STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. KASARGOD DISTRICT 1 ORCHA Bridge Thikkarippur 14/2011 Design Completed in Feb 2013 DD1 AD9 2 NELLIKKUNNU bridge Kasaragod 53/2012 Design Completed in Nov 2013 DD4 AD8 3 PADAMCODE bridge Uduma 66/2012 Design Completed in Jan 2014 DD1 AD2 4 BAKILAPADAVU Bridge Manjeswar 64/2013 Design Completed in Mar 2015 DD1 AD5 5 PAINIKKARA bridge 34/2015 Design Completed in Aug 2016 DD4 AD2

6 KANNAMKAI bridge Thrikkarippur 60/2014 Design Completed in Oct 2016 DD3 AD6

7 KOTTEKANNI Bridge Kasaragod 86/2013 Design Completed in Oct 2016 DD4 AD2

8 THOTTUKARA bridge Thrikkarippur 11/2011 Design Completed in Nov 2016 DD2 AD4 9 VIDYAGIRI Bridge 06/2015 Design completed in Dec 2016 DD4 AD5

10 VANHANGAD bridge Uduma 66/2014 Design Completed in Jan 2017 DD4 AD3 DD prepared. Awaiting feasibility report from 11 KALLAR Bridge Kanhangad 68/2012 DD3 AD9 CE(R&B) 12 ATHANADI bridge Uduma 68/2013 TGAD completed in Apr 2014. DD4 AD9

13 ARILKADAVU Bridge Thrikkarippur 43/2014 GAD completed in Sep 2015. Awaiting AS DD4 AD8

14 Bridge in UDUMA-MULLACHERI road Uduma 65/2014 GAD completed in Sep 2015. Awaiting AS DD1 AD4

15 PERUMBATTA Bridge Thikkarippur 76/2013 GAD completed in Jan 2016. Awaiting AS DD1 AD2

16 ODANKAL bridge 58/2015 TGAD under preparation DD4 AD8 17 PALLATHUMPARA bridge 61/2015 GAD completed in Sept2017. DD2 ABE10 Proposal Dwg completed in Mar 2013. Awaiting 18 KUTHUPULLU bridge Manjeswar 20/2013 DD2 ABE12 feasibility report from CE(R&B) Proposal Dwg completed in Dec 2013. 19 MUNIPADI bridge Manjeswar 88/2013 DD1 ABE12 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Nov 2016. 20 THUPPAKKAL Bridge 26/2016 DD4 ABE12 Awaiting feasibility report from CE(R&B) 21 ARAMANAPADY bridge 31/2016 GAD Put up DD4 AD9 22 POTHANKANDAM bridge 41/2016 Proposal under preparation DD1 ABE12

Awaiting reply for clarification sent to CE(R&B) 23 MUNAMBAM Udma 10/2015 DD1 ABE12 on 16.11.15 regarding shifting of alignment.

Proposal drawing completed in Feb 2015. 24 AYAMKADAVU Bridge Uduma 02/2015 DD3 ABE10 Awaiting feasibility & clarification 25 RAMANCHIRA Bridge 56/2017 TGD approved DD3 ABE10 26 KILTAKKAYAM Bridge 55/2017 TGD under preparation. DD3 ABE10 27 KALIKKADAVU Bridge 57/2017 Despatched on Dec 2017 DD3 ABE11 28 Bridge at KILIYALAM 52/2017 TGD UP DD3 ABE11 KANNUR DISTRICT

1 MAMBARAM Bridge(Revision) 4/2007 TGD despatched on july 2017. GD UP DD2 AD4

2 MANDAMCHERY Bridge 8/2012 Design Completed in Jan 2014 DD4 AD8 3 MANIYANKOLLY Bridge 11/2013 Design Completed in Apr 2015 DD1 AD1 4 MANIKKAL bridge Thaliparambu 19/2013 Design Completed in Nov 2015 DD1 AD7 Mattanoor- 5 ARENGAD bridge 14/2013 Design Completed in Mar 2016 DD2 AD1 peravoor 6 THUNDI (Thundiyil) Bridge Peravoor 12/2012 Design Completed in Jul 2016 DD4 AD6

7 KACHERIKADAVU bridge Peravoor 51/2012 DD Under preparation. DD3 ABE11

8 Kottakkeel Kadavu-Pattuvam bridge 46/2012 GAD completed in Feb 2013. Awaiting AS. DD4 AD6

9 KOOLIKKADAVU bridge Mattanoor 16/2013 GAD completed in Jul 2013. Awaiting AS. DD4 AD6

10 NUCHIYAD bridge (Revision) Irikkur 01/2014 GAD completed in Feb 2014. Awaiting AS. DD3 AD1 Page 1 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. 11 NANICHERKADAVU BRIDGE Azhikode 69/2013 GAD completed in Jul 2014. Awaiting AS. DD4 AD9

12 ALAKKATT bridge kaliissery 87/2013 GAD completed in Jan 2015. Awaiting AS. DD3 AD2

13 KOLANTHAKKADAVU bridge Irikkur 45/2014 GAD completed in Apr 2015. Awaiting AS. DD4 AD3

14 CHUNGAKUNNU bridge Peravoor 51/2014 DD Under preparation. DD3 ABE11

15 VALAYAMCHAL bridge 69/2014 GAD completed in Sep 2015. Awaiting AS. DD1 AD7

16 VANNATHIKKADAVU bridge 11/2015 GAD completed in Sep 2015. Awaiting AS. DD1 AD7

17 ALEX NAGAR-KANHILERI bridge 60/2015 GAD completed in Feb 2016. Awaiting AS. DD4 AD6

18 CHANOKUNDU bridge (Revision) 17/2013 GAD completed in Sept 2016. Awaiting AS. DD2 AD4

19 CHENGALYI bridge 3/2016 GAD completed in Nov 2016. Awaiting AS. DD3 AD7

20 CHOVVA Bridge 16/2016 Work completed. DD4 AD9

21 CHEKKUPALAM 06/2014 TGAD completed in Nov 2016. Awaiting AS. DD4 AD8

22 KUNDUCHIRA Bridge 10/2005 GAD completed in Dec 2016. Awaiting AS. DD3 AD7

23 MANKARA Bridge 38/3016 GAD completed in Dec 2016. Awaiting AS. DD3 AD7

24 ALAKKODE bridge (Revision) Irikkur 13/2013 Revised TGAD completed in Dec 2016. DD3 AD7

25 KARUVANCHAL Bridge (Revision) Irikkur 15/2013 GAD completed in Jan 2017. Awaiting AS. DD1 AD2

26 Puthur Bridge 02/2017 TGD completed in Feb 2017 DD3 AD7 27 VATTOLI Bridge Mattannur 21/2014 Revised TGAD completed in Mar 2017. DD3 AD6 TGAD completed in Mar 2017. Feasibility from 28 VADAVANTHOOR Bridge 17/2016 DD3 ABE11 EE received

29 CHOOLAKADAVU bridge Payyannur 05/2016 Revised TGD despatched on Oct 2017 DD3 ABE11

30 ODENTHODU bridge (Rev) Peravoor 52/2014 Revised TGAD completed in Apr 2017. DD2 AD6

31 THATTARI bridge Darmadom 26/2014 TGD completed in Apr 2017 DD1 AD1

Dilapidated condition of Pazhayangadi 32 28/2017 Rehabilitation report despatched DD3 AD7 Bridge(Repair &rehabitation)

33 MOOLAKEEL KADAVU Bridge Payyannur 26/2010 Revised TGD despatched on Dec 2017. DD1 ABE11

34 KALLACHERIKADAVU bridge Koothuparambu 67/2012 TGD completed on Aug 2017 DD3 ABE11

Proposal Dwg completed in Nov 2014. 35 PONNIYAM RANDAMKADAVU Bridge 54/2014 DD4 ABE11 Awaiting feasibility report from CE(R&B)

Proposal Dwg completed in May 2016. 36 MANNAMKUNDU KADAVU Bridge 10/2016 DD3 ABE11 Awaiting feasibility report from CE(R&B) Bridge across Kundoor puzha on 37 03/2017 Proposal despatched on Jan 2017 DD4 ABE11 Anapanthi-Angadikadavu road Awaiting reply of clarification sent to CE(R&B) 38 KALLIKANDY Bridge Koothuparambu 04/2017 DD2 ABE11 in Jan 2017 Awaiting reply of clarification regarding 39 KUNDOORPUZHA bridge Peravoor 20/2014 alignmentt plan, design data, soil report sent to DD1 ABE11 CE(R&B) in Mar 2014. Awaiting reply of clarification sent to CE(R&B) Bridge in St Jude Nattel road at 40 56/2014 in Oct 2014 regarding bore hole and design DD1 ABE11 Ayyankunnu data. Awaiting reply of clarification sent to CE(R&B) 41 MEENKUNNU NEERKADAVU bridge Azhikode 28/2015 in Jun 2015 regarding investigation report and DD2 ABE11 approved alignment plan.

Page 2 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. 42 Vengara ROB 37/2016 Clarification letter despatched DD4 ABE11

43 Thuruthy bridge(Revision) Design completed in Jan 2007. To be revised .

44 PULIMPLIKADAVU Bridge Dharmadam 71/2017 TGD UP DD3 ABE11

45 Bridge across NEDUVOT River 72/2017 TGD UP DD3 ABE11

46 THURUTHIMUKKU Bridge Kuthuparambu 74/2017 TGD UP DD3 ABE11

WAYANAD DISTRICT

1 POLLAMPARA Bridge 41/2012 Design Completed in Dec 2013 DD1 AD1 Design Completed in Aug 2014. Letter 2 THALIPPARAKKADAVU Bridge(Rev) 41/2013 mentioning revised concrete mix despatched DD1 AD2 on Apr.2017. 3 PANANTHARA Bridge 18/2015 Design Completed in Feb 2016 DD2 AD2 4 CHERUPUZHA Bridge 16/2015 Design Completed in Feb 2016 DD4 AD7 5 PATHIRI bridge (NH Dvn) 49/2014 Design Completed in Jan 2017 DD1 AD1 GAD completed in Dec 2014. Revised GAD to 6 MAMBILICHIKADAVU Bridge(Rev.) 80/2013 DD4 AD9 be prepared.. 7 VALLERY PARAKKADAVU Bridge 05/2014 GAD completed in Dec 2014. Awaiting AS. DD2 AD4

8 PULIKKATTUKADAVU Bridge 62/2017 TGD to be prepared DD3 ABE10

KOZHIKODE DISTRICT 1 ELENTHKADAVU bridge 22/2013 Design Completed in Aug 2014 DD3 AD4

2 KORAPUZHA Bridge in NH 17 (Bypass) 8/2014 Design Completed in Nov 2014 DD3 AD7 PURAKKATTIRI Bridge in NH 17 3 9/2014 Design Completed in Nov 2014 DD3 AD7 (Bypass) 4 CHEDIALAKKADAVU bridge 63/2012 Design Completed in Feb 2016 DD2 AD5

5 PALLIPADI bridge 26/2015 Design Completed in Dec 2016 DD1 AD5

6 MARAPPALAM Bridge 106/2013 Revised GAD &DD completed in Feb 2017. DD1 AD9 GAD completed in May 2014. Revised TGD 7 PUTHIYAPALAM Bridge 08/2013 DD3 ABE10 completed in Oct 2017 8 PATHAYAPARA Bridge 25/2013 GAD completed in Jul 2014. Awaiting AS. DD2 AD4

9 ULLOORKADAVU bridge 7/2006 GAD completed in Jun 2015. Awaiting AS. DD2 AD4

10 ERUDE Bridge 2/2014 GAD completed in Feb 2016. Awaiting AS. DD3 AD5 31(2)/20 11 Bridge across Neelithodu Work completed.. DD2 AD9 15 12 KURIKKALTHODIKA KADAVU bridge 43/2015 GAD completed in Mar 2016. Awaiting AS. DD1 AD1

13 Flyover at THONDAYAD (NH 17) 27/2015 Work completed. DD3 AD7 31(1)/20 14 Flyover at RAMANATTUKARA (NH17) Work completed. DD2 AD9 15 Draft GAD approved. Kept in abeyance till 15 Bridge at AZHEEKKAL KADAVU 08/2011 DD3 ABE11 further request for design GAD completed in May 2016. Detailed Dwg of 16 THONDAYAD Flyover 62/2015 DD3 AD7 sub structure despatched. TGD completed in Jul 2016. Awaiting feasibility 17 Bridge at NADUTHURUTHY 17/2015 DD4 AD6 report from CE(R&B) 18 Bridge at THORAYILKADAVU 21/2015 Revised GAD completed in Mar 2017. DD4 AD8

19 KOOLIMADU Bridge(rev) 15/2005 Revised TGAD completed in Mar 2017 DD4 AD9

20 AKALAPUZHA bridge (Rev.) 15/2015 Revised GAD completed in Apr 2017 DD3 ABE11

21 CHEMPUKKADAVU bridge(rev.) 40/2013 Revised GAD despatched on Apr 2017 DD4 AD9 Page 3 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. GAD completed in May 2017.DD under 22 THOTTUMUKKOM bridge 31/2013 DD3 ABE10 preparation. 23 KORAPUZHA bridge (Reconstruction) 59/2015 TGAD completed in May 2017 DD3 AD7 GAD completed in Nov 2013. Revised TGD 24 THONDILAKADAVU bridge(Rev) 60/2013 despatched on July 2017.Further clarification DD4 AD8 letter despatched. 25 PADANILAM bridge 59/2013 TGD completed in Dec 2017. DD3 ABE10 Proposal Dwg completed in Mar 2013. Awaiting 26 KAKKAD KADAVU bridge 26/2013 DD3 ABE11 feasibility report from CE(R&B) Proposal Dwg completed in Jun 2013. Awaiting 27 MOONAMPUZHA Bridge 50/2013 DD3 ABE11 feasibility report from CE(R&B) Proposal Dwg completed in Jun 2013. 28 POOLAKKADAVU bridge 57/2013 DD3 ABE11 Feasibility from EE received. Proposal Dwg completed in Aug 2014. 29 MUKKATHKADAVU bridge 07/2014 DD3 ABE11 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Oct 2014. Awaiting 30 PARAKKADAVATHU bridge Perambra 58/2014 DD3 ABE11 feasibility report from CE(R&B) Proposal Dwg completed in Mar 2015. Awaiting 31 KOTTAKKADAVU Bridge 40/2014 DD3 ABE11 feasibility report from CE(R&B) Proposal Dwg completed in Sep 2015. 32 Bridge at OLAVANA PALLIKADAVU 29/2015 DD3 ABE11 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Jan 2016. Awaiting 33 NADUTHODU bridge Nadapuram 57/2015 DD3 ABE11 feasibility report from CE(R&B) Proposal Dwg completed in Jul 2016. Awaiting 34 PUZHAMBURAM bridge 36/2015 DD3 ABE11 feasibility report from CE(R&B) TGD to be prepared. Kept pending as no 35 PULIMOOTTIL Bridge 24/2016 DD3 ABE11 urgency reporetd by AEE 36 CHENAYIL KADAVU Bridge 17/2017 TGD completed in Oct 2017 DD3 ABE10 Grade separator Eranhipalam on NH 37 40/2016 TGD completed in Oct 2017 DD3 ABE10 766 Proposal to be prepared. Kept pending as no 38 OTTATHANNIPALAM Bridge 18/2017 DD3 ABE11 urgency reporetd by AEE 39 KARIKUTTY KADAVU Bridge 22/2017 Proposal drawing to be prepared. DD3 ABE11 Bridge at KOYAMBRATHKANDI Awaiting reply of clarification sent to CE(R&B) 40 14/2015 DD1 ABE11 KADAVU in Jun 2015. Awaiting reply of clarification sent to CE(R&B) 41 Bridge at PADERIKADAVU Kunnamangalam 20/2015 DD3 AD2 in Jun 2015. 42 NADERIKKADAVU bridge 48/2014 TGD to be prepared DD3 ABE10 43 THRIKUTTISERRY Bridge 42/2017 TGD completed in August 2017 DD3 ABE10

44 MUZHAPPALAM bridge 41/2017 TGD completed in Oct 2017. DD3 ABE10

45 Subways - 2 Nos NIT Calicut 58/2017 Draft TGD UP. DD3 ABE10

46 Poonoor Bridge 59/2017 TGD UP DD3 ABE10

47 Chavaramuzhi Bridge 70/2017 TGD to be prpared DD3 ABE10 MALAPPURAM DISTRICT 1 CHEERPUNGALTHODU Bridge Thirungadi 46/2010 Design Completed in Aug 2013 DD3 AD5

2 VADAPURAM bridge Nilambur 15/2012 Design Completed in Aug 2013 DD2 AD9

3 MELATTUR(Ucharakadavu) Bridge Perinthalmanna 7/2012 Design Completed in May 2014 DD2 AD3

Design Completed in Nov 2014.Design of the 4 THAZHEPALAM bridge Thirur 63/2013 DD3 AD4 retaining wall - RE wall recommended.

5 THALIYANKUNDU Bridge Wandoor 105/2013 Design completed in Dec 2014 DD1 AD3

6 CHEBRAPALLIYALIl bridge 55/2014 Design completed in Jan 2015 DD2 AD1

7 MAMPURAM Bridge Vengara/Thiruran 59/2012 Design Completed in Jan 2015 DD3 AD7 gadi 8 PATHIKUZHI bridge Kondotti 24/2012 Design Completed in Apr 2015 DD1 AD1 Page 4 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. 9 KOOTAPADI Bridge Nilambur 57/2012 Design completed in Sep 2015 DD4 AD7

10 MANNATHIKADAVU Bridge Perinthalmanna 92/2013 Design completed in Feb 2016 DD3 AD9

11 KOOJOOLIKADAVU Tirur 28/2011 Design Completed in Mar 2016 DD1 AD1

12 PERUMKADAVU bridge Eranadu 27/2012 Design completed in Apr 2016 DD2 AD4 PARAPPANANGADI- PALATHINGAL 13 Thirurangadi 89/2013 Revised GD UP DD4 ABE8 bridge 14 CHOTTUKADAVU Bridge Eranadu 43/2012 Design completed in Nov 2016 DD4 AD7

15 MANANTHALAKADAVU bridge Kondotti 38/2012 Design completed in Jan 2017 DD2 AD7

16 PUTHUR bridge Kottakkal 67/2014 Design completed in May 2017 DD2 AD6 17 ELAMARAM KADAVU bridger Kondotti 28/2012 GAD completed in Dec 2012. Awaiting AS. DD4 AD1 18 ARYANTHODIKA bridge Eranadu 44/2012 Revised GD under preparation DD2 AD5 19 MARATHINKADAVU bridge Nilambur 49/2012 GAD completed in Jun 2013. Awaiting AS. DD2 AD9

20 KALIKADAVU Bridge a/s Kadalundi river Vengara 83/2013 GAD completed in Oct 2013. Awaiting AS. DD2 AD9

21 KARIYANNUR bridge 79/2013 GAD completed in Jul 2014. Awaiting AS. DD2 AD4

22 Bridge at CHENDI Mangada 09/2015 GAD completed in Aug 2015. Awaiting AS. DD4 AD9

23 KAKKATHODU Bridge Wandoor 12/2008 GAD completed in Sep 2015. Awaiting AS. DD1 AD2

24 CHETHU PALAM bridge 50/2015 GAD completed in Jan 2016. Awaiting AS. DD1 AD4

25 PANNIKOTTUMUNDA bridge Malappuram 53/2014 GAD completed in Aug 2016. Awaiting AS. DD4 AD7

26 PANAMPALAM Bridge(Revision) 42/2009 GAD completed in Oct 2016. Awaiting AS. DD3 AD7

27 Bridge at BADHARPALLI 12/2015 GAD completed in Nov 2016. Awaiting AS. DD2 AD1

28 OLAMPAKADAVU bridge(Revision) Ponnani 17/2012 TGAD completed in Nov 2016. Awaiting AS. DD3 AD7

29 PARAPPANANGADI - NEW CUTT bridge 13/2015 GAD completed in Dec 2016. Awaiting AS. DD4 AD2

30 AALAM bridge(Revision) Ponnani 9/2012 Revised TGD Despatched in Dec 2016. DD1 AD1

31 KALIKADAVU bridge a/s Thootha river Perinthalmanna 84/2013 GAD completed in Jan 2017. DD1 AD1 32 Enathi Bridge 39/2016 TGD completed in Feb. 2017. DD2 AD4

33 POOKAITHAKADAVU Bridge (NH Dvn) 29/2013 GAD despatched in Mar 2017. DD2 AD5

34 ROB at TIRUR 45/2015 TGAD completed in Apr. 2017. DD4 AD9 35 PATTARKADAVU Bridge Malappuram 28/2014 GD approved. DD3 ABE8 36 Flyover at JASEELA JUNCTION Manjeri 90/2013 Awaiting clarification DD4 ABE8 Bridge at CHAMRAVATTOM (Karma 37 37/2017 TGD under preparation. DD1 AD9 road Bridges) Bridge across CANOLI canal (Karma 38 36/2017 GD completed DD3 AD7 road Bridges) 39 PERUMTHURUTHY KADAVU Bridge 10/2017 GAD completed July 2017 DD1 AD2 Proposal Dwg completed in Nov 2008. 40 THOOTHAPUZHA Bridge Perintalmanna 14/2008 DD3 ABE8 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Mar 2012. Awaiting 41 PUZHAKKATHARA Bridge Tirur 21/2008 DD4 ABE8 feasibility report from CE(R&B) Proposal Dwg completed in Jul 2013. Awaiting 42 MARANCHERI bridge Ponnani 14/2012 DD4 ABE8 feasibility report from CE(R&B) Proposal Dwg completed in Nov 2013. 43 Bridge acrossTHUVAKKADU thodu Malappuram 85/2013 DD1 ABE8 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Dec 2013. 44 AKUMBAR bridge Wandoor 93/2013 DD1 ABE8 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Dec 2013. 45 PARUTHIPPATTA-PERIYANGAD Bridge Wandoor 100/2013 DD2 ABE8 Awaiting feasibility report from CE(R&B)

Page 5 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. Proposal Dwg completed in Dec 2013. 46 IRUMBOTHINGAL KADAVU Bridge Vallikkunnu 91/2013 DD2 ABE8 Awaiting feasibility report from CE(R&B) KOOTTILATHARA - MANJUKADAVU Proposal Dwg completed in Jan 2014. Awaiting 47 Thirur 101/2013 DD1 ABE8 Bridge feasibility report from CE(R&B) Feasibility report received. GD under 48 AKKIPURAM bridge 39/2015 DD3 ABE8 preparation. Proposal Dwg completed in Jul 2016. Awaiting 49 CHOORIYODU bridge 13/2016 DD1 ABE8 feasibility report from CE(R&B) Proposal Dwg completed in Oct 2016. Awaiting 50 Bridge at THUPPANAD 14/2016 DD2 ABE8 feasibility report from CE(R&B) Awaiting reply of clarification sent to CE(R&B) 51 POORAPUZHA Bridge Thirurangadi 29/2011 in Jan 2012 regarding Approval from CRZ, DD4 ABE8 requirement of Bridge cum regulator.

Awaiting reply of clarification sent to CE(R&B) 52 MUDHIYAM BEACH Bridge Vallikunnu 48/2013 DD3 ABE8 in May 2013 regarding CRZ. Awaiting reply of clarification sent to CE(R&B) 53 PUTHIYAKADAPPURAM bridge Thirur 94/2013 in Nov 13, regarding vertical clearance, DD4 ABE8 capacity of friction piles, etc.

54 Mampadu Bridge Proposal under preparation ABE8

55 Nayar thodu Bridge 68/2017 Clarification letter sent on Nov 2017 ABE8 PALAKKAD DISTRICT 1 KOOLIYATTUKADAVU Bridge (Rev) 31/2010 Design Completed in Jun 2014 DD4 AD9

2 PALOLIKUNDU bridge 34/2014 Design Completed in Feb 2016 DD4 AD8

3 NJETTARAKKADAVU Bridge 49/2010 GAD completed in Jun 2013. Awaiting AS. DD3 AD5

4 Bridge b/w MAPPATTUKARA & ELADU 33/2014 GAD completed in Apr 2016. Awaiting AS. DD4 ABE9

5 Bridge at PALLIKADAVU 42/2015 GAD completed in Jul 2016. Awaiting AS. DD1 AD2

6 PUZHAKKALPADI Bridge (Revision) 48/2010 GAD completed in Dec 2016. Awaiting AS. DD1 ABE9

7 KANNANKUNDU KADAVU bridge(Rev) 62/2012 Revised TGD completed in May 2017 DD1 ABE9

Bridge across Mulanjoorthode in 8 25/2017 TGD Put Up. DD2 AD4 Palappuram-Kuthiravazhi road 9 Arangattukadavu Bridge 29/2017 TGDcompleted DD4 AD9 10 OOTTARA Bridge 32/2015 TGD completed.Aug 2017 DD3 AD3 11 CHULLIMAD Bridge 31/2017 Draft TGD put up. DD1 ABE9 Bridge at Kampa over Kalpathi River 12 50/2010 Revised GAD completed Nov 2017 DD3 ABE8 (Rev.) Proposal Dwg completed in Jul 2012. Awaiting 13 MENONPARA bridge 25/2012 DD4 ABE9 feasibility report from CE(R&B) Proposal Dwg completed in Sep 2015. 14 CHETTIKKAD - AMBZHAKODE Bridge 22/2015 DD4 ABE9 Awaiting feasibility report from CE(R&B)

15 NJAVALKKADU Bridge Draft TGD put up. ABE8

THRISSUR DISTRICT 1 KOLANGATTUKARA Bridge 12/2014 Design Completed in Aug 2014 DD1 AD1 2 KACHERIKADAVU Bridge 55/2010 Design Completed in Oct 2016 DD4 AD9 3 Bridge at AZHIKKODE-MUNAMBAM 13/2009 Revised TGD under preparation DD3 AD9 4 BRIDGE - II 10/2011 GAD completed in Apr 2014. Awaiting AS. DD3 AD7 5 Bridge at PERUMPUZHA 09/2011 GAD completed in Aug 2014. Awaiting AS. DD3 AD3 6 SREEDHARIPALAM Bridge 16/2014 Revised TGAD completed in Mar 2017. DD3 AD7 7 KADAMTHODU Bridge 14/2014 GAD completed in Dec 2014. Awaiting AS. DD3 AD4 8 CHALAPADAM - KOOTTALA Bridge 13/2014 GAD completed in Dec 2014. Awaiting AS. DD4 AD8

Page 6 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. 9 CHAKKALAKADAVU 107/2013 GAD completed in Jan 2015. Awaiting AS. DD4 AD6 10 ARAPPA bridge 63/2014 GAD completed in Apr 2015. Awaiting AS. DD1 AD9 11 PARANOOR - KURITHICHAL Bridge 15/2014 GAD completed in Jun 2015. Awaiting AS. DD1 AD1 12 CHOTTILAPARA - VETTUKAVU Bridge 17/2014 GAD completed in Oct 2015. Awaiting AS. DD2 AD5 13 KARIMKULAMKADAVU bridge 68/2014 GAD completed in Jan 2016. Awaiting AS. DD2 AD5 14 PULAKKATTUKARA bridge 62/2014 GAD completed in Feb 2016. Awaiting AS. DD1 AD1

15 Bridge across MANALIPUZHA in PEECHI 18/2014 TGAD completed in Jun 2016. Awaiting AS. DD3 AD9

16 PUZHAKKAL 2nd bridge 29/2016 GAD completed in Dec 2016. DD1 AD9 17 PUZHAKKAL 1st bridge 30/2016 GAD completed in Dec 2016. Awaiting AS. DD1 AD9 18 KETCHERY bridge 27/2016 GAD completed in Dec 2016. Awaiting AS. DD2 AD9 19 GOTHURUTH - PULLUT Bridge 59/2014 GAD completed in Jan 2017. Awaiting AS. DD4 AD8

Revised TGAD completed in Apr 2017. 20 EDATHARAKAVU KADAVU bridge 61/2014 DD3 ABE11 Awaiting AS.

21 CHOONDAL para bridge 28/2016 TGAD completed in Mar 2017. DD3 AD6 22 Parallel bridge to PULLUT BRIDGE 64/2014 Revised TGAD completed in Mar 2017. DD3 AD7 KONDAZHY - KUTHAMPULLY Bridge 23 24/2011 TGD completed DD3 AD9 (Revision) Proposal Dwg completed in Apr 2014. Awaiting 24 PALAKKADAVU Bridge 19/2014 DD4 AD9 feasibility report from CE(R&B) Proposal Dwg completed in Apr 2016. Awaiting 25 CHAKKARAPADAM bridge 08/2016 DD2 AD9 feasibility report from CE(R&B) Proposal Dwg. completed in Aug 26 UPPUMTHURUTHY bridge 56/2015 DD1 AD9 2016.Awaiting feasibility report from CE(R&B)

Proposal Dwg. completed in Dec 27 Parallel bridge at KANDASAMKADAVU 09/2016 DD4 AD9 2016.Awaiting feasibility report from CE(R&B)

28 ARANGALI KADAVU bridge 53/2015 TGD UP DD3 AD9

29 THRIPRAYAR Bridge 54/2017 Draft TGDPut UP DD1 AD9

30 PARAYANKADAVU Bridge 60/2017 TGD Completed DD1 AD9

ERNAKULAM DISTRICT

1 NEERICODE bridge 30/2012 Design Completed on May 2013 DD2 AD5

2 KORANKADAVU Bridge 26/2011 Design Completed on Jun 2013 DD4 AD9

3 NETTOOR-KUNDANNUR Bridge 10/2012 Design Completed on Jun 2013 DD4 AD4

4 THADIKKAKADAVU Bridge Kalamasseri 04/2012 Design Completed on Aug 2013 DD3 AD5

5 KOTHAITHODU Bridge 21/2010 Design completed on Dec 2014 DD2 AD5

6 ALUNGALKADAVU bridge 35/2012 Design completed on Jan 2016 DD4 AD8

7 VALLUVALLY-THATHAPILLY bridge 47/2012 Design completed on Apr 2016 DD4 AD8

Reminder 3 dtd 11.04.14.,CS, position of bore 8 New bridge across PANAMKUTTY river 2/2010 DD3 AD5 hole, allignment plan etc missing Perumbalam-Mukathurkari Ferry - Work held up as per EE's letter.Work 9 03/2011 DD3 AD6 Vattavayalthuruthu bridge Outsourced. 10 KANNEGATTU - WILLINGTONISLAND 11/2012 Work outsourced DD2 AD3 Bridge across Kumbalom kayal 11 Foot Bridge at ALUVA MANAPPURAM 25/2014 Design Tender.Work Outsourced. DD3 AD5

8 NEDUNGAD NAYARAMBALAM 03/2002 Design completed on Nov 2016 DD3 ABE11

9 KEEZHMURIKADAVU Bridge(Rev.) 99/2013 Revised Design completed on May 2017. DD2 AD5 CHERANALLUR-ELOOR CHOWKA DD dwg. split up into two.2/2(a)&2/2(b). 2/2(a) 10 02/2016 DD1 AD1 bridge completed in Mar 2017.

Page 7 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. 11 KARIPUZHA Bridge 34/2012 GAD completed in Aug 2012. Awaiting AS. DD1 AD1 12 KURUVAPALLAM bridge 36/2012 GAD completed in Aug 2012. Awaiting AS. DD2 AD9 13 KALATHILKADAVU bridge 31/2012 GAD completed in Aug 2012. Awaiting AS. DD4 AD8 14 AIYROOR bridge 56/2012 GAD completed in Dec 2012. Awaiting AS. DD1 AD2 15 EXCISEKADAVU bridge (MVPA) 54/2013 GAD completed in Dec 2013. Awaiting AS. DD3 AD1 16 KOOVALLUR bridge 30/2015 GAD completed in Sep 2015. Awaiting AS. DD4 AD4 17 KUMBALANGI Bridge (Revision) 30/2010 Revised GD despatched DD2 AD4 KUTHIATHODU-KUNDOOR 18 33/2012 Revised GD completed Aug 2017 DD3 AD6 Bridge(Revision) Design Completed in Feby 2012. Revised 19 CONVENT BEACH Bridge 24/2010 DD3 ABE11 TGAD despatched Aug 2017 20 MANJERIKUZHY Bridge 15/2016 TGAD despatched Aug 2017 DD3 AD6 Proposal Dwg completed in Nov 2006. 21 RAMANCHIRA Bridge 08/2006 DD4 AD6 Awaiting feasibility report from CE(R&B) Bridge b/w POOTHOTTA & Proposal Dwg completed in Feb 2011. Awaiting 22 01/2011 DD1 AD6 VATTAVAYALTHURUTHU feasibility report from CE(R&B) Proposal Dwg completed in Jun 2012. Awaiting 23 VALLIKKADA Bridge 19/2012 DD4 AD6 feasibility report from CE(R&B) Proposal Dwg completed in Jul 2012. Awaiting 24 THALIKKATUKADAVU bridge 21/2012 DD3 AD6 feasibility report from CE(R&B) Proposal Dwg completed in Mar 2013. Awaiting 25 Bridge at KETTEZHUTHU KADAVU 28/2013 DD1 AD6 feasibility report from CE(R&B) 26 VADUTHALA - PERANDOOR Bridge 23/2014 TGD under preparation. DD4 AD6 Proposal Dwg completed in May 2014. 27 ALUPURAM - KAYATHINKARA Bridge 27/2014 DD4 AD6 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in July 2014. Awaiting 28 PUTHUSSERITHAZHAM Bridge 32/2014 DD2 AD6 feasibility report from CE(R&B) Proposal Dwg completed in Aug 2014. 29 MOOZHIKADAVU Bridge 30/2014 DD4 AD6 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Oct 2015. Awaiting 30 MANGALYA KADAVU bridge 35/2015 DD1 AD6 feasibility report from CE(R&B) Foot bridge EAST MANJANKKAD TO Proposal Dwg completed in Nov 2015. 31 38/2015 DD4 AD6 MANJANKKAD Awaiting feasibility report from CE(R&B) Awaiting reply of clarification sent to CE(R&B) in Jun 2015 regarding possibility of 2 lane 32 MARADU-VALANTHAKADU bridge 24/2015 bridge. Lr from EE received to give 6m vertical DD2 AD4 clearance. Clarifications sought regardign alignment and curves Awaiting reply of clarification sent to CE(R&B) 33 New bridge across Panamkutty river 2/2010 in regarding position of borehole,alignment DD3 AD6 plan

New Bridge across Periyar river in Clarification regarding vertical clearance yet to 34 07/2016 DD2 AD6 Kalady be received.

35 THEVARA-KUMBALAM Bridge 53/2017 TGD mailed for estimate purpose. DD4 AD7 File received in Oct 2017. TGD under 36 NAYARAMBALAM-HERBERT Bridge 49/2017 DD2 AD6 preparation Culverts and retaining walls in the new 37 bye-pass road from Chitrappuzha- 61/2017 Fair TGD put up DD2 AD4 Mamala

387 CHENNAMANGALAM Bridge 67/2017 TGD UP DD2 AD6

IDUKKI DISTRICT

1 Rehabilitation of POOPARA bridge (NH) 04/2013 Design Completed in May 2013 DD3 AD9

2 KSRTC BRIDGE at Munnar(NH) 03/2013 Design Completed in Jan 2014 DD3 AD6

3 Reconstruction of KALLAR Bridge 22/2014 Design Completed in Mar 2016 DD2 AD7

Page 8 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. Bridge in ANGAMVETTY 4 38/2014 Fair DD Put Up DD2 AD5 MADAKKATHANAM road Awaiting reply of clarification sent to CE(R&B) 5 CHERUTHONI bridge 55/2015 DD3 AD6 regarding possibility of 2 lane bridge. Improvements to Udumbamchola 2nd Mile Road (Mangathotty, 40 acre, Tea AD6& 6 45/2017 TGD Despatched DD2 company,Chappath, & Deshiyam AD5 bridges) 7 ANAKKAYAM Bridge 48/2017 TGD Despatched DD2 AD6

8 ELLACKAL BRIDGE 73/2017 TGD UP DD2 AD4

9 VALLAKADAVU BRIDGE 73/2017 TGD UP DD2 AD4 KOTTAYAM DISTRICT 1 Bridge at GRAMINCHIRA 55/2012 Design Completed in Jul 2013 DD2 AD4

2 Bridge at PARACHAL 60/2012 Design Completed in Nov 2013 DD3 AD9

3 ERATTUPETTA bridge 23/2013 Design Completed in Mar 2014 DD1 AD2

4 THARAPPEL KADAVU Bridge 15/2010 Design Completed in Apr 2014 DD3 AD6 5 COMPANYKKADAVU Bridge 03/2013 Design Completed in Apr 2014 DD1 AD4

6 MUTTEDATHUKARIPALAM Bridge 20/2012 Design Completed in Nov 2014 DD2 AD5 MUNDAKKAYAM bypass - design of 7 42/2014 Stability check completed in Dec 2014 DD3 AD7 gravity retaining wall 8 MUNDOLIKKADAVU Bridge 61/2013 Design Completed in Mar 2015 DD1 AD2 Proof checking of RCC box type approach 9 36/2009 Proof checking Completed in Sep 2015 DD1 AD9 for KANJIRAM Bridge

10 KADUTHURUTHY Bridge 62/2010 Design Completed in Jul 2016 DD1 AD2 Bridge across THENPUZHA AT 11 18/2011 GAD completed in Jun 2012. Awaiting AS. DD1 AD2 PULLAKKAYAR 12 Bridge at PUNNAKKAL KADAVU 61/2012 GAD completed in Apr 2013. Awaiting AS. DD4 AD9 FLY OVER IN BYEPASS road connecting 13 29/2010 GAD completed in Mar 2014. Awaiting AS. DD2 AD4 Kanjirapally town 14 KOKKATTUKADAVU Bridge 50/2012 GAD completed in Apr 2015. Awaiting AS. DD1 AD3 GAD completed in Jun 2015. Revied TGD 15 AKKARAPPADAM bridge (Rev) 42/2013 DD4 AD8 despatched 16 VALAYIL KADAVU bridge(Revision) 06/2011 Revised GAD completed in Feb 2017. DD2 AD4

17 MOOLEKADAVU Bridge 03/2005 TGAD completed in May 2017. DD3 ABE11

18 CHERPUNKAL Bridge(revision) 28/2004 Revised GAD completed in Jun 2017. DD4 AD8

19 ANCHUMANA Bridge 16/2017. TGD despatched DD3 AD4

20 CHUVANNAPLAVU Bridge 27/2013 TGD despatched DD2 AD4

Proposal Dwg completed in May 2013. 21 MOOLAKKAYAM Bridge 52/2013 DD4 AD4 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Jan 2015. Awaiting 22 CHAZHUVELATHUKARY cartable bridge 01/2015 DD4 AD4 feasibility report from CE(R&B) Proposal Dwg completed in Aug 2016. 23 MATTATHILKADAVU Bridge 44/2014 DD2 AD6 Awaiting feasibility report from CE(R&B)

Awaiting reply of clarification sent to CE(R&B) in Mar 2013 regarding chainages of boreholes 24 ERATHUPUZHA Bridge 24/2013 DD3 AD4 &sides of the bridges, necessity of foot path,vertical clearance etc.

25 Ret. Wall RIVER VIEW ROAD extn. 51/2015 TGD completed. DD2 AD9

Bridge b/w Ch. 1/290 & 1/650 of Awaiting reply of clarification sent to CE(R&B) 26 46/2014 DD2 AD4 Parakkulam-Thrikkothamangalam road in Aug 2016 . Page 9 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. Retaining wall in Kottayam Kumarakom 27 32/2016 DD despatched DD2 ABE1 road ALAPPUZHA DISTRICT 1 MADANASSERIKADAVU bridge 06/2001 Design Completed in Apr 2013 DD1 AD2 2 VAISHAMBHAGAM bridge (revision) 20/2010 Design Completed in Jan 2014 DD4 AD4 3 MUTHALA KURICHIKKAL Bridge 38/2013 Design Completed in Mar 2016 DD1 AD7 4 MUNDAKKAL bridge 22/2011 Design Completed in Aug 2016 DD2 AD3 5 MAKKEKADAVU Bridge 56/2010 Outsourced DD2 AD5 6 VALIAZHEEKAL Bridge 24/2014 Outsourced DD3 AD7 Retaining Wall at Parakulam- Ennasserikadavu Thirikothamangalam- 7 File returned Aug 2014 Kadamuri-Chakkanchira-Toottachadu Road 5 AARATTUKADAVU Bridge 32/2011 GAD completed in Jul 2012. Awaiting AS. DD4 AD9 6 K.C BRIDGE upgradation 65/2012 GAD completed in Mar2013. Awaiting AS. DD4 AD6 7 IRANIKUDY BRIDGE 29/2014 GAD completed in Oct 2014. Awaiting AS. DD4 AD9

8 KOTHARATHODU BRIDGE at Pullangadi 50/2012 GAD completed in Jan 2016. Awaiting AS. DD1 AD3

9 VAKKAYIL bridge 82/2013 GAD completed in Feb 2016. Awaiting AS. DD4 AD7 10 VAZHUVADIKADAVU bridge (rev.) 13/2006 Request for revision received DD1 AD2 11 KODUMTHUR-MEPPALAM bridge Harippad 39/2014 TGD despatched on Aug 2017 DD3 AD8

12 KAVAALAM-THATTASSERY Bridge Kuttanad 11/2014 Revised TGD Approved. DD4 AD6

13 PADAHARAM bridge 33/2016 TGAD completed in Dec 2016. Awaiting AS. DD3 AD7

14 KAIPALAKKADAVU bridge 24/2011 GAD completed in Dec 2016. Awaiting AS. DD4 AD9

15 PUNNAMADA Bridge 17/2011 TGAD completed in Mar 2017. DD4 AD8

16 KOMMADY Bridge 07/2017 Revised TGD put up DD4 AD9 17 POWER HOUSE Bridge 06/2017 Revised TGD under preparation DD4 AD8

18 KORAMKUZHI Bridge 19/2011 TGAD completed in March 2017. DD4 AD8 Pathiyoor and Cheriya pathiyoor 19 24/2017 TGAD completed in Jun 2017. DD4 AD8 Bridge

20 Madathilkadavu Bridge Chennithala 35/2017 Request for revision received DD4 AD8

21 PALLATHURUTHY out post Bridge 34/2017 Draft TGD mailed for estimate purpose DD4 AD8 Proposal Dwg completed in Mar 2007. Awaiting 22 P. S. KADAVU Bridge 09/2006 DD1 AD8 feasibility report from CE(R&B) Cartable bridge across OLAVAIPU Proposal Dwg completed in Feb 2015. Awaiting 23 57/2014 DD2 AD8 KAYAL feasibility report from CE(R&B) Proposal Dwg completed in Jan 2016. Awaiting 24 AYYAPARAMBU Bridge Harippad 44/2015 DD4 AD8 feasibility report from CE(R&B) KAINAKARY PANCHAYATHU KADAVU Proposal Dwg completed in Jul 2016. Awaiting 25 06/2016 DD2 AD8 Bridge feasibility report from CE(R&B)

ROB at Level cross No 43A/E2 across Awaiting reply of clarification sent to CE(R&B) 26 04/2014 DD1 AD2 KANICHUKULANGARA Beach Road in Jan 2014 regarding GAD of railway portion

Cartable bridge across PANAVALLY Awaiting reply of clarification sent to CE(R&B) 27 41/2014 DD2 AD5 KAYAL IN ANJUTHURUTHU in Jul 2014 Awaiting reply of clarification sent to CE(R&B) KRISHNAPURAM VADAKKAN 28 07/2015 in Mar 2015 regarding foundation DD4 AD8 VELIYANAD bridge recommendation 29 Muttel Bridge 01/2017 Awaiting reply of clarification. DD1 AD1

30 Widening of GILLA Court Bridge 05/2017 Awaiting reply of clarification. DD3 AD7 31 Naluchira Bridge 43/2017 Draft drawing mailed for estimate purpose DD4 AD7 Page 10 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. 32 THYCHERYTHODU Bridge 47/2017 TGD under preparation DD4 AD7 33 NEDUMBARAKADU Bridge 50/2017 TGD Put Up. DD4 AD7 34 PARK Bridge 78/2017 File received on 11/12/2017 DD4 AD7 35 MARKET Bridge 76/2017 File received on 11/12/2017 DD4 AD7 36 KOYIKKALPADI Bridge 77/2017 File received on 11/12/2017 DD4 AD7 PATHANAMTHITTA DISTRICT 1 Bridge at KANAMALA 16/2009 Design Completed in Apr 2013 DD1 AD5 2 ANJILIMOOTTILKADAVU Bridge 48/2012 Design Completed in Feb 2016 DD3 AD5

3 Vadasserikkara Foot overbridge 17/2010 GAD completed in May 2012. Awaiting AS. DD4 AD1

4 VAYARAPPUZHA KADAVU Bridge 39/2009 Revised TGD Despatched. DD2 AD6

5 NEW KOZHENCHERY bridge 35/2014 GAD completed in Apr 2015. Awaiting AS. DD3 AD7

6 VADASSERIKKARA bridge 20/2016 GAD completed in Dec 2016. Awaiting AS. DD4 AD8

7 Bridge at Pandalam by-pass road 09/2017 TGD completed in Mar 2017 DD1 AD1 8 PARAKADAVU bridge 12/2016 TGD completed in Feb 2017 DD4 AD8 9 MUTHOOR-KUTHUR Bridge 11/2017 TGD completed in Mar 2017. DD2 AD4 10 RANNI VALIYA Bridge 08/2017 TGD completed in Mar 2017 DD3 AD7 11 KAVUM BHAGAM Bridge 12/2017 TGD completed in Mar 2017 DD4 AD8 12 ADOOR TOWN Bridge 13/2017 TGD completed in Mar 2017 DD2 13 CONCORD Bridge 52/2015 TGD despatched. DD1 AD1 Single lane bridge at Varambinakathu 14 35/2016 Proposal despatched DD1 AD1 Malikadavu 15 UPADESIKADAVU Bridge 34/2016 Proposal under preparation DD3 AD6

KOLLAM DISTRICT

1 KOORYKKUZHY bridge Kunnathur 16/2012 Design Completed in Jul 2013 DD3 AD6

2 EZHAVAPPALAM Bridge 46/2013 Design Completed in Nov 2013 DD3 AD7 3 Bridge at PALLIKKAMANNADI Chattannur 39/2010 Design Completed in Mar 2014 DD1 AD3 4 Bridge 44/2013 Design Completed in Mar 2014 DD2 AD6 Reconstruction of KANDANCHIRA 5 Kollam 69/2012 Design Completed in May 2014 DD2 AD2 CHEEP Bridge Bridge connecting ISLANDS IN 6 51/2010 LA issues -- dropped. Current status asked DD1 AD3

Awaiting reply of clarification sent to CE(R&B) 7 Bridge at MARAKKULAMKADAVU Chatthannur 01/2013 DD4 AD8 in Dec 2012 - Work outsourced

8 PARAPPAYAM Bridge (Rev) 9/2005 Design Completed in Jun 2015 DD4 AD1

PADAPPAKARA-KUTHIRAMUNAMPU- Kundara/Kunnath 9 64/2012 GAD completed in Jun 2014. Awaiting AS. DD3 AD4 MANAKKADAVU bridge ur

10 KALCHIRAPPALLY Bridge 59/2010 GAD completed in Jun 2011. Awaiting AS. DD3 ABE11 11 KOZHIPPALAM Bridge 66/2013 GAD completed in Aug 2015. Awaiting AS. DD1 AD2 12 KANNANKADU Bridge Kunnathur 75/2013 GAD completed in Sep 2013. Awaiting AS. DD3 AD1 13 ARAKKADAVU Bridge Kottarakkara 74/2013 Revised TGD completed in Mar 2017. DD2 AD5 14 KONNAYIL KADAVU Bridge(Revision) Kunnathur 57/2010 Revised GAD completed in Feb 2017. DD3 AD4 CHETTIYARAZHIKATHU KADAVU GAD completed in Jul 2013. Revised TGAD 15 Kottarakkara 39/2013 DD4 AD8 bridge (Rev) completed in Jun 2017. Proposal Dwg completed in Sep 2013. 16 KAKKATTUKADAVU Bridge Kunnathur 77/2013 DD4 AD8 Awaiting feasibility report from CE(R&B) Kunnathur/Karun Proposal Dwg completed in Jul 2013. Awaiting 17 CHELONGOTTU KULANGARA Bridge 73/2013 DD2 AD3 agappally feasibility report from CE(R&B)

Page 11 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No.

18 Bridge at ARULAPPANTHURUTHU 47/2014 TGD despatched. DD2 AD4

Proposal Dwg completed in Oct 2014. Awaiting 19 KACHIKADAVU bridge 37/2014 DD1 AD9 feasibility report from CE(R&B) Proposal Dwg completed in Jan 2016. Awaiting 20 Extension of LINK ROAD Kollam 07/2014 DD3 AD1 feasibility report from CE(R&B) Proposal Dwg completed in Nov 2015. 21 ELAVOOR bridge Kundara 49/2015 DD2 AD3 Awaiting feasibility report from CE(R&B) Awaiting reply of clarification sent to CE(R&B) 22 CHITTUMOOLA ROB 04/2016 reg railway consent,approved alignment,in Jan DD4 AD8 2016 Poof checking of the design completed in Sep 23 Construction of gabbion wall - NH744 18/2016 DD3 AD7 2016

Authenticated details not received, Clarification Extension of Asramam link road - Phase 24 Kollam 23/2016 reg consent from IWA, approved alignment DD4 AD7 4 extension upto Thoppilkadavu plan etc

25 Fathima island Mukkathukadavu bridge 30/2017 TGD Despatched DD4 AD7

26 PERUMON MANROETHURUTHU bridge 33/2017 Clarification sent- awaiting reply DD4 AD7

27 PONMANA bridge 32/2017 TGD under preparation DD4 AD7 28 Vettiyathode bridge 11/2008 TGD despatched on Oct 2017 DD4 ABE1

THIRUVANANTHAPURAM DIST. Bridge at KEEZHAPALOOR 1 Aruvikkara 43/2013 Design Completed in Apr 2013 DD4 AD7 PARANDODE - MEENANKAL road 2 Bridge at PANNIKKUZHI Aruvikkara 34/2013 Design Completed in May 2013 DD2 AD1

3 10TH MILE STONE Bridge at Karakulam. Nedumangadu 41/2010 Design Completed in Jun 2013 DD1 AD9

4 KEEZHAROORKADAVU bridge Kattakada 32/2012 Design Completed in Nov 2013 DD1 AD6 5 Bridge at ANIYILAKADAVU 5/2011 Design Completed in Feb 2014 DD4 AD8

6 Reconstruction of MOOLAYAM bridge Nedumangadu 7/2013 Design Completed in Feb 2014 DD1 AD2 Reconstruction of PUTHUKURICHY 7 58/2013 Revised TGD despatched. DD4 AD7 Bridge 8 PALLATHUKADAVU bridge 5/2012 Design Completed in Mar 2014 DD1 AD1 9 Reconstruction of PONNARA bridge 09/2013 Design Completed in Mar 2014 DD4 AD6 10 KOOVAKKUDI Bridge Aruvikkara 45/2013 Design Completed in Mar 2014 DD1 AD3 11 ROB at KAZHAKKUTTOM Kazhakkuttom 15/2009 Design Completed in May 2014 DD3 AD5

12 KANNIPURAM bridge Neyyattinkara 33/2013 Revised TGAD completed in Mar 2017. DD3 ABE2

13 ANAPPADU bridge 95/2013 Design Completed in Jun 2014 DD2 AD4

14 PONGUMOODU- PUNNAVOOR bridge Nemam LA 12/2011 Design Completed in Aug 2014 DD2 AD4

15 VENKODE bridge Parassala 05/2013 Revision request received. UP. DD4 ABE1

16 PANCHIKKATTUKADAVU bridge Neyyattinkara 06/2013 Design Completed in Dec 2014 DD2 AD4

Design Completed in Dec 2014.Awaiting reply 17 MULLARAVILA Bridge Neyyattinkara 38/2004 DD2 ABE1 of clarification sent to CE(R&B) for revision.

Ret Wall in NETTICHIRA-VELLANAD 18 01/2016 Proof checking completed in Feb 2016 DD4 AD4 road Construction of compound wall, RCC wall 19 22/2016 Design Completed in Oct 2016 DD2 AD5 etc. at Mannanthala Govt. Press 20 NEYYAR bridge Parassala 70/2013 Design Completed in May 2016 DD3 AD7 21 Bridge at PARUTHOOR 62/2013 Design Completed in Jul 2016 DD2 AD1 22 MYLOTTUMOOZHY bridge Aruvikkara 72/2013 Design Completed in May 2016 DD4 AD4 23 PONNAM CHUNDU bridge Aruvikkara 32/2013 DD completed in Jul 2016. DD3 AD6 Page 12 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No.

24 ROB at CHIRAYINKEEZHU Chirayinkeezhu 52/2010 GAD completed in Dec 2010. Awaiting AS. DD2 AD6 25 MOOTHALA bridge 18/2013 GAD completed in Mar 2013. Awaiting AS. DD4 AD6

26 THIRUVALLAM PANATHURA bridge 30/2013 GAD completed in Mar 2013. Awaiting AS. DD2 AD1

27 New bridge near MADHUPALAM 37/2013 GAD completed in Apr 2013. Awaiting AS. DD3 AD7

28 VALIKODE bridge Nedumangadu 52/2012 Revision request received. UP. DD4 ABE1

29 CHANGADAKADAVU bridge Parassala 29/2012 GAD completed in Jul 2013. Awaiting AS. DD4 AD7

30 KATTUMURACKAL bridge 67/2013 GAD completed in Jul 2013. Awaiting AS. DD3 AD1 Bridge at CHETTACHAL 31 Aruvikkara 49/2013 GAD completed in Aug 2013. Awaiting AS. DD2 AD1 SOORYAKANTHI 32 Bridge at THOTTATHINKADAVU Aruvikkara 47/2013 GAD completed in Aug 2013. Awaiting AS. DD1 AD2

33 PLAMPAZHINJI bridge Parassala 103/2013 GAD completed in Jun 2014. Awaiting AS. DD2 AD4

34 PUTHENTHOPPU bridge 10/2014 GAD completed in Dec 2014. Awaiting AS. DD3 AD2

35 Bridge at MUDAVANMUGHAL 51/2013 GAD completed in Jul 2015. Awaiting AS. DD4 AD6

36 CHITTAR Bridge 03/2015 GAD completed in Oct 2015. Awaiting AS. DD2 AD4

37 MANGOTTUMOOLA PERAKAM bridge 54/2015 TGAD completed in Dec 2015. Awaiting AS. DD2 AD9

Construction of Retaining wall at 38 42/2016. Design completed Mar 2017. DD1 AD1 Pulayanarkotta old age home. Bridge at ARUVIKKARA- 39 Aruvikkara 35/2013 GAD under Preparation. DD2 AD4 CHARICHALKADAVU 40 KUDUVEETTIL KADAVU bridge Parassala 21/2016 GAD completed in Oct 2016. Awaiting AS. DD3 AD7 CHERKKRAM bridge at Nagaroor-Karette 41 46/2015 Fair TGD put up DD1 ABE8 road

42 Improvements of Palode -Brimore road 21/2017. GAD completed in Jun 2017.. DD2 AD6

43 MURINJA PALAM Bridge(Rev) 13/2011 GD Despatched DD4 ABE1 Bridge at Amaravila- 44 19/2017 GAD despatched. DD3 AD7 Ottasekharamangalam road 45 Bridge across THETTIYARTHODU 39/2012 GAD under preparation DD4 AD9 46 KUMBICHAL KADAVU Bridge Parassala 15/2017. GD despatched in July 2017 DD3 AD6 47 KALLADI MUKHAM Bridge 04/2005. TGD despatched. DD1 AD1 48 Cherukayalkara Bridge 20/2017. GD & DD completed. DD2 AD4

KIIFB- Four laning at Vazhayila- 49 26/2017. TGD despatched. DD3 AD7 Pazhakutty-Kacherinada- 11 th stone

Proposal Dwg completed in Feb 2012. Awaiting 50 Bridge at THENNOOR Vamanapuram 2/2012 DD4 ABE1 feasibility report from CE(R&B) Proposal Dwg completed in Jan 2014. Awaiting 51 MEENMOODU Bridge Vamanapuram 96/2013 DD1 ABE1 feasibility report from CE(R&B) Bridge at CHERUPALODE- Proposal Dwg completed in Oct 2015. Awaiting 52 41/2015 DD2 ABE1 MENAMCODE VAZHAYILA Vattiyurkavu feasibility report from CE(R&B) Proposal Dwg completed in Nov 2015. 53 NAGAROOR bridge 33/2015 DD4 ABE1 Awaiting feasibility report from CE(R&B) Bidge at KOCHUPALAM in Kilimanoor- Proposal Dwg completed in Dec 2015. 54 40/2015 DD4 ABE1 Attingal road Awaiting feasibility report from CE(R&B)

Proposal Dwg completed in Jan 2016. Awaiting 55 New bridge in THIRUVALLAM EDAYAR 25/2015 DD4 ABE1 feasibility report from CE(R&B)

Awaiting reply of clarification sent to CE(R&B) Bridge b/w BEEMAPALLY- Thiruvananthapur 56 14/2009 in Apr 2009 regarding Design detais, DD2 ABE1 PARUTHIKUZHI (NH bypass) am allignment plan, etc. Awaiting reply of clarification sent to CE(R&B) 57 Bridge over KADINAMKULAM KAYAL 09/2010 DD1 ABE1 in Apr 2010 regarding bore holes. Page 13 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. Awaiting reply of clarification sent to CE(R&B) 58 POZHIYOOR Foot Bridge 34/2011 DD3 AD1 in Jan 2012. Awaiting reply of clarification sent to CE(R&B) 59 ROB at CITY ROAD, Karamana 12/2013 in Feb 2013 regarding alignment plan, DD4 ABE1 Borehole, chainages. Awaiting reply of clarification sent to CE(R&B) 60 KALLUPALAM bridge Kattakada 98/2013 DD4 ABE1 in Feb 2014 regarding HFL Awaiting reply of clarification sent to CE(R&B) 61 KEEZHARANOOR Bridge 19/2016 DD1 ABE1 in Jul 2016 regarding foot path.

VISL-Vizhinjam international terminal 62 07/2011 No Action DD2 ABE1 bridge on 2Km connectivity road

63 Re construction of Attipara Bridge 39/2012 Awaiting Feasibility report. ABE1

64 Retaining wall at Adupukuttanpara 39/2017 Tentative GD despatched in Oct 2017 DD4 ABE1

Flyover between Karakulam Jn & 65 Nedumangad 40/2017 GD despatched in Sept 2017 DD4 AD7 Keltron Jn Retaining wall at Medical College 66 51/2017 Under preparation DD4 AD7 Pangappara

67 Retaining wall at Govt. M.C Hostel 63/2017 GD despatched on Nov DD4 AD7

Proof Checking of Mangottukadavu 68 DD1 AD9 Steel Bridge

69 Pallathukadavu Bridge 31/2012 Revision request received DD4 ABE1

70 Anappadu Bridge 76/2013 Revision request received DD4 ABE1

Page 14 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No.

Asst. Engineers or Asst. Executive Enginees of the concerned work shall call the concerned Assistant Director (AD) / Deputy Director (DD) listed below through Landline No.: 0471-2322029 or email to jdhighways.pwd@.gov.in for clarifications or suggestions, if any, regarding the design of the above bridge works.

Assistant Directors Deputy Directors AD1 Smt. Femina P DD1 Smt. Anithakumari K AD2 Smt. Indu B DD2 ri. Suju P S AD3 AD2 (addl. charge) DD3 Smt. Divya J Satheesh AD4 Smt. Lekshmi P V DD4 Smt. Anu A Cherian AD5 Silpa C Sreedharan AD6 Smt. Suma R Nair TGAD Tentative General Arrangement Drawing AD7 Sri. Arun K V GAD General Arrangement Drawing AD8 Smt. Phoenix S S DD Detailed Design Drawing AD9 Sri. Sony J S D ABE8 Sri. Kannan P ABE1 Sri. Deepak P S ABE11 Sri Remil K ABE10 Sri Arun K S -Sd/- Saju S. Joint Director

Page 15