Clean Energy Australia Report 2021
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Cattle Hill Wind Farm Collision Avoidanceanddetectionplan (CADP)
1 Joule Logic Renewable Energy and Environment Specialists Cattle Hill Wind Farm Collision Avoidance and Detection Plan (CADP) Developed to satisfy the requirements of Condition 6A of the Commonwealth Approval EPBC 2009/4839 for the Cattle Hill Wind Farm Date Revision Prepared Reviewed Approved 22/05/2018 5 Cindy Hull Sue Marsh Jeff Bembrick Joule Logic Joule Logic Goldwind Australia 2 Disclaimer Reports produced by Joule Logic Pty Ltd are prepared based on the Client’s objective and are based on a specific scope, conditions and limitations, as agreed between Joule Logic and the Client. Information and/or report(s) prepared by Joule Logic may not be suitable for uses other than the original intended objective. No parties other than the Client should use any information and/or report(s) without first conferring with Joule Logic. Although Joule Logic has taken all necessary steps to ensure that an accurate report has been prepared, the Company accepts no liability for any damages or loss incurred as a result of reliance placed upon the report and its contents. Copyright The concepts and information contained in this document are the property of Joule Logic. Use or copying of this document in whole or in part without the written permission of Joule Logic constitutes an infringement of copyright. Information shall not be assigned to a third party without prior consent. 3 Definitions In this Collision Avoidance and Detection Plan the following definitions apply: Cattle Hill Wind Farm Comprising 48 wind turbines and 150 MW capacity Central Highlands Region Is that described in Environment Protection Notice No. -
Wind Turbine Transportation
Wind Turbine Transportation Temporary delays – Gateway Motorway / Mt Gravatt-Capalaba Road intersection May 2019 – July 2019 Saturday to Thursday nights between 10pm and 12am Saturday to Thursday nights (six nights per week), between 10pm and 12am, the intersection of the Gateway Motorway and Mt Gravatt-Capalaba Road will be closed intermittently, for approximately 15-20 minutes, to allow for the safe movement of oversize vehicles transporting wind turbine blades and large tower sections to the Coopers Gap Wind Farm near Cooranga North. Traffic will be held at the Gateway Motorway / Mt Gravatt-Capalaba Road intersection and on the motorway off-ramp until it is safe to continue. We will try to minimise the disruption to other road users where possible, but some delays are to be expected. These temporary closures will be in place between May and July 2019. Closure times Gateway Motorway / Mt Gravatt-Capalaba Road intersection • Saturday to Thursday nights (six nights per week), intermittent closures between 10pm – 12am, from May to July 2019 Transportation of oversize wind turbine components Between January and November 2019, components for the wind farm’s 123 GE wind turbines will be transported over 300km from the Port of Brisbane to the Coopers Gap Wind Farm site. In total there will be approximately 1200 oversize transport movements to deliver all of the wind turbine components to site – including blades, tower sections, hubs and nacelles. The blades, which are up to 67.2 metres long, are the largest wind turbine blades ever transported in Australia. The movement of such large pieces of equipment requires detailed planning and coordination. -
Report: the Social and Economic Impact of Rural Wind Farms
The Senate Community Affairs References Committee The Social and Economic Impact of Rural Wind Farms June 2011 © Commonwealth of Australia 2011 ISBN 978-1-74229-462-9 Printed by the Senate Printing Unit, Parliament House, Canberra. MEMBERSHIP OF THE COMMITTEE 43rd Parliament Members Senator Rachel Siewert, Chair Western Australia, AG Senator Claire Moore, Deputy Chair Queensland, ALP Senator Judith Adams Western Australia, LP Senator Sue Boyce Queensland, LP Senator Carol Brown Tasmania, ALP Senator the Hon Helen Coonan New South Wales, LP Participating members Senator Steve Fielding Victoria, FFP Secretariat Dr Ian Holland, Committee Secretary Ms Toni Matulick, Committee Secretary Dr Timothy Kendall, Principal Research Officer Mr Terence Brown, Principal Research Officer Ms Sophie Dunstone, Senior Research Officer Ms Janice Webster, Senior Research Officer Ms Tegan Gaha, Administrative Officer Ms Christina Schwarz, Administrative Officer Mr Dylan Harrington, Administrative Officer PO Box 6100 Parliament House Canberra ACT 2600 Ph: 02 6277 3515 Fax: 02 6277 5829 E-mail: [email protected] Internet: http://www.aph.gov.au/Senate/committee/clac_ctte/index.htm iii TABLE OF CONTENTS MEMBERSHIP OF THE COMMITTEE ...................................................................... iii ABBREVIATIONS .......................................................................................................... vii RECOMMENDATIONS ................................................................................................. ix CHAPTER -
Project Updates Further Details Are Available in the Application Week Ending 28 April 2017 for Electricity Generation Authority: AGL Hydro
approximately 50km south-west of Kingaroy and 65km north of Dalby. The Regulator is seeking feedback from interested persons with regards to issuing AGL Hydro Partnership (the operator of the proposed generator) a generation authority for the Coopers Gap Wind Farm. Project Updates Further details are available in the Application Week ending 28 April 2017 for electricity generation authority: AGL Hydro Partnership for the Coopers Gap Wind Farm information paper. Off-Site Renewable Energy EOI 26 April Have your say Monash University (Monash) is inviting Written submissions about the proposed Expressions of Interest (EOI) from suitably Coopers Gap Wind Farm are welcome. Please qualified, experienced and resourced send your submissions to: providers for the long-term contract supply of 45 to 55 GWh of electricity from a renewable Email: energy source. The contract will also include [email protected] the provision of renewable energy certificates, namely Large-scale Generation Mail: Attn: Andrea Wold Certificates (LGC's). Regulation, Governance and Analytics Department of Energy and Water Supply More information available from PO Box 15456 https://www.tenderlink.com/monashuni/ CITY EAST QLD 4002 Source: Monash University Submissions close at 5pm on Monday, 1 May 2017. Source: Queensland Government Coopers Gap Wind Farm Click on project to go to online datasheet: Coopers Gap Wind Farm Under the Electricity Act 1994, the Regulator (i.e. the Director-General of the Department of Energy and Water Supply) issues authorities (licences) for generation, transmission and distribution activities in Queensland’s electricity industry. Storage to strengthen Victoria’s energy system When an applicant applies for a generation 27 April authority to connect generating plant with The Andrews Labor Government is calling for capacity greater than 30 megawatts (MW) to detailed proposals for large scale battery a transmission grid or supply network, the energy storage facilities in western Victoria. -
GOLDWIND AUSTRALIA PTY LTD Level 25, Tower 1, International Towers Sydney 100 Barangaroo Ave, Barangaroo NSW 2000
GOLDWIND AUSTRALIA PTY LTD Level 25, Tower 1, International Towers Sydney 100 Barangaroo Ave, Barangaroo NSW 2000 www.goldwindaustralia.com 11 September 2020 The Hon. Guy Barnett, MP Minister for Energy Department of State Growth 4 Salamanca Pl Hobart TAS 7000 Dear Minister Barnett Re: Response to the Draft Tasmanian Renewable Energy Action Plan Goldwind Australia (Goldwind) is pleased to present this response to the Tasmanian Governments Draft Renewable Energy Action Plan. Goldwind has over ten years’ experience of building renewable energy projects across Australia, with 562MW operating including the 144MW Cattle Hill Wind Farm in Tasmania, 960MW of wind farms currently under construction and a further 1.3 GW in the immediate development pipeline. As an experienced renewable energy developer, Goldwind shares the vision expressed in the Tasmanian Renewable Energy Action Plan and applauds the goal of achieving a 200% renewable energy target by 2040. We consider this long-term vision will bring substantial economic, social and environmental benefits for Tasmanian. We have made several suggestions that Goldwind considers would help achieve the stated goals in an efficient and effective manner. These are detailed in our submission, which is attached as Attachment A. We will continue to pursue opportunities for further renewable energy generation in Tasmania. John Titchen Managing Director, Goldwind Australia Goldwind Australia Pty Ltd (ABN 32 140 108 390) GOLDWIND AUSTRALIA PTY LTD Level 25, Tower 1, International Towers Sydney 100 Barangaroo Ave, Barangaroo NSW 2000 www.goldwindaustralia.com Attachment A Goldwind Australia Response to the Draft Renewable Energy Action Plan (Action Plan) 1. Introduction Goldwind supports the vision for Tasmania to become a powerhouse of sustainable, low cost and reliable energy production. -
Zielmarktanalyse Australien
www.exportinitiative.bmwi.de (A) Bereich für Bild AUSTRALIEN Energieeffiziente Lösungen für Infrastrukturentwicklung und Verkehr Zielmarktanalyse 2019 mit Profilen der Marktakteure www.german-energy-solutions.de Impressum Herausgeber German-Australian Chamber of Industry and Commerce Deutsch-Australische Industrie- und Handelskammer 8 Spring Street, Level 6 Sydney NSW 2000 Telefon: +61 2 8296 0400 E-Mail: [email protected] Webseite: www.germany-australia.com.au Stand 10.04.2019 Bildnachweis AHK Australien Redaktion Anja Kegel Director Consulting Services, Projects [email protected] Jürgen Wallstabe Consultant, Consulting Services, Projects [email protected] Mareile Teegen Consultant, Consulting Services, Projects & GTAI [email protected] Inhaltsverzeichnis I Tabellen 3 II Abbildungen 3 III Abkürzungen 4 1 Zusammenfassung 5 2 Länderprofil 6 2.1 Politischer Hintergrund 6 2.2 Wirtschaft, Struktur und Entwicklung 7 2.2.1 Aktuelle wirtschaftliche Lage 7 2.2.2 Außenhandel 8 2.2.3 Wirtschaftliche Beziehungen zu Deutschland 9 2.2.4 Investitionsklima und -förderung 9 3 Der Energiemarkt in Australien 10 3.1 Energieverbrauch 10 3.1.1 Energiebedarf und Aufteilung nach Sektoren 10 3.1.2 Energiequellen 12 3.1.3 Stromerzeugung und -verbrauch 13 3.2 Energiepreise 15 3.2.1 Strompreise 15 3.2.2 Gaspreise 15 3.2.3 Treibstoffpreise 16 3.3 Gesetzliche Rahmenbedingungen 17 3.4 Aktuelle Entwicklungen auf dem Energiemarkt 18 4 Energieeffiziente Lösungen für Infrastrukturentwicklung und Verkehr 21 4.1 Australische Trends mit -
Community Information Booklet
Community Information Booklet capitalbattery.com.au Gina Zheng, Project Manager [email protected] 1800 966 216 CONTENTS About Neoen 1 South Australia’s Big Battery 2 Delivering cheaper energy 3 Contribution to the Capital 5 What does a battery look like? 7 Project lifecycle 8 What can a battery do? 9 Facts & Figures 11 Choosing the site 12 Managed & operated in Canberra 13 Community Co-investment 14 FAQs 15 GLOBALLY The company is headquartered in Paris, EUROPE & AFRICA France, and has two Australian offices – in Finland Sydney and Canberra. AMERICAS Ireland USA France We operate across renewable energy Mexico Portugal technologies including solar, wind and storage El Salvador Zambia in Europe, Central America, Africa, the Middle Jamaica AUSTRALIA Mozambique East and Australia. Ecuador Australia Colombia Neoen’s total capacity in operation and under Argentina construction is currently over 3 GW and we are aiming for more than 5GW by 2021. LOCALLY Neoen Australia began operations in DeGrussa Solar and Storage Project Western Downs 2012. Over the last eight years the Green Power Hub company has initiated the development Dubbo Solar Hub Hornsdale Wind Farms 1, 2, 3 Parkes Solar Farm of more than 1.5GW of solar and wind Hornsdale Power Reserve Griffith Solar Farm projects through organic growth, local Coleambally Solar Farm partnerships and strategic acquisitions. Bulgana Green Power Hub Numurkah Solar Farm Neoen produce clean electricity from renewable sources such as sunlight and wind using mature, tried and tested technologies. -
Clean Energy Fact Sheet We All Want Affordable, Reliable and Clean Energy So We Can Enjoy a Good Quality of Life
Clean Energy fact sheet We all want affordable, reliable and clean energy so we can enjoy a good quality of life. This fact sheet sets out how we’re leading a transition from fossil fuels to cleaner forms of energy. Background Minimising or, where we can, avoiding financial EnergyAustralia is one of the country’s biggest hardship is part of the challenge as we transition generators of power from fossil fuels. Each to cleaner generation. We need to do this while preserving the reliability of supply. +800 MW year we produce around 20 million tonnes Rights to of greenhouse gases, mostly carbon dioxide Our approach involves supporting the renewable energy or CO₂, from burning coal and gas to supply development of clean energy while helping our electricity to our 2.4 million accounts across customers manage their own consumption so eastern Australia. they use less energy. Because when they do For around a century, coal-fired power plants that, they generate fewer emissions and they ~$3B have provided Australians with reliable and save money. Long term affordable power and supported jobs and renewable Supporting renewable energy agreements economic development. The world is changing with fossil fuel generation being replaced by Right now, EnergyAustralia has the rights to lower emissions technologies. more than 800 MW worth of renewable energy, combining solar and wind farm power purchase The way we generate, deliver and use energy agreements, and we half-own the Cathedral 7.5% has to change. As a big emitter of carbon, it’s Rocks wind farm. Of large-scale up to us to lead the transition to cleaner energy wind and solar in a way that maintains that same reliable and project in the NEM affordable access to energy for everyone. -
Renewable Energy Buyers Forum
Renewable Energy Buyers Forum - Brisbane - Sponsored by: DLA Piper Thursday 26th July 2018 Chair: Ben Waters Welcome Jackie McKeon, WWF-Australia Business Renewables Centre - Australia Kate Papailiou, DLA Piper Update from DLA Piper Andrew Burnett, Department of Natural Resources, Mining & Renewable Energy in Queensland Energy, Queensland (DNRME) James Eskdale, Mars GloBal Corporate Mars Enters the Solar System Michael Wheelahan, Victorian Government Department of Intelligent Water Networks (IWN) Aggregation Environment, Land, Water and Planning (DELWP) Simon Crock, Sunshine Coast Council Sunshine Coast Council Solar Farm PPA Roger Price, WindLaB Optimising the renewable energy mix in Queensland Mantas Aleks, WePower Innovative purchasing model Ben Waters, Presync Discussion and wrap-up Networking Renewable Energy Buyers Forum Sponsored by: DLA Piper, Brisbane 26th July 2018 Business Renewable Centre - USA Business Renewable Centre - Australia • A not-for-profit, online Australian resource centre and market platform to accelerate Australian corporate uptake of large-scale renewable energy. • To help Australian organisations procure 1GW of renewable energy (installed capacity) by 2022 and 5GW by 2030. Primers & Guides for Industry… Business Renewable Centre - Australia Online Marketplace Platform Current and planned renewable energy projects Renewable Energy Buyers Forum Sponsored by: DLA Piper, Brisbane 26th July 2018 QLD’s 50% Renewable Energy Target WWF Renewable Energy Buyers Forum 26 July 2018 An evolving policy context As the energy -
Automate CP.Xlsm
FCAS Causer Pays Settlement Factors Issued: 10/12/2020 Period of Application: 27/12/2020 to 23/01/2021 Sample Period: 12:05AM, 8/11/2020 to 12:00AM, 6/12/2020 Queensland, New South Wales, Victoria, South Australia and Tasmania Region Causer Pays Factors Scheduled and Semi-Scheduled Aggregations Factor AETV Pty Ltd 0.013562453 AGL Hydro Partnership 4.012190653 AGL Loy Yang Marketing Pty Ltd 0 AGL Macquarie Pty Limited 0 AGL PARF NSW Pty Ltd 2.310470219 AGL PARF QLD Pty Limited 0.46800389 AGL SA Generation Pty Limited 1.849553623 Alinta Energy Retail Sales Pty Ltd 0.449145117 Ararat Wind Farm Pty Ltd 0.875407241 Arrow Southern Generation Pty Ltd And Arrow Braemar 2 Pty Ltd 0.042579354 Boco Rock Wind Farm Pty Ltd 0.433630577 Bodangora Wind Farm Pty Limited 0.382480317 Bomen Solar Farm Pty Ltd As Trustee For Bomen SF Trust 0.556490672 Braemar Power Project Pty Ltd 0.706700821 Bulgana Wind Farm Pty Ltd 0.837111039 Callide Power Trading Pty Limited 0 Cherry Tree Wind Farm Pty Ltd As Trustee For The Cherry Tree Project Trust 0.156136526 Childers Solar Pty Ltd ATF The Childers Solar Trust 0.080755682 Clare Solar Farm Pty Ltd 0.651235137 CleanCo Queensland Limited 1.758098911 Clermont Asset Co Pty Ltd ATF Clermont Solar Unit Trust 0 Coleambally Solar Pty Ltd 1.111648664 Collector Wind Farm Pty Ltd 0.185651799 Crookwell Development Pty Ltd 0.401146682 CRWF Nominees Pty Ltd As Trustee For The CRWF Trust 0 CS Energy Limited 0 Darling Downs Solar Farm Pty Ltd 0.875202842 Darlington Point Solar Farm Pty Ltd 0.660040796 Daydream Solar Farm Pty Ltd As -
Energy Storage Report 2019
21 FEBRUARY 2019 n WWW.RENEWS.BIZ RANKED N°1 The transatlantic IN RELIABILITY law firm close FOR BESS to home FIND OUT MORE Find out more here ENERGY STORAGE REPORT 2019 Storage spark for renewables MADE IN GERMANY CONTENTS 21 February 2019 ENERGY STORAGE 02 UK 03–09 Battery overdrive he global installation of energy service markets, such as the balancing n Developers get creative storage is surging as costs mechanism, are now the name of Energy storage is continue to fall and regulators the game. n Pivot’s ambitious play T n Eelpower and Orsted set to deliver step up efforts to facilitate batteries to “There was a very significant growth n Council and EU salt cavern schemes flourishing as costs help balance growing volumes of in interest in storage, particularly after intermittent generation. the enhanced frequency response Figures compiled by reNEWS show auction, which seems to have peaked,” IRELAND/GERMANY 10–12 fall and regulations around 2.5GW of 1MW-plus storage is said Anthony Price, director at UK loosen in the drive to due online in major markets in 2019 storage consultancy Swanbarton. — more than double the around 1GW “It has turned into a more mature balance grids, writes deployed last year. This expansion is market with more sophisticated types led by the UK, Australia, the US and of investors who are doing it with their Tim Probert South Africa. eyes open,” he added. Storage developers believe the Nonetheless, UK installations are n DS3 capped tender finally launched technology is on an unstoppable path due to hit almost 600MW in 2019, n Brandenburg flagship blueprint as renewables-plus-storage solutions which would top last year’s tally of n German power-to-gas nears reality become increasingly competitive with 460MW. -
Final Report
RELIABILITY PANEL Reliability Panel AEMC FINAL REPORT 2020 ANNUAL MARKET REVIEW PERFORMANCE REVIEW 20 MAY 2021 Reliability Panel AEMC Final report Final Report 20 May 2021 INQUIRIES Reliability Panel c/- Australian Energy Market Commission GPO Box 2603 Sydney NSW 2000 E [email protected] T (02) 8296 7800 Reference: REL0081 CITATION Reliability Panel, 2020 Annual Market Performance Review, Final report, 20 May 2021 ABOUT THE RELIABILITY PANEL The Panel is a specialist body established by the Australian Energy Market Commission (AEMC) in accordance with section 38 of the National Electricity Law and the National Electricity Rules. The Panel comprises industry and consumer representatives. It is responsible for monitoring, reviewing and reporting on reliability, security and safety on the national electricity system, and advising the AEMC in respect of such matters. This work is copyright. The Copyright Act 1968 permits fair dealing for study, research, news reporting, criticism and review. Selected passages, tables or diagrams may be reproduced for such purposes provided acknowledgement of the source is included. Reliability Panel AEMC Final report Final Report 20 May 2021 RELIABILITY PANEL MEMBERS Charles Popple (Chairman), Chairman and AEMC Commissioner Stephen Clark, Marinus Link Project Director, TasNetworks Kathy Danaher, Chief Financial Officer and Executive Director, Sun Metals Craig Memery, Director - Energy + Water Consumer's Advocacy Program, PIAC Ken Harper, Group Manager Operational Support, AEMO Keith Robertson, General Manager Regulatory Policy, Origin Energy Ken Woolley, Executive Director Merchant Energy, Alinta Energy John Titchen, Managing Director, Goldwind Australia David Salisbury, Executive Manager Engineering, Essential Energy Reliability Panel AEMC Final report Final Report 20 May 2021 FOREWORD I am pleased to present this report setting out the findings of the Reliability Panel's (Panel) annual review of market performance, for the period 2019-20.