Waterside Rail Reopening SOBC

Total Page:16

File Type:pdf, Size:1020Kb

Waterside Rail Reopening SOBC WATERSIDE RAIL RE-OPENING STRATEGIC OUTLINE BUSINESS CASE February 2021 1 Contents Executive Summary .............................................................................................................. 1 1. Introduction .................................................................................................................. 11 2. The Approach to this Business Case ........................................................................... 13 2.1 Introduction ........................................................................................................... 13 2.2 The Five Case Model ............................................................................................ 13 2.3 Business Case Process ........................................................................................ 13 3. Strategic Case ............................................................................................................. 14 3.1 Developing the Strategic Case .............................................................................. 14 3.2 Background to the proposed Waterside Rail re-opening scheme .......................... 15 3.3 The Strategic Context ........................................................................................... 16 3.3.1 National Context ............................................................................................ 18 3.3.2 Regional Context ........................................................................................... 19 3.4 The Problem Identified (Case for Change) ............................................................ 22 3.4.1 Issue 1: Weak Productivity levels and low proportion of knowledge economy jobs 23 3.4.2 Issue 2: The Waterside area has poor transport connectivity and high dependence on the private car ..................................................................................... 24 3.4.3 Issue 3: Waterside has a low level of self-containment for travel to work increasing pressure on transport networks ................................................................... 28 3.4.4 Issue 4: A significant amount of Growth is Planned for the Totton and Waterside area increasing travel demand .................................................................... 30 3.4.5 Issue 5: The Waterside contains a number of wards with deprivation & health inequalities – limited access to services can contribute to social exclusion .................. 31 3.5 Impact of Not Changing ........................................................................................ 33 3.6 Internal Drivers of Change .................................................................................... 34 3.7 External Drivers of Change ................................................................................... 34 3.8 Scheme Aims and Objectives ............................................................................... 35 3.9 Measures for Success .......................................................................................... 36 3.10 Options Identified .................................................................................................. 36 3.10.1 Assessment of Options Long List ................................................................... 38 3.10.2 Operational Viability ....................................................................................... 39 3.10.3 Summary of Findings on Train Service Options ............................................. 40 3.10.4 Station Options .............................................................................................. 41 3.10.5 Summary of Options Taken Forward ............................................................. 43 3.11 Detailed Assessment of Shortlisted Options.......................................................... 44 3.11.1 Rail infrastructure enhancements ................................................................... 44 3.11.2 Timetable Validation ...................................................................................... 49 3.12 Overview of stakeholders ...................................................................................... 52 3.13 Constraints ........................................................................................................... 54 3.14 Inter-dependencies ............................................................................................... 55 3.14.1 Alignment with other Planned Transport Schemes ......................................... 55 3.14.2 Committed (fully funded) schemes: ................................................................ 55 3.14.3 Other schemes to be progressed subject to NSIP/ Planning consent and satisfactory business cases:......................................................................................... 56 i 4. Economic Case ............................................................................................................ 58 4.1 Overview of Economic Appraisal Methodology ..................................................... 58 4.2 Costs of the Shortlisted Options ............................................................................ 59 4.2.1 Capital Costs ................................................................................................. 59 4.2.2 Operating Costs ............................................................................................. 61 4.3 Modelling Approach and Assumptions .................................................................. 63 4.3.1 Do minimum SRTM Assumptions .................................................................. 63 4.3.2 Demand and Revenue Forecasts ................................................................... 64 4.3.3 Abstraction of Demand from other modes ...................................................... 66 4.4 Appraisal of Transport User Benefits .................................................................... 67 4.5 Appraisal of monetised costs and benefits ............................................................ 68 4.6 Sensitivity tests ..................................................................................................... 68 4.7 Environmental Impacts ......................................................................................... 69 4.8 Impacts During Construction ................................................................................. 71 4.9 Accessibility and social inclusion impacts ............................................................. 71 4.10 Level 2 and Level 3 Wider Impacts ....................................................................... 73 5. Financial Case ............................................................................................................. 74 6. Commercial Case ........................................................................................................ 76 6.1 Introduction ........................................................................................................... 76 6.2 Sourcing Options and Procurement Strategy ........................................................ 76 6.3 Procurement Timescales ...................................................................................... 77 6.4 Commercial Risks to Delivery – Land and consents .............................................. 77 7. Management Case ....................................................................................................... 78 7.1 Introduction ........................................................................................................... 78 7.2 Evidence of Similar Projects Delivered by HCC/NR .............................................. 78 7.3 High level Project Delivery Programme ................................................................. 78 7.4 Governance & reporting arrangements ................................................................. 78 7.5 Communications and Stakeholder Management/ Engagement Plan ..................... 79 7.6 Risk Management Strategy ................................................................................... 80 7.7 Monitoring and Evaluation ..................................................................................... 81 7.8 Summary of overall approach for project management ......................................... 82 Appendices ......................................................................................................................... 83 ii List of Figures Figure 2-1– Three Phase Business Case Process .............................................................. 13 Figure 3-1 – Strategic Transport Connections between South Hampshire and other regions ........................................................................................................................................... 16 Figure 3-2 – GVA per head for sub-areas of New Forest District relative to the GVA per head for the District as a whole (=100), 2015 (Source: ONS 2016 and HCC 2017 estimates)...... 23 Figure 3-3– % GVA Growth per annum over the period 2010-2015 for New Forest District, Hampshire and the UK (Source: ONS 2016 and HCC 2017 estimates)............................... 23 Figure 3-4– % Contribution to GVA of different economic sectors in Totton & Waterside (Source: HCC 2017 estimates) ........................................................................................... 24 Figure 3-5– Education levels of residents of Totton & Waterside area (2011 Census) ........ 24 Figure 3-6- Map showing
Recommended publications
  • Solent to the Midlands Multimodal Freight Strategy – Phase 1
    OFFICIAL SOLENT TO THE MIDLANDS MULTIMODAL FREIGHT STRATEGY – PHASE 1 JUNE 2021 OFFICIAL TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................................................................................... 4 1. INTRODUCTION TO THE STUDY .......................................................................................................................................................... 9 2. STRATEGIC AND POLICY CONTEXT ................................................................................................................................................... 11 3. THE IMPORTANCE OF THE SOLENT TO THE MIDLANDS ROUTE ........................................................................................................ 28 4. THE ROAD ROUTE ............................................................................................................................................................................. 35 5. THE RAIL ROUTE ............................................................................................................................................................................... 40 6. KEY SECTORS .................................................................................................................................................................................... 50 7. FREIGHT BETWEEN THE SOLENT AND THE MIDLANDS ....................................................................................................................
    [Show full text]
  • Solent Connectivity May 2020
    Solent Connectivity May 2020 Continuous Modular Strategic Planning Page | 1 Page | 2 Table of Contents 1.0 Executive Summary .......................................................................................................................................... 6 2.0 The Solent CMSP Study ................................................................................................................................... 10 2.1 Scope and Geography....................................................................................................................... 10 2.2 Fit with wider rail industry strategy ................................................................................................. 11 2.3 Governance and process .................................................................................................................. 12 3.0 Context and Strategic Questions ............................................................................................................ 15 3.1 Strategic Questions .......................................................................................................................... 15 3.2 Economic context ............................................................................................................................. 16 3.3 Travel patterns and changes over time ............................................................................................ 18 3.4 Dual-city region aspirations and city to city connectivity ................................................................
    [Show full text]
  • DEFENDING OUR LINES - Safeguarding Railways for Reopening
    DEFENDING OUR LINES - safeguarding railways for reopening A report by Smart Growth UK April 2020 http://www.smartgrowthuk.org 1 Contents __________________________________________________________________________________ Foreword by Paul Tetlaw 4 Executive summary 6 1. Introduction 8 2. Rail closures 9 3. Reopening and reinstatement 12 4. Obstacles to reinstatement of closed lines 16 5. Safeguarding alignments 19 6. Reopening and the planning system 21 7. Reopening of freight-only or mothballed lines 24 8. Reinstatement of demolished lines 29 9. New railways 38 10. Conclusions 39 Appendix 1 41 2 Smart Growth UK __________________________________________________________________________ Smart Growth UK is an informal coalition of organisations and individuals who want to promote the Smart Growth approach to planning, transportation and communities. Smart Growth is an international movement dedicated to more sustainable approaches to these issues. In the UK it is based around a set of principles agreed by the organisations that support the Smart Growth UK coalition in 2013:- Urban areas work best when they are compact, with densities appropriate to local circumstances but generally significantly higher than low-density suburbia and avoiding high-rise. In addition to higher density, layouts are needed that prioritize walking, cycling and public transport so that they become the norm. We need to reduce our dependence on private motor vehicles by improving public transport, rail-based where possible, and concentrating development in urban areas. We should protect the countryside, farmland, natural beauty, open space, soil and biodiversity, avoiding urban sprawl and out-of-town development. We should protect and promote local distinctiveness and character and our heritage, respecting and making best use of historic buildings, street forms and settlement patterns.
    [Show full text]
  • Response to GB
    Site Allocations Development Plan Document (DPD) Regulation 19 Representation Form 1. Personal details Sheila Carroll 2. Agent details n/a 3. Name of document: Site Allocations: Woking Borough Council (WBC) Site Allocations Development Plan Document (DPD) Regulation 19 Consultation 4. Do you consider the site allocations is: I do not believe the proposed plan is legally compliant or sound for reasons given below. 5. Please give details of why you consider the Site Allocations DPD is / is not legally compliant or is sound / unsound, or has met / not met the requirements of the Duty to Cooperate. Please be as precise as possible. Include any references to relevant legislation, policies and/or regulations. Not sound or legally compliant. For example: - HS4 Air: no consideration has been given to the most well known proposal from Heathrow Southern Railway Ltd which would link to the existing South West Mainline between Byfleet and Woking which goes through West Byfleet. WBC has failed completely to consider the potential compromising impact of its proposals in its assessments on this National Transport Infrastructure project. - Transport infrastructure linked to GB10 and GB11 both currently in the green belt- limited scope to introduce sustainable transport mitigation measures to address the traffic impacts of the development: anyone who lives in the local area will attest to the traffic problems on the A245 Parvis Road which passes through the heart of West Byfleet. This same road would see over 800 new homes built on the green belt that runs alongside (these would be in addition to the 255 new homes already agreed for the centre of West Byfleet).
    [Show full text]
  • South Western Main Line: Southampton - Bournemouth
    Train Simulator – South Western Main Line: Southampton - Bournemouth South Western Main Line: Southampton - Bournemouth © Copyright Dovetail Games 2019, all rights reserved Release Version 1.0 Page 1 Train Simulator – South Western Main Line: Southampton - Bournemouth Contents 1 Route Map ............................................................................................................................................ 4 2 Rolling Stock ........................................................................................................................................ 5 3 Driving the Class 444 & Class 450 ...................................................................................................... 7 Cab Controls ....................................................................................................................................... 7 Key Layout .......................................................................................................................................... 8 Class 444/450 Sander ......................................................................................................................... 8 Class 444/450 Power Reduction Button ............................................................................................. 8 5 Driving the LNER A2 60532 “Blue Peter”............................................................................................. 9 Cab Controls ......................................................................................................................................
    [Show full text]
  • Final Report
    High-Speed Rail Development Programme 2008/9 Principal Consultant Final Report 9 October 2009 Version 5.7 Contents 1 Introduction 4 1.1 The Study 4 1.2 Study Approach 5 1.3 The Guiding Principles for High Speed Rail Development 8 2 Corridor Status Report 10 2.1 Overview of Corridors 10 2.2 Passenger Travel Market 11 2.3 Rail Infrastructure and Services in the 5 Corridors 13 2.4 Planning Issues/Objectives 21 2.5 Findings from regional workshops 22 2.6 Core objectives for high speed rail 23 3 Network Scenarios: Initial Network Testing 24 3.1 Objective of Initial Network Testing 24 3.2 Strategic Choices and Design Criteria 24 3.3 Conclusions from the Initial Network Scenarios 30 4 Issues addressed by Corridor and Network Studies 36 4.1 Building on the initial network scenario study 36 4.2 Utilising other evidence 36 4.3 Costs of Routes to Scotland 36 4.4 Serving the second corridor north from London 37 4.5 London linkages 37 4.6 Serving South Wales and the South West 38 4.7 Transpennine 38 4.8 Scenario development 38 5 Scenarios Tested 39 5.1 Overview 39 5.2 Scenario Tests 39 5.3 Infrastructure 40 5.4 HS Service Patterns 41 5.5 Changes to Classic Services 42 6 Evaluation of Scenarios 44 6.1 Introduction 44 6.2 Evaluation criteria 44 6.3 High Speed line from London/Heathrow/HS-CT to Birmingham and Manchester 46 Page 2 of 80 6.4 High Speed line from London/ HS-CT to Sheffield/Leeds (via M11) 47 6.5 HS-NW extended to Scotland 49 6.6 Scenario 4: Incremental benefit of Heathrow link 51 6.7 Value of HS-NE to Newcastle (M1 corridor) 53 6.8 How
    [Show full text]
  • Can It Be an LNER Azuma? Picture: IAN SIMONS
    RA 014 01 August 2018 action Can it be an LNER Azuma? Picture: IAN SIMONS IN WITH THE NEW: Hitachi inter-city express train in the livery of LNER action Hitachi has stripped the Virgin branding from the new inter-city trains which were destined to be operated by Virgin Trains East Coast, but whether the trains will still railaction be called Azuma – the Japanese word for East – may be in doubt because Virgin could claim to “own” the name. VTEC, a joint venture between Stagecoach and railaction is edited by Virgin, asked to walk away from the East Coast franchise early because revenue Ray King had not matched its predictions. The new Hitachi class 800s will be operated by London North Eastern Railway which, although government owned, is managed by [email protected] a partnership of private sector consultants. It took over the existing East Coast fleet twitter: @railfuture from VTEC in June. After the default of twitter: @railwatch National Express in 2009, the East Coast trains were run successfully for six years by Directly Operated Railways. DOR however was scrapped by the Government, perhaps to avoid the embarrassment of a “nationalised” train operator doing a better job than the Picture: BARRIE FORREST private train operators. Former Network Rail chief Sir John Armitt told the BBC in July that the rail franchise model is “bust” and should Hitachi IEP train in Virgin livery at Dunbar be reviewed. Earlier, the House of last year Commons transport committee said the rail franchising system was “not fit for purpose” and pointed out “serious deficiencies” in the way the Department for Transport awards contracts.
    [Show full text]
  • South Western Main Line: Southampton - Bournemouth
    South Western Main Line: Southampton - Bournemouth Streckenbeschreibung South Western Main Line: Southampton - Bournemouth Zitat von Steam Auf der South Western Main Line: Southampton - Bournemouth Route für Train Simulator wird der szenische Pendler- und geschäftige Sommerurlaubsverkehr zum Leben erweckt! Die South Western Main Line wurde in Abschnitten gebaut, wobei die Verbindung von London nach Southampton zwischen 1838 und 1840 schrittweise eröffnet wurde. Der bald darauf einsetzende Verkehrsanstieg überzeugte andere Unternehmen, Eisenbahnen zu bauen, die den Südwesten verbinden und erweitern, einschließlich des Southampton und Dorchester Railway und der Great Western Railway; alles in allem wurde die heutige SWML in den 1880er Jahren gebaut. Eine andere Linie, die in den 1850er Jahren gebaut wurde, war die malerische Lymington Branch, die sich südlich von Brockenhurst erstreckt und nach Lymington fährt und zwei Stationen abfährt - die Stadt und die Anlegestelle. Die Pierstation erstreckt sich auf den Lymington Quay und ein Steg wurde gebaut, um Fährverbindungen zur Isle of Wight zu ermöglichen. Mit einer engen Verbindung zu wichtigen Häfen und einer Geschichte von Sommer-Specials, die die Londoner an die Küste brachten, wurde die SWML immer beliebter und verzeichnet heute täglich über 140 Züge. Nehmen Sie sich Zeit, um in den New Forest einzutauchen, und tauchen Sie ein in den authentischen Verkehr der South Western Main Line: Southampton - Bournemouth! Enthaltene Szenarien Insgesamt sind 7 packende Karriere- und 3 Railfan-Szenarien enthalten: [450] 1. The Lymington Branch [444] 2. Midday Express [450] 3. Stell dich hinein [444] 4. Verfolgung [450] 5. Stopper nach Osten [444] 6. Eine Erkältung [A2] 7. Fußballspecial [Railfan-Modus] Southampton Central [Standard-Szenario] [Railfan-Modus] Beaulieu Road [Railfan-Modus] Brockenhurst Hauptmerkmale 35-Meilen-Route von Southampton Central nach Bournemouth sowie St.
    [Show full text]
  • Court Leet Presentments 2018
    COURT LEET PRESENTMENTS 2018 No. LEAD OFFICER LEAD PRESENTMENT MEMBER 1. Arthur Jeffery - On behalf of the City of Southampton Society The Chapel of Our Lady of Grace Leader of the Council – Cllr On behalf of the City of Southampton Society, I present the City Council for failing to Hammond acknowledge Our Lady of Grace Chapel as a site of Heritage status. Throughout Inland Homes’ negotiations to build apartment blocks on the site, they only made verbal comments to honour the Chapel, and now they merely plan some Public Art items, items over which City Council officers have no control. This situation has been confirmed by Mr Darren Shorter, the City’s Urban Design Manager. CoSS has, on several occasions, asked Inland Homes to acknowledge the Chapel’s 12th century origins and its’ status as a place of pilgrimage. Henry VIII himself came as a pilgrim in 1510. Wessex Archaeology have exhumed over 100 skeletons at the Chapel. The Chapel is a heritage site of substance and the City Council should act to record and publicise this important site. RESPONSE: There are planning conditions and legal obligations placed on the planning permission for Chapel Riverside relating to the archaeology of the site. The developer is required to investigate, record and publish findings of their investigation and the remains of the Chapel will also be celebrated through public art on the site. To date, the developer has engaged with these requirements and the necessary work is ongoing. COURT LEET PRESENTMENTS 2018 No. LEAD OFFICER LEAD PRESENTMENT MEMBER 2. Arthur Jeffery Mayflower Park Cabinet Member for Transport Mayflower Park is the City Centre’s only park on the waterfront.
    [Show full text]
  • A Bibliography of the History of Inland Waterways, Railways and Road
    A Bibliography of thethe History of Inland Waterways, Railways andand Road Transport inin thethe BritishBritish Isles,Isles, 19921992 This eighth annual bibliographybibliography follows thethe usualusual format.format. 'Ott.xxxx'`Ott.xxxx' indicates a cross-reference toto anan entry in George Ottley, A bibliographybibliography of British railwayrailway historyhistory (1966) or its Supplement (1988). jt indicatesindicates thatthat aa copycopy ofof thethe bookbook has not beenbeen seenseen and, therefore,therefore, thethe bibliographicalbibliographical details may not be accurate. +1 The continuingcontinuing support ofof the regular contributorscontributors (listed in the introduction to the 1991 Bibliography), whowho searchsearch outout the rarer books and comb through somesome 300300 periodical titles, is gratefully acknowledged.acknowledged. ThanksThanks areare again due to the Ian AllanAllan Bookshop atat Waterloo,Waterloo, the World of Transport Bookshop at Twickenham, and the Inland Waterways Association bookshop for their kind indulgence.indulgence. SECTION GG GENERALGENERAL GB TRANSPORTTRANSPORT AT AT PARTICULAR PARTICULAR PERIODS GB1GBl PrehistoryPrehistory and and RomanRoman ANDERSON, JAMES D.D. RomanRoman militarymilitary supplysupply inin north-eastnorth·east England:England: anan analysisanalysis of and an alternativealternative to the PiereebridgcPiercebridge Formula. Oxford: TemposTempus Reparaturn,Reparatum, 1992.1992. pp.v,196. 2222 p1.,65pI. ,65 figs.figs. [B.[B.A.R. A.R. BritishBritish series, series, no.224.]no.224.) Based on Ph.D. thesis, Univ.of Newcastle upon Tyne. Examines transport by road & natural river, rejectingrejecting as 'unlikely''unlikely' thethe improvedimproved riverriver systemsystem suggestedsuggested inin Raymond Selkirk,Selkirk, The PiercebridgePiercebridge Formula (1983).(1983). GC TRANSPORTTRANSPORT IN IN PARTICULAR PARTICULAR REGIONS REGIONS OF THE BRITISH ISLESISLES GCGClb lb England—SouthEngland-South West West region 2 PERKINS, KEITH S.S.
    [Show full text]
  • Towards an International City of Culture
    Towards an International City of Culture Southampton City Council Arts and Heritage Strategic Vision Executive Summary This Strategic Vision defines Southampton City Council’s strategic role regarding Arts and Heritage provision within the wider context of the City of Southampton Strategy towards 2026, council priorities, the Southampton Heritage and Arts People initiative (SHAPe), and the sub-regional Partnership for Urban South Hampshire (PUSH). Southampton is a thriving and growing city with a diverse and dynamic population. However, these developments are in pockets and other parts of the city (economically, physically, socially) remain significantly deprived. We want to transform Southampton from being a gateway to a place of destination where people want to visit, put down roots and engage in community. The City has a fantastic opportunity over the next twenty years to transform its cultural offer and create an overall vibrant cultural soul, a sense of identity and uniqueness that connects people to each other and to Southampton as place. Its rich cultural makeup, internationally important heritage story and nationally dynamic arts and creative scene provide an inspirational resource for exploitation. The significance of Southampton within the Partnership for Urban South Hampshire (PUSH) regional development area will ensure that this potential can be realised particularly within the context of Living Places. Culture is critical to Southampton’s economic development, health and wellbeing and the creation of an attractive image of the city as a place in which people want to live, work and play. Without a vibrant cultural soul, Southampton becomes a divided, anonymous, modern and transient settlement with little civic pride or unique sense of place, and without an attractive, sustainable and stimulating environment that people value.
    [Show full text]
  • 2 Bus Time Schedule & Line Route
    2 bus time schedule & line map 2 Eastleigh View In Website Mode The 2 bus line (Eastleigh) has 4 routes. For regular weekdays, their operation hours are: (1) Eastleigh: 7:50 AM - 8:50 PM (2) Eastleigh: 11:02 PM (3) Fair Oak: 12:30 AM - 11:20 PM (4) Southampton City Centre: 4:56 AM - 10:09 PM Use the Moovit App to ƒnd the closest 2 bus station near you and ƒnd out when is the next 2 bus arriving. Direction: Eastleigh 2 bus Time Schedule 37 stops Eastleigh Route Timetable: VIEW LINE SCHEDULE Sunday 11:45 PM Monday 7:50 AM - 8:50 PM Bargate, Southampton City Centre 6 Hanover Buildings, Southampton Tuesday 7:50 AM - 8:50 PM Above Bar, Southampton City Centre Wednesday 7:50 AM - 8:50 PM 93 Above Bar Street, Southampton Thursday 7:50 AM - 8:50 PM Cenotaph, Southampton City Centre Friday 7:50 AM - 8:50 PM Above Bar Street, Southampton Saturday 7:50 PM - 8:50 PM Giddy Bridge, Bedford Place 41 London Road, Southampton Law Courts, Bedford Place 2 bus Info Archers Road, Banister Park Direction: Eastleigh Stops: 37 Stag Gates, Banister Park Trip Duration: 34 min 144 Lodge Road, Southampton Line Summary: Bargate, Southampton City Centre, Above Bar, Southampton City Centre, Cenotaph, Cedar Road, Portswood Southampton City Centre, Giddy Bridge, Bedford 98-100 Lodge Road, Southampton Place, Law Courts, Bedford Place, Archers Road, Banister Park, Stag Gates, Banister Park, Cedar Spring Crescent, Portswood Road, Portswood, Spring Crescent, Portswood, 51 Portswood Road, Southampton Waitrose, Portswood, Portswood Broadway, Portswood, Sainsbury, Portswood,
    [Show full text]