STATUS of BRIDGE DESIGN WORKS AS on 12.12.2017 Design Sl

STATUS of BRIDGE DESIGN WORKS AS on 12.12.2017 Design Sl

STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. KASARGOD DISTRICT 1 ORCHA Bridge Thikkarippur 14/2011 Design Completed in Feb 2013 DD1 AD9 2 NELLIKKUNNU bridge Kasaragod 53/2012 Design Completed in Nov 2013 DD4 AD8 3 PADAMCODE bridge Uduma 66/2012 Design Completed in Jan 2014 DD1 AD2 4 BAKILAPADAVU Bridge Manjeswar 64/2013 Design Completed in Mar 2015 DD1 AD5 5 PAINIKKARA bridge 34/2015 Design Completed in Aug 2016 DD4 AD2 6 KANNAMKAI bridge Thrikkarippur 60/2014 Design Completed in Oct 2016 DD3 AD6 7 KOTTEKANNI Bridge Kasaragod 86/2013 Design Completed in Oct 2016 DD4 AD2 8 THOTTUKARA bridge Thrikkarippur 11/2011 Design Completed in Nov 2016 DD2 AD4 9 VIDYAGIRI Bridge 06/2015 Design completed in Dec 2016 DD4 AD5 10 VANHANGAD bridge Uduma 66/2014 Design Completed in Jan 2017 DD4 AD3 DD prepared. Awaiting feasibility report from 11 KALLAR Bridge Kanhangad 68/2012 DD3 AD9 CE(R&B) 12 ATHANADI bridge Uduma 68/2013 TGAD completed in Apr 2014. DD4 AD9 13 ARILKADAVU Bridge Thrikkarippur 43/2014 GAD completed in Sep 2015. Awaiting AS DD4 AD8 14 Bridge in UDUMA-MULLACHERI road Uduma 65/2014 GAD completed in Sep 2015. Awaiting AS DD1 AD4 15 PERUMBATTA Bridge Thikkarippur 76/2013 GAD completed in Jan 2016. Awaiting AS DD1 AD2 16 ODANKAL bridge 58/2015 TGAD under preparation DD4 AD8 17 PALLATHUMPARA bridge 61/2015 GAD completed in Sept2017. DD2 ABE10 Proposal Dwg completed in Mar 2013. Awaiting 18 KUTHUPULLU bridge Manjeswar 20/2013 DD2 ABE12 feasibility report from CE(R&B) Proposal Dwg completed in Dec 2013. 19 MUNIPADI bridge Manjeswar 88/2013 DD1 ABE12 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Nov 2016. 20 THUPPAKKAL Bridge 26/2016 DD4 ABE12 Awaiting feasibility report from CE(R&B) 21 ARAMANAPADY bridge 31/2016 GAD Put up DD4 AD9 22 POTHANKANDAM bridge 41/2016 Proposal under preparation DD1 ABE12 Awaiting reply for clarification sent to CE(R&B) 23 MUNAMBAM Udma 10/2015 DD1 ABE12 on 16.11.15 regarding shifting of alignment. Proposal drawing completed in Feb 2015. 24 AYAMKADAVU Bridge Uduma 02/2015 DD3 ABE10 Awaiting feasibility & clarification 25 RAMANCHIRA Bridge 56/2017 TGD approved DD3 ABE10 26 KILTAKKAYAM Bridge 55/2017 TGD under preparation. DD3 ABE10 27 KALIKKADAVU Bridge 57/2017 Despatched on Dec 2017 DD3 ABE11 28 Bridge at KILIYALAM 52/2017 TGD UP DD3 ABE11 KANNUR DISTRICT 1 MAMBARAM Bridge(Revision) 4/2007 TGD despatched on july 2017. GD UP DD2 AD4 2 MANDAMCHERY Bridge 8/2012 Design Completed in Jan 2014 DD4 AD8 3 MANIYANKOLLY Bridge 11/2013 Design Completed in Apr 2015 DD1 AD1 4 MANIKKAL bridge Thaliparambu 19/2013 Design Completed in Nov 2015 DD1 AD7 Mattanoor- 5 ARENGAD bridge 14/2013 Design Completed in Mar 2016 DD2 AD1 peravoor 6 THUNDI (Thundiyil) Bridge Peravoor 12/2012 Design Completed in Jul 2016 DD4 AD6 7 KACHERIKADAVU bridge Peravoor 51/2012 DD Under preparation. DD3 ABE11 8 Kottakkeel Kadavu-Pattuvam bridge 46/2012 GAD completed in Feb 2013. Awaiting AS. DD4 AD6 9 KOOLIKKADAVU bridge Mattanoor 16/2013 GAD completed in Jul 2013. Awaiting AS. DD4 AD6 10 NUCHIYAD bridge (Revision) Irikkur 01/2014 GAD completed in Feb 2014. Awaiting AS. DD3 AD1 Page 1 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. 11 NANICHERKADAVU BRIDGE Azhikode 69/2013 GAD completed in Jul 2014. Awaiting AS. DD4 AD9 12 ALAKKATT bridge kaliissery 87/2013 GAD completed in Jan 2015. Awaiting AS. DD3 AD2 13 KOLANTHAKKADAVU bridge Irikkur 45/2014 GAD completed in Apr 2015. Awaiting AS. DD4 AD3 14 CHUNGAKUNNU bridge Peravoor 51/2014 DD Under preparation. DD3 ABE11 15 VALAYAMCHAL bridge 69/2014 GAD completed in Sep 2015. Awaiting AS. DD1 AD7 16 VANNATHIKKADAVU bridge 11/2015 GAD completed in Sep 2015. Awaiting AS. DD1 AD7 17 ALEX NAGAR-KANHILERI bridge 60/2015 GAD completed in Feb 2016. Awaiting AS. DD4 AD6 18 CHANOKUNDU bridge (Revision) 17/2013 GAD completed in Sept 2016. Awaiting AS. DD2 AD4 19 CHENGALYI bridge 3/2016 GAD completed in Nov 2016. Awaiting AS. DD3 AD7 20 CHOVVA Bridge 16/2016 Work completed. DD4 AD9 21 CHEKKUPALAM 06/2014 TGAD completed in Nov 2016. Awaiting AS. DD4 AD8 22 KUNDUCHIRA Bridge 10/2005 GAD completed in Dec 2016. Awaiting AS. DD3 AD7 23 MANKARA Bridge 38/3016 GAD completed in Dec 2016. Awaiting AS. DD3 AD7 24 ALAKKODE bridge (Revision) Irikkur 13/2013 Revised TGAD completed in Dec 2016. DD3 AD7 25 KARUVANCHAL Bridge (Revision) Irikkur 15/2013 GAD completed in Jan 2017. Awaiting AS. DD1 AD2 26 Puthur Bridge 02/2017 TGD completed in Feb 2017 DD3 AD7 27 VATTOLI Bridge Mattannur 21/2014 Revised TGAD completed in Mar 2017. DD3 AD6 TGAD completed in Mar 2017. Feasibility from 28 VADAVANTHOOR Bridge 17/2016 DD3 ABE11 EE received 29 CHOOLAKADAVU bridge Payyannur 05/2016 Revised TGD despatched on Oct 2017 DD3 ABE11 30 ODENTHODU bridge (Rev) Peravoor 52/2014 Revised TGAD completed in Apr 2017. DD2 AD6 31 THATTARI bridge Darmadom 26/2014 TGD completed in Apr 2017 DD1 AD1 Dilapidated condition of Pazhayangadi 32 28/2017 Rehabilitation report despatched DD3 AD7 Bridge(Repair &rehabitation) 33 MOOLAKEEL KADAVU Bridge Payyannur 26/2010 Revised TGD despatched on Dec 2017. DD1 ABE11 34 KALLACHERIKADAVU bridge Koothuparambu 67/2012 TGD completed on Aug 2017 DD3 ABE11 Proposal Dwg completed in Nov 2014. 35 PONNIYAM RANDAMKADAVU Bridge 54/2014 DD4 ABE11 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in May 2016. 36 MANNAMKUNDU KADAVU Bridge 10/2016 DD3 ABE11 Awaiting feasibility report from CE(R&B) Bridge across Kundoor puzha on 37 03/2017 Proposal despatched on Jan 2017 DD4 ABE11 Anapanthi-Angadikadavu road Awaiting reply of clarification sent to CE(R&B) 38 KALLIKANDY Bridge Koothuparambu 04/2017 DD2 ABE11 in Jan 2017 Awaiting reply of clarification regarding 39 KUNDOORPUZHA bridge Peravoor 20/2014 alignmentt plan, design data, soil report sent to DD1 ABE11 CE(R&B) in Mar 2014. Awaiting reply of clarification sent to CE(R&B) Bridge in St Jude Nattel road at 40 56/2014 in Oct 2014 regarding bore hole and design DD1 ABE11 Ayyankunnu data. Awaiting reply of clarification sent to CE(R&B) 41 MEENKUNNU NEERKADAVU bridge Azhikode 28/2015 in Jun 2015 regarding investigation report and DD2 ABE11 approved alignment plan. Page 2 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl. No Name of bridge Constituency Remarks/Status DD AD file No. 42 Vengara ROB 37/2016 Clarification letter despatched DD4 ABE11 43 Thuruthy bridge(Revision) Design completed in Jan 2007. To be revised . 44 PULIMPLIKADAVU Bridge Dharmadam 71/2017 TGD UP DD3 ABE11 45 Bridge across NEDUVOT River 72/2017 TGD UP DD3 ABE11 46 THURUTHIMUKKU Bridge Kuthuparambu 74/2017 TGD UP DD3 ABE11 WAYANAD DISTRICT 1 POLLAMPARA Bridge 41/2012 Design Completed in Dec 2013 DD1 AD1 Design Completed in Aug 2014. Letter 2 THALIPPARAKKADAVU Bridge(Rev) 41/2013 mentioning revised concrete mix despatched DD1 AD2 on Apr.2017. 3 PANANTHARA Bridge 18/2015 Design Completed in Feb 2016 DD2 AD2 4 CHERUPUZHA Bridge 16/2015 Design Completed in Feb 2016 DD4 AD7 5 PATHIRI bridge (NH Dvn) 49/2014 Design Completed in Jan 2017 DD1 AD1 GAD completed in Dec 2014. Revised GAD to 6 MAMBILICHIKADAVU Bridge(Rev.) 80/2013 DD4 AD9 be prepared.. 7 VALLERY PARAKKADAVU Bridge 05/2014 GAD completed in Dec 2014. Awaiting AS. DD2 AD4 8 PULIKKATTUKADAVU Bridge 62/2017 TGD to be prepared DD3 ABE10 KOZHIKODE DISTRICT 1 ELENTHKADAVU bridge 22/2013 Design Completed in Aug 2014 DD3 AD4 2 KORAPUZHA Bridge in NH 17 (Bypass) 8/2014 Design Completed in Nov 2014 DD3 AD7 PURAKKATTIRI Bridge in NH 17 3 9/2014 Design Completed in Nov 2014 DD3 AD7 (Bypass) 4 CHEDIALAKKADAVU bridge 63/2012 Design Completed in Feb 2016 DD2 AD5 5 PALLIPADI bridge 26/2015 Design Completed in Dec 2016 DD1 AD5 6 MARAPPALAM Bridge 106/2013 Revised GAD &DD completed in Feb 2017. DD1 AD9 GAD completed in May 2014. Revised TGD 7 PUTHIYAPALAM Bridge 08/2013 DD3 ABE10 completed in Oct 2017 8 PATHAYAPARA Bridge 25/2013 GAD completed in Jul 2014. Awaiting AS. DD2 AD4 9 ULLOORKADAVU bridge 7/2006 GAD completed in Jun 2015. Awaiting AS. DD2 AD4 10 ERUDE Bridge 2/2014 GAD completed in Feb 2016. Awaiting AS. DD3 AD5 31(2)/20 11 Bridge across Neelithodu Work completed.. DD2 AD9 15 12 KURIKKALTHODIKA KADAVU bridge 43/2015 GAD completed in Mar 2016. Awaiting AS. DD1 AD1 13 Flyover at THONDAYAD (NH 17) 27/2015 Work completed. DD3 AD7 31(1)/20 14 Flyover at RAMANATTUKARA (NH17) Work completed. DD2 AD9 15 Draft GAD approved. Kept in abeyance till 15 Bridge at AZHEEKKAL KADAVU 08/2011 DD3 ABE11 further request for design GAD completed in May 2016. Detailed Dwg of 16 THONDAYAD Flyover 62/2015 DD3 AD7 sub structure despatched. TGD completed in Jul 2016. Awaiting feasibility 17 Bridge at NADUTHURUTHY 17/2015 DD4 AD6 report from CE(R&B) 18 Bridge at THORAYILKADAVU 21/2015 Revised GAD completed in Mar 2017. DD4 AD8 19 KOOLIMADU Bridge(rev) 15/2005 Revised TGAD completed in Mar 2017 DD4 AD9 20 AKALAPUZHA bridge (Rev.) 15/2015 Revised GAD completed in Apr 2017 DD3 ABE11 21 CHEMPUKKADAVU bridge(rev.) 40/2013 Revised GAD despatched on Apr 2017 DD4 AD9 Page 3 STATUS OF BRIDGE DESIGN WORKS AS ON 12.12.2017 Design Sl.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us