Community Information Booklet

Total Page:16

File Type:pdf, Size:1020Kb

Community Information Booklet Community Information Booklet victorianbigbattery.com.au Inès Béchameil, Project Manager [email protected] 1800 966 202 GLOBALLY The company is headquartered in Paris, EUROPE & AFRICA France, and has two Australian offices – in Finland Sydney and Canberra. AMERICAS Ireland USA France We operate across renewable energy Mexico Portugal technologies including solar, wind and storage El Salvador Zambia in Europe, Central America, Africa, the Middle Jamaica AUSTRALIA Mozambique East and Australia. Ecuador Australia Colombia Neoen’s total capacity in operation and under Argentina construction is currently over 3 GW and we are aiming for more than 5GW by 2021. Kaban Green Power Hub LOCALLY Neoen Australia began operations in DeGrussa Solar and Storage Project Western Downs 2012. Over the last eight years the Green Power Hub company has initiated the development Dubbo Solar Hub Hornsdale Wind Farms 1, 2, 3 Parkes Solar Farm of more than 2GW of solar and wind Hornsdale Power Reserve Griffith Solar Farm projects through organic growth, local Coleambally Solar Farm partnerships and strategic acquisitions. Bulgana Green Power Hub Numurkah Solar Farm Victorian Big Battery Neoen produce clean electricity from renewable sources such as sunlight and wind using mature, tried and tested technologies. We are also leaders in energy storage. Page 1 WORLD’S FIRST BIG BATTERY HORNSDALE POWER RESERVE FIRST STAGE TOOK LESS THAN SIX MONTHS TO BUILD • 150MW Lithium-ion battery located next to Hornsdale Wind Farm • Owned and operated by Neoen • Installed and maintained by Tesla • Provides grid stability services • Saved SA energy consumers over $150 million in its first two years • Now testing grid scale inertia services in a world-first REDUCES RISK OF BLACKOUT IN SOUTH AUSTRALIA Page 2 DELIVERING CHEAPER ENERGY FOR INDUSTRY LAVERTON STEELWORKS VICTORIA Laverton Steelworks have agreed to take power from Neoen's 128 MW Numurkah Solar Farm under a 15-year deal. GFG Alliance’s Executive Chairman said the deal would help lower energy costs at Laverton. DEGRUSSA MINING WESTERN AUSTRALIA DeGrussa is the largest off-grid solar battery storage project in Australia. It powers a gold and copper mine in remote WA. Commissioned in June 2016, it provides a solar and storage solution to the majority of the mine’s daytime electricity requirements, offsetting up to 20% of total diesel consumption annually. COLES AUSTRALIA-WIDE Coles has signed an agreement that will source large- scale generation certificates (LGCs) from Neoen’s portfolio of renewables located across New South Wales, Queensland, Victoria and South Australia. The deal will help Coles towards its target of 100% renewable energy by 2025. Page 3 WHAT DOES A BIG BATTERY LOOK LIKE? Our 150MW battery outside Jamestown, SA co-located with Hornsdale Wind Farm Our 20MW battery in Bulgana, Victoria located next to the Bulgana substation. Page 4 CHOOSING THE SITE 1) Good grid location 2) Proximity to substation 3) Renewables Support The Victorian Big Battery will This land is flat, making it ideal for The Victorian Big Battery will support be located near the existing construction and operation of a battery the increasing number of solar and Moorabool Terminal Station, storage facility, and is adjacent to the wind projects in Victoria and increase approximately 13km northwest high voltage 500KV transmission line transfer capacity over the Victoria- of Geelong. which means the power can be sent New South Wales Interconnector quickly to where it is needed. (VNI) of 250MW at peak times. 500m Evans Rd Atkinsons Road Moorabool Terminal Station VICTORIAN BIG BATTERY SITE Anakie Rd Steiglitz Rd Existing 500kV transmission line Moorabool River Geelong-Ballan Rd N GEELONG LOVELY W E MOORABOOL BANKS Geelong Ring Rd S Page 5 PROJECT LIFECYCLE PHASE 1: DEVELOPMENT Community Info Day Choose site Meet local Design land owners Government submission CONTRACT Appoint Service contract Grid connection Government contractors signed agreement approval Arrange finance PHASE 2: CONSTRUCTION Prepare for Hire workers Build Regular construction community updates PHASE 3: OPERATION Testing & accreditation Benefit-sharing initiatives Community Generate Grid celebration electricity connection Operations & maintenance Back to phase 1 Plant operates for 20+ years Site visits Environmental Renewal or & open days monitoring decommission? Decommission Page 6 WHAT CAN A BIG Basic function When there is excess energy, the battery will charge. When there is high demand for energy, the battery will discharge. Frequency support To maintain the stability of the system, the grid has frequency control. The battery injects electricity in response to frequency changes. The battery will also add competition to the markets which helps reduce consumer electricity prices, helping to reduce electricity costs. Page 7 BATTERY DO? Firming renewables Big batteries can store wind and solar energy, then release it when the wind isn’t blowing and the sun isn’t shining. The Victorian Big Battery aims to be an essential component in the stable transition to clean electricity. Transmission network support Grid-scale batteries can provide dynamic warp-speed responses so existing transmission lines can operate at full Inertia capacity. Like adding another lane to a As with vehicle suspension on an freeway, the battery can unlock additional uneven road, inertia services are capacity on existing transmission networks essential for stabilising the grid. A – saving customers millions of dollars in big battery can enable the advanced expensive transmission line upgrades. power inverters to emulate the existing The Victorian Big Battery will be inertia services being supplied by an performing this function to unlock more ageing fleet of fossil fuel power plants. room on the transmission line that This service is currently being trialled connects Victoria with New South Wales. at our Hornsdale Power Reserve. Page 8 FACTS & FIGURES GRID-SCALE ENERGY STORAGE SYSTEM 300MW 450MWh power capacity energy storage ENERGY STORAGE: Will hold enough energy in reserve to power over half a million homes for one hour SIZE: Will cover an area similar in size to the football oval at Geelong’s GMHBA Stadium OPERATIONAL: Will be operational by the end of 2021. THE TECHNOLOGY Battery packs are enclosed in custom designed, dust and waterproof ‘cabinets’ made of galvanised steel. Cabinet colour is white or light coloured to assist with heat management and each cabinet has its own internal thermal management system. Likely to be lithium-ion Will conform to electricity Battery cabinet battery packs enclosed industry standards Width: in steel cabinets , similar 2.5 metres to shipping containers Height: 2.5 metres Will use an industrial inverter to convert DC power to AC Will meet all safety and when discharging (vice versa bushfire risk requirements when charging) Length: 12 metres Inverter Will use 210 Tesla Megapacks which Width: 2.5 metres have a 20-year lifespan Inverters are made from galvanised steel, and may Height: exist as one single 20ft container or a few outdoor 2.5 metres cabinets on concrete slabs. Length: 12 metres Page 9 WE OWN & OPERATE OUR PROJECTS Victorian Big Battery Neoen’s Portfolio The Victorian Big Battery will be managed Neoen develops renewable energy from Neoen’s 24/7 Operational Control projects to own and operate them – not to Centre in Canberra, which currently on-sell them. With over GW of operating operates our 14 existing projects across projects connected to Australia’s National Australia. This office coordinates with Electricity Market (AEMO), our asset and local maintenance contractors for safe, operations team play an important role in effective and compliant operations. managing our power plants. Our Partnerships Neoen and Tesla have a proud history of working together on the world’s first big battery in South Australia. The Victorian Big Battery will use Tesla Megapack technology – a high -density, modular system that can be installed quickly. Neoen is working closely with our network partner AusNet Services, who will deliver the connection required for the Victorian Big Battery. AusNet Services is an ASX listed company which owns and operates the Moorabool Terminal Station and Victoria’s electricity transmission network. Page 10 WHAT HAPPENS DURING CONSTRUCTION Up to 80 people during peak construction 6 permanent staff EARLY WORKS CONSTRUCTION December 2020 – January 2021 February – July 2021 IN THE TOWN ON THE ROADS AT THE SITE Economic boost Road upgrades Increased activity The project is expected to Minor road upgrade works are being Increased activity with up to 80 provide more than 80 jobs during undertaken at the intersection of people at work. construction and six full-time Atkinsons Road and Geelong-Ballan The site has been mobilised with permanent jobs. Road to ensure safe access to the construction expected to continue battery site and in accordance with It provides opportunities for local until July/August, 2021. the Traffic Management Plan. suppliers, businesses, schools and community groups. Network partner AusNet Services has sourced the project’s power transformers from local business Wilson Transformer Company. Page 11 COMMUNITY BENEFITS Community benefit fund Educational resources Local tourism The funds would be allocated to Develop educational resources for Develop a local tourism initiative local community projects through a local schools to support learning centred on batteries or renewable competitive annual grants process.
Recommended publications
  • Zielmarktanalyse Australien
    www.exportinitiative.bmwi.de (A) Bereich für Bild AUSTRALIEN Energieeffiziente Lösungen für Infrastrukturentwicklung und Verkehr Zielmarktanalyse 2019 mit Profilen der Marktakteure www.german-energy-solutions.de Impressum Herausgeber German-Australian Chamber of Industry and Commerce Deutsch-Australische Industrie- und Handelskammer 8 Spring Street, Level 6 Sydney NSW 2000 Telefon: +61 2 8296 0400 E-Mail: [email protected] Webseite: www.germany-australia.com.au Stand 10.04.2019 Bildnachweis AHK Australien Redaktion Anja Kegel Director Consulting Services, Projects [email protected] Jürgen Wallstabe Consultant, Consulting Services, Projects [email protected] Mareile Teegen Consultant, Consulting Services, Projects & GTAI [email protected] Inhaltsverzeichnis I Tabellen 3 II Abbildungen 3 III Abkürzungen 4 1 Zusammenfassung 5 2 Länderprofil 6 2.1 Politischer Hintergrund 6 2.2 Wirtschaft, Struktur und Entwicklung 7 2.2.1 Aktuelle wirtschaftliche Lage 7 2.2.2 Außenhandel 8 2.2.3 Wirtschaftliche Beziehungen zu Deutschland 9 2.2.4 Investitionsklima und -förderung 9 3 Der Energiemarkt in Australien 10 3.1 Energieverbrauch 10 3.1.1 Energiebedarf und Aufteilung nach Sektoren 10 3.1.2 Energiequellen 12 3.1.3 Stromerzeugung und -verbrauch 13 3.2 Energiepreise 15 3.2.1 Strompreise 15 3.2.2 Gaspreise 15 3.2.3 Treibstoffpreise 16 3.3 Gesetzliche Rahmenbedingungen 17 3.4 Aktuelle Entwicklungen auf dem Energiemarkt 18 4 Energieeffiziente Lösungen für Infrastrukturentwicklung und Verkehr 21 4.1 Australische Trends mit
    [Show full text]
  • Community Information Booklet
    Community Information Booklet capitalbattery.com.au Gina Zheng, Project Manager [email protected] 1800 966 216 CONTENTS About Neoen 1 South Australia’s Big Battery 2 Delivering cheaper energy 3 Contribution to the Capital 5 What does a battery look like? 7 Project lifecycle 8 What can a battery do? 9 Facts & Figures 11 Choosing the site 12 Managed & operated in Canberra 13 Community Co-investment 14 FAQs 15 GLOBALLY The company is headquartered in Paris, EUROPE & AFRICA France, and has two Australian offices – in Finland Sydney and Canberra. AMERICAS Ireland USA France We operate across renewable energy Mexico Portugal technologies including solar, wind and storage El Salvador Zambia in Europe, Central America, Africa, the Middle Jamaica AUSTRALIA Mozambique East and Australia. Ecuador Australia Colombia Neoen’s total capacity in operation and under Argentina construction is currently over 3 GW and we are aiming for more than 5GW by 2021. LOCALLY Neoen Australia began operations in DeGrussa Solar and Storage Project Western Downs 2012. Over the last eight years the Green Power Hub company has initiated the development Dubbo Solar Hub Hornsdale Wind Farms 1, 2, 3 Parkes Solar Farm of more than 1.5GW of solar and wind Hornsdale Power Reserve Griffith Solar Farm projects through organic growth, local Coleambally Solar Farm partnerships and strategic acquisitions. Bulgana Green Power Hub Numurkah Solar Farm Neoen produce clean electricity from renewable sources such as sunlight and wind using mature, tried and tested technologies.
    [Show full text]
  • Energy Storage Report 2019
    21 FEBRUARY 2019 n WWW.RENEWS.BIZ RANKED N°1 The transatlantic IN RELIABILITY law firm close FOR BESS to home FIND OUT MORE Find out more here ENERGY STORAGE REPORT 2019 Storage spark for renewables MADE IN GERMANY CONTENTS 21 February 2019 ENERGY STORAGE 02 UK 03–09 Battery overdrive he global installation of energy service markets, such as the balancing n Developers get creative storage is surging as costs mechanism, are now the name of Energy storage is continue to fall and regulators the game. n Pivot’s ambitious play T n Eelpower and Orsted set to deliver step up efforts to facilitate batteries to “There was a very significant growth n Council and EU salt cavern schemes flourishing as costs help balance growing volumes of in interest in storage, particularly after intermittent generation. the enhanced frequency response Figures compiled by reNEWS show auction, which seems to have peaked,” IRELAND/GERMANY 10–12 fall and regulations around 2.5GW of 1MW-plus storage is said Anthony Price, director at UK loosen in the drive to due online in major markets in 2019 storage consultancy Swanbarton. — more than double the around 1GW “It has turned into a more mature balance grids, writes deployed last year. This expansion is market with more sophisticated types led by the UK, Australia, the US and of investors who are doing it with their Tim Probert South Africa. eyes open,” he added. Storage developers believe the Nonetheless, UK installations are n DS3 capped tender finally launched technology is on an unstoppable path due to hit almost 600MW in 2019, n Brandenburg flagship blueprint as renewables-plus-storage solutions which would top last year’s tally of n German power-to-gas nears reality become increasingly competitive with 460MW.
    [Show full text]
  • Project Update Week Ending 18 May 2018
    Project Update Week ending 18 May 2018 First Solar secures finance for May 2023, and the GST facility matures in May 2020. The Credit Facility is secured by NSW project pledges of the borrower’s assets, accounts, 11 May material project documents, and by the equity FS NSW Project No 1 Finco Pty Ltd, a limited interests in the entity. liability project financing company organized and existing under the laws of Australia and The Credit Facility contains customary an indirect wholly-owned subsidiary of First representations and warranties, covenants, Solar, Inc., entered into a term loan and events of default for comparable agreement with MUFG Bank, Ltd.; Société construction loan facilities in Australia. Générale, Hong Kong Branch; and Mizuho Bank, Ltd. (the “Credit Facility”). The Credit Source: First Solar Facility provides for aggregate borrowings of up to AUD 151.0 million ($113 million) and NOTE: First Solar is developing the 87 MW has been entered into for the development Beryl Solar Farm in NSW. and construction of a photovoltaic power plant of up to 87 MWAC located in New South Wales, Australia. Downer awarded Beryl Solar The Credit Facility consists of an AUD 140.0 Farm contract million ($105 million) construction loan 14 May facility, an AUD 7.0 million ($5 million) goods Downer EDI Limited (Downer) announced and service tax facility (“GST facility”) to fund today it had been awarded an Engineering, certain taxes associated with the construction Procurement and Construction (EPC) contract of the project, and an AUD 4.0 million ($3 worth approximately $150 million by First million) letter of credit facility.
    [Show full text]
  • 2019 AGM Chairman's Address and Presentation
    18 July 2019 Chairman’s Address and Annual General Meeting Presentation The Chairman’s Address and the presentation, to be given at today’s Annual General Meeting, are attached. Claire Hamilton Company Secretary 2019 CHAIRMAN’S ADDRESS Mr Peter Mason AM, Chairman, AusNet Services Good afternoon and welcome to AusNet Services’ Annual General Meeting. I would like to take this opportunity to thank you, as shareholders, for your continued support of our company during the past year. For the financial year ended 31 March 2019, AusNet Services has provided a solid performance for shareholders, increasing dividends by 5% and recording total shareholder returns of 13.9%, whilst making good progress refining and implementing our strategy. Australia’s energy sector continues to undergo disruption, driven by technology change, an accelerating shift to renewables and increasing customer engagement. Customer choices are shaping the energy supply chain and energy consumers have unprecedented opportunities to participate more actively in the sector. Policy uncertainty abounds in a national energy market that, as a result of Australia’s federal system of government, is subject to a mix of policies from the federal government and six state and two territory governments. In my Chairman’s message in the 2019 annual report, I noted the pressure upon governments and regulators to determine policies to assist the industry in responding to this disruption. For AusNet Services we must have an investment environment which enables us to adapt our long established transmission and distribution networks to provide access and supply in a pattern for which they were not originally designed.
    [Show full text]
  • Debt Market Update
    Debt Market Update Q1 2018 A number of large leveraged buyout transactions, renewable energy project financings as well as general purpose Key themes corporate (re)financing contributed to the loan volume in Q1 2018. Notable transactions for the quarter included: • Australian bank debt market – expectedly • Image Bidco Pty Ltd, the borrower for private equity firm slow start to the year, with the quarter opening with leveraged buyout transactions and more Permira Advisers Ltd launched a A$690 million 5-year renewable energy projects year LBO loan to fund its takeover of X-ray provider I-Med Pty Ltd. The opening margins are 375bps over BBSY for • Australian domestic bond market – steady amortising term loan and 400bps over BBSY for bullet opening to the market with issuers continuing term and revolver tranches; to benefit from investor demand, increasingly at longer tenors • China Merchants became the first Chinese bank to lead • USPP – the market continues to work for the the financing of a leveraged buyout in Australia, winning domestic borrowers and complement the local a sole mandate on a A$400 million loan for the acquisition markets of Real Pet Food Co. The interest margin is 250bps over BBSY, which appears competitively priced, • Robust pipeline - with several large-scale infrastructure projects in the 2018 pipeline demonstrating strong demand for local credit; • Sydney Desalination Plant received A$1.6 billion in AUSTRALIAN DOMESTIC BANK DEBT MARKET funding to refinance its existing debt. The deal contains a A$500 million 11-year Ninja loan underwritten by MUFG Consistent with every opening quarter since 2001, the first and syndicated to Japanese lenders.
    [Show full text]
  • Clean Energy Australia Report 2021
    CLEAN ENERGY AUSTRALIA REPORT 2021 AUSTRALIA CLEAN ENERGY CLEAN ENERGY AUSTRALIA REPORT 2021 CONTENTS 4 Introduction 6 2020 snapshot 12 Jobs and investment in renewable energy by state 16 Industry outlook: small-scale renewable energy 20 Industry outlook: large-scale renewable energy 22 Federal politics 24 State policies 26 Australian Capital Territory 28 New South Wales 30 Northern Territory 32 Queensland 34 South Australia 36 Tasmania 38 Victoria 40 Western Australia 42 Employment 46 Renewables for business 50 International update 52 Electricity prices 54 Transmission 56 Energy reliability 58 Technology profiles 60 Battery storage 64 Bioenergy 66 Hydro and pumped hydro 68 Hydrogen 70 Solar: Small-scale systems up to 100 kW 78 Solar: Medium-scale systems between 100 kW and 5 MW 80 Solar: Large-scale systems larger than 5 MW 84 Wind Cover image: Wind turbine blade installation, Collector Wind Farm, New South Wales INTRODUCTION Kane Thornton Chief Executive, Clean Energy Council Australia’s clean energy came from clean energy sources, territories’ progressive energy policies transition accelerated with wind and rooftop solar leading only served to highlight the ongoing again in 2020 as wind the way. This represents a massive failures at the federal level, where transformation that makes Australia’s arguments about government support and rooftop solar set new electricity system cheaper, more for gas and coal overshadowed some records, battery storage reliable and, most importantly, cleaner. genuinely positive developments. came of age, and the But the best news is that the shift is These included the continued showing no sign of slowing down. hydrogen sector continued growth of clean energy jobs, with the its rapid development.
    [Show full text]
  • Wind Map of Australia 2021
    LEGEND Place name 88 Under construction 88 Project 88 Operating Asset Main owner opened, Year expected completion Capacity (MW) Asset Main owner opened, Year expected completion Capacity (MW) WESTERN AUSTRALIA NEW SOUTH WALES 5km wind map Mean wind speed at 80m 1 Collgar REST 2011 206 107 Sapphire Partners Group 2018 270 108 Silverton Powering Australian 2020 200 11 21 32km/h 2 Badgingarra APA Group 2019 130 Renewables 3 Walkaway 1 Infigen Energy 2006 89 109 White Rock Wind Farm Stage 1 CECWPC 2018 175 4 Emu Downs Wind APA Group 2006 80 110 Gullen Range Beijing Jingneng Clean 2014 166 DARWIN 5 Mumbida Infrastructure Capital Group 2013 55 Energy Australia 6 Albany Bright Energy 2001 21 111 Capital Infigen Energy 2009 141 7 Agnew Mine Hybrid EDL 2020 18 112 Crudine Ridge Partners Group 2020 135 Wind Map of 3 6 9m /s 8 Grasmere Bright Energy 2012 14 113 Bodangora Infigen Energy 2019 113 9 Karakin Wind Farm Blair Fox 2013 5 114 Boco Rock EGCO 2014 113 10 West Hills Wind Farm Blair Fox 2012 5 115 Taralga Pacific Hydro 2015 107 11 Nine Mile Synergy 2003 4 116 Crookwell 2 Naturgy 2018 91 12 Port Gregory Advanced Energy Resources 2019 3 117 Woodlawn Infigen Energy 2011 48 13 Mt Barker Mt Barker Power 2011 2 118 Gunning Wind Acciona 2011 47 Australia 2021 14 Ten Mile Lagoon Synergy 1993 2 119 Cullerin Range Energy Developments 2009 30 15 Denmark Community Denmark Community 2010 2 120 Blayney Tilt Renewables 2001 10 The Wind Map of Australia 2021 shows approximate locations of wind projects bigger than 1MW operating, under construction or in the planning 16 Kalbarri Synergy 2008 2 121 Crookwell Tilt Renewables 1998 5 process as of December 2020.
    [Show full text]
  • Clean Energy Australia 2020
    CLEAN ENERGY AUSTRALIA CLEAN ENERGY AUSTRALIA REPORT 2020 AUSTRALIA CLEAN ENERGY REPORT 2020 CONTENTS 4 Introduction 6 2019 snapshot 12 Jobs and investment in renewable energy by state 15 Project tracker 16 Renewable Energy Target a reminder of what good policy looks like 18 Industry outlook: small-scale renewable energy 22 Industry outlook: large-scale renewable energy 24 State policies 26 Australian Capital Territory 28 New South Wales 30 Northern Territory 32 Queensland 34 South Australia 36 Tasmania 38 Victoria 40 Western Australia 42 Employment 44 Renewables for business 48 International update 50 Electricity prices 52 Transmission 54 Energy reliability 56 Technology profiles 58 Battery storage 60 Hydro and pumped hydro 62 Hydrogen 64 Solar: Household and commercial systems up to 100 kW 72 Solar: Medium-scale systems between 100 kW and 5 MW 74 Solar: Large-scale systems larger than 5 MW 78 Wind Cover image: Lake Bonney Battery Energy Storage System, South Australia INTRODUCTION Kane Thornton Chief Executive, Clean Energy Council Whether it was the More than 2.2 GW of new large-scale Despite the industry’s record-breaking achievement of the renewable generation capacity was year, the electricity grid and the lack of Renewable Energy Target, added to the grid in 2019 across 34 a long-term energy policy continue to projects, representing $4.3 billion in be a barrier to further growth for large- a record year for the investment and creating more than scale renewable energy investment. construction of wind and 4000 new jobs. Almost two-thirds of Grid congestion, erratic transmission solar or the emergence this new generation came from loss factors and system strength issues of the hydrogen industry, large-scale solar, while the wind sector caused considerable headaches for by any measure 2019 was had its best ever year in 2019 as 837 project developers in 2019 as the MW of new capacity was installed grid struggled to keep pace with the a remarkable year for transition to renewable energy.
    [Show full text]
  • Supplementary Submission No 6A SUSTAINABILITY of ENERGY SUPPLY and RESOURCES IN
    Supplementary Submission No 6a SUSTAINABILITY OF ENERGY SUPPLY AND RESOURCES IN NSW Name: Mr Adrian Ingleby Date Received: 6 May 2020 Adrian Ingleby 5th May, 2020 My second submission to the inquiry on Sustainability of energy supply and resources in NSW Re :- The inquiry’s terms of reference having been updated to reflect new economic challenges facing NSW in light of the COVID-19 pandemic. In addition to the existing terms of reference, the Committee will also consider the capacity and economic opportunities of renewable energy for workforces, industries, and the wider economy impacted by COVID-19. 1. In my first submission [on page 3] I said, “The renewable energy revolution can’t be stopped.” That claim remains true, however, it can be impeded and slowed down. Who has the power to impede the renewable energy revolution? 2. Politicians, governments, opposition parties at a state, territory and federal level. Why impede? - when our planet is threated by global warming and climate change? 3. The main source of energy supply to NSW and Australia over the past 100 years has been via fossil fuels in the form of coal, gas and oil. The lobby groups representing those industries support the two major political parties [LNP/Nationals & Labor] at a state, territory and federal level with massive donations. The sums of money donated are in almost equal amounts to the presiding government and its opposition. The fossil fuel energy sector have the advantage of being the larger long-serving incumbent energy supplier with established political contacts. They want to protect their business model and defend it against any opposition ie the renewable energy sector.
    [Show full text]
  • Market and Regulatory Update Australian Energy Storage Alliance Conference
    MARKET AND REGULATORY UPDATE AUSTRALIAN ENERGY STORAGE ALLIANCE CONFERENCE SUZANNE FALVI, EGM SECURITY AND RELIABILITY 12 JUNE 2019 Overview 1. National electricity market 2. Governance of energy markets 3. Changing power system 4. AEMC reform priorities 5. Regulatory projects relevant to storage 2 National electricity market • >40,000 km of transmission lines • ~200 TWh of electricity to businesses and households each year • Total electricity generating capacity of almost 54,421 MW (as at Dec 2017) • >$18 billion annual turnover in 2018 3 NEM market design WHOLESALE MARKET (Generators sell their power to retailers) RETAIL MARKET NATURAL MONOPOLIES METER ELECTRICITY SUPPLY CHAIN ELECTRICITY TRANSMISSION DISTRIBUTION RETAILER GENERATION NETWORK CONSUMERS More consumers are buying and selling power NETWORK REGULATION The rules enable the regulator to set the maximum prices network business AEMC MAKES AUSTRALIAN ENERGY REGULATOR can charge for services they provide. THE RULES RULES (AER) APPLIES THE RULES Prices are set every five years. Natural Monopoly Sector Component Competitive Sector Component 46.5% 53.5% Based on the average NSW residential bill in 2017/2018. Source: AEMC Price Trends 2018 4 National governments and energy policy development COAG COAG Energy Council Council of Australian COAG Energy Council Governments (COAG) is made up of the nation’s implements policy reforms of energy ministers. They provide national significance that require national leadership on energy cooperative action by federal, market development which state and territory governments is so important for the health of the national economy 5 Market body roles AEMC AER AEMO Australian Energy Australian Energy Australian Energy Market Commission Regulator Market Operator Rule maker, market Economic regulation Electricity and gas systems developer and expert adviser and rules compliance and market operator to governments Polices the system and Works with industry Protects consumers and achieves monitors the market.
    [Show full text]
  • Transmission Loss Factors) Rule 2020
    Australian Energy Market Commission RULE DETERMINATION RULE NATIONAL ELECTRICITY AMENDMENT (TRANSMISSION LOSS FACTORS) RULE 2020 PROPONENT Adani Renewables 27 FEBRUARY 2020 Australian Energy Rule determination Market Commission Transmission loss factors 27 February 2020 INQUIRIES Australian Energy Market Commission PO Box A2449 Sydney South NSW 1235 E [email protected] T (02) 8296 7800 F (02) 8296 7899 Reference: ERC0251 CITATION AEMC, Transmission loss factors, Rule determination, 27 February 2020 ABOUT THE AEMC The AEMC reports to the Council of Australian Governments (COAG) through the COAG Energy Council. We have two functions. We make and amend the national electricity, gas and energy retail rules and conduct independent reviews for the COAG Energy Council. This work is copyright. The Copyright Act 1968 permits fair dealing for study, research, news reporting, criticism and review. Selected passages, tables or diagrams may be reproduced for such purposes provided acknowledgement of the source is included. Australian Energy Rule determination Market Commission Transmission loss factors 27 February 2020 SUMMARY 1 The Australian Energy Market Commission (AEMC or Commission) has made a more preferable rule to provide the Australian Energy Market Operator (AEMO) with greater flexibility to refine and improve the methodology to determine marginal loss factors (MLF). 2 This final rule complements the recent changes the Commission has made to the National Electricity Rules (NER) on improving the transparency of new generation projects.1 It also supports AEMO's work to improve the transparency and predictability of loss factors. Together, these changes are in the long term interest of consumers as they will enable better, more informed decision-making for prospective investors of generation assets.
    [Show full text]