Building Stronger Communities Wind’S Growing Role in Regional Australia (Second Edition) 1 Note to Second Edition – November 2019
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Cattle Hill Wind Farm Collision Avoidanceanddetectionplan (CADP)
1 Joule Logic Renewable Energy and Environment Specialists Cattle Hill Wind Farm Collision Avoidance and Detection Plan (CADP) Developed to satisfy the requirements of Condition 6A of the Commonwealth Approval EPBC 2009/4839 for the Cattle Hill Wind Farm Date Revision Prepared Reviewed Approved 22/05/2018 5 Cindy Hull Sue Marsh Jeff Bembrick Joule Logic Joule Logic Goldwind Australia 2 Disclaimer Reports produced by Joule Logic Pty Ltd are prepared based on the Client’s objective and are based on a specific scope, conditions and limitations, as agreed between Joule Logic and the Client. Information and/or report(s) prepared by Joule Logic may not be suitable for uses other than the original intended objective. No parties other than the Client should use any information and/or report(s) without first conferring with Joule Logic. Although Joule Logic has taken all necessary steps to ensure that an accurate report has been prepared, the Company accepts no liability for any damages or loss incurred as a result of reliance placed upon the report and its contents. Copyright The concepts and information contained in this document are the property of Joule Logic. Use or copying of this document in whole or in part without the written permission of Joule Logic constitutes an infringement of copyright. Information shall not be assigned to a third party without prior consent. 3 Definitions In this Collision Avoidance and Detection Plan the following definitions apply: Cattle Hill Wind Farm Comprising 48 wind turbines and 150 MW capacity Central Highlands Region Is that described in Environment Protection Notice No. -
Wind Turbine Transportation
Wind Turbine Transportation Temporary delays – Gateway Motorway / Mt Gravatt-Capalaba Road intersection May 2019 – July 2019 Saturday to Thursday nights between 10pm and 12am Saturday to Thursday nights (six nights per week), between 10pm and 12am, the intersection of the Gateway Motorway and Mt Gravatt-Capalaba Road will be closed intermittently, for approximately 15-20 minutes, to allow for the safe movement of oversize vehicles transporting wind turbine blades and large tower sections to the Coopers Gap Wind Farm near Cooranga North. Traffic will be held at the Gateway Motorway / Mt Gravatt-Capalaba Road intersection and on the motorway off-ramp until it is safe to continue. We will try to minimise the disruption to other road users where possible, but some delays are to be expected. These temporary closures will be in place between May and July 2019. Closure times Gateway Motorway / Mt Gravatt-Capalaba Road intersection • Saturday to Thursday nights (six nights per week), intermittent closures between 10pm – 12am, from May to July 2019 Transportation of oversize wind turbine components Between January and November 2019, components for the wind farm’s 123 GE wind turbines will be transported over 300km from the Port of Brisbane to the Coopers Gap Wind Farm site. In total there will be approximately 1200 oversize transport movements to deliver all of the wind turbine components to site – including blades, tower sections, hubs and nacelles. The blades, which are up to 67.2 metres long, are the largest wind turbine blades ever transported in Australia. The movement of such large pieces of equipment requires detailed planning and coordination. -
Miners Rights
Archives ACT Finding Aid ACT Miner’s Rights Introduction This index lists 200 miner’s rights issued under section 12 of the Mining Ordinance 1930-193, 31 entries in the Register of Applications for Authority to Prospect made under section 14 of the Ordinance and the 2 entries in the Register of Leases made under section 38 of the Ordinance. The first entry in the Register of Applications for Authority to Prospect was in 1932 and the last in 1962. Before the Mining Ordinance of 1930, New South Wales legislation was applied in the Australian Capital Territory. Those acts were the Mining Act 1906 and the Mining Amendment Act 1907. To locate mining leases issued before 1930 in the area of New South Wales that became the Australian Capital Territory, use the State Records Authority of New South Wales online index to gold mining leases 1874-1928 at: http://www.records.nsw.gov.au/state-archives/indexes-online/indexes-to-land-records/registers-of-auriferous-gold-leases-1874-1928 This index includes NRS 10100, Mines, Registers of leases of auriferous lands, Tumut and Adelong Mining District (Adelong, Tumut, Tumbarumba, Gundagai, Kiandra, Queanbeyan, Captains Flat, Albury, Cooma) 1875-1908.. This index is compiled from the following items: Register of applications Register of leases Miner's rights 1- 50 Miner's rights 51- 100 Miner's rights 101- 150 Miner's rights 151- 200 Territory and Municipal Services • Territory Records Office • ArchivesACT GPO Box 158 • Canberra ACT 2601 • Telephone (02) 6207 5726 • Facsimile (02) 6207 5835 Web: www.archives.act.gov.au email: [email protected] Version 1 21 December 2010 Miner's rights, Authority to Prospect and Mining Leases No. -
Report: the Social and Economic Impact of Rural Wind Farms
The Senate Community Affairs References Committee The Social and Economic Impact of Rural Wind Farms June 2011 © Commonwealth of Australia 2011 ISBN 978-1-74229-462-9 Printed by the Senate Printing Unit, Parliament House, Canberra. MEMBERSHIP OF THE COMMITTEE 43rd Parliament Members Senator Rachel Siewert, Chair Western Australia, AG Senator Claire Moore, Deputy Chair Queensland, ALP Senator Judith Adams Western Australia, LP Senator Sue Boyce Queensland, LP Senator Carol Brown Tasmania, ALP Senator the Hon Helen Coonan New South Wales, LP Participating members Senator Steve Fielding Victoria, FFP Secretariat Dr Ian Holland, Committee Secretary Ms Toni Matulick, Committee Secretary Dr Timothy Kendall, Principal Research Officer Mr Terence Brown, Principal Research Officer Ms Sophie Dunstone, Senior Research Officer Ms Janice Webster, Senior Research Officer Ms Tegan Gaha, Administrative Officer Ms Christina Schwarz, Administrative Officer Mr Dylan Harrington, Administrative Officer PO Box 6100 Parliament House Canberra ACT 2600 Ph: 02 6277 3515 Fax: 02 6277 5829 E-mail: [email protected] Internet: http://www.aph.gov.au/Senate/committee/clac_ctte/index.htm iii TABLE OF CONTENTS MEMBERSHIP OF THE COMMITTEE ...................................................................... iii ABBREVIATIONS .......................................................................................................... vii RECOMMENDATIONS ................................................................................................. ix CHAPTER -
Project Updates Further Details Are Available in the Application Week Ending 28 April 2017 for Electricity Generation Authority: AGL Hydro
approximately 50km south-west of Kingaroy and 65km north of Dalby. The Regulator is seeking feedback from interested persons with regards to issuing AGL Hydro Partnership (the operator of the proposed generator) a generation authority for the Coopers Gap Wind Farm. Project Updates Further details are available in the Application Week ending 28 April 2017 for electricity generation authority: AGL Hydro Partnership for the Coopers Gap Wind Farm information paper. Off-Site Renewable Energy EOI 26 April Have your say Monash University (Monash) is inviting Written submissions about the proposed Expressions of Interest (EOI) from suitably Coopers Gap Wind Farm are welcome. Please qualified, experienced and resourced send your submissions to: providers for the long-term contract supply of 45 to 55 GWh of electricity from a renewable Email: energy source. The contract will also include [email protected] the provision of renewable energy certificates, namely Large-scale Generation Mail: Attn: Andrea Wold Certificates (LGC's). Regulation, Governance and Analytics Department of Energy and Water Supply More information available from PO Box 15456 https://www.tenderlink.com/monashuni/ CITY EAST QLD 4002 Source: Monash University Submissions close at 5pm on Monday, 1 May 2017. Source: Queensland Government Coopers Gap Wind Farm Click on project to go to online datasheet: Coopers Gap Wind Farm Under the Electricity Act 1994, the Regulator (i.e. the Director-General of the Department of Energy and Water Supply) issues authorities (licences) for generation, transmission and distribution activities in Queensland’s electricity industry. Storage to strengthen Victoria’s energy system When an applicant applies for a generation 27 April authority to connect generating plant with The Andrews Labor Government is calling for capacity greater than 30 megawatts (MW) to detailed proposals for large scale battery a transmission grid or supply network, the energy storage facilities in western Victoria. -
FINAL REPORT Annual Market Performance Review 2014
ghgh FINAL REPORT Annual Market Performance Review 2014 16 July 2015 Reference: REL0055 Final Report Inquiries Reliability Panel Australian Energy Market Commission PO Box A2449 Sydney South NSW 1235 E: [email protected] T: (02) 8296 7800 F: (02) 8296 7899 Reference: REL0055 Citation Reliability Panel, Annual Market Performance Review 2014, Final report, 16 July 2015, Sydney About the Reliability Panel The Reliability Panel (Panel) is a specialist body established by the AEMC and comprises industry and consumer representatives. It is responsible for monitoring, reviewing and reporting on reliability, security and safety of the national electricity system and advising the AEMC in respect of such matters. The Panel’s responsibilities are specified in section 38 of the National Electricity Law. This work is copyright. The Copyright Act 1968 permits fair dealing for study, research, news reporting, criticism and review. Selected passages, tables or diagrams may be reproduced for such purposes provided acknowledgement of the source is included. Foreword I am pleased to present this report setting out the findings of the Reliability Panel's annual review of market performance. The Panel carried out this review in accordance with the requirements of the National Electricity Rules where we have reviewed the performance of the National Electricity Market (NEM) in terms of reliability, security and safety over the 2013-14 financial year. The NEM regions experienced the warmest spring on record for Australia in 2013. Temperatures were warmer than average for Australia over summer and autumn with a number of heat waves affecting Victoria, South Australia and Tasmania during January 2014. -
Gippsland Roadmap
9 Dec 2019 The Energy Innovation Foreword Co-operative1, which has 10 years of experience On behalf of the Victorian Government, I am pleased to present the Victorian Regional Renewable Energy Roadmaps. delivering community-based As we transition to cleaner energy with new opportunities for jobs and greater security of supply, we are looking to empower communities, accelerate renewable energy and build a more sustainable and prosperous energy efficiency and state. renewable energy initiatives in Victoria is leading the way to meet the challenges of climate change by enshrining our Victorian Renewable Energy Targets (VRET) into law: 25 per the Southern Gippsland region, cent by 2020, rising to 40 per cent by 2025 and 50 per cent by 2030. Achieving the 2030 target is expected to boost the Victorian economy by $5.8 billion - driving metro, regional and rural industry and supply chain developed this document in development. It will create around 4,000 full time jobs a year and cut power costs. partnership with Community It will also give the renewable energy sector the confidence it needs to invest in renewable projects and help Victorians take control of their energy needs. Power Agency (community Communities across Barwon South West, Gippsland, Grampians and Loddon Mallee have been involved in discussions to help define how Victoria engagement and community- transitions to a renewable energy economy. These Roadmaps articulate our regional communities’ vision for a renewable energy future, identify opportunities to attract investment and better owned renewable energy understand their community’s engagement and capacity to transition to specialists)2, Mondo renewable energy. -
GOLDWIND AUSTRALIA PTY LTD Level 25, Tower 1, International Towers Sydney 100 Barangaroo Ave, Barangaroo NSW 2000
GOLDWIND AUSTRALIA PTY LTD Level 25, Tower 1, International Towers Sydney 100 Barangaroo Ave, Barangaroo NSW 2000 www.goldwindaustralia.com 11 September 2020 The Hon. Guy Barnett, MP Minister for Energy Department of State Growth 4 Salamanca Pl Hobart TAS 7000 Dear Minister Barnett Re: Response to the Draft Tasmanian Renewable Energy Action Plan Goldwind Australia (Goldwind) is pleased to present this response to the Tasmanian Governments Draft Renewable Energy Action Plan. Goldwind has over ten years’ experience of building renewable energy projects across Australia, with 562MW operating including the 144MW Cattle Hill Wind Farm in Tasmania, 960MW of wind farms currently under construction and a further 1.3 GW in the immediate development pipeline. As an experienced renewable energy developer, Goldwind shares the vision expressed in the Tasmanian Renewable Energy Action Plan and applauds the goal of achieving a 200% renewable energy target by 2040. We consider this long-term vision will bring substantial economic, social and environmental benefits for Tasmanian. We have made several suggestions that Goldwind considers would help achieve the stated goals in an efficient and effective manner. These are detailed in our submission, which is attached as Attachment A. We will continue to pursue opportunities for further renewable energy generation in Tasmania. John Titchen Managing Director, Goldwind Australia Goldwind Australia Pty Ltd (ABN 32 140 108 390) GOLDWIND AUSTRALIA PTY LTD Level 25, Tower 1, International Towers Sydney 100 Barangaroo Ave, Barangaroo NSW 2000 www.goldwindaustralia.com Attachment A Goldwind Australia Response to the Draft Renewable Energy Action Plan (Action Plan) 1. Introduction Goldwind supports the vision for Tasmania to become a powerhouse of sustainable, low cost and reliable energy production. -
Alinta Energy Sustainability Report 2018/19
Alinta Energy Sustainability Report 2018/19 ABN 39 149 229 998 Contents A message from our Managing Director and CEO 2 Employment 50 FY19 highlights 4 Employment at Alinta Energy 52 Key sustainability performance measures 6 Employee engagement 53 Employee data 54 Our business 8 Supporting our people 55 Offices 10 Ownership 10 Our communities 60 Where we operate 12 Community development program 62 Electricity generation portfolio 14 Employee volunteering 62 Sales and customers 17 Sponsorships, donations and partnerships 64 Vision and values 18 Excellence Awards – community contribution 64 Business structure and governance 19 Community impacts from operations 65 Executive leadership team 20 Management committees 21 Markets and customers 66 Board biographies 21 Customer service 68 Risk management and compliance 23 Branding 72 Economic health 24 New products and projects 74 Market regulation and compliance 74 Safety 26 Fusion – our transformation program 77 Safety performance 28 Safety governance 29 Our report 80 Safety and wellbeing initiatives and programs 32 Reporting principles 82 Glossary 83 Environment 34 GRI and UNSDG content index 85 Climate change and energy industry 36 Sustainability materiality assessment 88 National government programs, policies and targets 39 Deloitte Assurance Report 96 State government programs, policies and targets 40 Energy consumption and emissions 42 Our approach to renewable energy 43 Energy efficiency and emission reduction projects 45 Environmental compliance 46 Waste and water 47 Case study 48 2018/19 Alinta Energy - Sustainability Report Page 1 Changes to our vision and leadership A message My comment above on our new vision to be the best energy company sounds a little different than in the past. -
Zielmarktanalyse Australien
www.exportinitiative.bmwi.de (A) Bereich für Bild AUSTRALIEN Energieeffiziente Lösungen für Infrastrukturentwicklung und Verkehr Zielmarktanalyse 2019 mit Profilen der Marktakteure www.german-energy-solutions.de Impressum Herausgeber German-Australian Chamber of Industry and Commerce Deutsch-Australische Industrie- und Handelskammer 8 Spring Street, Level 6 Sydney NSW 2000 Telefon: +61 2 8296 0400 E-Mail: [email protected] Webseite: www.germany-australia.com.au Stand 10.04.2019 Bildnachweis AHK Australien Redaktion Anja Kegel Director Consulting Services, Projects [email protected] Jürgen Wallstabe Consultant, Consulting Services, Projects [email protected] Mareile Teegen Consultant, Consulting Services, Projects & GTAI [email protected] Inhaltsverzeichnis I Tabellen 3 II Abbildungen 3 III Abkürzungen 4 1 Zusammenfassung 5 2 Länderprofil 6 2.1 Politischer Hintergrund 6 2.2 Wirtschaft, Struktur und Entwicklung 7 2.2.1 Aktuelle wirtschaftliche Lage 7 2.2.2 Außenhandel 8 2.2.3 Wirtschaftliche Beziehungen zu Deutschland 9 2.2.4 Investitionsklima und -förderung 9 3 Der Energiemarkt in Australien 10 3.1 Energieverbrauch 10 3.1.1 Energiebedarf und Aufteilung nach Sektoren 10 3.1.2 Energiequellen 12 3.1.3 Stromerzeugung und -verbrauch 13 3.2 Energiepreise 15 3.2.1 Strompreise 15 3.2.2 Gaspreise 15 3.2.3 Treibstoffpreise 16 3.3 Gesetzliche Rahmenbedingungen 17 3.4 Aktuelle Entwicklungen auf dem Energiemarkt 18 4 Energieeffiziente Lösungen für Infrastrukturentwicklung und Verkehr 21 4.1 Australische Trends mit -
Community Information Booklet
Community Information Booklet capitalbattery.com.au Gina Zheng, Project Manager [email protected] 1800 966 216 CONTENTS About Neoen 1 South Australia’s Big Battery 2 Delivering cheaper energy 3 Contribution to the Capital 5 What does a battery look like? 7 Project lifecycle 8 What can a battery do? 9 Facts & Figures 11 Choosing the site 12 Managed & operated in Canberra 13 Community Co-investment 14 FAQs 15 GLOBALLY The company is headquartered in Paris, EUROPE & AFRICA France, and has two Australian offices – in Finland Sydney and Canberra. AMERICAS Ireland USA France We operate across renewable energy Mexico Portugal technologies including solar, wind and storage El Salvador Zambia in Europe, Central America, Africa, the Middle Jamaica AUSTRALIA Mozambique East and Australia. Ecuador Australia Colombia Neoen’s total capacity in operation and under Argentina construction is currently over 3 GW and we are aiming for more than 5GW by 2021. LOCALLY Neoen Australia began operations in DeGrussa Solar and Storage Project Western Downs 2012. Over the last eight years the Green Power Hub company has initiated the development Dubbo Solar Hub Hornsdale Wind Farms 1, 2, 3 Parkes Solar Farm of more than 1.5GW of solar and wind Hornsdale Power Reserve Griffith Solar Farm projects through organic growth, local Coleambally Solar Farm partnerships and strategic acquisitions. Bulgana Green Power Hub Numurkah Solar Farm Neoen produce clean electricity from renewable sources such as sunlight and wind using mature, tried and tested technologies. -
Clean Energy Fact Sheet We All Want Affordable, Reliable and Clean Energy So We Can Enjoy a Good Quality of Life
Clean Energy fact sheet We all want affordable, reliable and clean energy so we can enjoy a good quality of life. This fact sheet sets out how we’re leading a transition from fossil fuels to cleaner forms of energy. Background Minimising or, where we can, avoiding financial EnergyAustralia is one of the country’s biggest hardship is part of the challenge as we transition generators of power from fossil fuels. Each to cleaner generation. We need to do this while preserving the reliability of supply. +800 MW year we produce around 20 million tonnes Rights to of greenhouse gases, mostly carbon dioxide Our approach involves supporting the renewable energy or CO₂, from burning coal and gas to supply development of clean energy while helping our electricity to our 2.4 million accounts across customers manage their own consumption so eastern Australia. they use less energy. Because when they do For around a century, coal-fired power plants that, they generate fewer emissions and they ~$3B have provided Australians with reliable and save money. Long term affordable power and supported jobs and renewable Supporting renewable energy agreements economic development. The world is changing with fossil fuel generation being replaced by Right now, EnergyAustralia has the rights to lower emissions technologies. more than 800 MW worth of renewable energy, combining solar and wind farm power purchase The way we generate, deliver and use energy agreements, and we half-own the Cathedral 7.5% has to change. As a big emitter of carbon, it’s Rocks wind farm. Of large-scale up to us to lead the transition to cleaner energy wind and solar in a way that maintains that same reliable and project in the NEM affordable access to energy for everyone.