Register of Measures The Murray–Darling Basin Authority (MDBA) has the responsibility for maintaining a register of supply and efficiency measures agreed by Basin governments to be considered in the Sustainable Diversion Limit (SDL) adjustment mechanism. This register must be published on the MDBA website. The register of measures reflects: • the formal notification of the package of measures to the Authority by the Basin Officials Committee (BOC) • all efficiency measures added to the notified package of measures until 31 December 2023 • updates to entitlements as they are acquired under the efficiency program until 31 December 2023 • all amendments to notifications up to 31 December 2023. Because of the interdependent nature of measures, an estimate of the likely supply contribution: • is calculated at an overall package level, rather than for each separate notified measure • is available subject to the completion of modelling of SDL adjustment measures • is provided through apportioning across surface water SDL resource units. The register is provided in the form of two tables: • Table A lists the relevant details of each notified measure (this Table is current at 4 May 2018) • Table B lists the efficiency entitlements and likely SDL adjustment for each of the Basin’s surface water SDL resource units (this table is current at 31 March 2019).

1

Office locations Adelaide, -Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected]

Table A - Details of measures

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

1 Chowilla SA, NSW and Chowilla Creek Supply This measure identifies This project is not BOC 48 30/06/2024 The Chowilla Floodplain works is part of a program of The Floodplain Victoria all southern connected reliant on 18/05/2017 Living Murray (TLM) works at icon sites along the River TLM Project basin SDL resource constraint Murray to ensure that environmental water recovered as units as affected units measures for part of TLM is used efficiently and ecological elements are for the purposes of implementation or maintained. The Chowilla Floodplain project involves a major notifying supply operation. environmental regulator on the Chowilla Creek and a range measures. of complementary works. The environmental regulator will allow flows to be managed to enable flooding across the floodplain under relatively low river flow conditions.

2 Flows for the SA Eastern Mount Lofty Supply This measure identifies This project is not Out-of-session 30/06/2024 The project proposes activities that reduce the interception Future (F4F) Ranges, the SA River all southern connected reliant on other 28/06/2017 of low flows and result in additional flows to riverine Murray and the Lower basin SDL resource supply or (following BOC environments in the Eastern Mount Lofty Ranges (EMLR) Lakes units as affected units constraint 50) and to the River Murray including the Coorong, Lower Lakes for the purposes of measures for and Murray Mouth in SA. The project will help restore the notifying supply implementation or BOC 52 natural low flow patterns within the EMLR through measures. operation. 21/09/2017 measures that will improve the passage of low flows and freshes to improve ecological habitat conditions.

3 Riverine SA 600 km River Murray Supply This project aims to return a number of wetlands to a more This measure identifies This project is not Out-of-session 30/06/2024 Recovery corridor between the natural wetting/drying regime which results in evaporative all southern connected reliant on other 28/06/2017 Project (RRP) SA/Victoria border to savings. These savings are assigned to the Cwlth basin SDL resource supply or (following BOC Wellington Government as a SA Class 9 water access entitlement. This units as affected units constraint 50) entitlement can be used for environmental purposes either for the purposes of measures for within or upstream of the SA/Victoria border. notifying supply implementation or BOC 52 measures. operation. 21/09/2017

4 South East SA Blackford Drain, and Supply The project will use a combination of newly constructed This measure identifies This project is not BOC 48 30/06/2024 Flows Coorong South Lagoon drains and widened existing drains within the Upper South all southern connected reliant on other 18/05/2017 Restoration East drainage system to divert additional water that basin SDL resource supply or Project (SEFRP) currently flows to the sea from the Blackford Drain in the units as affected units constraint BOC 51 Upper South East into the Coorong South Lagoon. The for the purposes of measures for 29/08/2017 diverted water will provide significant environmental notifying supply implementation or outcomes for en-route wetlands of the Upper South East measures. operation. through the provision of additional water of suitable quality,

2

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

as well as salinity improvements in the Coorong South Lagoon.

5 SA Riverland SA SA River Murray Supply The project aims to create an integrated and resilient This measure identifies This project is not Out-of-session 30/06/2024 Floodplain between SA/Victoria floodplain along the SA River Murray, between the border all southern connected reliant on other 28/06/2017 Integrated border and Lock 1; and Lock 1, through a package of works and measures that basin SDL resource supply or (following BOC Infrastructure Pike Floodplain; enable floodplain inundation and freshening of groundwater units as affected units constraint 50) Program Katarapko Floodplain lenses with particular focus on the Pike and Katarapko for the purposes of measures for (SARFIIP) floodplains. Environmental works on the Pike and Katarapko notifying supply implementation or floodplains will optimise the frequency, duration and extent measures. operation. of inundation events to protect and restore these floodplain ecosystems and contribute to Murray-Darling Basin Plan (MDBP) environmental outcomes. Salinity management measures will complement the floodplain inundation works to manage ecological risk, enhance ecological condition by maximising the area of soil salinity that is within the tolerances of target vegetation and to manage any long term and real time in-stream salinity risk.

6 Belsar-Yungera Victoria The Belsar-Yungera Supply This proposed supply measure will maintain and improve This measure identifies Not directly linked BOC 48 30/06/2024 Floodplain Floodplain is located flora and fauna habitat values and provide periodic breeding all southern connected to any specific 18/05/2017 Management on the River Murray opportunities for wetland species, such as fish, frogs and basin SDL resource constraint Project floodplain, waterbirds. Managed flows will be able to be delivered to units as affected units measures but approximately 30 km 2,370 ha of highly valued floodplain, representing one third for the purposes of implementing a upstream of the of the total area. The works can be operated flexibly to meet notifying supply confirmed package Euston weir, near the water requirements of different vegetation measures. of constraint Robinvale in communities, mimicking a broad range of River Murray flows measures may northwest Victoria. up to 170,000 ML/day. Through the construction of three have implications large regulators, a series of smaller supporting regulators, for the proposed track raising (levees) and a pipeline (to allow use of operating strategy. temporary pumps) this project will connect extensive areas of floodplain through tiered watering events. These works will make use of natural flow paths to increase the extent, frequency and duration of inundation from either MDBP flows or pumping during low flow events.

7 Burra Creek Victoria The Burra Creek Supply The proposed works will enable inundation of an area of 407 This measure identifies Not directly linked BOC 48 30/06/2024 Floodplain floodplain is located ha. This represents 33% of the total forest area and almost all southern connected to any specific 18/05/2017 Management on the western bank all of the flood dependent communities found within the basin SDL resource constraint Proposal of the River Murray forest, and provides a greater extent of watering than is units as affected units measures but just upstream of the possible under MDBP flows. The works involve the for the purposes of implementing a junctions with the construction of three large regulators, raising tracks to form notifying supply confirmed package Murrumbidgee and levees, and the removal of barriers to flow on the floodplain. measures. of constraint

3

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

Wakool Rivers. Burra measures may Creek is a 54 km have implications anabranch of the River for the proposed Murray that diverges operating strategy. from the river near Piangil and re-joins to the north.

8 Gunbower Victoria, SA Gunbower Forest is Supply A suite of engineering works have been built through TLM to This measure identifies Not directly linked Out-of-session 30/06/2024 Forest TLM and NSW situated on the River deliver environmental water to the Gunbower Forest Icon all southern connected to any specific 28/06/2017 Project Murray floodplain in Site, watering up to 4,800 ha. These works and associated basin SDL resource constraint (following BOC northern Victoria operating regime have been designed to achieve the units as affected units measures, but 50) between Torrumbarry ecological objectives that have been set for the forest. The for the purposes of relationships and Koondrook. works include two main components: notifying supply amongst the • Lower Landscape Works — target the forest wetlands measures. Goulburn, Hume to and use relatively small volumes of water. Works Yarrawonga, included refurbishing existing regulators within the Yarrawonga to forest, constructing new regulators and constraints decommissioning of a single regulator. These regulators proposals and the deliver water from either Gunbower Creek or the River broader constraints Murray (when flows exceed 14,000 ML/day). package may have • Hipwell Road Channel — targets large areas of river red implications for the gums and can create the conditions required for large proposed operating colonial waterbird breeding events. Works include strategy. construction of a channel to deliver water from Gunbower Creek to the forest, a new weir in Gunbower Creek and associated works.

9 Gunbower Victoria The Gunbower Supply The project has been developed to enable the delivery of This measure identifies Not directly linked Out-of-session 30/06/2024 National Park National Park is environmental water to the wetlands and forest of the all southern connected to any specific 28/06/2017 Floodplain located on the mid- Gunbower National Park. It will mimic a natural flood event basin SDL resource constraint (following BOC Management Murray floodplain in of up to 50,000 ML/day across 500 ha. This includes almost units as affected units measures but 50) Project northern Victoria. It 50% of the permanent and temporary wetlands in the for the purposes of implementing a sits within the broader project area and 20% (250 ha) of river red gum with flood notifying supply confirmed package Gunbower Forest, an dependent understorey. The package of works include measures. of constraint internationally regulator and creek enhancement works. The mid forest measures may recognised wetland works will consist of a 100 ML/day pump station location on have implications system in the Murray- the River Murray and a number of regulators. This will for the proposed Darling Basin. The enable the provision of water to approximately 500 ha of operating strategy. forest forms part of Gunbower National Park, currently unable to be watered by the Gunbower- any other infrastructure. Koondrook-Perricoota Forest icon site under

4

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

the TLM Initiative, together with the Koondrook-Perricoota Forest in NSW.

10 Guttrum and Victoria Guttrum and Benwell Supply The project will reinstate a more natural flooding regime for This measure identifies Not directly linked Out-of-session 30/06/2024 Benwell State Forests are located on the Guttrum and Benwell Forests, addressing, in particular, all southern connected to any specific 28/06/2017 Forests the mid-Murray the reduced frequency and duration of floods. The proposed basin SDL resource constraint (following BOC Floodplain floodplain of northern works will water 1,200 ha via pump stations, including semi- units as affected units measures but 50) Environmental Victoria, downstream permanent wetlands and 82% of the river red gum forest for the purposes of implementing a Works Project of Koondrook and with flood dependent understorey. The works will include notifying supply confirmed package have a combined area two separate pump stations to deliver environmental water measures. of constraint of 1,930 ha. into Guttrum Forest, one pump station in Benwell Forest and measures may containment works (regulators and levees) in both forests to have implications contain water on the floodplain. The works have been for the proposed designed to meet the environmental watering requirements operating strategy. of the ecological values by mimicking a 26,000 ML/day flood event in the River Murray for Guttrum Forest and a 24,000 ML/day flood event for Benwell Forest.

11 Hattah Lakes Victoria The Hattah Lakes Supply This project will complement TLM works at the Hattah Lakes This measure identifies Not directly linked BOC 48 30/06/2024 North North site is located in Icon Site by enhancing flooding across higher floodplain all southern connected to any specific 18/05/2017 Floodplain north western Victoria terraces. The project will also increase the flexibility for basin SDL resource constraint Management on the western bank environmental water management across the lakes. The units as affected units measures but Project of the River Murray proposed works will water an additional 1,130 ha of for the purposes of implementing a between Robinvale floodplain through the construction of two new regulators, a notifying supply confirmed package and Red Cliffs. The causeway across an existing track and 1.7 km of levees along measures. of constraint project area lies within track alignments. measures may the Murray-Kulkyne have implications Park and the Hattah- for the proposed Kulkyne National Park. operating strategy.

12 Hattah Lakes Victoria, SA Hattah Lakes is in Supply The project aims to deliver a watering regime that will This measure identifies Not directly linked BOC 45 The measure is Environmental and NSW north-west Victoria, achieve the ecological objectives for the Hattah Lakes TLM all southern connected to any specific 16/02/2017 operational. Flows TLM on the bank of the Icon Site. The on-ground works have been designed to basin SDL resource constraint Project River Murray between increase the frequency, duration and extent of flooding units as affected units measures, but The works Robinvale and across the lakes and surrounding floodplain. The package of for the purposes of relationships were Mildura. works enables watering of 6,000 ha and includes: notifying supply amongst the commissioned • A new pumping station at Messenger’s Crossing measures. Goulburn, Hume to in 2013. • Sill lowering in Chalka Creek South Yarrawonga, • Four new regulators (Messenger’s, Oatey’s, Cantala, Yarrawonga to Kramen) and associated works Wakool constraints • Refurbishment of an existing regulator (Little Hattah) proposals and the

5

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

• Three new stop banks or levees. broader constraints package may have implications for the proposed operating strategy.

13 Lindsay Island Victoria, SA Lindsay Island is Supply Lindsay Island is part of the Lindsay-Wallpolla Icon Site. The This measure identifies Not directly linked BOC 45 The measure is (Stage 1) and NSW downstream of the Stage 1 works were funded by TLM and aimed to maintain all southern connected to any specific 16/02/2017 operational. Upper Lindsay junction of the Murray existing high quality habitat for native fish, increase the basin SDL resource constraint watercourse and Darling Rivers and extent of flowing habitat on Lindsay Island by about 28 km, units as affected units measures, but The works Enhancement lies within the Murray- improve fish passage between the Lindsay Island for the purposes of relationships were TLM Project Sunset National Park. anabranches and the River Murray and improve the notifying supply amongst the Hume commissioned condition of riparian vegetation. These works will contribute measures. to Yarrawonga, in 2015. to achieving the ecological objectives that have been set for Yarrawonga to the site, focusing on in-stream habitat. The works include Wakool, Lower three new regulators: Murray constraints • Upper Lindsay River regulators (north and south inlets) proposals and the • Mullaroo Creek regulator and fishway. broader constraints package may have implications for the proposed operating strategy.

14 Lindsay Island Victoria The project is located Supply The Lindsay Island Floodplain Project will inundate 5,152 ha This measure identifies Not directly linked BOC 48 30/06/2024 (Stage 2) on the River Murray of the floodplain and connect many parts of the floodplain all southern connected to any specific 18/05/2017 Floodplain floodplain in north through tiered watering events, including areas of unique basin SDL resource constraint Management west Victoria, 100 km fast-flowing aquatic habitat, through to sections of black units as affected units measures but Project west of Mildura. box, lignum and onto the higher alluvial terraces. The for the purposes of implementing a Lindsay Island is proposed works will be operated in tandem with the notifying supply confirmed package downstream of the completed TLM works at this site (Lindsay State 1) and Lock measures. of constraint junction of the Murray 7 to mimic flows of 40,000 ML/day to 120,000 ML/day. measures may and Darling Rivers and The proposed works include two components: have implications lies within the Murray- • Primary: Berribee Regulator and fishway, five for the proposed Sunset National Park. containment regulators and 2.6 km of levees along track operating strategy. alignments. • Secondary: 13 regulators and associated works, and 4.9 km of levees along track alignments.

15 Mulcra Island Victoria, SA Mulcra Island is Supply Mulcra Island is part of the Lindsay-Wallpolla Islands Icon This measure identifies Not directly linked BOC 45 The measure is Environmental and NSW located on the River Site. The works have been funded through TLM and will all southern connected to any specific 16/02/2017 operational. Flows TLM Murray floodplain in assist in achieving the ecological objectives that have been basin SDL resource constraint Project north-west Victoria, set for the icon site by increasing the frequency, duration units as affected units measures, but The works and extent of wetland and floodplain inundation, improving for the purposes of relationships were

6

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

approximately 70 km fish access to the creek and introducing flows to the upper notifying supply amongst the Hume commissioned west of Mildura. Potterwalkagee Creek. The works enable watering of 820 ha measures. to Yarrawonga, from 2013- included the construction of seven environmental regulators Yarrawonga to 2015. and associated works, including sill lowering, stream Wakool, Lower rehabilitation and upgrading access tracks. Murray constraints proposals and the broader constraints package may have implications for the proposed operating strategy.

16 Nyah Victoria The Nyah Floodplain Supply The proposed works will water almost 500 ha of floodplain This measure identifies Not directly linked BOC 48 30/06/2024 Floodplain Management Project within Nyah Forest, replicating River Murray flows of up to all southern connected to any specific 18/05/2017 Management is located in the Nyah 25,000 ML/day. The works will influence over 53% of the basin SDL resource constraint Project Vinifera Regional Park total forest area and almost all of the flood dependent units as affected units measures but on the western bank communities. The works consist of four regulators, three on for the purposes of implementing a of the River Murray, the downstream end of Parnee Malloo Creek and one on the notifying supply confirmed package 30 km north of Swan upstream end. Additional works to contain water within the measures. of constraint Hill. This floodplain forest include 1.7 km of low level track raising, forming a measures may includes 913 ha of levee at the downstream end of the forest. have implications wetland, forest and for the proposed woodland areas. operating strategy.

17 Vinifera Victoria The Vinifera Supply The Vinifera Floodplain project will water up to 350 ha of This measure identifies Not directly linked BOC 48 30/06/2024 Floodplain Floodplain Project is floodplain within Vinifera Forest. This represents 55% of the all southern connected to any specific 18/05/2017 Management located in the Nyah total forest area (638 ha) and almost all of the flood basin SDL resource constraint Project Vinifera Regional Park dependent communities. The proposed works involve units as affected units measures but on the western bank construction of four regulators and 1.1 km of low level track for the purposes of implementing a of the River Murray, raising to enable control of both flood and pumped flows notifying supply confirmed package 30 km north of Swan into and out of Vinifera Creek. Water will be delivered to the measures. of constraint Hill. site through a combination of natural inflows or temporary measures may pumping when river flows are insufficient. have implications for the proposed operating strategy.

18 Wallpolla Victoria The Wallpolla Island Supply Wallpolla Island is part of TLM’s Lindsay-Wallpolla Islands This measure identifies Not directly linked BOC 48 30/06/2024 Island Project is located in Icon Site. The proposed works will complement existing TLM all southern connected to any specific 18/05/2017 Floodplain Victoria on the River works at this site. The project will increase the frequency basin SDL resource constraint Management Murray floodplain, and duration of floodplain inundation across 2,650 ha, units as affected units measures but Project downstream of the providing significant benefit to nationally important species, for the purposes of implementing a junction of the Murray threatened vegetation communities, ecological values, notifying supply confirmed package and Darling Rivers and carbon cycling and downstream water quality. This will measures. of constraint

7

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

approximately 40 km benefit both Wallpolla Island and the broader Lower Murray measures may west of Mildura. The region. The proposed works include four major regulators, have implications site is part of the 22 smaller containment regulators and 4.5 km of levees for the proposed Murray-Sunset (raised tracks). The works have been designed to operating strategy. National Park. complement weir pool manipulation activities (Locks 8 and 9) and connect areas of flowing aquatic habitat with sections of black box, lignum and higher alluvial terraces. This will enable watering at a landscape scale, mimicking flows of 30,000–120,000 ML/day.

19 Barmah- Victoria and The Barmah-Millewa Supply Rule change to vary the rules associated with the water set This measure identifies Not directly linked Out-of-session 30/06/2024 Millewa Forest NSW Forest consists of the aside by Victoria and NSW in an environmental account (the all southern connected to any specific 28/06/2017 Environmental Barmah Forest in Barmah-Millewa Forest Environmental Watering Account or basin SDL resource constraint (following BOC Water Victoria and the BMFEWA) to water the Barmah-Millewa Forest proposed to units as affected units measures, but 50) Allocation Millewa group of allow the use of other environmental entitlements to target for the purposes of there is potential forests in NSW. It is the environmental requirements specified in the MDBP. This notifying supply that the the largest River Red measure proposes to not initiate or continue release from measures. implementation of Gum forest in BMFEWA if a four monthly flood has already occurred. the Hume to and covers Yarrawonga and approximately 66,000 Yarrawonga to ha of floodplain Wakool constraints between the proposals and the townships of broader constraints , package could and Echuca. enhance project outcomes.

20 Flexible Rates Victoria and Hume is located Supply Rule change to allow Hume releases to be reduced more This measure identifies Not directly linked Out-of-session 30/06/2024 of Fall in River NSW approximately 27 km quickly when flows have not been elevated for an extended all southern connected to any specific 28/06/2017 Levels east of Albury, NSW. period beforehand, with the water saved released at a basin SDL resource constraints (following BOC Downstream different point in time or in a different flow pattern that units as affected units measures. 50) of would provide additional environmental benefits. The for the purposes of additional flexibility improves Hume Dam operational notifying supply efficiency. measures.

21 Hume Dam Victoria and Hume Dam is located Supply Rule change to allow future environmental water releases in This measure identifies Project success is Out-of-session 30/06/2024 airspace NSW approximately 27 km airspace management. all southern connected not directly linked 28/06/2017 management east of Albury, NSW. basin SDL resource to any specific (following BOC and pre- units as affected units constraint 50) release rules for the purposes of measures, but notifying supply there is potential BOC 52 measures. that the 21/09/2017 implementation of

8

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

the Hume to Yarrawonga and Yarrawonga to Wakool constraints proposals and the broader constraints package could enhance project outcomes.

22 Improved Victoria and River Murray system, Supply The proposal was to formalise recent observed This measure identifies Not directly linked Out-of-session 30/06/2024 Regulation of NSW in particular along the improvements in operational loss performance. all southern connected to any specific 28/06/2017 the River River Murray reach BOC did not agree to include the project as part of the basin SDL resource constraint (following BOC Murray from Hume Dam to SA modelled package of supply measures. units as affected units measures. 50) (IRRM)1 Border. for the purposes of notifying supply measures.

23 Computer NSW This measure applies Supply The CARM project aims to use better information in the This measure identifies Not directly linked Out-of-session 30/06/2024 Aided River to the whole of the form of metering, inundation models and more accurate loss all southern connected to constraint 28/06/2017 Management Murrumbidgee estimates to allow operators to more accurately make basin SDL resource measures but will (following BOC (CARM) regulated river releases to meet downstream orders. The saved operational units as affected units assist in the 50) Murrumbidgee system. The loss may then be calculated and set aside to achieve for the purposes of operational is environmental outcomes. A callable entitlement as a result notifying supply implementation of BOC 51 a very complex of the envisaged savings will allow delivery of previous measures. the Murrumbidgee 29/08/2017 regulated river basin losses (which were also contributing to environmental constraints which provides bulk outcomes) in a more managed way. management BOC 52 water supplies from strategy (see 21/09/2017 the two main separate supply storages, Blowering measure and Burrinjuck , notification) and is to satisfy downstream expected to demands for major improve irrigation areas environmental ( and outcomes in the Murrumbidgee), other Murrumbidgee. private diverters, important Ramsar wetlands and key

1 IRRM was not modelled as part of the SDL adjustment determination

9

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

towns in the region.

24 Improved Flow NSW The site of the Supply This proposal aims to return the Creek system closer This measure identifies The Murrumbidgee Out-of-session 30/06/2024 Management proposed works is at to a pre-development wetting/drying regime, while all southern connected constraints 28/06/2017 Works at the the Yanco Creek off- improving infrastructure that supplies irrigation and stock basin SDL resource management (following BOC Murrumbidgee take from the and domestic water. Upgrades to Yanco Weir on the units as affected units strategy will 50) River - Yanco Murrumbidgee River, Murrumbidgee River would result in more control over flows for the purposes of improve the ability Creek Offtake approximately 20km through the proposed Yanco Creek regulator. This may notifying supply to release water BOC 51 west of . provide the Cwlth Environmental Water Holder and the measures. from storages to 29/08/2017 Office of Environment and Heritage with more flexibility in create higher flows managing flows within the Murrumbidgee River system. along the Murrumbidgee River. The improved flow management works set out in the Improved flow management works at the Murrumbidgee Rivers – Yanco Creek off-take measure, will further improve the environmental outcomes for the mid-Murrumbidgee wetlands.

25 Modernising NSW The Yanco Creek Supply This proposal involves returning parts of three creek systems This measure identifies This measure is not Out-of-session 30/06/2024 Supply system is an effluent closer to a pre-development wetting/drying regime, while all southern connected directly linked to 28/06/2017 Systems for creek within the improving infrastructure that supplies irrigation and stock basin SDL resource any constraint (following BOC Effluent Creeks lowland reaches of the and domestic water. This project may provide the Cwlth units as affected units measures. 50) – Murrumbidgee River Environmental Water Holder and the Office of Environment for the purposes of Implementation of Murrumbidgee on the Riverina Plain, and Heritage with more flexibility in managing flows within notifying supply the Murrumbidgee BOC 51 River between Narrandera the Murrumbidgee River system. measures. constraints 29/08/2017 in the northeast and management the confluence of the strategy is not BOC 52 with expected to lead to 21/09/2017 the at different outcomes in the for this supply southwest. measure.

10

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

26 Nimmie Caira NSW The Nimmie-Caira Supply Reconfigure water delivery infrastructure to more effectively This measure identifies Not directly linked Out-of-session 30/06/2024 Infrastructure forms part of the deliver environmental flows to the Nimmie-Caira floodplain all southern connected to constraint 28/06/2017 Modifications lower Murrumbidgee and other parts of the Lowbidgee. This project, along with basin SDL resource measures but (following BOC Proposal River system located the Murray and Murrumbidgee Valley National Parks SDL units as affected units implementing the 50) northwest of adjustment supply measure, has the potential to supply for the purposes of Murrumbidgee in southern NSW. The significant additional environmental benefit to the area. notifying supply constraints BOC 51 Nimmie-Caira measures. management 29/08/2017 comprises the strategy will southern floodplain provide outcomes area of the that are Murrumbidgee River complimentary to near the confluence this Nimmie-Caira with the infrastructure that is generally modifications dominated by lignum supply measure. shrubland, and is adjacent to .

27 SDL offsets in NSW The measure is in the Supply The project aims to improve environmental water delivery This measure identifies Not directly linked Out-of-session 30/06/2024 the Lower lowland reaches of the and achieve better environmental and operational outcomes all southern connected to constraint 28/06/2017 Murray NSW River Murray and than achieved under the SDL benchmark model. This is to be basin SDL resource measures, but (following BOC Darling Rivers in done through the manipulation of weir pools, construction units as affected units implementing the 50) southwest NSW. It is of a replacement pump station for Lake Cullulleraine (in for the purposes of Hume to within the Riverland- Victoria), and works in the Carrs, Capitts and Bunberoo notifying supply Yarrawonga, Chowilla Floodplain Creek systems to provide evaporative and seepage water measures. Yarrawonga to hydrologic indicator savings. Weir pools can create unnatural inundation of Wakool and SA site under the MDBP, connected wetlands when the river is held artificially high. Murray Key Focus which includes the Lowering the weir pool can be used to return wetlands to a Area constraints Riverland Ramsar site more natural wetting/drying regime, while raising it can will provide and TLM Chowilla allow water to reach areas that would be difficult to water outcomes that are Floodplain and under most conditions. The strategy of raising and lowering complementary to Lindsay-Wallpolla the weirs should provide an environmental benefit this supply Islands icon sites. compared to an artificially constant weir pool level. measure.

28 2011 Snowy NSW The Snowy Scheme is Supply Amendments to licence in 2011 allow the This measure identifies Not directly linked Out-of-session 30/06/2024 Water Licence located in the NSW water recovered by RMIF to be held and called out. all southern connected to constraint 28/06/2017 Schedule 4 Snowy Mountains. Previously the release of the water was at the discretion of basin SDL resource measures, but (following BOC Amendments Snowy Hydro and was generally at times suited to Snowy units as affected units implementing the 50) to River Hydro’s commercial outcomes. The proposal intends to for the purposes of Hume to Murray provide a means to control the timing of RMIF water notifying supply Yarrawonga, Increased releases from the Snowy Scheme, allowing more flexibility to measures. Yarrawonga to Flows (RMIF) Wakool and SA

11

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

Call Out achieve environmental outcomes targeted in the River Murray Key Focus Provisions Murray below Hume Dam. Area constraints proposals will provide outcomes that are complementary to this supply measure.

29 Menindee NSW The Supply This project is a package of operational changes and This measure identifies The measure Out-of-session 30/06/2024 Lakes Water system are key infrastructure works designed to improve the efficiency of all southern connected includes the 28/06/2017 Savings Project storages in the Lower the Menindee Lakes system. The enhanced Menindee basin SDL resource concept proposal (following BOC (including Darling system, project introduces some new works and measures to units as affected units for the Lower 50) consideration supplying towns and incorporate a wider range of infrastructure, operations, for the purposes of Darling constraints of constraints irrigation along the regulatory and adjustment options which in combination will notifying supply area. This will BOC 52 in the Lower Murray and Lower deliver greater water efficiency savings. The proponent measures. complement the 21/09/2017 Darling key Darling rivers. acknowledges the need for consultation with communities implementation of focus area) The Lower Darling and the need to set out transparent governance the three Murray BOC 57 River System is located arrangements. constraints concept 1/12/2017 in southwestern NSW, As part of the Menindee Lakes Water Savings Project the proposals for the extending along the Lower Darling key focus area investigates opportunities to River Murray (see from the address physical and policy constraints to the delivery of separate supply Menindee lakes higher regulated flows (up to 14,000 ML/day at Weir 32). measure storages to the Investigations will include the potential effects of higher notifications). upstream limit of the flows on third parties and mitigation options to address Wentworth Weir pool unacceptable impacts (including easements and/or near Burtundy. infrastructure) to allow the delivery of these flows (to support improved river and wetland health outcomes). Landholder acceptance of potential works will be critical. This project must be considered in relation to the other southern connected Basin constraints projects.

30 TLM NSW, Victoria KP Forest is located in Supply KP Forest is a highly significant floodplain ecosystem on the This measure identifies The Yarrawonga to Out-of-session 30/06/2024 environmental and SA the Riverina region of River Murray in NSW. The KP Forest is a large mosaic of river all southern connected Wakool Reach 28/06/2017 works and NSW, downstream of red gum, black box and grey box communities, interspersed basin SDL resource constraints (following BOC The works measures - Torrumbarry Weir on by wetland ecosystems in NSW. Covering 32,000 ha the units as affected units management 50) have been Koondrook- the NSW side of the state forest (Crown land) is managed by Forests NSW and is for the purposes of strategy, one of built and Perricoota (KP) River Murray. It listed on the Register of the National Estate. The structures notifying supply three integrated partially Forest Flood extends from the area have been built and partially commissioned by NSW Water measures. constraints commissioned Enhancement opposite the Victorian and MDBA River Murray Operations. measures for the by NSW Water proposal township of River Murray (see and MDBA Torrumbarry in the separate supply River Murray south to a few km measure Operations.

12

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

from Barham in the notifications for north. the Hume to Yarrawonga and River Murray in SA Constraints measure business cases), which aims to relax flow constraints in the Thule and Barbers Creeks systems to provide better outcomes for the KP icon site beyond those outlined in this supply measure.

31 Murray and NSW This supply measure Supply The proposal is for a suite of works across the national park This measure identifies Not directly linked Out-of-session 30/06/2024 Murrumbidgee proposal consists of estate in the Murray and Murrumbidgee valleys. It aims to all southern connected to constraint 28/06/2017 Valley National two elements, deliver more targeted environmental watering than basin SDL resource measures but (following BOC Parks SDL involving a package of achieved under benchmark conditions of development and units as affected units implementing the 50) Adjustment works and other benefit public land areas exceeding 70,000 ha. Benefits for the purposes of Murrumbidgee and Supply measures at point identified include improved native fish outcomes and a notifying supply Murray constraints BOC 51 Measure locations across two reduction in the frequency and level of flooding on private measures. management 29/08/2017 areas: a) Yanga land holdings and blackwater events. strategies (See (Murrumbidgee Valley separate supply National Park) near measure Balranald on the notifications) will Lower Murrumbidgee provide outcomes River; and b) Millewa that are forest (Murray Valley complementary to National Park) near this supply Deniliquin on the River measure proposal. Murray.

32 Enhanced NSW, Victoria EEWD involves Supply This project will achieve enhanced environmental outcomes This measure identifies EEWD is dependent BOC 52 30/06/2024 environmental and SA changes to the by increasing environmental water holders’ ability to time all southern connected on Constraints 21/09/2017 water delivery planning, delivery, site releases of environmental water from dams with increases basin SDL resource Management (EEWD) management and in natural flows caused by rainfall. Proponents and units as affected units Implementation: BOC 56 evaluation stages of environmental water holders will work together to explore for the purposes of Hume to 24/11/2017 environmental water opportunities to better mimic natural conditions without notifying supply Yarrawonga; management across impacting long and short term reliability. The environmental measures. The BOC 57

13

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

the southern benefits, in part, will be dependent on the extent to which identification of Yarrawonga to 1/12/2017 connected basin. The constraints projects are implemented. Any changes will be affected units does not Wakool Reach; proposal interacts tested progressively and monitored in an adaptive constitute an Goulburn; with the operation of management process consistent with agreed constraints agreement between Murrumbidgee; floodplain regulators, outcomes. Proponents acknowledge the need for focussed jurisdictions on Lower Darling; weirs, wetland engagement and consultation with communities on this apportioning the supply SA Murray. watering project. contribution. infrastructure, and barrages in Lake Alexandrina and Lake Albert.

33 New Goulburn Victoria The new Goulburn Constraints Investigation of opportunities to address in-channel This measure identifies Hume to Goulburn River 30/06/2024 constraints constraints measure constraints to the delivery of higher regulated flows up to all southern connected Yarrawonga key focus area measure2 encompasses the mid 20,000 ML/day at Shepparton. Allowing the delivery of flows basin SDL resource (Murray Stem; constraints-as- (replacing and lower sections of to the top of the bank would improve river health outcomes. units as affected units Victoria); supply Goulburn River the Goulburn River, This work will be done in a staged and bottom-up way with for the purposes of Yarrawonga to measure — key focus area extending from Lake communities to understand the risks, impacts and costs, and notifying supply Wakool (Murray withdrawn constraints-as- Eildon to the develop feasible, practical and acceptable solutions to measures. Stem; NSW) out-of-session supply connection with the mitigate third party impacts. Building on this work, in close 28/06/2017 measure) River Murray near consultation with landholders and communities, further (following BOC Echuca. improvements to environmental water delivery will also be 50) investigated. Landholder acceptance of potential works will be critical. This project must be considered in relation to the other southern connected Basin constraints projects.

34 Hume to Victoria and The River Murray and Constraints Investigation of opportunities to address physical and policy This measure identifies Yarrawonga to Out-of-session 30/06/2024 Yarrawonga NSW its floodplain, -as-supply constraints to the delivery of higher regulated flows (up to all southern connected Wakool (Murray 28/06/2017 key focus area between Hume Dam 40,000 ML/day from Hume Dam). Investigations will include basin SDL resource Stem; NSW); (following BOC and Yarrawonga. the potential effects of higher flows on third parties and units as affected units Goulburn 50) mitigation options to address unacceptable impacts for the purposes of (Victoria); (including easements and/or infrastructure) to allow the notifying supply Lower Murray (SA) delivery of these flows (to support improved river and measures. wetland health outcomes). Landholder acceptance of potential works will be critical. This project must be considered in relation to the other southern connected Basin constraints projects.

35 Murrumbidgee NSW The proposed Constraints Investigation of opportunities to address physical and policy This measure identifies This supply Out-of-session 30/06/2024 key focus area relaxation of flow -as-supply constraints to the delivery of higher regulated flows (up to all southern connected measure is for the 28/06/2017

2 New Goulburn constraints was not notified as a supply measure and has not been included in the SDL adjustment determination

14

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

constraints in the 40,000 ML/day at ). Investigations will include basin SDL resource Murrumbidgee (following BOC Murrumbidgee valley the potential effects of higher flows on third parties and units as affected units constraints 50) will result in increased mitigation options to address unacceptable impacts for the purposes of management flows at (including easements and/or infrastructure) to allow the notifying supply strategy and will BOC 51 environmentally delivery of these flows (to support improved river and measures. improve the ability 29/08/2017 beneficial times from wetland health outcomes). Landholder acceptance of to release water the major headworks potential works will be critical. This project must be from storages to storages (Burrinjuck considered in relation to the other southern connected create higher flows and Blowering Dams) Basin constraints projects. along the to the confluence of Murrumbidgee the Murrumbidgee River. and Murray Rivers below Balranald.

36 SA Murray key SA River Murray in SA, Constraints Investigation of opportunities to address physical and policy This measure identifies Hume to Out-of-session 30/06/2024 focus area from the SA border to -as-supply constraints to the delivery of higher regulated flows up to all southern connected Yarrawonga 28/06/2017 the Coorong, Lower 80,000 ML/day at the SA border. Higher flows are important basin SDL resource (Murray Stem; (following BOC Lakes and Murray for maintaining longitudinal connectivity from the border to units as affected units Victoria); 50) Mouth. the Coorong, Lower Lakes and Murray Mouth and promoting for the purposes of Yarrawonga to lateral connectivity to deliver water to the wetlands, notifying supply Wakool (Murray floodplains, creeks and anabranches connected to the main measures. Stem; NSW); river channel. Landholder acceptance of potential works will Murrumbidgee be critical. This project must be considered in relation to the (NSW); other southern connected Basin constraints projects. Goulburn (Victoria); Lower Darling (integrated into Menindee Lakes Water Savings Project, NSW).

37 Yarrawonga to Victoria and The Yarrawonga to Constraints Investigation of opportunities to address physical and policy This measure identifies This supply Out-of-session 30/06/2024 Wakool NSW Wakool Reach -as-supply constraints to enable the delivery of higher flows (up to all southern connected measure is for the 28/06/2017 junction key encompasses the mid- 30,000 ML/day downstream of Yarrawonga Weir, with a basin SDL resource Yarrawonga to (following BOC focus area Murray downstream buffer for flows up to 50,000 ML/day). NSW will consult units as affected units Wakool Reach 50) of Yarrawonga Weir to communities on mitigation options to address unacceptable for the purposes of constraints the Wakool junction impacts (including easements and/or infrastructure) to allow notifying supply management BOC 51 including the Edward, the delivery of these flows (to support improved river and measures. strategy, one of 29/08/2017 Wakool and Niemur wetland health outcomes). Landholder acceptance of three integrated Rivers. potential works will be critical. This project must be constraints considered in relation to the other southern connected measures for the Basin constraints projects. River Murray (see separate supply

15

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

measure notifications for the Hume to Yarrawonga and SA Murray constraints measure business cases).

38 On Farm Cwlth of This notification Efficiency The on farm irrigation and other water use efficiencies ACT (SS1); Victorian Relevant focus 30/06/2024 Irrigation Australia outlines the set of measures include works that could be undertaken on farm Murray (SS2); Kiewa areas from Efficiency and funding works that can be and/or off farm with the participation of consumptive water (SS3); Ovens (SS4); Constraints Other Water categorised as an users. Broken (SS5); Goulburn Management Use Cwlth or Basin efficiency measure The aim of these works is to decrease the quantity of water (SS6); Campaspe (SS7); Strategy: Efficiencies State through ‘on farm required for one or more consumptive uses in a set of Loddon (SS8); Hume to undertaking irrigation efficiency surface water SDL resource units, compared with the Wimmera-Mallee (SS9); Yarrawonga (Upper and other water use quantity required under the benchmark conditions of SA Non-Prescribed Murray); efficiencies’ development. Areas (SS10); SA Below Yarrawonga The water savings from these efficiency works can then be Murray (SS11); Marne- to Wakool Junction transferred to the Cwlth, forming part of the Cwlth Saunders (SS12); (Mid-Murray); environmental water holdings. Eastern Mount Lofty Goulburn; Ranges (SS13); NSW Murrumbidgee; Murray (SS14); Lower Darling; Murrumbidgee (SS15); Gwydir; Lachlan (SS16); SA Lower Murray. Intersecting Streams (SS17); Lower Darling (SS18); Barwon-Darling Watercourse (SS19); Macquarie-Castlereagh (SS20); Namoi (SS21); Gwydir (SS22); NSW Border Rivers (SS23); Queensland Border Rivers (SS24); Moonie (SS25); Condamine- Balonne (SS26); Nebine (SS27); Warrego (SS28); Paroo (SS29)

39 Urban or Cwlth of This notification Efficiency These efficiency measures consist of works that may be ACT (SS1); Victorian Relevant focus 30/06/2024 Industrial and Australia outlines the set of undertaken in urban or industrial and mining areas with the Murray (SS2); Kiewa areas from Mining areas funding works that can be participation of consumptive water users. (SS3); Ovens (SS4); Constraints categorised as an Broken (SS5); Goulburn

16

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Murray-Darling Basin Authority

Measure Proponent Geographic location Type of Details of the measure Surface water SDL Relevant Notification Date the measure resource units affected constraint amendment measure by the measure measures approval entered or will enter operation

water Cwlth or Basin efficiency measure The aim of these works is to decrease the quantity of water (SS6); Campaspe (SS7); Management efficiency State through ‘urban or required for one or more consumptive uses in a set of Loddon (SS8); Strategy: undertaking industrial and mining surface water SDL resource units, compared with the Wimmera-Mallee (SS9); Hume to areas water efficiency’ quantity required under the benchmark conditions of SA Non-Prescribed Yarrawonga (Upper development. Areas (SS10); SA Murray); The water savings from these efficiency works can then be Murray (SS11); Marne- Below Yarrawonga transferred to the Cwlth, forming part of the Cwlth Saunders (SS12); to Wakool Junction environmental water holdings. Eastern Mount Lofty (Mid-Murray); Ranges (SS13); NSW Goulburn; Murray (SS14); Murrumbidgee; Murrumbidgee (SS15); Lower Darling Lachlan (SS16); (integrated into Intersecting Streams Menindee Lakes (SS17); Lower Darling Water Savings (SS18); Barwon-Darling Project); Watercourse (SS19); Gwydir; Macquarie-Castlereagh SA Lower Murray. (SS20); Namoi (SS21); Gwydir (SS22); NSW Border Rivers (SS23); Queensland Border Rivers (SS24); Moonie (SS25); Condamine- Balonne (SS26); Nebine (SS27); Warrego (SS28); Paroo (SS29)

17

Office locations Adelaide, Albury-Wodonga, Canberra, Goondiwindi, Toowoomba Published 13/06/2019

mdba.gov.au 1800 230 067 [email protected] Table B – Efficiency entitlements and likely SDL adjustment for each surface water SDL resource unit (as at 31 March 2019)

A B C D E = C + D F G H = G ‐ E

long‐term long‐term annual average additional annual average current apportioned efficiency volume of reduced supply SDL adjustment Item surface water SDL resource unit1 efficiency volume of efficiency supply entitlements2 additional contribution7 amount8 3 efficiency contribution 6 entitlements efficiency contribution entitlements4 entitlements5

(GL) (GL) (GL/y) (GL/y) (GL/y) (GL/y) (GL/y) (GL/y) Queensland 1 Paroo (SS29) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2 Warrego (SS28) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3 Nebine (SS27) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 4 Condamine‐Balonne (SS26) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 5 Moonie (SS25) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6 Queensland Border Rivers (SS24) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Queensland ‐ ‐ ‐ ‐ ‐ ‐ 7 Intersecting Streams (SS17) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8 Barwon‐Darling Watercourse (SS19) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 9 NSW Border Rivers (SS23) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 10 Gwydir (SS22) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 11 Namoi (SS21) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 12 Macquarie‐Castlereagh (SS20) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 13 Lachlan (SS16) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 14 Murrumbidgee (SS15) ‐ ‐ ‐ ‐ ‐ 162.0 145.7 145.7 15 NSW Murray (SS14) ‐ ‐ ‐ ‐ ‐ 124.8 112.3 112.3 16 Lower Darling (SS18) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Total NSW ‐ ‐ ‐ 286.8 258.0 258.0 Victoria 17 Victorian Murray (SS2) ‐ ‐ ‐ ‐ ‐ 72.8 65.5 65.5 18 Kiewa (SS3) ‐ ‐ ‐ ‐ ‐ 1.3 1.2 1.2 19 Ovens (SS4) ‐ ‐ ‐ ‐ ‐ 3.0 2.7 2.7 20 Goulburn (SS6) ‐ ‐ ‐ ‐ ‐ 174.5 157.0 157.0 21 Broken (SS5) ‐ ‐ ‐ ‐ ‐ 1.1 1.0 1.0 22 Campaspe (SS7) ‐ ‐ ‐ ‐ ‐ 2.6 2.3 2.3 23 Loddon (SS8) ‐ ‐ ‐ ‐ ‐ 10.9 9.8 9.8 24 Wimmera‐Mallee (surface water) (SS9) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Victoria ‐ ‐ ‐ 266.2 239.5 239.5 South Australia 25 South Australian Murray (SS11) 1.4 ‐ 1.3 ‐ 1.3 52.0 46.8 45.5 26 South Australian Non‐Prescribed Areas (SS10) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 27 Eastern Mount Lofty Ranges (SS13) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 28 Marne‐Saunders (SS12) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Total South Australia 1.3 ‐ 1.3 52.0 46.8 45.5 Australian Capital Territory 29 ACT (surface water) (SS1) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Total ACT ‐ ‐ ‐ ‐ ‐ ‐

Basin 1.3 ‐ 1.3 605.0 544.3 543.0

Notes 1 SDL resource units with a column shown as '‐' contribute a zero volume. 2 efficiency entitlements – sum of face value of held environmental water entitlements transferred to Commonwealth Environmental Water Holder for efficiency measures. This does not include efficiency measures that are contracted and the entitlement is yet to be transferred. Efficiency measures are the notified measures that formed the initial adjustment proposed by the MDBA in 2017. Refer to Table A. 3 additional efficiency entitlements – sum of face value of held environmental water entitlements transferred to Commonwealth Environmental Water Holder for additional efficiency measures notified after the 2017 adjustment, as per s7.12(2) Basin Plan. This does not include additional efficiency measures that are contracted and the entitlement is yet to be transferred.

4 long‐term annual average volume of efficiency entitlements ‐ volumes as per s6A.02 (1) Basin Plan Schedule 6A. This is the long term annual average and not the face value of efficiency entitlements. This volume increases when an efficiency measure results in a transfer of an entitlement that is registered as held environmental water and is owned by the Commonwealth Environmental Water Holder. Face value of efficiency entitlements are converted using the agreed long‐term diversion limit equivalent factors (LTDLE factors), v2.05 dated November 2011 agreed to by Ministerial Council or are consistent with accredited water resource plans. 5 long‐term annual average volume of additional efficiency entitlements ‐ volumes as per s6A.02 (1) Basin Plan Schedule 6A. This is the long term annual average and not the face value of efficiency entitlements. This volume increases when an efficiency measure results in a transfer of an entitlement that is registered as held environmental water and is owned by the Commonwealth Environmental Water Holder. Face value of efficiency entitlements are converted using the agreed long‐term diversion limit equivalent factors (LTDLE factors), v2.05 dated November 2011 agreed to by Ministerial Council or are consistent with accredited water resource plans. 6 apportioned supply contribution ‐ volumes as per s6A.02 (2) Basin Plan Schedule 6A.

7 reduced supply contribution ‐ The Basin Plan limits the net adjustment for supply and efficiency measures to SDLs to 5% of the Basin‐wide SDL, or 543 GL/y. Until efficiency measures results in entitlements being transferred to CEWH have at least a long term annual average volume of 62 GL/y, the full effect of the apportioned supply contribution (605 GL/y) is reduced and SDLs remain limited. The apportioned supply contribution is reduced proportionately across all surface water SDL resources with a supply contribution (Basin Plan Schedule 6A s6A.05(3)).

8 SDL adjustment amount ‐ is the combination of achieved long term annual average volume of efficiency entitlements and the reduced supply contribution. Overall, this volume has a maximum adjustment of +/‐ 543 GL/y. The SDL adjustment amount is currently added to the BDL and deductions are made for the local reduction amount and the shared reduction amount to determine the likely SDL (as set out in Basin Plan Schedule 2). The MDBA's web site provides more details about BDL (Table 1) and SDLs (Table 2) at https://www.mdba.gov.au/basin‐plan‐roll‐out/sustainable‐ diversion‐limits under More information.

31/05/2019 12:02 PM