the expected basement elevations compared to the seasonal high groundwater elevations to estimate the volumes of groundwater to be drained or pumped away from the buildings.

4. There are a few minor discrepancies/errors/omissions in the report that must be updated/corrected:

a) The borehole logs are not included for the Terraprobe wells shown in the figures;

b) Monitoring well GLL-4was drilled on this property in 2005 for the NE King application. It is not included in the interpretation;

c) The report does not include geological cross sections;

d) There are discrepancies between the information provided in the King City East development's FSDAS report and that provided in this report (e.g. monitoring wells and road network, shallow water level interpretations). The servicing and layout for this application needs to correspond with the Functional Servicing Report for the entire Northeast Quadrant of King City.

e) The report does not provide a clear interpretation of groundwater-surface water interaction. Geological cross-sections and piezometers installed at key locations along Eaton Creek, equipped with transducers, would assist in this regard;

f) The water levels were only provided for February. Water levels for the Spring period are not included.

Planning Department Report Page 66 of 95 Number P-2018-14 Technical Memorandum Page4 of4 Project No.: 300042067 January 23,2018

g) Ifthe water levels in the monitoring wells are Interpreted to reflect potentiometric surfaces for confined sands (as suggested by the consultant) then shallow monitoring wells/piezometers should be installed to confirm that the water table is no present in the overlying shallow soils.

h) A rationale for changing the infiltration factors between scenarios (refer to the summary table in Section 1) is needed, especially for areas where the Site is assumed to remain unchanged with development;

i) Additional detail is required to demonstrate how pre-development infiltration will be maintained.

j) The report must address potential impacts on nearby water supply wells.

RJ. Burnside & Associates Limited

Kim Hawkes Project Engineer

KSH:KSH cc: Jim Walls, R.J. Bumside &Associates Limited otherthan by the addressee, copying or distribution of this document, Inwhole or in part, is not pemrltted withoutthe express written consent of R.J. Bumside & Associates Limited.

042067_HydroG Memo_Gouigoulias_i80109.docx 1/24/2018 11:31 AM

Planning Department Report Page 67 of 95 Number P-2018-14 RJ. Burnside & Associates Limited 17345 Leslie Street, Suite 200 Newmarket ON L3Y0A4 CANADA telephone (905)953-8967 fax (905) 953-8945 web www.rjburnslde.com

BurnsIde [Tiie Difference is our People]

Memorandum

Date: January 18,2017 Project No.: 300042067.0000 ProjectKroject Name-Name, ^ DufferinReviewStreet (Gougoulias)

Client Name: Township of King

To: Michael Dutschek, C.E.T. From: Henry Centen, P. Eng.

This memorandum provides our comments on the following documentation: • Traffic Brief, 13330 Dufferin Street, Township of King; dated May 2017; prepared by C.F. Crozier & Associates Ltd.

The Traffic Brief (TB) proposes two access roads off Dufferin Street (i.e., one full moves and one right-in/right-out) to serve twenty-five (25) condominium units on the east part of the site. It also proposes that nine (9) condominium units on the west part of the site be accessed via a road connection in the adjacent proposed King Rocks development.

The TB forecasts that the proposed accesses will provide acceptable traffic operations, with no northbound left turn lane being required. In addition, the existing access to the Country Day School will have sufficient capacity, although egress movements in the a.m. peak hour will have long delays.

Burnside Comments: 1. Comments are required from York Region.

2. Attachments to the TB indicate that the Region had concerns over having direct access to Dufferin Street. The TB notes that a road connection to the north is constrained by a wetland buffer in that area. No information is provided on this constraint, or on potential development plans on the lands to the north. However, a recent presentation by the King City East (KCE) development group shows a potential future signalized intersection at the Country Day School driveway, which would be a logical connection to these adjacent development lands. Further review of the proposed access roads to Dufferin Street is required and on the potential for better integration with adjacent developments. Ifa connection is not possible to the lands to the north, then consideration should be given to providing a single access to Dufferin Street.

Planning Department Report Page 68 of 95 Number P-2018-14 Memorandum Page 2of3 300042067.0000 January 18,2017

3. The KCE development group has proposed a configuration of roads, sidewalks, trails and multi-use paths on the broader lands inthis area. Also, the Country Day School may warrant improved pedestrian crossing facilities on Dufferin Street, to connect to the development lands on the west side ofthis road. Furtherreview of the integration of the subject development to the KCE lands and/or the Country Day School is required. Also since part of the subject development relies on servicing through the King Rocks development, the viability of that development (I.e., long cul-de-sac servicing a relatively high number of units), needs to be established.

4. Awidening is proposed along the Dufferin Street frontage. The timing/responsibility for sidewalks on Dufferin Street should be confirmed.

5. Access to public transit is located about 0.9 km to 1.0 km from the site. The potential for modification to transit routes should be identified.

6. A single lane egress is proposed for the south access to Dufferin Street. Consideration should be given to providing separate right tum and left turn egress lanes.

7. It is forecasted that the south access to the Country Day School will have poor operations (LOS F, 80 second delay). The analysis also assumes two-stage entry from this driveway onto the central median area, which is not desirable from an operational perspective. Considering the nature of this facility (i.e. 760 students, 350 seat performing arts theatre, recent (2016) 51,000 sq.ft. addition), it is likelythat signals may be required at this location. A recent request by the Country Day School to have this intersection signalized was supported by King Township Council, however we are not aware of the Region's decision on this matter. The TB should review the possibility that this intersection will be signalized.

8. The TB applies the Region's criteria for access spacing on Dufferin Street based on the minimum spacing between minor driveways (Access Guidelines for Regional Roads, Region of York, 2007). Considering that the accesses to the proposed development are via condominium roads and that the County Day School access has 460 vph In the peak hour, we suggest that the spacing criteria between maior accesses should apply (i.e., minimum 200 metres). Consideration should be given to eliminating the second access to the development site to achieve better access management on Dufferin Street.

9. The TB suggests that the low left turn percentage (1.8%) is not sufficient to trigger the use of the MTO left turn warrant chart to determine whether a left turn lane is required on Dufferin Street, at the development's south access. Consideration of the applicability of the warrant charts should also consider the overall traffic volumes on Dufferin Street, and not just the relative percentages of left turn movements in the advancing traffic

Planning Department Report Page 69 of 95 Number P-2018-14 Memorandum Page3 of3 300042067.0000 January 18, 2017

Stream.The IB forecasts that the a.m. peak houropposing traffic is 1119 vph at the site access, which indicates a high levelof utilization of the existing southbound lane and few gaps for achieving a northbound left turn movement intothe site. With the proposed development of the broader KCE lands, these opposing traffic volumes are expected to increase significantly. Considering that the runout lane for the southbound left turn lane at the Country Day School drivewayterminates In the vicinity of the proposed access to the subject development, further consideration should be given to providing a northbound left turn lane at the proposed access. The widening to accommodate the left tum lane at the subject access would be maintained between this access and the Country Day School access.

10. The TB forecasts traffic conditions in horizon year 2017 only. As required by the Region's Transportation Mobility Plan Guidelines for Development Applications (2016), traffic conditions in additional horizon years should also be reviewed, including build-out year and 5 years after build-out.

11. The draft plan proposes a 7.9 metre road, within an 11.9 metre condominium road right- of-way (ROW). The TB should provide cross sections that confirm that this road and ROW can meet the Town's servicing requirements, including access for all travel modes, parking etc.

HBC:

042067_TrafRc Revi8W_1st Sub_Revi8W.docx 1/18/2018 10:26 AM

Planning Department Report Page 70 of 95 Number P-2018-14 Natural Heritage System

i i ' "J!

•mner's Cerlificale

Surveyor's Certificate

Sdiedule of Laitd Use i "desisiPTiCN

Natural Heritage SyEtem

Planning Department Report Page 71 of 95 Number P-2018-14

THE CORPORATION OF THE TOWNSHIP OF KING

COUNCIL MEETING #4 – MINUTES (DRAFT)

MONDAY, FEBRUARY 5, 2018

Township Council met at 6:00 p.m. in the Council Chambers, Township of King Municipal Building, 2075 King Road, King City, with Mayor Pellegrini presiding.

The following were present at this Meeting:

Council Staff

Mayor Steve Pellegrini Susan Plamondon – Chief Administrative Officer Councillor Cleve Mortelliti Kathryn Moyle – Director of Clerks/By-law Enforcement and Councillor David Boyd Township Clerk Councillor Bill Cober Allan Evelyn – Director of Finance and Treasurer Councillor Debbie Schaefer Gaspare Ritacca – Manager of Planning and Development Councillor Avia Eek Andrzej Drzewiecki– Director of Engineering, Public Works and Building Chris Fasciano – Director of Parks, Recreation and Culture Jim Wall – Fire Chief/CEMC Rona O’Banion – CEO and Chief Librarian Diane Moratto – Admin Clerk – Council/Committee Jason Ballantyne – Communications Officer Jamie Smyth – Economic Development Officer Nancy Cronsberry – Deputy Clerk Denny Timm – Manager of Legislative Services Elizabeth – Martelluzzi – Planner II/Heritage Coordinator

1. CALL TO ORDER

Mayor Pellegrini called the meeting to order. A quorum was present.

2. INTRODUCTION OF ADDENDUM ITEMS

The Clerk advised that correspondence has been received and circulated prior to this evening’s meeting for: Council Public Meeting Item #6 6.1 – Planning Department Report Number P-2018- 08 – Official Plan Amendment, Zoning By-law Amendment and Draft Plan of Subdivision for Part Lot 7, Concession 4, King City.

The Clerk advised there has been an amendment made to Committee of the Whole Item #1 – Finance Department Report Number FR-2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget – Page 3 (Revised Tax Levy/Tax Rate sensitivity analysis) and Page 4 (Revised 2018 Tax Levy – Scenario #2 and #3).

3. APPROVAL OF AGENDA

A motion was made by Councillor Eek, seconded by Councillor Schaefer and carried that the Agenda for the Council Meeting of February 5th 2018 be adopted, as amended.

The Corporation of the Township of King, 2075 King Road, King City, ON Minutes of the Council Page 72 of 95 Meeting of February 5, 2018 Council Minutes – February 5, 2018 4. DECLARATIONS OF PECUNIARY INTEREST

Mayor Pellegrini declared a pecuniary interest in COW Item #1 – Finance Department Report FR-2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget, (salaries and benefits) as his daughter is a seasonal employee of the Township’s Parks, Recreation & Culture Department.

Councillor Eek declared a pecuniary interest in COW Item #1 – Finance Department Report FR- 2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget, (salaries and benefits) as her spouse is a seasonal employee of the Township’s Engineering, Public Works & Building Department.

Councillor Boyd declared a pecuniary interest in COW Item #1 - Finance Department Report FR- 2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget, (salaries and benefits) as he and his wife are volunteer fire fighters in the Township.

5. MAYOR’S COMMENTS

Mayor Pellegrini highlighted the recently held and upcoming community events in the Township of King, being; the Blood Donor Clinic at the on February 21st, ‘Meet the Mayor & Ward Councillors’ informal meet and greets, and the 2018 Volunteer Appreciation Night on April 26th, 2018.

6. PUBLIC MEETING(S)

6.1 Planning Department Report Number P-2018-08 Re: Application for Official Plan Amendment, File Number: OP-2015-01 Application for Zoning By-law Amendment, File Number: Z-2015-03 Application for Draft Plan of Subdivision, File Number: 19T-15K02 Applicant: Bushland Heights Ltd.; Part of Lot 7, Concession 4; King City Owner: Bushland Heights Ltd. Date of Notice: January 16, 2018

(a) Presentation by Gaspare Ritacca, Manager of Planning & Development

Mr. Ritacca reviewed Planning Department Report P-2018-08 and the proposed applications to amend the Township’s Official Plan (King City Community Plan) and seek approval for related applications for Draft Plan of Subdivision and Zoning By-law Amendment. The subject applications propose to permit the development of eighty-eight (88) residential dwellings comprised of a mix of lot sizes for single detached lots. The subject lands are located east of Jane Street, north of King Road and described as Part of Lot 7, Concession 4; King City and are currently used for agricultural and rural purposes, contain various environmental sensitive and/or related buffers and are designated as “Estate Residential 3 Area”. The applications propose to amend the “Estate Residential” land use designation to Low Density Residential and increase the permitted density for the subject lands, as well as establish reductions in the required environmental buffers to facilitate the development of a residential plan of subdivision.

Mr. Ritacca further commented on; public comments/concerns received to-date, agency comments, the applicant’s draft official plan amendments, the Township’s Official Plan Review, the environmental protection area, functional servicing/development area study, road connection concerns, and the Ontario Municipal Board (OMB) appeal received in January 2018.

The Corporation of the Township of King, 2075 King Road, King City, ON Minutes of the Council Page 73 of 95 Meeting of February 5, 2018 Council Minutes – February 5, 2018 Mr. Ritacca advised the applications are subject to the King City Community Plan (KCCP), the Region of York Official Plan and Provincial Policy/Plans.

(b) Presentation by Applicant

Glen Lucas, Lucas & Associates, spoke on behalf of the applicant and provided a slide presentation on the proposed applications and commented on the following: the Ontario Municipal Board appeal, the purpose of the public meeting, property description, existing uses, surrounding land use, Oak Ridges Moraine Conservation Plan, Region of York Official Plan, Township of King Official Plan (King City Community Plan), Zoning By-law 74-53, proposed plan of subdivision, development details, studies prepared in support of the development proposal, wetlands and encroachments, the proposed Official Plan amendment, the proposed zoning by- law amendment, and reasoning for buffer sizes. Mr. Lucas noted the applicant has been in discussions with Mansion of King on coordinating services, the owner of the lands at the north- west portion of the subject lands in the cul-de-sac area and the future development of their lands, and will schedule a public consultation meeting with the public shortly. He advised that the Ontario Municipal Board (OMB) appeal was intended to get the application in to the OMB prior to any uncertain changes that may result in the overhaul of their system and how it will affect applications going forward.

Mr. Lucas responded to questions.

(c) Public Comments and Concerns

(i) Michael Baldesarra

Mr. Baldesarra spoke on behalf of the property owner at 13185 Jane Street and expressed their concerns on; how the proposed application will impact buffers, and the effects it will have on natural environmental features. Mr. Baldesarra asked how residents can be added to the interested parties list in the Ontario Municipal Board (OMB) process.

(ii) Mary Muter

Ms. Muter, Co-Chair, Kingscross Ratepayers Association (KRA), provided a slide presentation commenting on the following: the report from Hunter and Associates (Garry Hunter), overview of Bushland Heights and Mansions of King developments, street profile, watershed planning (protecting natural heritage and water), Oak Ridges Moraine Conservation Plan, flood plain mapping with correct elevations, need for infill, grading concerns, connection to King Road, increase in traffic, effects on the Manitou easement, setbacks, need for adjacent private well assessments, and connections to York Region water and sewers for properties along Jane Street or in Kingscross.

(iii) Hans Martin

Mr. Martin commented he does not support the application as currently proposed and expressed concerns with addressing topography issues, water runoff and flooding, climate change and financial costs relating to the ecosystem down the road.

(iv) Ian Hilley

Mr. Hilley expressed his concerns with; road linkage, traffic crossing a floodplain, wells and sustainability, need for constant water monitoring, the need to put an insurance program in place to protect property owners with wells, the upcoming OMB appeal and protecting heritage

The Corporation of the Township of King, 2075 King Road, King City, ON Minutes of the Council Page 74 of 95 Meeting of February 5, 2018 Council Minutes – February 5, 2018 lands. Mr. Hilley commented he supports staff’s recommendations in the planning report however, would like to see Council’s position on the subject applications.

(v) Greg Maltby

Mr. Maltby advised he is a property owner whose lands are on the west side of the Bushland Heights property and commented on his concerns with the elevation of the land from Jane Street to the valley and traffic issues currently and in the future.

(vi) Basheer Khan

Mr. Khan expressed concerns with; the potential road linkage to Manitou Drive, traffic, safety due to lack of sidewalks, preservation of the current subdivision, effects on the floodplain, private wells and water in Kingscross, need for a water impact study, and setting aside funds incase an alternate source of water is needed in the future. Mr. Khan noted he does not want to see a future road connection from the subject lands to Manitou Drive.

(vii) Debbe Crandall

Ms. Crandall spoke on behalf of Save the Oak Ridges Moraine (STORM) and commented on their concerns with respect to; the settlement areas identified in or around the Oak Ridges Moraine, respecting the environment, creative development, degrading of the East , a need for the Province to work with landowners and developers, and cookie cutter development templates. Ms. Crandall commented that the time is now to make changes on how to deal with the proposed development to ensure there is no loss of uniqueness in King.

(viii) Bruce Craig

Mr. Craig spoke on behalf of Concerned Citizens of King Township (CCKT) and expressed their concerns with; the OMB appeal, environmental impacts, intensification, best practices, buffers, cut and fill, wells, water and wastewater, and lack of agency comments.

(ix) Gary Letichever

Mr. Letichever advised he is not against development as long as it is done in a smart manner and commented on; the need for intensification in this particular area of King, access through Manitou Drive, disturbing key features, increase in traffic, safety, noise, creating a short cut to Highway 400 at rush hour.

(x) Rosalind Elson

Ms. Elson questioned why this is the last quadrant to be developed and commented on; the hilly terrain, water and private wells, effects on the floodplain, steepness of potential roads and the overall footprint of the lands.

(xi) Mike Lamanna

Mr. Lamanna commented on concerns with the effects the development will have on local wells and water quality and the safety of Manitou Drive and area residents should the road extension be approved between the two (2) proposed developments. Mr. Lamanna noted that its’ okay to say no if something doesn’t work.

The Corporation of the Township of King, 2075 King Road, King City, ON Minutes of the Council Page 75 of 95 Meeting of February 5, 2018 Council Minutes – February 5, 2018 (xii) Ali Bagheri

Mr. Bagheri advised he is against the proposed Manitou Drive easement being considered as a road access to the subject lands and is not against development but is concerned how a development can destroy an area.

Committee recommends that the above deputations be received.

Staff and representatives of the applicant responded to questions.

A motion was made by Councillor Schaefer, seconded by Councillor Mortelliti and carried that Planning Department Report Number P-2018-08 be received, the correspondence from Dave Henderson be received, and the recommendations therein be approved, as follows:

A. That Planning Report No. P-2018-08 be received;

B. That the applications for Official Plan Amendment OP-2015-01, Draft Plan of Subdivision 19T-15K02, and Zoning By-law Amendment Z-2015-03, submitted by Bushland Heights Ltd. to allow the residential development of the lands described as Part of Lot 7, Conc. 4, and more specifically to amend the Estate Residential land use designation to Low Density Residential and increase the permitted density for the subject lands, as well as establish reductions in the required environmental buffers to facilitate the development of a residential plan of subdivision consisting of a range of lot sizes for 88 single detached homes, be received and referred back to staff together with all agency, applicant, Township departments, Council and public comments for a further report following the receipt of the same and completion of the Planning Department’s review;

C. That the proposed Official Plan Amendment application be considered concurrently as an element of the Township’s on-going overall Official Plan Review as well as the site specific official plan amendment review process;

D. That Planning staff’s review and consideration of the subject applications be carried out in conjunction and coordination with the applications submitted by Mansions of King Inc., Official Plan Amendment OP-2016-03, Draft Plan of Subdivision 19T-06K01, and Zoning By-law Amendment Z-2016-07 Subject Lands: 2710 King Road; 13371 Jane Street; to ensure that common and related issues with respect to road network connections, pedestrian connections, trails/paths, servicing connections and other similar development considerations have been appropriately addressed.

E. That staff continue to work and meet with the applicant to review and address the issues expressed by Council, the public, the applicant, Township departments and other public agencies and report back to Committee of the Whole.

F. That the Township Solicitor and Planning staff, together with supporting staff and consultants as necessary, be authorized to prepare for and attend the Ontario Municipal Board proceedings in regard to applications for Official Plan Amendment OP-2015-01, Draft Plan of Subdivision 19T-15K02, and Zoning By-law Amendment Z-2015-03, and report back to Committee of the Whole in advance of the OMB hearing to provide a status update with respect to staff’s

The Corporation of the Township of King, 2075 King Road, King City, ON Minutes of the Council Page 76 of 95 Meeting of February 5, 2018 Council Minutes – February 5, 2018 on-going review of the applications and the nature of the issues with the applications, and recommendations with respect to Council’s position on the subject applications.

7. ADOPTION OF MINUTES OF COUNCIL MEETINGS AND COMMITTEE REPORTS

7.1 Council Minutes

1. Minutes of the Council Meeting of January 22, 2018

A motion was made by Councillor Cober, seconded by Councillor Boyd and carried that the Minutes of the Council Meeting of January 22, 2018 be adopted.

2. Minutes of the Special Council Meeting of January 29, 2018

A motion was made by Councillor Cober, seconded by Councillor Boyd and carried that the Minutes of the Special Council Meeting of January 29, 2018 be adopted.

7.2 Committee Reports

1. Committee of the Whole Reports of January 22, 2018

A motion was made by Councillor Cober, seconded by Councillor Boyd and carried that the Minutes of the Committee of the Whole Meeting of January 22, 2018 be adopted.

2. Special Committee of the Whole Reports of January 29, 2018

A motion was made by Councillor Cober, seconded by Councillor Boyd and carried that the Minutes of the Special Committee of the Whole Meeting of January 29, 2018 be adopted.

8. NOTICE OF MOTION

There was no Notice of Motion.

9. RECESS INTO COMMITTEE OF THE WHOLE

A motion was made by Councillor Mortelliti, seconded by Councillor Eek and carried that the Council Meeting recess into Committee of the Whole.

The Council Meeting recessed at 8:10 p.m.

10. RE-CONVENE COUNCIL MEETING

A motion was made by Councillor Eek, seconded by Councillor Schaefer and carried that the Council Meeting re-convene.

The Council Meeting re-convened at 10:33 p.m.

The Corporation of the Township of King, 2075 King Road, King City, ON Minutes of the Council Page 77 of 95 Meeting of February 5, 2018 Council Minutes – February 5, 2018 11. ADOPTION OF COMMITTEE OF THE WHOLE RECOMMENDATIONS OF FEBRUARY 5TH, 2018

(a) Committee of the Whole

Mayor Pellegrini declared a Pecuniary Interest in COW Item #1 - Finance Department Report FR-2018-04 – 2018 Operating Budget & Business Plan and Amended 2018 Capital Budget, (salaries and benefits – Parks, Recreation and Culture Department) and refrained from participating in the voting of this item.

Councillor Eek declared a Pecuniary Interest in COW Item #1 - Finance Department Report FR- 2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget (salaries and benefits – Engineering, Public Works and Building Department) and refrained from participating in the voting of this item.

Councillor Boyd declared a Pecuniary Interest in COW Item #1 - Finance Department Report FR-2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget, (salaries and benefits – King Fire & EMS Department) and refrained from participating in the voting of this item.

COW Item #1 – Finance Department Report Number FR-2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget

A motion was made by Councillor Cober, seconded by Councillor Mortelliti and carried that the recommendations of COW Item #1 – Salaries and Benefits, of the Committee of the Whole meeting of February 5, 2018 be adopted.

Mayor Pellegrini and Councillors Eek and Boyd resumed participation in the meeting.

A motion was made by Councillor Eek, seconded by Councillor Schaefer and carried that the remainder of the recommendations of the Committee of the Whole meeting of February 5th, 2018 be adopted.

12. MOTION TO RECESS INTO COMMITTEE OF THE WHOLE CLOSED SESSION

A motion was made by Councillor Cober, seconded by Councillor Boyd and carried that the Council Meeting recess into Committee of the Whole, Closed Session, to consider the following items:

Motion to move into Closed Session pursuant to Section 2.7 of the Procedural By-law Number 2007-76 to consider the items as set out in the Agenda.

12.1 Section 2.7(b), Subsections 5 and 6: Litigation or Potential Litigation Affecting the Municipality

Planning Department Report Number P-2018-07 Re: Upcoming Hearing of the Ontario Municipal Board Part of Lots 7 & 8, Concession 4, 2710 King Road & 13371 Jane Street, King City (Mansions of King Inc.)

The Corporation of the Township of King, 2075 King Road, King City, ON Minutes of the Council Page 78 of 95 Meeting of February 5, 2018 Council Minutes – February 5, 2018 12.2 Section 2.7 (b), Subsection 6: Solicitor-Client Privilege

Clerks Department Report Verbal Report Re: Solicitor-Client Privilege

12.3 Approval of Closed Session, Confidential Reports

Committee Closed Session Confidential Report of January 8th, 2018

The Council Meeting recessed into Closed Session at 10:34 p.m.

13. RE-CONVENE COUNCIL MEETING

A motion was made by Councillor Eek, seconded by Councillor Schaefer and carried that the Council Meeting re-convene.

The Council Meeting re-convened at 11:12 p.m.

14. BUSINESS ARISING FROM CLOSED SESSION

14.1 Section 2.7(b), Subsections 5 and 6: Litigation or Potential Litigation Affecting the Municipality

Planning Department Report Number P-2018-07 Re: Upcoming Hearing of the Ontario Municipal Board Part of Lots 7 & 8, Concession 4, 2710 King Road & 13371 Jane Street, King City (Mansions of King Inc.)

A motion was made by Councillor Cober, seconded by Councillor Boyd and carried that the report by Staff be received and that staff proceeds as directed.

14.2 Section 2.7 (b), Subsection 6: Solicitor-Client Privilege Clerks Department Report Verbal Report Re: Solicitor-Client Privilege

A motion was made by Councillor Cober, seconded by Councillor Boyd and carried that the verbal update by Staff be received and that staff proceeds as directed.

14.3 Approval of Closed Session, Confidential Reports

Committee Closed Session Confidential Report of January 8, 2018

A motion was made by Councillor Cober, seconded by Councillor Boyd and carried that the Closed Session Confidential Report of January 8, 2018, be approved.

The Corporation of the Township of King, 2075 King Road, King City, ON Minutes of the Council Page 79 of 95 Meeting of February 5, 2018 Council Minutes – February 5, 2018 15. BY-LAWS

By-law #2018-16 A BY-LAW TO ADOPT THE ESTIMATES OF ALL SUMS REQUIRED DURING THE YEAR 2018 FOR THE PURPOSES OF THE TOWNSHIP OF KING (Ref. Finance Dept. Report No.: FR-2018-04, C.O.W. Feb. 5, 2018 – 2018 Budgets & Business Plan)

A motion was made by Councillor Mortelliti, seconded by Councillor Cober and carried that By- law #2018-16 be taken as read a first, second and third time and passed.

16. CONFIRMATION OF PROCEEDINGS BY-LAW

By-law #2018-17 A BY-LAW TO CONFIRM THE PROCEEDINGS OF COUNCIL AT ITS MEETING HELD ON FEBRUARY 5, 2018

A motion was made by Councillor Mortelliti, seconded by Councillor Eek and carried that By-law Number 2018-17 be taken as read a first, second and third time and passed.

17. ADJOURNMENT

There being no further business, Mayor Pellegrini declared the meeting to be adjourned.

The meeting adjourned at 11:15 p.m.

______Steve Pellegrini Mayor

______Kathryn Moyle Director of Clerks/By-law Enforcement Township Clerk

The Corporation of the Township of King, 2075 King Road, King City, ON Minutes of the Council Page 80 of 95 Meeting of February 5, 2018

THE CORPORATION OF THE TOWNSHIP OF KING

COMMITTEE OF THE WHOLE MEETING MINUTES (DRAFT) MONDAY, FEBRUARY 5, 2018

Township Committee of the Whole met at 8:12 p.m. in the Council Chambers, Township of King Municipal Building, 2075 King Road, King City with Councillor Eek presiding.

The following were present at this Meeting:

Council Staff

Mayor Steve Pellegrini Susan Plamondon – Chief Administrative Officer Councillor Cleve Mortelliti Kathryn Moyle – Director of Clerks/By-law Enforcement Councillor David Boyd and Township Clerk Councillor Bill Cober Allan Evelyn – Director of Finance & Treasurer Councillor Debbie Schaefer Gaspare Ritacca – Manager of Planning & Development Councillor Avia Eek Andrzej Drzewiecki – Director of Engineering, Public Works & Building Chris Fasciano – Director of Parks, Recreation & Culture Jim Wall – Fire Chief/CEMC Rona O’Banion – CEO and Chief Librarian Diane Moratto – Admin. Clerk – Council/Committee Nancy Cronsberry – Deputy Clerk Jason Ballantyne – Communications Officer Jamie Smyth – Economic Development Officer Denny Timm – Manager of Legislative Services Elizabeth Martelluzzi – Planner II/Heritage Coordinator

1. INTRODUCTION OF ADDENDUM ITEMS

The Clerk advised there has been an amendment made to Committee of the Whole Item #1 – Finance Department Report Number FR-2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget – Page 3 (Revised Tax Levy/Tax Rate sensitivity analysis) and Page 4 (Revised 2018 Tax Levy – Scenario #2 and #3).

2. APPROVAL OF AGENDA

Committee recommended and carried that the Agenda for the Committee of the Whole Meeting of February 5, 2018 be approved, as amended.

3. DECLARATIONS OF PECUNIARY INTEREST

Mayor Pellegrini declared a pecuniary interest in COW Item #1 – Finance Department Report FR-2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget, (salaries and benefits) as his daughter is a seasonal employee of the Township’s Parks, Recreation & Culture Department.

The Corporation of the Township of King, 2075 King Road, King City, ON

Committee of the Whole Page 81 of 95 Reports of February 5, 2018 - 2 - C.O.W. Minutes – February 5, 2018

Councillor Eek declared a pecuniary interest in COW Item #1 – Finance Department Report FR- 2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget, (salaries and benefits) as her spouse is a seasonal employee of the Township’s Engineering, Public Works & Building Department.

Councillor Boyd declared a pecuniary interest in COW Item #1 - Finance Department Report FR-2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget, (salaries and benefits) as he and his wife are volunteer fire fighters in the Township.

4. DETERMINATION OF COMMITTEE ITEMS REQUIRING SEPARATE DISCUSSION

4.1 Items # 1, 6, 7

5. APPROVAL OF COMMITTEE ITEMS NOT REQUIRING SEPARATE DISCUSSION

5.1 Items # 2, 3, 4, 5, 8

6. DEPUTATION(S)

6.1 Erin Rogers, Special Events Officer Southlake Foundation Re: 2018 Run or Walk for Southlake

Erin Rogers, Special Events Officer, Southlake Regional Health Centre Foundation provided a slide presentation on the ‘2018 Run or Walk for Southlake’ and the Municipal Challenge taking place on Sunday, April 29, 2018. Ms. Rogers provided background information on Southlake Regional Health Centre and its’ programs and highlighted the following health care areas of direct benefit that the event supports; an emergency department that sees 110,000+ patients annually, ranked #1 of 14 cancer care in the province, 3rd largest regional cardiac care program in Ontario, maternal child care, surgical, and mental health. Ms. Rogers reviewed the ‘2018 Run or Walk for Southlake’ event options; types of team challenges available such as the Municipal Team Challenge; acknowledged past and encouraged future Township participation; and provided general registration information. Ms. Rogers asked that King support the ‘2018 Run or Walk for Southlake’ and help transform a life.

Ms. Rogers responded to questions.

Committee recommends that the deputation by Ms. Rogers be received.

6.2 Heidi Bonner, Executive Director Hope House Community Hospice (formerly Hospice King-Aurora-Richmond Hill) Re: Overview of Services and Upcoming Events

Heidi Bonner, Executive Director, Hope House Community Hospice provided a slide presentation overview of their services and commented on the following: hospice, hospice palliative care, hospice care in York Region, who they are, their clients (family caregivers, bereaved), their volunteers and professional staff, programs and services (wellness, grief & bereavement support), grief busters summer camp, and the Jitterbug Ball event on Friday, October 12, 2018.

Ms. Bonner responded to questions.

The Corporation of the Township of King, 2075 King Road, King City, ON

Committee of the Whole Page 82 of 95 Reports of February 5, 2018 - 3 - C.O.W. Minutes – February 5, 2018

Committee recommends that the deputation by Ms. Bonner be received.

7. AGENDA ITEMS

C.O.W. #1

Finance Department Report Number FR-2018-04 Re: 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget

Allan Evelyn, Director of Finance & Treasurer provided a slide presentation on the 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget and reviewed the following: direction from Council, Council priorities, context, tax rate impacts, strategy, reserves, reserve funds, proposed Capital Programs, and the amended 2018 Capital Budget.

DEPUTATION(S)

(i) Neva Lorenzon

Ms. Lorenzon commented on her concerns with the Municipal Property Assessment Corporation’s (MPAC) four year incremental assessment increases and the effects the combined mill rate, York Region rate and Education rate are having on her taxes. Ms. Lorenzon commented that less money should be going into reserve funds and that Council should consider further lowering of the mill rate to help offset the increase in property taxes residents are experiencing based on the MPAC assessments.

(ii) Janet Mior

Ms. Mior reiterated the previous deputants comments and noted that being on a fixed income can be difficult at times to cope financially. Ms. Mior asked that Council consider what Township building projects they have in the works today as they will have to be supported somehow tomorrow.

(iii) Robert Sandness

Mr. Sandness commented on the lack of control municipalities have over provincially legislated financial impacts but they can control their staffing and salary/benefit increases. Mr. Sandness asked that the Township ensure that budget matters such as the increase in the 2017 reserve fund, be better communicated to the public in the future.

(iv) Sylvia Pal

Ms. Pal, Chair of the King Township Library Board, commented that they are looking forward to the new King City Library and Seniors Centre facility as library facilities such as this one are a vital part of any municipality and offer much needed services to residents and visitors.

(v) Bruce Craig

Mr. Craig commented on the need for better communication between the Township, media and public and asked that King keep in mind how they are going to maintain infrastructure and new facilities going forward and still keep taxes at a reasonable level.

Committee recommends that the above deputations be received.

The Corporation of the Township of King, 2075 King Road, King City, ON

Committee of the Whole Page 83 of 95 Reports of February 5, 2018 - 4 - C.O.W. Minutes – February 5, 2018

Mr. Evelyn responded to questions.

Committee considered Finance Department Report Number FR-2018-04 to present the 2018 Operating Budget & Business Plans and the Amended 2018 Capital Budgets, be considered for approval by Council at its meeting of February 5, 2018.

Mayor Pellegrini and Councillor Eek declared a Pecuniary Interest in COW Item #1 - Finance Department Report FR-2018-04 – 2018 Operating Budget & Business Plan and Amended 2018 Capital Budget, (salaries and benefits – Parks, Recreation and Culture Department and Engineering, Public Works and Building Department) and refrained from participating in the voting of this item.

Councillor Schaefer assumed the position of Chair.

A motion was made by Councillor Mortelliti, seconded by Councillor Boyd and carried that the recommendations of COW Item #1 – Salaries and Benefits, for the Parks, Recreation and Culture Department and Engineering, Public Works and Building Department of the Committee of the Whole meeting of February 5, 2018 be adopted.

Mayor Pellegrini and Councillor Eek resumed participation in the meeting.

Councillor Eek resumed her position as Chair.

Councillor Boyd declared a Pecuniary Interest in COW Item #1 - Finance Department Report FR-2018-04 – 2018 Operating Budget & Business Plans and Amended 2018 Capital Budget, (salaries and benefits – King Fire & EMS Department) and refrained from participating in the voting of this item.

A motion was made by Councillor Schaefer, seconded by Councillor Cober and carried that the recommendations of COW Item #1 – Salaries and Benefits, for the King Fire & EMS Department of the Committee of the Whole meeting of February 5, 2018 be adopted.

Councillor Boyd resumed participation in the meeting.

Committee recommends that Finance Department Report Number FR- 2018-04 be received and the remainder of the recommendations therein be approved, as amended, as follows:

a) That Finance Department Report Number FR-2018-04 be received, as corrected;

b) That By-law 2018-16, being a By-Law to adopt the 2018 Operating Budget & Business Plans and the 2018 Capital Budget, as amended, be considered for approval by Council at its meeting of February 5, 2018.

C.O.W. #2

Resolution: Re: Request to the Ministry of Transportation of Ontario (MTO) to Expedite the Design and Construction of the Highway 400 – 404 Connecting Link

Committee considered the Resolution regarding requesting the Ministry of Transportation of Ontario (MTO) to expedite the design and construction of the Highway 400-404 connecting link to provide needed traffic capacity, and improve traffic connectivity and flow.

The Corporation of the Township of King, 2075 King Road, King City, ON

Committee of the Whole Page 84 of 95 Reports of February 5, 2018 - 5 - C.O.W. Minutes – February 5, 2018

Committee recommends that the Resolution be received and supported, as follows:

“WHEREAS municipalities surrounding the Township of King are all experiencing rapid and extensive growth resulting in increased volumes of traffic; and

WHEREAS a well-connected road network between Simcoe County and York Region with multiple route options is necessary for movement of goods, safety and ease of mobility; and

WHEREAS the roads system for the area is not designed to carry the extra traffic generated by the population growth in the surrounding municipalities, and much of the traffic is from outside of King traveling through the Township in order to access main arteries such as Regional Road #27, Regional Road #11 (Highway 11), and Provincial Highway #400; and

WHEREAS Highway 11 through King Township gets a high volume of traffic destined for East Gwillimbury and Bradford West Gwillimbury and provides the only high capacity link between these communities from Davis Drive (Highway 9) to north of Lake Simcoe; and

WHEREAS poor weather conditions, road maintenance, traffic congestion and collisions can result in significant delays and closure of this high capacity link with no feasible detour route in reasonable proximity; and

WHEREAS produce from the (the ‘Marsh’) region is being transported to the distribution centre(s) for the big chain stores and must arrive by a certain time and be time- checked, road delays could result in the farming community in King Township being penalized financially for ‘arriving late’ as timely movement of goods and services is crucial to the bottom line of the Marsh’s agri-food businesses, and

WHEREAS as a result of traffic delays/disruptions along Highway #9, Highway #400 and Highway 11, commuters are often rerouted through the northern region of King Township (the Marsh), which at certain times of the year, spring planting, fall harvest and the growing season in between, is affecting the safety of our roads, our residents and our farming community;

THEREFORE, BE IT RESOLVED THAT:

As traffic patterns have changed and traffic loads through King Township have significantly grown since 2007, the Council of the Township of King requests;

THAT the Ministry of Transportation be requested to expedite the design and construction of the Highway 400-404 Connecting Link to provide needed traffic capacity, and improve traffic connectivity and flow; and

THAT the Regional Municipality of York and the County of Simcoe be respectfully requested to review further options to improve east/west and north/south connectivity; and

THAT the Regional Municipality of York complete a comprehensive review of the recently constructed Bathurst Street/Highway 11/Holland Landing intersection configuration to better improve traffic flow, reduce excessive queuing, improve safety, reduce future road maintenance costs; and

The Corporation of the Township of King, 2075 King Road, King City, ON

Committee of the Whole Page 85 of 95 Reports of February 5, 2018 - 6 - C.O.W. Minutes – February 5, 2018

THAT Council direct the Township Clerk to forward a copy of this Resolution to the Ministry of Transportation and the local Members of Provincial Parliament;

AND FURTHER THAT a copy of this resolution be forwarded to the Regional Municipality of York, the County of Simcoe, the Town of East Gwillimbury, the Town of Bradford West Gwillimbury; the Town of Georgina, the Town of Aurora, the Town of Newmarket, the Town of Whitchurch-Stouffville seeking their consideration and support.”

C.O.W. #3

Engineering, Public Works and Building Department Report Number EPW-2018-02 Re: Building Permit Annual Comparison Report January 1st – December 31st, 2016 & 2017

Committee considered Engineering, Public Works and Building Department Report Number EPW-2018-02 to advise and update Committee on building permit activity for the period of January 1, 2017 to December 31, 2017 and January 1, 2016 to December 31, 2016 for comparison.

Committee recommends that Engineering, Public Works and Building Department Report Number EPW-2018-02 be received and the recommendations therein be approved, as follows:

a) That Engineering, Public Works and Building Department – Building Division Report Number EWP-2018-02 be received as information.

C.O.W. #4

Planning Department Report Number P-2018-04 Re: Application for Heritage Permit File No.: HP-17-01 Part Lot 4, Concession 6 2920 King Road, Laskay Hall Owner: Township of King Applicant: Township of King – Parks, Recreation and Culture Department

Committee considered Planning Department Report Number P-2018-04 to review Heritage Permit application HP-2017-01 made by the Parks, Recreation and Culture Department for alterations to Laskay Hall, located at 2920 King Road. The property located at 2920 King Road is designated under Par IV of the Ontario Heritage Act. As per Section 33 of the Act, no owner of property designated under the Act shall alter the property if the alteration is likely to affect the property’s heritage attributes unless the owner applies to the council of the municipality and receives consent in writing to the alteration.

Committee recommends that Planning Department Report Number P- 2018-04 be received and the recommendations therein be approved, as follows:

a. That Planning Report P-2018-04 be received as information.

b. That the alterations to a designated property located at 2920 King Road, Laskay Hall, BE APPROVED in accordance with the details described in Heritage Permit Application HP-17-01, which was deemed complete on November 7, 2017, with said alterations to:

The Corporation of the Township of King, 2075 King Road, King City, ON

Committee of the Whole Page 86 of 95 Reports of February 5, 2018 - 7 - C.O.W. Minutes – February 5, 2018

Install railing for the accessibility ramp, decking and stairs on the exterior of Laskay Hall with clear pine newel posts, spindle and handrail as shown in Appendix B to this report.

C.O.W. #5

Planning Department Report Number P-2018-05 Re: Request to remove a property from the Municipal Heritage Register Part Lot 11, Concession 2 1480 15th Sideroad Owner: Joseph Cartaginese

Committee considered Planning Department Report Number P-2018-05 to consider the request of the owner of 1480 15th Sideroad to remove the property from the Municipal Heritage Register. The owner is not requesting to move or demolish the structure, but rather to remove all reference of the property from the Municipal Heritage Register. The property was listed on the Municipal Heritage Register on August 27, 2012. Section 27 of the Ontario Heritage Act only gives Council the authority to add or remove reference to a property on the Municipal Heritage Register.

Committee recommends that Planning Department Report Number P- 2018-05 be received and the recommendations therein be approved, as follows:

a. That Planning Report P-2018-05 be received as information.

b. That Council directs the Township Clerk to keep all reference to Part lot 11, Concession 2, municipally known as 1480 15th Sideroad on the Municipal Heritage Register.

C.O.W. #6

Planning Department Report Number P-2018-03 Re: Proposed SBA Canada Telecommunications Tower Brookdale Treeland Nurseries Limited (Property Owner) Part Lot 22, Concession 9 15500 Highway 27 Planning File Number: SPD-17-28 Applicant: SBA Canada per Morteza Alabaf

Committee considered Planning Department Report Number P-2018-03 to provide information with respect to Council’s request to consider a tower design for the proposed SBA Canada telecommunications tower on the subject property. Specifically, Council provided direction that the tower should be designed as a tree to blend in with the surrounding landscape and to provide co-location opportunities for additional communication carriers.

Committee recommends that Planning Department Report Number P- 2018-03 be received and the recommendations therein be approved, as amended, as follows:

A. That Planning Report No. P-2018-03 be received;

The Corporation of the Township of King, 2075 King Road, King City, ON

Committee of the Whole Page 87 of 95 Reports of February 5, 2018 - 8 - C.O.W. Minutes – February 5, 2018

B. That with respect to a preferred tower design from the five tower options provided by the applicant for the SBA Canada – Brookdale Nurseries Telecommunications Tower site at 15500 Highway 27, the Tubular Tripole (tree) design is the preferred tower design;

C. That Council direct staff to explore opportunities with SBA Canada for developing a wireless partnership with the Township regarding the potential for municipal lands to serve as infrastructure sites;

D. That the Planning Department provide Industry Canada and the applicant with a copy of Planning Report No. P-2018-03, together with a Planning memo outlining Council’s preferred tower design.

C.O.W. #7

Planning Department Report Number P-2018-06 Re: Proposed Inclusionary Zoning Regulation Policy Planning File #PP-2016-02

Committee considered Planning Department Report Number P-2018-06 to provide information on inclusionary zoning and to present staff comments on the proposed regulation related to inclusionary zoning, which were submitted to the Province before the commenting deadline of February 1, 2018 for Council endorsement.

Committee recommends that Planning Department Report Number P- 2018-06 be received and the recommendations therein be approved, as follows:

a) That Planning Report P-2018-06 be received as information;

b) That Council endorse Planning staff comments on the Ontario Ministry of Municipal Affairs (MMA) EBR Posting “Proposed regulation under the Planning Act related to Inclusionary Zoning” (EBR Number 013-1977) attached as Appendix A to this report;

c) That additional comments of Committee be sent to the Province by the Planning Department as an addendum; and

d) That the Township Clerk circulate this report to York Region.

C.O.W. #8

Planning Department Report Number P-2018-09 Re: Receipt of Notice of Objection under Part IV of the Ontario Heritage Act Subject Lands: Part Lot 3, Plan 87; 66 Main Street Applicant/Owner: King Ridge Developments Inc.

Committee considered Planning Department Report Number P-2018-09 to advise of receipt of a Notice of Objection to the designation of the property at 66 Main Street. In accordance with the Ontario Heritage Act, staff is seeking direction to refer the matter to the Conservation Review Board (CRB).

The Corporation of the Township of King, 2075 King Road, King City, ON

Committee of the Whole Page 88 of 95 Reports of February 5, 2018 - 9 - C.O.W. Minutes – February 5, 2018

Committee recommends that Planning Department Report Number P- 2018-09 be received and the recommendations therein be approved, as follows:

A. That Planning Report No. P-2018-09 be received as information;

B. That the Township Clerk refers the Notice of Objection to the Conservation Review Board as per Section 29(7) of the Ontario Heritage Act;

C. That the Township Solicitor and Planning staff, together with supporting staff and consultants as necessary, be authorized to prepare for and attend the Conservation Review Board to support Council’s decision to designate the property at 66 Main Street under Section 29, Part IV of the Ontario Heritage Act;

D. That Township staff continue to work with the owner in advance of and/or during a Conservation Review Board (CRB) hearing.

8. NEW BUSINESS

There was no new business.

9. ADJOURNMENT

A motion was made by Committee and carried that the Committee of the Whole Meeting of February 5, 2018 be adjourned.

The meeting adjourned at 10:33 p.m.

At the meeting of February 26, 2018, a motion was made by Councillor xx, seconded by Councillor xx and carried that the Committee of the Whole Report for the Meeting of February 5, 2018 be adopted.

The Corporation of the Township of King, 2075 King Road, King City, ON

Committee of the Whole Page 89 of 95 Reports of February 5, 2018

THE CORPORATION OF THE TOWNSHIP OF KING

COMMITTEE OF THE WHOLE CLOSED SESSION MEETING – MINUTES (DRAFT) MONDAY, FEBRUARY 5, 2018

Committee of the Whole, Closed Session met at 10:45 p.m. in the Council Chambers, Township of King Municipal Building, 2075 King Road, King City with Councillor Eek presiding.

The following were present at this Meeting:

Council Staff

Mayor Steve Pellegrini Susan Plamondon – Chief Administrative Officer Councillor Cleve Mortelliti Kathryn Moyle – Director of Clerks/By-law Enforcement Councillor David Boyd and Township Clerk Councillor Bill Cober Gaspare Ritacca – Manager of Planning & Development Councillor Debbie Schaefer Denny Timm – Manager of Legislative Services Councillor Avia Eek

1. CALL TO ORDER

Councillor Eek called the meeting to order. A quorum was present.

2. APPROVAL OF AGENDA

Committee recommended and carried that the Agenda for the Committee of the Whole Closed Session Meeting of February 5th 2018 be approved.

3. DECLARATIONS OF PECUNIARY INTEREST

There were no declarations of pecuniary interest.

4. ITEMS FOR DISCUSSION

4.1 Section 2.7(b), Subsections 5 and 6: Litigation or Potential Litigation Affecting the Municipality

Planning Department Report Number P-2018-07 Re: Upcoming Hearing of the Ontario Municipal Board (OMB) Part of Lots 7 & 8, Concession 4, 2710 King Road & 13371 Jane Street, King City (Mansions of King Inc.)

The Manager of Planning & Development reviewed the confidential staff report regarding a potential litigation matter pertaining to an upcoming hearing of the Ontario Municipal Board in the Township.

The Corporation of the Township of King, 2075 King Road, King City, ON

Committee of the Whole Page 90 of 95 Closed Session Reports of - 2 - COW Closed Session Minutes – February 5, 2018

Committee recommends that the confidential staff report be received and that the following recommendations be adopted within the Open Session of Council for staff to proceed as directed.

4.2 Section 2.7(b), Subsection 6: Solicitor-Client Privilege

Clerks Department Verbal Report Re: Solicitor-Client Privilege

The Township Clerk provided a verbal update on a solicitor-client privilege matter in the Township.

Committee recommends that the verbal report by the Township Clerk be received and that a recommendation be adopted within the Open Session of Council for staff to proceed as directed.

5. APPROVAL OF CLOSED SESSION CONFIDENTIAL REPORTS

5.1 Committee Closed Session Confidential Report of January 8, 2018

Committee reviewed the Closed Session Confidential Report of January 8, 2018 and referred to the Council Meeting for adoption.

6. ADJOURNMENT

A motion was made by Committee and carried that the Committee of the Whole Closed Session Meeting of February 5, 2018 be adjourned.

The meeting adjourned at 11:12 p.m.

At the meeting of February 26th, 2018, a motion was made by Councillor xx, seconded by Councillor xx and carried that the Committee of the Whole Closed Session Report for the Meeting of February 5th, 2018 be adopted.

The Corporation of the Township of King, 2075 King Road, King City, ON

Committee of the Whole Page 91 of 95 Closed Session Reports of THE CORPORATION OF THE TOWNSHIP OF KING

BY-LAW NUMBER 2018-14

A BY-LAW TO AUTHORIZE THE MAYOR AND CLERK TO ENTER INTO A SHARED USE AGREEMENT BETWEEN THE YORK REGION DISTRICT SCHOOL BOARD AND THE CORPORATION OF THE TOWNSHIP OF KING

WHEREAS the York Region District School Board (the “Board”) is the owner of various schools and their associated athletic fields;

AND WHEREAS the Council of the Township deems it desirable to utilize the Board owned athletic fields for the purpose of serving the residents of the Township;

NOW THEREFORE the Council of the Corporation of the Township of King HEREBY ENACTS AS FOLLOWS:

1. THAT the Mayor and Clerk are authorized and directed to execute the necessary documents to enter into a Shared Use Agreement, attached as Appendix “A” hereto, dated February 26, 2018 for the provision of athletic fields and the applicable maintenance.

READ a FIRST and SECOND time this 26th day of February, 2018.

READ a THIRD time and FINALLY PASSED this 26th day of February, 2018.

Steve Pellegrini Mayor

Kathryn Moyle Director of Clerks/By-law Enforcement Township Clerk

(Ref. Parks, Recreation & Culture Dept. Report No. PRC-2018-04, C.O.W. Feb 26/18)

By-law #2018-14 Page 92 of 95

THE CORPORATION OF THE TOWNSHIP OF KING

BY-LAW NUMBER 2018-15

A BY-LAW TO AUTHORIZE THE MAYOR AND CLERK TO ENTER INTO A RECYCLING BIN LICENCE AGREEMENT AND TEXTILE RECYCLING AGREEMENT BETWEEN THE NATIONAL DIABETES TRUST AND THE CORPORATION OF THE TOWNSHIP OF KING

WHEREAS the National Diabetes Trust (the “Trust”) is the owner and operator of a textile recycling program and the associated infrastructure;

AND WHEREAS the Council of the Township deems it desirable to partner with the Trust to provide a textile recycling program for the residents of the Township;

NOW THEREFORE the Council of the Corporation of the Township of King HEREBY ENACTS AS FOLLOWS:

1. THAT the Mayor and Clerk are authorized and directed to execute the necessary documents to enter into a Textile Recycling Agreement, attached as Appendix “A” hereto, dated February 26, 2018 for the provision providing a textile recycling program; and

2. THAT the Mayor and Clerk are authorized and directed to execute the necessary documents to enter into a Recycling Bin License Agreement, attached as Appendix “A” hereto, dated February 26, 2018 for the provision of providing textile bins associated with a textile recycling program; and

READ a FIRST and SECOND time this 26th day of February, 2018.

READ a THIRD time and FINALLY PASSED this 26th day of February, 2018.

Steve Pellegrini Mayor

Kathryn Moyle Director of Clerks/By-law Enforcement Township Clerk

(Ref. Parks, Recreation & Culture Dept. Report No. PRC-2018-05, C.O.W. Feb 26/18)

By-law #2018-15 Page 93 of 95

THE CORPORATION OF THE TOWNSHIP OF KING

BY-LAW NUMBER 2018-18

A BY-LAW TO AUTHORIZE THE MAYOR AND CLERK TO EXECUTE A BOUNDARY ROAD AGREEMENT BETWEEN THE TOWN OF EAST GWILLIMBURY AND THE CORPORATION OF THE TOWNSHIP OF KING

WHEREAS the Council of the Corporation of the Township of King deems it advisable to enter into a Boundary Road Agreement with the Town of East Gwillimbury for the shared maintenance of certain boundary road(s) as identified in the Agreement;

NOW THEREFORE the Council of the Corporation of the Township of King HEREBY ENACTS AS FOLLOWS:

1. THAT the Mayor and Clerk are authorized and directed to execute a Boundary Road Agreement, attached as Appendix ‘A’, between the Town of East Gwillimbury and the Corporation of the Township of King for the shared maintenance of certain boundary road(s) as identified in the Agreement

READ a FIRST and SECOND time this 26th day of February, 2018

READ a THIRD time and FINALLY PASSED this 26th day of February, 2018.

______Steve Pellegrini Mayor

______Kathryn Moyle Director of Clerks/By-law Enforcement Township Clerk

(Ref. Engineering, Public Works & Building Dept. Report No.: EPW 2018-04 C.O.W. February 26/18)

By-law #2018-18 Page 94 of 95

THE CORPORATION OF THE TOWNSHIP OF KING

BY-LAW NUMBER 2018-19

A BY-LAW TO CONFIRM THE PROCEEDINGS OF COUNCIL AT ITS MEETING HELD ON FEBRUARY 26, 2018

The Council of the Corporation of the Township of King HEREBY ENACTS AS FOLLOWS:

1. The action of Council in respect of each motion, resolution and other action passed and taken by the Council at its said meeting is, except where the prior approval of the Ontario Municipal Board is required, hereby adopted, ratified and confirmed.

2. The Mayor and the proper officers of the Municipality are hereby authorized and directed to do all things necessary to give effect to the said action or to obtain approvals where required, and, except where otherwise provided, the Mayor and Clerk are hereby directed to execute all documents necessary in that behalf, and the said Clerk is hereby authorized and directed to affix the corporate seal of the Municipality to all such documents.

READ a FIRST and SECOND time this 26th day of February, 2018.

READ a THIRD time AND FINALLY PASSED this 26th day of February, 2018.

______Steve Pellegrini Mayor

______Kathryn Moyle Director of Clerks/By-law Enforcement Township Clerk

By-law #2018-19 Page 95 of 95