Waterside Rail Reopening SOBC

Waterside Rail Reopening SOBC

WATERSIDE RAIL RE-OPENING STRATEGIC OUTLINE BUSINESS CASE February 2021 1 Contents Executive Summary .............................................................................................................. 1 1. Introduction .................................................................................................................. 11 2. The Approach to this Business Case ........................................................................... 13 2.1 Introduction ........................................................................................................... 13 2.2 The Five Case Model ............................................................................................ 13 2.3 Business Case Process ........................................................................................ 13 3. Strategic Case ............................................................................................................. 14 3.1 Developing the Strategic Case .............................................................................. 14 3.2 Background to the proposed Waterside Rail re-opening scheme .......................... 15 3.3 The Strategic Context ........................................................................................... 16 3.3.1 National Context ............................................................................................ 18 3.3.2 Regional Context ........................................................................................... 19 3.4 The Problem Identified (Case for Change) ............................................................ 22 3.4.1 Issue 1: Weak Productivity levels and low proportion of knowledge economy jobs 23 3.4.2 Issue 2: The Waterside area has poor transport connectivity and high dependence on the private car ..................................................................................... 24 3.4.3 Issue 3: Waterside has a low level of self-containment for travel to work increasing pressure on transport networks ................................................................... 28 3.4.4 Issue 4: A significant amount of Growth is Planned for the Totton and Waterside area increasing travel demand .................................................................... 30 3.4.5 Issue 5: The Waterside contains a number of wards with deprivation & health inequalities – limited access to services can contribute to social exclusion .................. 31 3.5 Impact of Not Changing ........................................................................................ 33 3.6 Internal Drivers of Change .................................................................................... 34 3.7 External Drivers of Change ................................................................................... 34 3.8 Scheme Aims and Objectives ............................................................................... 35 3.9 Measures for Success .......................................................................................... 36 3.10 Options Identified .................................................................................................. 36 3.10.1 Assessment of Options Long List ................................................................... 38 3.10.2 Operational Viability ....................................................................................... 39 3.10.3 Summary of Findings on Train Service Options ............................................. 40 3.10.4 Station Options .............................................................................................. 41 3.10.5 Summary of Options Taken Forward ............................................................. 43 3.11 Detailed Assessment of Shortlisted Options.......................................................... 44 3.11.1 Rail infrastructure enhancements ................................................................... 44 3.11.2 Timetable Validation ...................................................................................... 49 3.12 Overview of stakeholders ...................................................................................... 52 3.13 Constraints ........................................................................................................... 54 3.14 Inter-dependencies ............................................................................................... 55 3.14.1 Alignment with other Planned Transport Schemes ......................................... 55 3.14.2 Committed (fully funded) schemes: ................................................................ 55 3.14.3 Other schemes to be progressed subject to NSIP/ Planning consent and satisfactory business cases:......................................................................................... 56 i 4. Economic Case ............................................................................................................ 58 4.1 Overview of Economic Appraisal Methodology ..................................................... 58 4.2 Costs of the Shortlisted Options ............................................................................ 59 4.2.1 Capital Costs ................................................................................................. 59 4.2.2 Operating Costs ............................................................................................. 61 4.3 Modelling Approach and Assumptions .................................................................. 63 4.3.1 Do minimum SRTM Assumptions .................................................................. 63 4.3.2 Demand and Revenue Forecasts ................................................................... 64 4.3.3 Abstraction of Demand from other modes ...................................................... 66 4.4 Appraisal of Transport User Benefits .................................................................... 67 4.5 Appraisal of monetised costs and benefits ............................................................ 68 4.6 Sensitivity tests ..................................................................................................... 68 4.7 Environmental Impacts ......................................................................................... 69 4.8 Impacts During Construction ................................................................................. 71 4.9 Accessibility and social inclusion impacts ............................................................. 71 4.10 Level 2 and Level 3 Wider Impacts ....................................................................... 73 5. Financial Case ............................................................................................................. 74 6. Commercial Case ........................................................................................................ 76 6.1 Introduction ........................................................................................................... 76 6.2 Sourcing Options and Procurement Strategy ........................................................ 76 6.3 Procurement Timescales ...................................................................................... 77 6.4 Commercial Risks to Delivery – Land and consents .............................................. 77 7. Management Case ....................................................................................................... 78 7.1 Introduction ........................................................................................................... 78 7.2 Evidence of Similar Projects Delivered by HCC/NR .............................................. 78 7.3 High level Project Delivery Programme ................................................................. 78 7.4 Governance & reporting arrangements ................................................................. 78 7.5 Communications and Stakeholder Management/ Engagement Plan ..................... 79 7.6 Risk Management Strategy ................................................................................... 80 7.7 Monitoring and Evaluation ..................................................................................... 81 7.8 Summary of overall approach for project management ......................................... 82 Appendices ......................................................................................................................... 83 ii List of Figures Figure 2-1– Three Phase Business Case Process .............................................................. 13 Figure 3-1 – Strategic Transport Connections between South Hampshire and other regions ........................................................................................................................................... 16 Figure 3-2 – GVA per head for sub-areas of New Forest District relative to the GVA per head for the District as a whole (=100), 2015 (Source: ONS 2016 and HCC 2017 estimates)...... 23 Figure 3-3– % GVA Growth per annum over the period 2010-2015 for New Forest District, Hampshire and the UK (Source: ONS 2016 and HCC 2017 estimates)............................... 23 Figure 3-4– % Contribution to GVA of different economic sectors in Totton & Waterside (Source: HCC 2017 estimates) ........................................................................................... 24 Figure 3-5– Education levels of residents of Totton & Waterside area (2011 Census) ........ 24 Figure 3-6- Map showing

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    103 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us