Geoplex Drillteq Ltd Technical Proposal for Coiled Tubing and Pressure

Total Page:16

File Type:pdf, Size:1020Kb

Geoplex Drillteq Ltd Technical Proposal for Coiled Tubing and Pressure TECHNICAL PROPOSAL FOR COILED TUBING AND PRESSURE PUMPING SERVICES WELLBERG ENERGY SERVICES GEOPLEX DRILLTEQ LTD TECHNICAL PROPOSAL FOR COILED TUBING AND PRESSURE PUMPING SERVICES SUBMITTED TO WELLBERG ENERGY SERVICES JAN 2020 Geoplex Geoplex Drillteq Limited 8A Goriola Street, Off Adeola Odeku St. V.I. Lagos 2, Chief Nwuke Street Tel: (234-1) 873 6370, (234-1) 295 6151; Fax: (234-1) 269 3324 Trans Amadi Ind. Layout, Port Harcourt Nigeria E-mail:[email protected] Tel: (234-84)302 853, Fax: (234-84)238394 17th January , 2020. Wellberg Energy Services, Km 2 Eku-Osubi Road, Warri. Delta State, Nigeria Attention: Mr. Chinedu Dear Sir, TECHNICAL PROPOSAL FOR COILED TUBING AND PRESSURE PUMPING SERVICES We are pleased to submit our technical proposal for Coiled Tubing and Pressure Pumping Service as contained in the attached. Having considered the operations requirements and we are confident that Geoplex’s relatively new coiled tubing unit and pressure pumping spread can deliver to your client's expectation if deployed. We hope that this meets your expectations. Please let us know if you require some clarifications or additional information at your earliest convenience. Yours Faithfully, For: Geoplex Drillteq Limited Joshua Akanle Business Development [email protected] TECHNICAL PROPOSAL FOR COILED TUBING AND PRESSURE PUMPING SERVICES WELLBERG ENERGY SERVICES TABLE OF CONTENTS SECTION 1: DETAILS OF COILED TUBING TECHNICAL SPECIFICATION 4 SECTION 2: ADDITIONAL PICTURES OF COILD TUBING 36 SECTION 3: CERTIFICATE OF CONFORMANCE 47 SECTION 4: CERTIFICATE OF INSPECTION 61 SECTION 5: COILED TUBING WORK EXPERIENCE 65 SECTION 6: CURRICULUM VITAE OF KEY PERSONNEL 67 Geoplex Geoplex TECHNICAL PROPOSAL FOR COILED TUBING AND PRESSURE PUMPING SERVICES WELLBERG ENERGY SERVICES SECTION 1: DETAILS OF COILED TUBING TECHNICAL SPECIFICATION Geoplex Geoplex 1.0 INTRODUCTION This specification covers a ZONE II Four (4) Skids Mounted Coiled Tubing Unit with trailers which have the capability of working with 17,000 ft (5,180 m) of 1- 1/2″ diameter Coiled Tubing Strings . This Unit consist of the following assemblies/components: • One (1) Power Pack Assembly • One (1) Tubing Reel Assembly • One (1) Control Cabin Assembly • One (1) Injector/Stripper/BOP Transport Assembly • Two (2) Transport Trailer Assembly This unit is suitable for both offshore use in hazardous area and onshore requirements. This Coiled Tubing Unit is designed to meet the requirements of the potentially explosive hazardous areas often found in offshore applications. The diesel engine is suitable for use in 1 / 31 atmospheres classed as Zone II. The diesel engine is equipped with engine gas coolers to ensure that the diesel engine meets hazardous area requirements. The diesel engine also meet the most current offshore emissions requirements. To ensure that this CTU meets hazardous standard where required, the following are incorporated onto this CTU: • All Junction Boxes are as Zone II approved. • All measurement sensors are ZoneII approved and intrinsically safe (i.e. operate at such low voltage and current so as to meet Zone II). • Short circuit Zone II protection for all downstream powered sensor circuits are installed • All solenoid valve controls are ZoneII approved. • All connectors, glands, seals, and penetrations through any electrical box are sealed. • All the wiring is professionally installed and is properly marked and identified. This unit is fully unitized and completed and is suitable for operation ambient temperature ranges of - 10 Deg C to +55 Deg C (14 Deg F to +113 Deg F). The unit includes the following main components: ITEM QTY DESCRIPTION QUAD (4) and Tridem (3) Axle fixed gooseneck, Carrier 2 “single drop” trailer Power Transmission 1 Hydraulic Power Pack Diesel Engine 1 DDC S60 ATEX, rated 500 BHP @ 2,100 RPM Carrier 4 Heavy duty skid/protection frame ZoneIIControl Cabin with Pressure Purged Control System 1 Console, Local Controls Reel Assembly 1 LGGT 130-72-62 Hose Carriers and Hoses 3 Hose Reels c/w 131 feet (40 m) Hoses Cooling System 1 Vertical radiator with Mechanical Fan Drive Injector 1 Model ZRT-80K with 72 inch gooseneck Stripper Assembly 1 J&N 4.06″ Side Door Stripper Packer, 10,000 psi; Blow Out Preventer (BOP) 1 J&N 4.06″ Quad BOP, 10,000 psi Unitization and Completion 1 - Geoplex Data Acquisition Software 1 GDAS 2 / 31 Geoplex Simulation Analysis System 1 - 2.0 UNIT DIMENSIONS The physical dimensions and weights of the power pack skid are as follows: • Length: 4.8 m (15′ 9″) • Width: 2.6 m (8′ 6″) • Height: 2.6 m (8′ 6″) • Weight(withoutTractorandTubing): 9,500kg(20,900lbs) The physical dimensions and weights of the control cabin skid are as follows: • Length: 3.6 m (15′ 9″) • Width: 2.6 m (8′ 6″) • Height: 2.6 m (8′ 6″) • Weight(withoutTractorandTubing): 6,000kg(13,200lbs) The physical dimensions and weights of the tubing reel skid are as follows: • Length: 4.1 m (13′ 6″) • Width: 2.6 m (8′ 6″) • Height: 3.4 m (11′ 3″) • Weight(withoutTractorandTubing): 8,500kg(18,700lbs) The physical dimensions and weights of the injector/gooseneck skid are as follows: • Length: 3.94 m (12′ 11″) • Width: 2.6 m (8′ 6″) • Height: 3.4 m (11′ 3″) • Weight(withoutTractorandTubing): 9,000kg(19,800lbs) Trailer 1: Transporting Control Cabin Skid & Tubing Reel Skid & Injector Skid • Length (without Tractor ): 12.20 m (40′ 0″) • Width: 2.60 m (8′ 6″) • Height: 4.50 m (14′ 9″) • Weight(withoutTractorandTubing): 40,000kg(88,200lbs) Trailer 2: Transporting Power Pack Skid & BOP • Length (without Tractor): 12.20 m (40′ 0″) 3 / 31 • Width: 2.60 m (8′ 6″) • Height: 4.20 m (13′ 9″) • Weight(without Tractor): 35,000 kg (55,115 lbs) 3.0 CARRIER This is a Tridem, (three axles) fixed, single drop trailer used to transport the Control Cabin Skid & Tubing Reel Skid & Injector Skid and a double axles fixed, single drop trailer used to transport the Power Pack Skid & BOP with fifth wheel towing attachment for use with a suitable Tractor with the following features: • Heavy duty type with steel “I” section (outer) beam main rails and cross member construction. • Semi-elliptic leaf spring type suspension • Air brakes with parking brake (mounted above the axles) and WABCO (or equivalent) ABS system • 275/70 R22.5 radial tires • Two (2) hydraulic operated landing gears at the front of the trailer with locally mounted hand pump operated hydraulic power system. • 88.9 mm (3 1/2″) King Pin assembly (the height of the King Pin is 1.29 m (50.8″) from the ground) • 24 VDC electrical system • Air/electric QD tractor/trailer connections • Fenders rear with mud flaps with centrally mounted towing loop 4.0 POWER PACK ASSEMBLY This Assembly is skid mounted include a heavy duty, skid base/protection frame, a diesel engine, hydraulic system, a Tubing Injector Drive Hose Reel and all related components; details of this Assembly are as follows: 4 / 31 The physical dimensions of this Power Pack Assembly are as follows: • Length: 4.80 m (15′ 9″) • Width: 2.60 m (8′ 6″) • Height: 2.60 m (8′ 6″) • Weight: 9,500 kg (20,900 lb) 4.1 CARRIER This is a heavy duty steel oilfield skid and protection frame that has the following features: • Structural Steel longitudinal main beams and cross beams • A structural Steel protection/crash frame • Forklift tubes are incorporated into the skid base • ISO corner blocks are installed on the top of the unit • Fluid containment sump drains and flush drain plugs • Recessed lift eyes are below the top of the skid assembly at each corner (to allow a 5 / 31 4-point lift with slings) • Top side access ladder with non-slip rungs • Access walkways on top of the protection frame • All required component mounts. • Installed on this skid and connected to the assembly hydraulic/pneumatic/electrical systems is a Bulkhead Panel with quick coupling type connectors (with clearly identified tag numbers) for required hose connections to the Tubing Reel and Control Cabin Assemblies and the Injector. Installed on the unit is a 400 liter (105 gallons) total capacity fuel system/fuel circuit. The fuel tank is equipped with a breather system. The unit fuel circuit includes a fuel water separator, fuel suction and return lines are of adequate size to minimize restriction. This fuel system provides diesel fuel to the Unit mounted Diesel Engine. Installed on the unit is a dedicated battery system. This system is installed in a fabricated battery and include an increased safety deep discharge battery pack with integral junction box and isolator switch configured in 24 volts, pre wired battery cables to the deck mounted diesel engine 24 VDC electric power systems. 4.2 DIESEL ENGINE MTU/DDC series 60, turbocharged, 4-cycle, 6-cylinder in line configuration, high speed, water cooled, direct fuel injection, electronic type diesel engine operating at up to 500 HP@2,100 RPM. The diesel engine is equipped with a “Zone II” kit to ensure that both them meet Group II Category 3G T3 hazardous environments (ZoneII) and is equipped as per the following: • ATEX 95 certificates for PYRONBAN “ZONE II” kit • Heavy duty dry type air filters with replaceable cartridges • A Ex d 24V alternator for use in hazardous areas • Air start system with air operated pilot type start valve. • Exhaust flexible pipe • Spark arrestor • Crankcase breather flame arrestor 6 / 31 • Positive emergency kill air shut off device activated on engine over speed or emergency stop. • Shutdown system for low oil pressure, high water temp, high exhaust gas temperature and engine over speed. • Installed on the flywheel housing of this diesel engine is a multi-output drive gearbox to provide power to the unit hydraulic system • Unit cooling is accomplished by a vertically mounted radiator with a coolant expansion tank and the following features: • Marine rated radiator including two cores for engine and heat exchanger cooling • Engine driven anti-static fan • Coolant expansion tank • Coolant piping interconnections • Anti-static fan belts • All rotating parts is covered by protective guard • Exhaust gas cooler, plenum and outlet box assembly.
Recommended publications
  • Annual Report and Financial Statements
    ANNUAL REPORT AND FINANCIAL STATEMENTS ANNUAL REPORT AND FINANCIAL STATEMENTS 2015 STERLING BANK PLC TABLE OF CONTENTS Notice of AGM Governance Basic Information Overview Leadership – Corporate The Management Team 182 056 Governance Report Why Integrated Reporting 006 Branch Network 184 Directors, Officers and 060 Performance Highlights 007 Professional Advisers Change of Address Form 193 Chairman’s Statement 008 Board of Directors 061 E-bonus/offer/rights Form 195 Report of the Directors 066 Mandate for Dividend Payment to Bank 197 Strategic report Statement of Directors’ (e-dividend form) Responsibilities in relation to 073 Managing Director/ Chief Shareholder’s Data Update 012 the Financial Statements 199 Executive Officer’s Report Form Our Strategy/Business Model 018 Report of the External Consultants on the Board 074 Proxy Form 201 Key Performance Indicators 027 Appraisal of Sterling Bank Plc Economic Report 028 Independent Auditors’ Report 075 Performance Review 031 Report of Statutory Audit 077 Committee Statement of Compliance 078 Sustainability Sustainability Approach 044 Enriching Lives 044 Financial statements Education 045 Statement of Profit or Loss Environment 047 and other Comprehensive 080 Income Entertainment 049 Statement of Financial Community Development 050 081 Position Customer Service Initiatives 050 Statement of Changes in 082 For our Employees 051 Equity For our Shareholders 051 Statements of Cash Flows 084 Statement of Prudential For the Government 052 085 Adjustments Materiality Analysis 052 Notes to the Financial 086 Stakeholder Engagement 053 Statements Statement of Value Added 177 Five-year Financial Summary 178 Share Capital History 180 ANNUAL REPORT AND FINANCIAL STATEMENTS 2015 STERLING BANK PLC NOTICE OF ANNUAL GENERAL MEETING NOTICE IS HEREBY GIVEN that the 54th Annual General Meeting of Sterling Bank Plc will be held at Eko Hotel & Suites, Plot 1415, Adetokunbo Ademola Street, Victoria Island, Lagos on Tuesday, the 19th day of April, 2016 at 10.00 a.m.
    [Show full text]
  • An E-Copy of the Report for Rivers State
    13% DERIVATION RIVERS STATE REPORT ABOUT KEBETKACHE WOMEN DEVELOPMENT & RESOURCE CENTRE ebetkache Women Development & Resource Centre is non-governmental organization registered with the Corporate Affairs Commission (CAC) in Nigeria Kwith IT/CERT N0.15890. Kebetkache is a community action, education and advocacy women's rights organization working on development and social justice issues that affect women and children in Nigeria and around the world. Kebetkache envisions a just society where women's rights and gender equality are mainstreamed irrespective of status, race, background or diversity. Kebetkache's mission is to achieve gender equality, environmental and climate justice through advocacy for good governance, movement building and capacity strengthening. Kebetkache is committed to supporting women to achieve gender equality. The organization helps women to understand their rights through sensitization, capacity development, research, mentoring, and movement building targeted at increasing their skills and creating opportunities that will help them solve identified problems. The overall change Kebetkache wants to see: · A sustainable, vibrant, healthy community of women with recognized rights, power and opportunity to participate in the decision-making processes. Kebetkache identified the following domains of change. · Implementation of community driven gender equality strategies. · Environmental responsive extractive practices with increased participation of women in all decision making processes. · A sustainable environment with a remediated ecosystem with vibrant rural health and security. · Women's rights supported and protected. · Support peace building processes Kebetkache believes that the following action areas are pathways to bringing about the domains of change. · Build and sustain an active women's environmental justice movement in the Niger Delta region of Nigeria.
    [Show full text]
  • Reality of Tourism Management: Business Viability and Tourists’ Behaviour in Plateau State, Nigeria
    CULTUR, ano 06 ‐ nº 03 ‐ Ago/2012 www.uesc.br/revistas/culturaeturismo Licença Copyleft: Atribuição‐Uso não Comercial‐Vedada a Criação de Obras Derivadas Special issue: SUSTAINABILITY, TOURISM & ENVIRONMENT IN THE SHIFT OF A MILLENNIUM: A PERIPHERAL VIEW. REALITY OF TOURISM MANAGEMENT: BUSINESS VIABILITY AND TOURISTS’ BEHAVIOUR IN PLATEAU STATE, NIGERIA Henry Mm aduabuchi Ijeomah Department of Forestry and Wildlife Management University of Port Harcourt, Nigeria [email protected] Bernard. Chimezie Herbert Department of Agricultural Economics University of Port Harcourt, Nigeria ABSTRACT: Though ecotourism is popularly perceived as the fastest growing sector of tourism and a spinner of benefits the reality of its viability and growth is relative to site and yet to be ascertained in many areas. The purpose of this study is therefore to explore the reality of tourism managements in Plateau State, Nigeria with the aim of ascertaining the sponsors of ecodestinations; perceived viability of tourism activities; and tourists’ behaviour towards gate fee increments in Assop falls, Naraguta Tourist Village, Jos National Museum and Zoo, Rayfield Resort, Pandam and Jos Wildlife Parks which are functional ecotourism destinations in Plateau State.Ten communities bordering these ecodestinations were selected based on ownership and impact on tourism site. Listing of households in selected communities was done and ten percent of households in each community were sampled. Information for the study were elicited using three sets of structured questionnaire. In all, 410 households were sampled. Fifty percent of staff of each ecodestination was also sampled while 40 tourists were sampled in each ecodestination. A total of 240 tourists and 335 staff respondents were interviewed.
    [Show full text]
  • Morphological Analysis of the Woji River in Port Harcourt, Nigeria; Using Temporal Data and Mathematical Algorithm
    Landform Analysis 35: 45–54 doi: 10.12657/landfana.035.008 © 2017 Author(s) Received: 9.12.2017; Accepted: 29.12.2017 This is an open access article distributed under Morphological analysis of the Woji River in Port Harcourt, Nigeria; using temporal data and mathematical algorithm Michael U. K. Anya, Clinton I. Ezekwe, Charles U. Oyegun Department of Geography and Environmental Management, University of Port Harcourt, Nigeria; [email protected] Abstract: The research analysed morphological variations of the Woji River between 1986 and 2016 using mathematical extrapolations and temporal data. A 50% reduction in the River mean channel width, full- bank discharge and the stream power was found. Channel siltation occurred due to high sediment fluxes from rapid urban processes versus reduced stream power of the river. Water hyacinth invasion, domestic waste dumps and narrow culvers constricted the river channels. Finally, an impaired river status was found and extinction projected by 2043. Recommended were correction and monitoring exercises to check activ- ities along the river channel and to restore the head stream wetlands. Keywords: channel morphology, river catchment, rivers state, urbanization, mathematical algorithm, Nigeria Introduction attributes (Paul, Meyer 2001, Chin 2006, Adebayo, Arohunsoro 2014). The morphology of a river describes the geomorphic The Woji River, in this instance, is situated right parameters of its channel/gully and by its implica- at the heart of Port Harcourt cosmopolitan city with- tion explains how the river profile has changed in in the Nigeria Niger Delta region, where it is cur- shape and direction over time. A given river channel rently experiencing serious alterations in its fluvial dynamics can result out of a number of processes discharges and its channel morphometry consequent amidst the pressing environmental conditions: such the rapid urbanization of its basin (Weli, Ideki 2014).
    [Show full text]
  • Approved Cbt Centress for Registration 3/25/2017
    JOINT ADMISSIONS AND MATRICULATION BOARD 2017 UTME LIST OF APPROVED CBT CENTRESS FOR REGISTRATION 3/25/2017 STATE- ABIA S/N TOWN CENTRE NAME 1 ABA Bright Stars International Schools, 10/12, Ikpemaeze Street, UMUIKPO, Ariaria, Aba, Abia State 2 ABA CITIZEN INTERNATIONAL SCHOOL 3 ABA Covenant Polythecnic, Aba, No 321 ABA-Owerri Road,ABA , ABIA ,OSISIOMA 4 ABA Ekcela International Secondary School, 23, Egbelu Road, Umuehilegbu Osisioma-Ngwa, Aba 5 ABA FREEDOM WORLD ACADEMY INT'L, 12 OKPOMUBO STREET, OSISIOMA Aba, Abia State 6 ABA Giant Immaculate School ICT Centre Aba, 48 Dikenafai Road off Ngwa Road by East, Aba, Abia State 7 ABA Golden Foundations Int'l School, No. 1, GFI Close, Off Ovurukwu Road, Umuobeke by 352 Portharcourt Road, Aba, Abia State 8 ABA Heritage and Infinity ICT Centre Aba, 4 Ezenwagbara Avenue off 279 Faulks Road, Aba, Abia State 9 ABA JP FLINCT INT'L SCHOOL, 279/281 Umueze Road/Udeagbala rd, OSISIOMA, Aba, Abia State 10 ABA Makac Global Intergrated Services Nig Ltd., 63/64, Asa Road, Aba, Abia State 11 ABA MATAR MISERICORDIAE HUMAN EMPOWERMENT COMPUTER SCH, 4B OBOHIA RD ABA 12 ABA Mchief Communication Limited, ICT Centre, 2 ikenna st., off Faulks Rd, by Nwala, Aba, Abia State 13 ABA National Comprehensive Secondary School, 1, Oji Avenue, Via Omoba Road, Near 7up Plant, Umoukea, Aba 14 ABA Okwyzil Computer Institute Aba, KM 4 PH/Aba Express way, off Ariaria Junction by Faulks Rd. Abia 15 ABA Temple Gate Polytechnic, Aba 16 ABA Unique Unibright INT'L SCH, No 152 faulks Road , ABA , Abia- North 17 EHERE Sound Base Academy, Ehere,Obingwa LGA, Umuahia, Abia State 18 ISIALA-NGWA Living Bread International School, Umuoleke, Omoba Isiala-Ngwa South L.G.A., Abia State 19 OBINGWA BENJYN INTERNATIONA ACADEMEY, 1 BENJYN AVENUE AMORJI UKWU, OBINGWA.ABIA STATE 20 OBINGWA JET AGE PRIVATE SCH,AMAPU, OBINGWA,ABIA OBINGWA 21 OHAFIA GIFTED AND TALENTED EDUC.
    [Show full text]
  • Patterns and Determinants of Recreational Behaviour in Port Harcourt, Rivers State, Nigeria
    Obinna V., Owei O., Ayodele A. and Okwakpam I. PATTERNS AND DETERMINANTS OF RECREATIONAL BEHAVIOUR IN PORT HARCOURT, RIVERS STATE, NIGERIA PATTERNS AND DETERMINANTS OF RECREATIONAL BEHAVIOUR IN PORT HARCOURT, RIVERS STATE, NIGERIA Victor OBINNA Rivers State University of Science and Technology ement PMB 5080, Nkpolu – Oroworukwo, PortHarcourt, Rivers State, Nigeria [email protected] Opuene OWEI Rivers State University of Science and Technology PMB 5080, Nkpolu – Oroworukwo, PortHarcourt, Rivers State, Nigeria [email protected] Aroyehun AYODELE Rivers State University of Science and Technology PMB 5080, Nkpolu – Oroworukwo, PortHarcourt, Rivers State, Nigeria [email protected] Ikechi OKWAKPAM Rivers State University of Science and Technology PMB 5080, Nkpolu – Oroworukwo, PortHarcourt, Rivers State, Nigeria eria [email protected] Abstract Number3(12) / August 2009 By surveying a 5% probability sample of residential clusters, yielding 369 residents in Port Harcourt, Nigeria, this study has ascertained actual recreational behaviour of the residents; determinants of recreational behaviour; perceived adequacy/inadequacy of government provision of recreational facilities; and residents’ suggestions for improvement of recreational facilities. It was found, amongst others, that weekly participation in passive (outdoor) recreation averaged 3.7 hours and 2.5 hours for females and males, respectively; the corresponding figures for passive (indoor) recreation were 35.2 hours and 43.9 hours. For active (outdoor) recreation males and
    [Show full text]
  • Levels of Nitrogen Dioxide and Sulphur Dioxide Measured Around Roadside Gardens in Port Harcourt Metropolis 1Trinya
    International Journal of Environmental & Agriculture Research (IJOEAR) [Vol-1, Issue-5, September- 2015] Levels of Nitrogen Dioxide and Sulphur Dioxide Measured Around Roadside Gardens in Port Harcourt Metropolis 1Trinya. W. and 2Ideriah, T.J. K. 1Department of Forestry and Environment, Rivers State University of Science and Technology Port Harcourt, Rivers State, Nigeria 2Institute of Pollution studies, Rivers State University of Science and Technology Port Harcourt, Rivers State, Nigeria Abstract — Levels of nitrogen dioxide and sulphur dioxide around roadside gardens in Port Harcourt metropolis were determined at 0m and 50m from road junctions using portable hand held Multi RAE PLUS (PGM-50), a programmable multi gas monitor with an electrochemical sensor for the detection of Sulphur dioxide and ITX Multi Gas monitor for the detection of Nitrogen dioxide. The results showed that the concentrations of NO 2 and SO 2 ranged from 0 – 0.3ppm in both seasons. The mean concentration of SO 2 at 0m and high traffic density stations were higher than the mean concentration at 50m and low traffic density stations. The difference in mean concentrations between dry and rainy seasons, traffic density and distance were not significant for NO 2 but significant for SO 2. The concentration of NO 2 and SO 2 recorded at the study stations exceeded the permissible limits of 0.004ppm and 0.01ppm respectively, recommended by the Federal Ministry of Environment and therefore poses serious threat to the environment particularly small farms and gardens around major roads. The levels of NO 2 and SO 2 around the gardens were influenced by traffic density, seasonal variations and distances from major roads, therefore authorities should embark on sensitization and enlightenment campaigns; farming activities and raw consumption of exposed vegetables, crops and fruits should be discouraged in the study areas.
    [Show full text]
  • Ecosystem Services and Mapping of Amenity Trees in Port Harcourt Zoo, Nigeria
    African Journal of Agriculture Technology and Environment Vol. 6(1): 106-117 June, 2017 E-ISSN: 2346-7290 Ecosystem services and mapping of amenity trees in Port Harcourt Zoo, Nigeria *Oladele A.T. and Udo N.E. Department of Forestry and Wildlife Management, University of Port Harcourt, Nigeria *Corresponding author (E-mail: [email protected]) ABSTRACT This paper reports the benefits, which selected stakeholders derive from amenity trees in Port Harcourt Zoo, Nigeria. Two sets of structured questionnaires were administered for data collection among some stakeholders - tourist (99) and residents in the neighbourhood (98), between August and November, 2015. The trees encountered were identified while their benefits to respondents’ were noted and co-ordinates carefully recorded with GPS equipment and subsequently mapped. Results revealed that 41.4% of the tourists were attracted to the park by trees and animals, 39.4% were attracted by the serenity and cool breeze derived under and around the trees. Some tourists visited for collection of plant parts for medicine (18.0%). Benefits derived from the amenity trees by the neighbourhood around the zoo include: cool breeze (35.0%), serene/scenic view of the environment (21.0%), noise reduction (26.0%), games/ bird viewing (10.0%) and local medicinal plants collection (8.0%). In all, 84 amenity trees were encountered in the zoo park comprising 29 species belonging to 18 families. Identified stakeholders were observed to derive environmental, psychological, social and livelihood support benefits from the amenity trees. Keywords: Urban trees, Ecosystem services, Zoo stakeholders, medicinal plants. INTRODUCTION avenues and walkways, city parks and Urban trees play active roles in providing recreation centres, institutions (schools, goods and services, improve livelihood, and research centres, hospitals and public enhance the wellbeing of inhabitants buildings), zoological gardens and other (Fuwape and Onyekwelu, 2011).
    [Show full text]
  • Okoro/Oginigba Creek, Port Harcourt GREGORY
    JASEM ISSN 1119-8362 Full-text Available Online at J. Appl. Sci. Environ. Manage. March., 2016 JAllO UrightsRN AreservedL OF APPLIED S www.ajol.infoCIENCE A NandD ENVIRONVol.ME N20T (A1L) 25M –A 31NA GEMENT. www.bioline.org.br/ja Monitoring of specific activities of long-lived radioactive elements along the Mini- Okoro/Oginigba Creek, Port Harcourt 1GREGORY O. AVWIRI, 2*OLANREWAJU LAWAL, 1EDITH I. NWOKEOJI 1Department of Physics, Faculty of Science, University of Port Harcourt, Port Harcourt, Rivers State 2Department of Geography and Environmental Management, Faculty of Social Sciences, University of Port Harcourt, Port Harcourt, Rivers State *Corresponding author’s contact: Tel.: +2349097347063; Email: [email protected] ABSTRACT: Presence and concentrations of radionuclides could be as a result of natural and human activities. This study examined the associations and differences among soil, sediment and water specific activities of long-lived radioactive element (LLRE). Gamma spectroscopy was used to measure the concentration of the LLRE along the Mini Okoro/Oginigba Creek, Port Harcourt. Specific activities of three selected LLRE were derived. Correlation analysis was carried out to examine associations among the specific activities across different substrates. A strong and a significant negative correlation exists between the specific activities of Water 40K and Soil 232Th (r =-0.721, p<0.05); Water 238U and Soil 238U (r = -0.717, p<0.05) and Water 40K and Sediment 238U (r=-0.69, p<0.05). Comparison using Mann-Whitney U test shows that, soil and sediment are similar in their specific activities with Z values of -0.408, -1.209 and -1.021 (p > 0.05) for 40K, 232Th and 238U respectively.
    [Show full text]
  • World Rural Observations 2017;9(1) 22
    World Rural Observations 2017;9(1) http://www.sciencepub.net/rural Spatial Distribution Pattern of Outdoor Recreation Centres in Port Harcourt Metropolis, Rivers State, Nigeria Washington Gogo Uwowa, Samuel Bankole Arokoyu, Andrew Adesola Obafemi Department of Geography and Environmental Management, University of Port Harcourt, Port Harcourt, Nigeria [email protected] Abstract: This study examined the spatial distribution of outdoor recreation centers in Port Harcourt Metropolis, Rivers State, Nigeria. The recreation centers were geo-located using global positioning system (GPS). Both descriptive and inferential statistics were employed to analyzed data in this study using Statistical Package for Social Science (SPSS) 20.0 version. Nearest neighbour analysis was used to determine the spatial distribution pattern of recreation centers using ArcGIS 10.1. Findings revealed that twenty seven outdoor recreation centers were identified in the study area in which 66.7% were owned by government and 33.3% were privately owned. However, 18.5% of total recreation centers were found in Obio/Akpor LGA while 81.5% were found in Port Harcourt LGA. The spatial distribution pattern of recreation centers was slightly clustered (Z=0.266; p=0.790). The study recommended that policymakers should always provide for open spaces where recreation exercises should take place in order to generate revenue for government. [Uwowa W.G., Arokoyu S.B., Obafemi A.A. Spatial Distribution Pattern of Outdoor Recreation Centres in Port Harcourt Metropolis, Rivers State, Nigeria. World Rural Observ 2017;9(1):22-31]. ISSN: 1944-6543 (Print); ISSN: 1944-6551 (Online). http://www.sciencepub.net/rural. 4. doi:10.7537/marswro090117.04.
    [Show full text]
  • Original Paper Exploring the Tourism Potentials of Port Harcourt City
    Social Science, Humanities and Sustainability Research ISSN 2690-3628 (Print) ISSN 2690-3636 (Online) Vol. 1, No. 1, 2020 www.scholink.org/ojs/index.php/sshsr Original Paper Exploring the Tourism Potentials of Port Harcourt City Chinago B. Alexander1* & Kponi Godwin2 1 Department of Transportation Planning and Logistics, Captain Elechi Amadi Polytechnic, Port Harcourt, Rivers State, Nigeria 2 Niger Delta Science School, Rumuola, Port Harcourt, Rivers State, Nigeria * Chinago B. Alexander, Department of Transportation Planning and Logistics, Captain Elechi Amadi Polytechnic, Rumuola, Port Hacourt, P.M.B 5936, Port Harcourt, Rivers State, Nigeria Received: February 17, 2020 Accepted: March 9, 2020 Online Published: March 15, 2020 doi:10.22158/sshsr.v1n1p16 URL: http://dx.doi.org/10.22158/sshsr.v1n1p16 Abstract The emergence of urbanization and application of modern technologies in modern cities is indeed the essence of this academic research. However, Port Harcourt city in South-South Nigeria, it is noted that there are enough potentials for maximum tourism as well as enough resource that are yet to be harnessed for the ultimate development of tourism. Thereby, this paper explores the tourism potentials of the arguing that its tourism potentials have not been fully exploited due to low level of development, associated with lack of interest ignorance neglect form both Government and non-governmental organization in terms of investment or patronage. Also, it posits that the neglect of power town planning has dwarfed the aesthetics of the city. The paper aligns with greater Port Harcourt City plan as long as it is made a State policy and not a regime goal.
    [Show full text]
  • Effects of Automobile Emissions on the Distribution of Ambient Suspended
    International Journal of Recent Trends in Science And Technology, E-ISSN 2249-8109, Volume 2, Issue 2, 2012 pp 09-24 Distribution of Ambient Suspended Particulates and Volatile Organic Carbon in a Fast Developing Metropolis in the Niger Delta, Nigeria Emerhi, E.A1. Ideriah, T.J.K.*2 and Trinya, W.3 1Department of Forestry and Wildlife, Delta State University, Abraka, Delta State, Nigeria. [email protected] 2Institute of Pollution Studies, Rivers State University of Science and Technology, Port Harcourt, Rivers State, Nigeria. [email protected] 3Department of Forestry and Environment, Rivers State University of Science and Tech., Port Harcourt Rivers State, Nigeria. Corresponding Addresses: *[email protected], [email protected] Research Article Abstract: The concentrations of various sizes of originate from the same sources as the correlations suspended particulates and volatile organic carbons between PM2.5 and other fractions as well as between along selected roadsides and control sites in the fast the suspended particulates and VOC were very low developing city of Port Harcourt in the Niger Delta with decreasing mean r = 0.2174PM1, 0.2052 PM2.5, were determined at 0m and 50m from roads during the 0.0591 PM7, 0.0386 PM10 and 0.0209 TSP. The levels dry and rainy seasons. The parameters were of VOC call for serious environmental concern as their determined using portable hand held air monitors concentrations at the high density stations exceeded which include an Industrial Scientific Corporation ITX permissible limit recommended by the Federal Multi Gas Monitor and Aerosol Mass Monitor by Met Environmental Protection Agency of Nigeria and One Instrument INC.
    [Show full text]