STATUS of BRIDGE DESIGN WORKS AS on 12.12.2017 Design Sl
Total Page:16
File Type:pdf, Size:1020Kb
STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. KASARGOD DISTRICT 1 ORCHA Bridge Thikkarippur 14/2011 Design Completed in Feb 2013 DD1 AD9 2 NELLIKKUNNU bridge Kasaragod 53/2012 Design Completed in Nov 2013 DD4 AD8 3 PADAMCODE bridge Uduma 66/2012 Design Completed in Jan 2014 DD1 AD2 4 BAKILAPADAVU Bridge Manjeswar 64/2013 Design Completed in Mar 2015 DD1 AD5 5 PAINIKKARA bridge 34/2015 Design Completed in Aug 2016 DD4 AD2 6 KANNAMKAI bridge Thrikkarippur 60/2014 Design Completed in Oct 2016 DD3 AD6 7 KOTTEKANNI Bridge Kasaragod 86/2013 Design Completed in Oct 2016 DD4 AD2 8 THOTTUKARA bridge Thrikkarippur 11/2011 Design Completed in Nov 2016 DD2 AD4 9 VIDYAGIRI Bridge 06/2015 Design completed in Dec 2016 DD4 AD5 10 VANHANGAD bridge Uduma 66/2014 Design Completed in Jan 2017 DD4 AD3 DD prepared. Awaiting feasibility report from 11 KALLAR Bridge Kanhangad 68/2012 DD3 AD9 CE(R&B) 12 ATHANADI bridge Uduma 68/2013 TGAD completed in Apr 2014. DD4 AD9 13 ARILKADAVU Bridge Thrikkarippur 43/2014 GAD completed in Sep 2015. Awaiting AS DD4 AD8 14 Bridge in UDUMA-MULLACHERI road Uduma 65/2014 GAD completed in Sep 2015. Awaiting AS DD1 AD4 15 PERUMBATTA Bridge Thikkarippur 76/2013 GAD completed in Jan 2016. Awaiting AS DD1 AD2 16 ODANKAL bridge 58/2015 TGAD under preparation DD4 AD8 17 PALLATHUMPARA bridge 61/2015 GAD completed in Sept2017. DD2 ABE10 Proposal Dwg completed in Mar 2013. Awaiting 18 KUTHUPULLU bridge Manjeswar 20/2013 DD2 ABE12 feasibility report from CE(R&B) Proposal Dwg completed in Dec 2013. 19 MUNIPADI bridge Manjeswar 88/2013 DD1 ABE12 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Nov 2016. 20 THUPPAKKAL Bridge 26/2016 DD4 ABE12 Awaiting feasibility report from CE(R&B) 21 ARAMANAPADY bridge 31/2016 GAD Put up DD4 AD9 22 POTHANKANDAM bridge 41/2016 Proposal under preparation DD1 ABE12 Awaiting reply for clarification sent to CE(R&B) 23 MUNAMBAM Udma 10/2015 DD1 ABE12 on 16.11.15 regarding shifting of alignment. Proposal drawing completed in Feb 2015. 24 AYAMKADAVU Bridge Uduma 02/2015 DD3 ABE10 Awaiting feasibility & clarification 25 RAMANCHIRA Bridge 56/2017 TGD approved DD3 ABE10 26 KILTAKKAYAM Bridge 55/2017 TGD under preparation. DD3 ABE10 27 KALIKKADAVU Bridge 57/2017 Despatched on Dec 2017 DD3 ABE11 28 Bridge at KILIYALAM 52/2017 TGD UP DD3 ABE11 KANNUR DISTRICT 1 MAMBARAM Bridge(Revision) 4/2007 TGD despatched on july 2017. GD UP DD2 AD4 2 MANDAMCHERY Bridge 8/2012 Design Completed in Jan 2014 DD4 AD8 3 MANIYANKOLLY Bridge 11/2013 Design Completed in Apr 2015 DD1 AD1 4 MANIKKAL bridge Thaliparambu 19/2013 Design Completed in Nov 2015 DD1 AD7 Mattanoor- 5 ARENGAD bridge 14/2013 Design Completed in Mar 2016 DD2 AD1 peravoor 6 THUNDI (Thundiyil) Bridge Peravoor 12/2012 Design Completed in Jul 2016 DD4 AD6 7 KACHERIKADAVU bridge Peravoor 51/2012 DD Under preparation. DD3 ABE11 8 Kottakkeel Kadavu-Pattuvam bridge 46/2012 GAD completed in Feb 2013. Awaiting AS. DD4 AD6 9 KOOLIKKADAVU bridge Mattanoor 16/2013 GAD completed in Jul 2013. Awaiting AS. DD4 AD6 10 NUCHIYAD bridge (Revision) Irikkur 01/2014 GAD completed in Feb 2014. Awaiting AS. DD3 AD1 Page 1 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. 11 NANICHERKADAVU BRIDGE Azhikode 69/2013 GAD completed in Jul 2014. Awaiting AS. DD4 AD9 12 ALAKKATT bridge kaliissery 87/2013 GAD completed in Jan 2015. Awaiting AS. DD3 AD2 13 KOLANTHAKKADAVU bridge Irikkur 45/2014 GAD completed in Apr 2015. Awaiting AS. DD4 AD3 14 CHUNGAKUNNU bridge Peravoor 51/2014 DD Under preparation. DD3 ABE11 15 VALAYAMCHAL bridge 69/2014 GAD completed in Sep 2015. Awaiting AS. DD1 AD7 16 VANNATHIKKADAVU bridge 11/2015 GAD completed in Sep 2015. Awaiting AS. DD1 AD7 17 ALEX NAGAR-KANHILERI bridge 60/2015 GAD completed in Feb 2016. Awaiting AS. DD4 AD6 18 CHANOKUNDU bridge (Revision) 17/2013 GAD completed in Sept 2016. Awaiting AS. DD2 AD4 19 CHENGALYI bridge 3/2016 GAD completed in Nov 2016. Awaiting AS. DD3 AD7 20 CHOVVA Bridge 16/2016 Work completed. DD4 AD9 21 CHEKKUPALAM 06/2014 TGAD completed in Nov 2016. Awaiting AS. DD4 AD8 22 KUNDUCHIRA Bridge 10/2005 GAD completed in Dec 2016. Awaiting AS. DD3 AD7 23 MANKARA Bridge 38/3016 GAD completed in Dec 2016. Awaiting AS. DD3 AD7 24 ALAKKODE bridge (Revision) Irikkur 13/2013 Revised TGAD completed in Dec 2016. DD3 AD7 25 KARUVANCHAL Bridge (Revision) Irikkur 15/2013 GAD completed in Jan 2017. Awaiting AS. DD1 AD2 26 Puthur Bridge 02/2017 TGD completed in Feb 2017 DD3 AD7 27 VATTOLI Bridge Mattannur 21/2014 Revised TGAD completed in Mar 2017. DD3 AD6 TGAD completed in Mar 2017. Feasibility from 28 VADAVANTHOOR Bridge 17/2016 DD3 ABE11 EE received 29 CHOOLAKADAVU bridge Payyannur 05/2016 Revised TGD despatched on Oct 2017 DD3 ABE11 30 ODENTHODU bridge (Rev) Peravoor 52/2014 Revised TGAD completed in Apr 2017. DD2 AD6 31 THATTARI bridge Darmadom 26/2014 TGD completed in Apr 2017 DD1 AD1 Dilapidated condition of Pazhayangadi 32 28/2017 Rehabilitation report despatched DD3 AD7 Bridge(Repair &rehabitation) 33 MOOLAKEEL KADAVU Bridge Payyannur 26/2010 Revised TGD despatched on Dec 2017. DD1 ABE11 34 KALLACHERIKADAVU bridge Koothuparambu 67/2012 TGD completed on Aug 2017 DD3 ABE11 Proposal Dwg completed in Nov 2014. 35 PONNIYAM RANDAMKADAVU Bridge 54/2014 DD4 ABE11 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in May 2016. 36 MANNAMKUNDU KADAVU Bridge 10/2016 DD3 ABE11 Awaiting feasibility report from CE(R&B) Bridge across Kundoor puzha on 37 03/2017 Proposal despatched on Jan 2017 DD4 ABE11 Anapanthi-Angadikadavu road Awaiting reply of clarification sent to CE(R&B) 38 KALLIKANDY Bridge Koothuparambu 04/2017 DD2 ABE11 in Jan 2017 Awaiting reply of clarification regarding 39 KUNDOORPUZHA bridge Peravoor 20/2014 alignmentt plan, design data, soil report sent to DD1 ABE11 CE(R&B) in Mar 2014. Awaiting reply of clarification sent to CE(R&B) Bridge in St Jude Nattel road at 40 56/2014 in Oct 2014 regarding bore hole and design DD1 ABE11 Ayyankunnu data. Awaiting reply of clarification sent to CE(R&B) 41 MEENKUNNU NEERKADAVU bridge Azhikode 28/2015 in Jun 2015 regarding investigation report and DD2 ABE11 approved alignment plan. Page 2 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. 42 Vengara ROB 37/2016 Clarification letter despatched DD4 ABE11 43 Thuruthy bridge(Revision) Design completed in Jan 2007. To be revised . 44 PULIMPLIKADAVU Bridge Dharmadam 71/2017 TGD UP DD3 ABE11 45 Bridge across NEDUVOT River 72/2017 TGD UP DD3 ABE11 46 THURUTHIMUKKU Bridge Kuthuparambu 74/2017 TGD UP DD3 ABE11 WAYANAD DISTRICT 1 POLLAMPARA Bridge 41/2012 Design Completed in Dec 2013 DD1 AD1 Design Completed in Aug 2014. Letter 2 THALIPPARAKKADAVU Bridge(Rev) 41/2013 mentioning revised concrete mix despatched DD1 AD2 on Apr.2017. 3 PANANTHARA Bridge 18/2015 Design Completed in Feb 2016 DD2 AD2 4 CHERUPUZHA Bridge 16/2015 Design Completed in Feb 2016 DD4 AD7 5 PATHIRI bridge (NH Dvn) 49/2014 Design Completed in Jan 2017 DD1 AD1 GAD completed in Dec 2014. Revised GAD to 6 MAMBILICHIKADAVU Bridge(Rev.) 80/2013 DD4 AD9 be prepared.. 7 VALLERY PARAKKADAVU Bridge 05/2014 GAD completed in Dec 2014. Awaiting AS. DD2 AD4 8 PULIKKATTUKADAVU Bridge 62/2017 TGD to be prepared DD3 ABE10 KOZHIKODE DISTRICT 1 ELENTHKADAVU bridge 22/2013 Design Completed in Aug 2014 DD3 AD4 2 KORAPUZHA Bridge in NH 17 (Bypass) 8/2014 Design Completed in Nov 2014 DD3 AD7 PURAKKATTIRI Bridge in NH 17 3 9/2014 Design Completed in Nov 2014 DD3 AD7 (Bypass) 4 CHEDIALAKKADAVU bridge 63/2012 Design Completed in Feb 2016 DD2 AD5 5 PALLIPADI bridge 26/2015 Design Completed in Dec 2016 DD1 AD5 6 MARAPPALAM Bridge 106/2013 Revised GAD &DD completed in Feb 2017. DD1 AD9 GAD completed in May 2014. Revised TGD 7 PUTHIYAPALAM Bridge 08/2013 DD3 ABE10 completed in Oct 2017 8 PATHAYAPARA Bridge 25/2013 GAD completed in Jul 2014. Awaiting AS. DD2 AD4 9 ULLOORKADAVU bridge 7/2006 GAD completed in Jun 2015. Awaiting AS. DD2 AD4 10 ERUDE Bridge 2/2014 GAD completed in Feb 2016. Awaiting AS. DD3 AD5 31(2)/20 11 Bridge across Neelithodu Work completed.. DD2 AD9 15 12 KURIKKALTHODIKA KADAVU bridge 43/2015 GAD completed in Mar 2016. Awaiting AS. DD1 AD1 13 Flyover at THONDAYAD (NH 17) 27/2015 Work completed. DD3 AD7 31(1)/20 14 Flyover at RAMANATTUKARA (NH17) Work completed. DD2 AD9 15 Draft GAD approved. Kept in abeyance till 15 Bridge at AZHEEKKAL KADAVU 08/2011 DD3 ABE11 further request for design GAD completed in May 2016. Detailed Dwg of 16 THONDAYAD Flyover 62/2015 DD3 AD7 sub structure despatched. TGD completed in Jul 2016. Awaiting feasibility 17 Bridge at NADUTHURUTHY 17/2015 DD4 AD6 report from CE(R&B) 18 Bridge at THORAYILKADAVU 21/2015 Revised GAD completed in Mar 2017. DD4 AD8 19 KOOLIMADU Bridge(rev) 15/2005 Revised TGAD completed in Mar 2017 DD4 AD9 20 AKALAPUZHA bridge (Rev.) 15/2015 Revised GAD completed in Apr 2017 DD3 ABE11 21 CHEMPUKKADAVU bridge(rev.) 40/2013 Revised GAD despatched on Apr 2017 DD4 AD9 Page 3 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl.