Adare, Co. Limerick Unique ID

Total Page:16

File Type:pdf, Size:1020Kb

Adare, Co. Limerick Unique ID Location: Adare, Co. Limerick Unique ID: 240364 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 146500 Northing: 146750 River / Catchment / Sub-catchment River Maigue Type of Flooding / Flood Risk Fluvial non-tidal Fluvial tidal Coastal (identify all that apply) Stage 1: Desktop Review 1.1 Flood History River Flow Path (include review of The River Maigue borders the east and north of the town. A small unnamed Floodmaps.ie) tributary (watercourse A) of the Maigue flows through the centre of town, merging with the Maigue north of the town at the rear of the Manor Court Estate (next to WWTP). The river is tidal up to around the weir at the existing N21 road bridge in Adare. Flood Event Records Seven flood records are listed in floodmaps.ie mainly associated with tidal embankment breaches near Islandea (d/s of Adare) and in the vicinity of the railway bridge. 1.2 Relevant PFRA database comments (in italics): information on flooding issues from OPW comments OPW and LA staff Designated APSR on the basis of predictive analysis and LA comments. Residential flooding, large number of houses protected by opw defences LA comments (am) Embankment protecting well under high tide level.(pm) All agreed Meeting / discussion summary comments: OPW comments • There are large areas of benefiting land (green area on GIS layer). • Estate close to river has flooded. • Significant embankments – green on GIS layer. • Lots of land drains for agricultural purposes, dug essentially to provide storage of surface water. • Embankment construction was for agricultural land protection, and embankments have been there for around 50 years. • Tidal limit of the Maigue is just upstream of Adare. • Mixed fluvial and tidal problem. • There are numerous back drains at the Adare scheme, draining land behind the embankments. • Development pressure south of river. • Hole in embankment u/s of school. • Raised embankment by Manor Court Estate. Flood Risk Review Report – UoM 24 Adare V0_A 1 LA comments • The northwest corner of Manor Court housing estate is known to flood approx every 2 years. This is mainly on the roads and at present is seen as a more of a nuisance. • The adjacent sewage treatment works was recently upgraded. A proposal to pump sewage from Adare, through Patrickswell and on to Limerick has not progressed. This has not flooded, but is currently protected by the embankments. • Proposed development at Blackabbey has planning permission and can proceed if funded. However, the current planning permission may have expired. 1.4 PFRA Data 1.4.1 PFRA hazard PFRA mapping available in GIS layer: Yes No mapping PFRA mapping included on FRR map: Yes No 1.4.2 Summary of Type FRI score Principal Receptors (if available) WWTP 25 Monuments 24 (LV) Total: 1888.09 1.7 Stage 1 Aspect Clearly APSR Uncertain Evaluation Flood History (1.1) X OPW / LA Information (1.2) X PFRA Evaluation (1.4) X Overall Desktop Evaluation (if any above aspect is uncertain X then overall designation is uncertain) 1.8 Proposed level of Level A Site Visit assessment for Stage 2 site visits Level B Site Visit X Flood Risk Review Report – UoM 24 Adare V0_A 2 Stage 2: Site Inspection Level B Assessment Date and Time of Inspection Date: 13/04/11 Time: 10:00 Names of inspection team Iain Blackwell (including OPW/LA staff if present) Kelly Kasperczyk 2.3 Local No on-site comments. knowledge - on-site comments (OPW, LA and any info volunteered by local residents during visit) 2.4 Comments on 10-arch bridge on the Maigue, next to the School and Church could potentially hydraulic act as a restriction during significant fluvial flows as the arches are not large constrictions compared to the channel cross-sectional area. (bridges, etc.) and The tributary (watercourse A) is culverted twice in the town (twin culverts) for conveyance routes various road / access crossings. 2.6 Defence Assets Formal and Open Channel Watercourses Informal Flood Man-made river channel Flood relief channel Canal Defence Assets Mill leat Drainage channels / back drains (include effective and ineffective Bridges and Culvert crossings assets to inform Single Arch bridge Multi-Arch bridge asset survey and Single Span bridge Multi-Span bridge potential Box culvert(s) Pipe culvert(s) Arch Culvert(s) mitigation measures) Culverted Watercourses (culvert length is greater than just a crossing) Box culvert(s) Pipe culvert(s) Arch Culvert(s) Irregular Culvert(s) Walls and Embankments Embankment(s) Raised wall(s) Retaining wall(s) Control Structures – weirs, gates, dams Fixed crest weir Adjustable weir Dam / Barrage Sluice gates Lock gates Radial gates Storage On-line storage (natural) On-line storage (artificial) Off-line storage Outfalls Flapped outfall(s) into watercourse Unflapped outfall(s) into watercourse i.e. from smaller watercourses, drains etc. into river / estuary / sea Tidal flap(s) Tidal sluice(s) i.e. from main watercourse into estuary / sea Other Pumping Station Erosion Protection Sand Dunes Flood Risk Review Report – UoM 24 Adare V0_A 3 Additional notes (if required): Most FD assets in Adare are associated with the River Maigue. There is an additional tributary which flows through the centre of town and into the Maigue from the left bank which also has embankments and crossings / culverts associated with it. Some of these embankments are not effective as they are not tied into high ground (or other defences). 2.8 Initial Potential Mitigation Measures Non-structural Planning and Development control measures Sustainable Urban Drainage Systems Flood forecasting / warning Change in Operating Procedures for water level control: Public awareness campaign Individual property protection Land use management Structural Strategic development management for floodplain development: measures (integration of measures into strategic development proposals) Storage: On-line Off-line Flow diversion: Flood relief channel Flood relief culvert Increase conveyance: Bridge works Channel works Floodplain Flood defences: Walls Embankments Localised works: Defence raising In-fill gaps Trash screen Maintenance works: Culvert / channel clearance Asset maintenance Relocation of properties: Improve existing defences: (describe) Other (describe): Outcomes Recommended APSR not an APSR IRR Designation Summary comments (if Significant number of properties located behind the River Maigue required) Embankments along a tidal reach. Flood Risk Review Report – UoM 24 Adare V0_A 4 Photo 2: Adare Castle and weir looking Photo 1: Main bridge over the River Maigue in Adare looking d/s u/s from main bridge in Adare Photo 3: River Maigue embankment (left Photo 4: Typical drainage outfall through bank), d/s of main bridge the Maigue embankments 5 Flood Risk Review Report – UoM 24 Adare V0_A Photo 6: Embankment adjacent to small Photo 5: River Maigue embankment (left tributary on left bank of the River Maigue bank) protecting properties behind 6 Flood Risk Review Report – UoM 24 Adare V0_A 143500 144000 144500 145000 145500 146000 146500 147000 147500 148000 148500 149000 149500 Adare 0 0 5 8 4 1 0 0 0 8 4 1 0 0 5 7 4 1 Legend APSR Boundary Rail Network 0 0 0 for CARs only Roads 7 4 1 Historic Flooding (National Roads Authority) Incidents Airport Land Water bodies mapped OPW Embankments from RADARSAT-2 * Historic Flood Data 0 0 Hydrometric Gauging 5 6 Architectural Heritage 4 Stations 1 EPA River Network UNESCO Sites Rail Stations Special Protection Area Special Area for Nursing Homes 0 Conservation 0 0 6 Residential Care Proposed National 4 1 for the Elderly Heritage Area Schools National Heritage Area Ports and Harbours Benefiting Lands 0 Flood Extents (PFRA, 2010) 0 5 OPW Buildings 5 4 10% AEP Flood Extent 1 Health Centres (1 in 10 chance in any given year) Garda Stations 1% AEP Flood Extent Hospitals (1 in 100 chance in any 0 0 0 given year) 5 Fire Stations 4 1 0.1% AEP Flood Extent Civil Defence (1 in 1000 chance in any Head Quarters given year) Airports * Data Source - Service Régional de Traitement d’Image et de Télédétection (SERTIT) (acquired on the 5th of December 2009). 0 0 5 4 4 1 Client 0 0 0 Project 4 Shannon CFRAM Study 4 1 The PFRA Flood Extents shown are indicative. They have been developed using Flood Risk Review Map Title simple and cost-effective methods that are suitable for the PFRA. They should not be Adare used for local decision-making or any other purpose without verification. Drawing Status FINAL Job No. 32102500 Figure No. Revision CAR 3 0 0 Scale 1:20,000 @ A3 Jun 28, 2011 5 Checked Review Approved Drawn 3 AD/SF JC KK/JM IB/PS 4 1 Copyright reserved 0 0.2 0.4 0.8 Includes Ordnance Survey Ireland data reproduced under OSi Licence number EN0021011. Jacobs UK Ltd Km Unauthorised reproduction infringes Ordnance Survey Ireland and Government of Ireland copyright, © Ordnance Survey Ireland, 2011. 95 Bothwell Street, Glasgow, G2 7HX.
Recommended publications
  • FISHING on the RIVER MAIGUE Experience An
    1 THE LANTERN LODGE 21 THE CEDAR OF LEBANON was a little Cairn Terrier belonging 29 THE WALLED GARDENS to Lady Olein Wyndham Quin, aunt The Lantern Lodge, or gate lodge The Cedar of Lebanon is native The walled gardens were originally to the 7th Earl of Dunraven. “Nibs” as it was once known, was built c. to the mountains of the Eastern the kitchen gardens, supplying belonged to Marjorie Wyndham- 1830. Originally it was an entrance Mediterranean Basin. This magnificent Adare Manor with much of its daily Quin, a grand-daughter of the 5th to the demesne of Adare Manor specimen is recorded by the National produce. The high walls enclosing Earl of Dunraven. and would have been inhabited Tree Register as the largest Cedar of the garden block winds and trap by estate workers. The Gothic Lebanon in Ireland. It is more than 16 27 THE OGHAM STONES heat, creating a micro-climate Revival architectural style of this metres in height and over 10 metres where plants can grow and flourish. small structure gives it a grand air, in girth. Local lore suggests the tree These stones, dating from between Vegetables, fruit, berries, herbs with gablets, lancet windows and was planted in 1645 AD, which the 5th and 7th centuries, were and cut flowers would have been buttresses which echo the features would also make it the oldest tree brought to Adare Manor from Kerry harvested here to grace the tables of of the main manor house. It is an of its type on the island. In February by the 3rd Earl of Dunraven.
    [Show full text]
  • (CFRAM) Study Flood Risk Review Report
    Shannon Catchment-based Flood Risk Assessment and Management (CFRAM) Study Flood Risk Review Report 28 March 2012 Document control sheet Client: Office of Public Works Project: Shannon CFRAM Study Job No: 32103000 Document Title: Flood Risk Review Report Originator Checked by Reviewed by Approved by ORIGINAL NAME NAME NAME NAME v0_0 Iain Blackwell Peter Smyth Peter Smyth Mike Hind DATE SIGNATURE SIGNATURE SIGNATURE SIGNATURE 30-June-11 Document Status Draft Flood Risk Review Report REVISION NAME NAME NAME NAME V0_A Iain Blackwell James Murray James Murray Mike Hind DATE SIGNATURE SIGNATURE SIGNATURE SIGNATURE 18-Nov-11 Document Status Final Flood Risk Review Report REVISION NAME NAME NAME NAME V1_0 DATE SIGNATURE SIGNATURE SIGNATURE SIGNATURE 28-Mar-12 Document Status Final Flood Risk Review Report (Legal Disclaimer amended) Copyright Copyright Office of Public Works. All rights reserved. No part of this report may be copied or reproduced by any means without prior written permission from the Office of Public Works. If you have received this report in error, please destroy all copies in your possession or control and notify the Office of Public Works . Legal Disclaimer This report is subject to the limitations and warranties contained in the contract between the commissioning party (Office of Public Works) and Jacobs Engineering Ireland Limited. Contents Executive Summary 1 Glossary 4 1 Introduction 5 1.1 Scope 5 1.2 Structure of this Report 6 1.3 Flood Risk Review Sites 6 2 Flood Risk Review Methodology 8 2.1 Context 8 2.2 Overall Approach
    [Show full text]
  • VIKING AGE SILVER HOARDS in IRELAND Regional Trade and Cultural Identity
    VIKING AGE SILVER HOARDS IN IRELAND Regional trade and cultural identity Linn Marie Krogsrud Master’s thesis in Archaeology Department of Archaeology, Conservation and History University of Oslo Autumn 2008 Cover image: Unlocalized mixed hoard from Antrim c. AD 910 (after Sheehan 2001:54; with courtesy of Ulster Museum, Belfast) Acknowledgements First, I would like to thank my supervisor Lotte Hedeager for her constructive support and optimism. She has made this thesis seem, at times, almost easy to write. Secondly, my other supervisor Stephen Harrison deserves much credit for all his help: his knowledge of Viking Age Ireland and supply of hand-outs have been invaluable. A warm thank you also goes to Julie Lund for stepping in for Lotte. John Sheehan and Charles Doherty willingly shared their ideas and off-prints with me, for which I am very grateful. I would also like to thank Dr. Colmán Etchingham for his bibliography tips, and Unn Pedersen for providing me with the article on Woodstown. A special thank you goes to Zanette T. Glørstad for leading me to the Viking Age silver hoards and for supplying me with one of her articles. Many thanks go to Herdis Hølleland and Tale Marthe Dæhlen for proof-reading the final draft of the thesis. All the students at Blindernveien 11 deserve thanks for all the non-academic conversations in the lunch room, especially Anna Alexandra Myrer, Grethe Móell Pedersen, Gunnhild Wentzel, Maria Valum, Annette Solberg and Elise Naumann. Irish transplant Joanne Ó Sullivan also deserves credit. At last, I would like to thank my family and my good friends Suzanne Leidl and Anja Steinsland for all their support.
    [Show full text]
  • Environment, Heritage, Landscape and Green Infrastructure
    LIMERICK DEVELOPMENT PLAN 2022-2028 Background Paper Environment, Heritage, Landscape & Green Infrastructure Contents 1.0 – Introduction……………………………………………………………………………………….................... 2 2.0 – Legalisation and Policy background……………………………………………………………………… 3 2.1 – European Union Biodiversity Strategy 2030.................................................. 3 2.2 – European Green Infrastructure Strategy........................................................ 3 2.3 – National Planning Framework......................................................................... 3 2.4 – National Biodiversity Action Plan 2017 – 2021................................................ 5 2.5 – The All Ireland Pollinator Plan......................................................................... 5 2.6 – Regional Spatial and Economic Strategy......................................................... 5 3.0 – Biodiversity, Flora and Fauna...................................................................................... 9 4.0 – Cultural Heritage........................................................................................................ 13 4.1 – Archaeological Heritage................................................................................... 13 4.2 – Architectural Heritage..................................................................................... 14 4.3 – Landscape........................................................................................................ 15 4.4 – Climate Change and Heritage.........................................................................
    [Show full text]
  • Historic Land Reclamation in the Intertidal Wetlands of the Shannon Estuary, Western Ireland
    UCC Library and UCC researchers have made this item openly available. Please let us know how this has helped you. Thanks! Title Historic land reclamation in the intertidal wetlands of the Shannon estuary, western Ireland Author(s) Healy, Michael; Hickey, Kieran R. Publication date 2002 Original citation HEALY M. & HICKEY, K. R. (2002) Historic land reclamation in the intertidal wetlands of the Shannon estuary. In: Cooper, J. A. G., and Jackson D. W. T. (eds.), Proceedings from the International Coastal Symposium (ICS) 2002 (Templepatrick, Northern Ireland). Journal of Coastal Research, Special Issue No. 36, pp. 365-373 Type of publication Conference item Link to publisher's http://www.jcronline.org/page/special_publications version Access to the full text of the published version may require a subscription. Rights © 2002 Coastal Education and Research Foundation, Inc. (CERF) Item downloaded http://hdl.handle.net/10468/2521 from Downloaded on 2021-09-26T22:53:02Z Journal of Coastal Research SI 36 365-373 (ICS 2002 Proceedings) Northern Ireland ISSN 0749-0208 Historic land reclamation in the intertidal wetlands of the Shannon estuary, western Ireland Michael G. Healy† and Kieran R. Hickey‡ †Department of Geography Mary Immaculate College, University of Limerick, Ireland ‡ Department of Geography, National University of Ireland, Galway, Ireland ABSTRACT There is abundant landscape evidence for extensive land reclamation conducted within the Shannon estuary wetlands. To date, little published research is available which identifies how much reclamation has occurred, its timing and the likely environmental implications. This paper addresses these questions on the basis of available cartographic and documentary data on land reclamation in this area.
    [Show full text]
  • Table of Contents
    Water Framework Directive Fish Stock Survey of Rivers in the Shannon International River Basin District 2012 Fiona L. Kelly, Ronan Matson, Lynda Connor, Rory Feeney, Emma Morrissey, Ciara Wogerbauer and Kieran Rocks Inland Fisheries Ireland, Swords Business Campus, Swords, Co. Dublin CITATION: Kelly, F.L., Matson, R., Connor, L., Feeney, R., Morrissey, E., Wogerbauer, C. and Rocks, K. (2013) Water Framework Directive Fish Stock Survey of Rivers in the Shannon International River Basin District. Inland Fisheries Ireland, Swords Business Campus, Swords, Co. Dublin, Ireland. Cover photo: Ronan electric-fishing © Inland Fisheries Ireland © Inland Fisheries Ireland 2013 ACKNOWLEDGEMENTS The authors wish to gratefully acknowledge the help and co-operation of the regional director Ms Amanda Mooney and staff from IFI Limerick as well as various other offices throughout the region. The authors also gratefully acknowledge the help and cooperation of colleagues in IFI Swords. We would like to thank the landowners and angling clubs that granted us access to their land and respective fisheries. Furthermore, the authors would like to acknowledge the funding provided for the project from the Department of Communications, Energy and Natural Resources for 2012. PROJECT STAFF Project Director/Senior Research Officer: Dr. Fiona Kelly Project Manager: Ms. Lynda Connor Research Officer: Dr. Ronan Matson Technician Mr. Rory Feeney Technician: Ms. Emma Morrissey Technician: Dr. Ciara Wögerbauer GIS Officer: Mr. Kieran Rocks Fisheries Assistant: Dr. Letizia Cocchiglia (Jul 2012 – Nov 2012) Fisheries Assistant: Ms. Karen Kelly (Jul 2012 – Nov 2012) Fisheries Assistant: Mr. Kilian Kelly (Jul 2012 – Nov 2012) Fisheries Assistant: Dr. Bernadette O‟Neill (Jul 2012 – Nov 2012) Fisheries Assistant: Ms.
    [Show full text]
  • List of Rivers of Ireland
    Sl. No River Name Length Comments 1 Abbert River 25.25 miles (40.64 km) 2 Aghinrawn Fermanagh 3 Agivey 20.5 miles (33.0 km) Londonderry 4 Aherlow River 27 miles (43 km) Tipperary 5 River Aille 18.5 miles (29.8 km) 6 Allaghaun River 13.75 miles (22.13 km) Limerick 7 River Allow 22.75 miles (36.61 km) Cork 8 Allow, 22.75 miles (36.61 km) County Cork (Blackwater) 9 Altalacky (Londonderry) 10 Annacloy (Down) 11 Annascaul (Kerry) 12 River Annalee 41.75 miles (67.19 km) 13 River Anner 23.5 miles (37.8 km) Tipperary 14 River Ara 18.25 miles (29.37 km) Tipperary 15 Argideen River 17.75 miles (28.57 km) Cork 16 Arigna River 14 miles (23 km) 17 Arney (Fermanagh) 18 Athboy River 22.5 miles (36.2 km) Meath 19 Aughavaud River, County Carlow 20 Aughrim River 5.75 miles (9.25 km) Wicklow 21 River Avoca (Ovoca) 9.5 miles (15.3 km) Wicklow 22 River Avonbeg 16.5 miles (26.6 km) Wicklow 23 River Avonmore 22.75 miles (36.61 km) Wicklow 24 Awbeg (Munster Blackwater) 31.75 miles (51.10 km) 25 Baelanabrack River 11 miles (18 km) 26 Baleally Stream, County Dublin 27 River Ballinamallard 16 miles (26 km) 28 Ballinascorney Stream, County Dublin 29 Ballinderry River 29 miles (47 km) 30 Ballinglen River, County Mayo 31 Ballintotty River, County Tipperary 32 Ballintra River 14 miles (23 km) 33 Ballisodare River 5.5 miles (8.9 km) 34 Ballyboughal River, County Dublin 35 Ballycassidy 36 Ballyfinboy River 20.75 miles (33.39 km) 37 Ballymaice Stream, County Dublin 38 Ballymeeny River, County Sligo 39 Ballynahatty 40 Ballynahinch River 18.5 miles (29.8 km) 41 Ballyogan Stream, County Dublin 42 Balsaggart Stream, County Dublin 43 Bandon 45 miles (72 km) 44 River Bann (Wexford) 26 miles (42 km) Longest river in Northern Ireland.
    [Show full text]
  • Inspectors of Irish Fisheries Fisheries Op Ireland
    REPORT OF THE INSPECTORS OF IRISH FISHERIES ON THE SEA AND INLAND FISHERIES OP IRELAND, ♦ . • V * FOR . 1878. Presented to both houses of parliament by Command of Her majesty D U B L I N: PRINTED BY ALEXANDER THOM, 87 & 88, AB BE Y = ST RE ET, PRINTER TO THE QUEEN’S MOST EXCELLENT MAJESTY, FOR HER MAJESTY’S STATIONERY OFFICE. 1879. [C.—2333.] Price 91-A CONTENTS. Pago REPORT, . 3 APPENDIX, 47 Appendix gEA ANI) OYSTER FISHERIES. 1.—List of Defaulters and Loans Recalled under Reproductive Loan Fund Act, • 47 2.—Abstract of Returns from Coast Guard, ..... • 49 3.—By-Laws in force, ........ 50-53 4.—Oyster Licenses revoked, ....... 53 5.—Oyster Licenses in force, ...... 54-60 G.—Herring Fishery, ........ , 60 7.—Mackerel Fishery, ... ..... 60 8.—Herrings, Mackerel, and Cod, exported to certain places, . 60 9.—Irish Reproductive Loan Fund, ...... 61 10.—Total Amounts advanced on Loan, and Total Repayments since passing of Act, . 61 Salmon Fisheries. 11.—License duties received in 1878, ...... • • . 62 12. Do. received in 1863 to 1878, ..... • • • 62 13. Do. payable in Ireland, ...... • . 63 14.—By-Laws in force, ........ • • 64-66 15.—Rivers, the mouths of which have been defined in 1878, . • • 67 16.—Tidal and Fresh Boundaries, . ..... • • • 67 17—Close Seasons in Ireland, ....... • • 68, G9 18.—Certificates granted up to 31st December, 1878, for Fixed Engines for fishing for Salmon or Trout, 70-73 19__ Result of Inquiries held by the Inspectors of Irish Fisheries into the Legality or Illegality oi Fixed Nets erected or used for catching Salmon in Ireland,continued from the Report tor 18/o, 72,73 20.—Salmon exported to certain places, .....
    [Show full text]
  • Inland Fisheries Ireland 1
    ___________________________________________________________Inland Fisheries Ireland 1 ___________________________________________________________Inland Fisheries Ireland EREP 2013 Annual Report Inland Fisheries Ireland & the Office of Public Works Environmental River Enhancement Programme 2 ___________________________________________________________Inland Fisheries Ireland Acknowledgments The assistance and support of OPW staff, of all grades, from each of the three Drainage Maintenance Regions is gratefully appreciated. The support provided by regional IFI officers, in respect of site inspections and follow up visits and assistance with electrofishing surveys is also acknowledged. Overland access was kindly provided by landowners in a range of channels and across a range of OPW drainage schemes. Project Personnel Members of the EREP team include: Dr. Martin O’Grady Dr. James King Dr. Karen Delanty Brian Coghlan Rossa O’Briain Michelle O’Regan The report includes Ordnance Survey Ireland data reproduced under OSi Copyright Permit No. MP 007508. Unauthorised reproduction infringes Ordnance Survey Ireland and Government of Ireland copyright. © Ordnance Survey Ireland, 2012. 3 ___________________________________________________________Inland Fisheries Ireland Table of Contents 1 Introduction ...................................................................................................................................... 1 2 EREP Programme 2013 ....................................................................................................................
    [Show full text]
  • Unit of Management 24: Shannon Estuary South - Flood History and Key Environmental Issues
    Unit of Management 24: Shannon Estuary South - Flood History and Key Environmental Issues Strategic Environmental Assessment - Scoping Report [Consultation Draft] - Annex II Document Control Sheet BPP 04 F8 Version 7 April 2011 Client: Office of Public Works Project No: 3210300 Project: Shannon CFRAM Study Document Title: Unit of Management 24: Shannon Estuary South Flood History and Key Environmental Issues Ref. No: TD_ENVT_0316_V1_C_JAC_Env_Scoping_AnnexII_UoM24_120919 Originated by Checked by Reviewed by Approved by ORIGINAL NAME NAME NAME NAME Muriel Ennis Kelly Scott Johnson / Peter Smyth Kasperczyk Oonagh Duffy Kelly Kasperczyk DATE INITIALS INITIALS INITIALS INITIALS July 2012 Document Status Draft: Issue to OPW for Review REVISION NAME NAME NAME NAME Muriel Ennis Oonagh Duffy Denise Meade Peter Smyth DATE INITIALS INITIALS INITIALS INITIALS August 2012 Document Status Issue to OPW for Approval REVISION NAME NAME NAME NAME Oonagh Duffy Denise Meade Denise Meade Peter Smyth DATE INITIALS INITIALS INITIALS INITIALS September Document Status Final Report for Consultation 2012 Copyright Copyright Office of Public Works. All rights reserved. No part of this report may be copied or reproduced by any means without prior written permission from the Office of Public Works. If you have received this report in error, please destroy all copies in your possession or control and notify the Office of Public Works . Legal Disclaimer This report is subject to the limitations and warranties contained in the contract between the commissioning party
    [Show full text]
  • Summer 2020 Newsletter Roughan & O’Donovan
    Summer 2020 Newsletter Roughan & O’Donovan CGI of Trinity Wharf Harry Meighan ROD 2020 MANAGING DIRECTOR Contents Welcome to the ROD Summer 2020 Newsletter. I hope that March and April. Design development work is ongoing, you are all keeping safe during this unprecedented time. and utility survey and ground investigation contracts across It has always been our custom to print hard copies of the all four BusConnects regions are being administered by 28 Work advances on the National ENVIRONMENTAL newsletter and post them to our clients. We consider the ROD. Barry Corrigan reports on our planning stage work Children’s Hospital Satellite Centre for the DART Expansion: Maynooth Line and City Centre 8 An Bord Pleanála approves Trinity Wharf at Tallaght Hospital hard copy to be more personal than digital editions. They Development in Wexford can also be more useful – I encountered one previously in Enhancements project where the target is to submit the 29 Convent Lands, Portlaoise use as a doorstop in a client’s office. I trust you will forgive railway order application by Q2 2021, with procedures in 10 Progressing the Proposed Dublin South place for remote public consultation events. This edition Campshires Development us this time publishing just a digital edition, anticipating that ROD-IS most of our clients are working from home. also includes articles on planning approvals granted for the 11 Dublin Mountains Visitor Centre Trinity Wharf development in Wexford, Dublin Mountains ROD design office staff have been working from home since 30 ROD-IS News Update – Winter 2020 Visitor Centre and a 426-unit housing development for mid-March, although we recently commenced a phased Cairn Homes in Wicklow.
    [Show full text]
  • IP(09)10 Protection, Restoration and Enhancement of Salmon Habitat
    IP(09)10 Protection, Restoration and Enhancement of Salmon Habitat Focus Area Report EU-Ireland INTRODUCTION ......................................................................................................... 3 1. Overview of Salmon Rivers within the Jurisdiction .................................................. 3 2. Current status of salmon habitat and the quantity and quality of salmon habitat (historic and current) ...................................................................................................... 6 Quantity and Quality of Salmon Habitat ................................................................... 6 Quality of Salmon Habitat ......................................................................................... 9 Water Quality ........................................................................................................... 11 3. Process for identifying and designating priority/key habitat areas and issues to be addressed ...................................................................................................................... 14 1. Salmonid River Surveys ...................................................................................... 14 2. Salmon Conservation Stamp Funding ................................................................. 14 3. Catchment Wide Electro-fishing .......................................................................... 14 4. Rehabilitation of Salmon Rivers above Hydro-Electric Dams ............................ 14 5. Programme for Rehabilitation
    [Show full text]