15 Queens Quay East, Toronto New Development—Flagship Retail Opportunity

Total Page:16

File Type:pdf, Size:1020Kb

15 Queens Quay East, Toronto New Development—Flagship Retail Opportunity 15 QUEENS QUAY EAST, TORONTO NEW DEVELOPMENT—FLAGSHIP RETAIL OPPORTUNITY 15 QUEENS QUAY EAST, TORONTO NEW DEVELOPMENT—FLAGSHIP RETAIL OPPORTUNITY DETAILS Flagship retail opportunity located in Cityzen Developments and Fernbrook Homes ’ new 35-storey condominium tower at Pier 27 in the heart of Toronto’s harbourfront community A rapidly developing mixed-use, high-rise neighbourhood, including neighbouring proposals that would see over 6 million square feet of residential space and nearly 3 million square feet of commercial office and retail space added to the immediate area Located at the foot of Yonge Street with direct exposure to a new park and board- walk connecting with the Yonge Street Slip and Toronto ’s newly revitalized Water’s Edge Promenade Steps to Union Station, the South Core financial district, Air Canada Centre, Jack Layton Ferry Terminal, Canada Square, and Toronto’s finest restaurants and shops Exceptional signage opportunity at the foot of Yonge Street and Queens Quay East Size: Up to 11,180 square feet Rents and Timing: TBD INQUIRIES Rami Kozman Avi Behar Director of Landlord Services Chairman & CEO LANDLORD SERVICES Sales Representative Broker 416 636 8898 x245 416 636 8898 x227 [email protected] [email protected] 15 QUEENS QUAY EAST, TORONTO NEW DEVELOPMENT—FLAGSHIP RETAIL OPPORTUNITY FUTURE AREA DEVELOPMENT LANDLORD SERVICES 15 QUEENS QUAY EAST, TORONTO NEW DEVELOPMENT—FLAGSHIP RETAIL OPPORTUNITY 7 9 10 11 6 19 18 15 15 5 11 7 14 5 13 8 13 10 14 4 6 4 12 9 12 3 20 8 16 3 17 1 1 2 2 Shops & Restaurants Landmarks 1 Watermark Irish Pub and Restaurant 1 Harbourfront Centre 11 Metro Toronto Convention Centre 2 Amsterdam Brewhouse 2 Harbourfront Centre Natrel Rink 12 Toronto Star Building 3 Miller Tavern on Bay Street 3 Harbour Square Park 13 Pinnacle proposed multi-tower development 4 Real Sports Bar & Grill 4 Sugar Beach Park 14 Menkes proposed multi-tower development 5 Aria Ristorante 5 Sherbourne Common 15 Daniels Waterfront—City of the Arts (under construction) 6 Hoops Sports Bar & Grill—Toronto 6 Sony Centre for the Performing Arts 16 Water’s Edge Promenade 7 Taverna Mercatto 7 St. Lawrence Centre for the Arts 17 Jack Layton Ferry Terminal 8 Steam Whistle Brewing 8 Air Canada Centre 18 Union Station 9 Bymark 9 Ripley’s Aquarium of Canada 19 Fairmont Royal York 10 Esplanade Restaurant District 10 CN Tower 20 The Westin Harbour Castle and Conference Centre 11 Brookfield Place 12 Longo’s Maple Leaf Square 13 Real Sports Apparel 14 LCBO 15 Loblaws All information is from sources deemed reliable and is subject to errors and omissions which we believe to be correct and assume no responsibility. Changes of price, rental, prior sale and withdrawal without notice. People are not to construe this information as legal or tax advice. You should consult your legal counsel, accountant, or other advisors on matters relating to this presentation. The Behar Group Realty Inc., Brokerage. LANDLORD SERVICES The Behar Group Realty Inc., Brokerage 1170 Sheppard Avenue West, Unit 24, Toronto, Ontario M3K 2A3 / Tel: 416.636.8898 / Fax: 416.636.8890 / Website: www.thebehargroup.com .
Recommended publications
  • Expropriation of Part of 228-230 Queens Quay West
    GM8.19 STAFF REPORT ACTION REQUIRED Expropriation of Part of 228-230 Queens Quay West and Part of the Lands at the Rear of 250-270 Queens Quay West for the Reconstruction of the York/Bay/Yonge Off-ramp from the F.G. Gardiner Expressway Date: October 23, 2015 To: Government Management Committee From: Chief Corporate Officer Wards: Ward 20 – Trinity Spadina Reference P:\2015\Internal Services\RE\Gm15038re (AFS #21976) Number: SUMMARY The purpose of this report is to seek authorization from City Council to commence proceedings for the expropriation of certain lands forming part of the condominium property known municipally as 228-230 Queens Quay West and certain lands located to the north (rear) of the condominium properties known municipally as 250-270 Queens Quay West. These lands are required for the reconstruction and realignment of the Gardiner Expressway's York/Bay/Yonge off ramp (the "Project") with a new ramp to Lower Simcoe Street. While discussions with the affected owner and condominium corporations are ongoing, it appears unlikely that satisfactory negotiated terms can be achieved, as the required land is directly part of, or subject to easements in favour of, condominium properties. Pursuant to the Condominium Act (Ontario), a condominium corporation is prohibited from selling part of the condominium's common elements unless at least 80% of the unit owners vote in favour of the sale and 80% of those persons with a registered claim against the property consent in writing to the sale. In order to release easements that benefit a condominium, a majority, or in some cases 80%, of the unit owners must approve the release.
    [Show full text]
  • Bay Street, Between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
    REPORT FOR ACTION Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 28, Toronto Centre-Rosedale SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. Transportation Services is requesting approval to amend the existing parking regulations on the east side of Bay Street, between Harbour Street and Queens Quay West. The proposed changes will allow for safe and efficient northbound right-turns from Bay Street to Harbour Street, and also improve sight lines at this intersection. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District, recommends that: 1. City Council rescind the existing designated commercial loading zone in effect from 4:30 p.m. of one day to 8:00 a.m. of the next following day Monday to Friday and anytime Saturday, Sunday, and public holidays from July 1 to August 31, inclusive; Anytime from September 1 of one year to June 30 of the next following year, inclusive on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north. 2. City Council rescind the existing designated bus parking zone in effect from 8:00 a.m. to 4:30 p.m. Monday to Friday from July 1 to August 31, inclusive, for a maximum period of 1 hour on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north.
    [Show full text]
  • Toronto Central Waterfront Public Forum #2
    TORONTO CENTRAL WATERFRONT PUBLIC FORUM #2 Queens Quay Revitalization EA Bathurst Street to Lower Jarvis Street Municipal Class Environmental Assessment (Schedule C) December 08, 2008 1 WATERFRONT TORONTO UPDATE 2 Central Waterfront International Design Competition 3 Waterfront Toronto Long Term Plan – Central Waterfront 4 Waterfront Toronto Long Term Plan – Central Waterfront 5 Waterfront Toronto Long Term Plan – Central Waterfront 6 Waterfront Toronto Long Term Plan – Central Waterfront 7 East Bayfront Waters Edge Promenade: Design Underway 8 Spadina Wavedeck: Opened September 2008 9 Spadina Wavedeck: Opened September 2008 10 Spadina Wavedeck: Opened September 2008 Metropolis Article 11 Rees Wavedeck: Construction Underway 12 Simcoe Wavedeck: Construction Underway 13 Spadina Bridge: Construction Early-2009 14 What Have We Been Doing for the Past 11 Months? • Consider and follow up on comments from Public Forum 1 • Assess baseline technical feasibility of design alternatives – Over 90 meetings in total: • City and TTC technical staff • Partner agencies •Stakeholders • Landowners/Property Managers • Adjacent project efforts • Advanced transit and traffic modelling • Develop Alternative Design Concepts and Evaluation (Phase 3) • Coordination with East Bayfront Transit EA 15 Study Area: Revised 16 Overview • Review of EA Phases 1 & 2 from Public Forum #1: January 2008 • EA Phase 3: Alternative Design Alternatives – Long list of Design Alternatives – Evaluation of Design Alternatives • Next Steps – Evaluation Criteria for Shortlisted Design
    [Show full text]
  • Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn
    Waterfront Transit “Reset” Phase 2 Study Public Information & Consultation Meetings September 18 & 26, 2017 Agenda 6:00 Open House 6:30 Agenda Review, Opening Remarks and Introductions 6:40 Study Overview and Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn 2 Project Study Team • A Partnership of: • The project study team is led by a joint City-TTC- Waterfront Toronto Executive Steering Committee • Metrolinx, City of Mississauga and MiWay have also provided input on relevant aspects of the study 3 What’s the Purpose of this Meeting? • Present the waterfront transit network travel demand considerations to 2041 • Present and gather feedback on options assessment for transit improvements in key areas of the network, including: – Union Station – Queens Quay Connection – Humber Bay Link – Bathurst - Fleet - Lake Shore – Queens Quay Intersection • Report the overall draft findings of the Phase 2 Study, priorities, and draft directions for further study prior to reporting to Executive Committee and Council 4 Study Timeline 5 Phase 1 Recap To view the Phase 1 Report and other background material, please visit the City’s website: www.toronto.ca/waterfronttransit 6 Vision Provide high quality transit that will integrate waterfront communities, jobs, and destinations and link the waterfront to the broader City and regional transportation network Objectives Connect waterfront communities locally and to Downtown with reliable and convenient transit service: • Promote and support residential and employment growth
    [Show full text]
  • Play Me, I'm Yours
    PLAY ME, 40 I’M YOURS 6,7,8,17,23, 25,30,33,37 College St. Carlton St. 12 Bay St. Bay Jarvis St. University Ave. University 36 St. Church Yonge St. Yonge Parliament St. Parliament 16 20 Dundas St. W. Dundas St. W. 28 27 Dundas St. E. Bathurst St. 24 Church St. Church Bay St. Bay Spadina Ave. 11 5 26 Queen St. W. Queen St. E. Queen St. E. 39 University Ave. University 38 34 Jarvis St. York St. York 22 15 St. Parliament King St. W. King St. E. King St. E. Peter St. Peter 19 9 1 31 Yonge St. Yonge 3 2 Bathurst St. Front St. W. Front St. W. 4 21 2929,35, 41 Bay St. Bay Lake Shore Blvd. W Bremner Blvd. 13 Spadina Ave. Lake Shore Blvd. W Gardiner Expressway 32 Queens Quay W. Lake Shore Blvd. W Queens Quay W. 18 14 10 FUNDING PARTIES - Bailleurs DE fonds Location Legend ANTIGUA AND BARBUDA ARGENTINA ARUba BAHAMAS CBC The Distillery District Brookfield Place 1 2 3 4 Union Station 205 Wellington St. W. 9 Trinity St. 161 Bay St. 65 Front St. W. BARbaDOS BELIZE BERMUDA BOLIVIA Royal Ontario Museum University of Toronto 5 CIBC Queen & Spadina 6 Royal Conservatory 7 8 378 Queen St. W. 273 Bloor St. W. 100 Bloor St. W. 91 Charles St. W. BRAZIL BRITISH VIRGIN ISLANDS CANADA CaYMAN ISLANDS 9 CIBC Commerce Court 10 Harbourfront Centre 11 Nathan Phillips Square 12 Allan Gardens 25 King St. W. 235 Queens Quay W. 100 Queen St.
    [Show full text]
  • L U X U R Y B Y T H E L A
    THIS PAGE GETS SPOT GLOSS www.benchmarksignaturerealty.com LUXURY BY THE LAKE 06 TORONTO’S HARBOUR, FRONT & CENTRE 52 HAVE A LAKE NIGHT 92 THE FUTURE OF HARBOURFRONT Discover year-round events Check out these popular spots This neighbourhood’s momentum is and activities on the waterfront. for divine drinks and dining. showing no signs of slowing down. THIS PAGE GETS FLOOD GLOSS VARNISH Sugar Beach AQUABELLA MAG_V17_Sep 20 revisions.indd 1-2 2016-09-20 5:05 PM LUXURY BY THE LAKE Exclusive waterfront homes from $1.0 million. AQUABELLA is a place where open concept goes far beyond the concept. Where a dynamic expression of large windows blur the boundary between the building and its setting. Providing an immersion in city and sky, AQUABELLA is uniquely designed to follow the contours of the lake with grand terraces, bordered by vast panoramas. Amid opportunities for living, working, shopping, dining and entertaining, AQUABELLA is luxury by the lake. tridel.com Tridel®, Tridel Built for Life® and Tridel Built Green. Built for Life® are registered trademarks of Tridel and used under license. ©Tridel 2016. All rights reserved. Buildings and views are not to scale. Features and finishes may vary by suite designs. Specifications and prices subject to change without notice. Illustrations are artist's concepts. E.&O.E. September 2016. AQUABELLA MAG_V17_Sep 20 revisions.indd 3-4 2016-09-20 5:05 PM HTO Park CONTENTS 06 TORONTO’S HARBOUR, 42 A PET’S PARADISE 66 A COMMUNITY CONNECTED FRONT & CENTRE Places you will love as much as Living in the new age of connectivity Discover year-round events and your furry friends.
    [Show full text]
  • Now Until Jun 16. NXNE Music Festival. Yonge and Dundas. Nxne
    hello ANNUAL SUMMER GUIDE Jun 14-16. Taste of Little Italy. College St. Jun 21-30. Toronto Jazz Festival. from Bathurst to Shaw. tolittleitaly.com Featuring Diana Ross and Norah Jones. hello torontojazz.com Now until Jun 16. NXNE Music Festival. Jun 14-16. Great Canadian Greek Fest. Yonge and Dundas. nxne.com Food, entertainment and market. Free. Jun 22. Arkells. Budweiser Stage. $45+. Exhibition Place. gcgfest.com budweiserstage.org Now until Jun 23. Luminato Festival. Celebrating art, music, theatre and dance. Jun 15-16. Dragon Boat Race Festival. Jun 22. Cycle for Sight. 125K, 100K, 50K luminatofestival.com Toronto Centre Island. dragonboats.com and 25K bike ride supporting the Foundation Fighting Blindness. ffb.ca Jun 15-Aug 22. Outdoor Picture Show. Now until Jun 23. Pride Month. Parade Jun Thursday nights in parks around the city. Jun 22. Pride and Remembrance Run. 23 at 2pm on Church St. pridetoronto.com topictureshow.com 5K run and 3K walk. priderun.org Now until Jun 23. The Book of Mormon. Jun 16. Father’s Day Heritage Train Ride Jun 22. Argonauts Home Opener vs. The musical. $35+. mirvish.com (Uxbridge). ydhr.ca Hamilton Tiger-Cats. argonauts.ca Now until Jun 27. Toronto Japanese Film Jun 16. Father’s Day Brunch Buffet. Craft Jun 23. Brunch in the Vineyard. Wine Festival (TJFF). $12+. jccc.on.ca Beer Market. craftbeermarket.ca/Toronto and food pairing. Jackson-Triggs Winery. $75. niagarawinefestival.com Now until Aug 21. Fresh Air Fitness Jun 17. The ABBA Show. $79+. sonycentre.ca Jun 25. Hugh Jackman. $105+. (Mississauga). Wednesdays at 7pm.
    [Show full text]
  • Sugar Wharf Is a Community of Extraordinary Proportions
    A WHOLE NEW COMMUNITY From Humber Bay to the Eastern Beaches, Toronto’s magnificent waterfront spans 46 kms. Under the direction of Waterfront Toronto, this highly desirable section of the city is undergoing a sea change. Created by the federal and provincial government and the City of Toronto, Waterfront Toronto has the mandate to transform the area into a vibrant public and cultural space for all Torontonians. Unequalled in size, it’s one of the largest urban revitalization projects in the world. The total area for development is 800 hectars in size, and is one of the largest revitalization projects in the world! Collaborating with developers like Menkes, Waterfront Toronto aims to create 40,000 new residences and approximately 40,000 new jobs. With the introduction of mixed-used neighbourhoods, offices, expanding public transit, parks, and public spaces, the waterfront will be a coveted place to live, work, learn and play. By adopting an economically and environmentally sustainable design approach, this reimagination will change the face of Toronto and deliver a positive, meaningful relationship between the lake and the city. THE LAKE. THE LIFE. THE CITY. LAKE SHORE BLVD E NEW ST COOPER ST Rising on the shores of Toronto’s waterfront, Sugar Wharf is a community of extraordinary proportions. FREELAND ST Striking the perfect work-life balance, this exceptional development will be the future-forward ideal today’s urban population seeks. Home to 7,500 residents, and 4,000 HARBOUR ST office workers once completed, this 11.5-acre community RETAIL PROMENADE offers homes, offices, shops, restaurants, school, daycare, park and more.
    [Show full text]
  • 550 Queen's Quay W #311
    LIST PRICE $$259,800 ADDRESS 550 Queen’s Quay W #311 See More Photos And Community Information At… www.TorontoRealEstate.ca How Much Can YOU Afford? Based on 4.95% 5% 10% 15% 25% Mortgage Rate Down Down Down Down Down Payment $13,000 $26,000 $39,000 $65,000 TOTAL Monthly Payment $2,125 $2,025 $1,950 $1,750 (Mortgage, taxes, condo fees & utilities) Closing Costs $17,000 $30,000 $43,000 $69,000 (Including down payment) Gross Income Req’d To $68,500 $64,000 $60,500 $52,500 Qualify For The Mortgage Above calculations are estimates only for income required and closing costs … buyer must verify for themselves! Welcoming lobby with friendly, 24 hr concierge, terrific gym, sauna, and whirlpool. Huge party room with kitchen and library/TV area. Terrific city and lake views from the rooftop deck. List Of Neighbourhood Features Restaurants Many restaurants along Queens Quay … and fine dining in downtown Toronto, all the way from Hooters and Gretzky’s to the top of the CN Tower Night Clubs / Theatre duMaurier and Premier Dance Theatres, CIBC Stage and more at Harbourfront Centre … and Toronto’s Entertainment District … approx. King to Richmond, Duncan to Peter; The Paramount at Richmond and John has multi-theatres for 1st run movies, and the Princess of Wales at King & John for live theatre and musicals. Bookstores / Coffee Cafes all along Harbourfront; Chapters at SW corner of Richmond & Peter; Starbucks; Second Cup Shops at Pier 6, Harbourfront Parks Toronto Music Garden, 475 Queens Quay W; Greenspace at the Ferry Docks, ferry access to the Toronto Islands with more than 230 hectares of parkland; Spadina Quay Wetland; Harbour Square; Coronation Park, south of Lakeshore, west of Stadium Rd, and along the lake front.
    [Show full text]
  • Redesigning Streets for a Growing City and Better Neighbourhoods
    Toronto’s Great Streets Redesigning Streets for a Growing City and Better Neighbourhoods July 2018 Toronto’s Great Streets Redesigned for Greatness Harbord Street Roncesvalles Avenue St. Clair Avenue West Bike lanes for safer mobility & village improvement Toronto placemaking at its best The streetcar neighbourhood The 2014 redesign installed continuous cycling Completed in 2011, the Roncesvalles redesign The dedicated streetcar lane, opened in 2010, has infrastructure from Ossington to Parliament, trans- focused on placemaking and people, improving safety made hopping on transit an efficient alternative to forming Harbord into one of the most well-travelled and enhancing pedestrian space while strengthening the car and has transformed this midtown corridor bike routes in the city. Roncy’s capacity to serve local needs. into a vibrant main street. Queens Quay West Market Street A street for all users A future-proof street for people (and patios!) The 2015 redesign repositioned Queens Quay as Market Street’s 2014 redesign prioritizes the pedes- a public waterfront promenade, reallocating street trian experience to support adjacent retail and space to accommodate all modes – pedestrians, restaurants while celebrating the unique heritage cyclists, transit, and cars. and culture of St. Lawrence Market. Toronto’s Great Streets 2 Toronto’s Great Streets The Ones to Watch Bloor Street King Street Downtown Yonge Street Bike lanes on Bloor from east to west Relief for Toronto’s busiest surface transit route Canada’s Main Street See (a) credit image The Bike Lane Pilot Project on Bloor Street proved to The King Street Pilot Project transformed this busy A vision to pedestrianize a busy foot traffic stretch of be a great success and the lanes are now permanent.
    [Show full text]
  • Waterfront Transit Network Update – Summer 2020 Agenda
    Waterfront Transit Network Update Stakeholder Advisory Committee (SAC) July 23, 2020 Waterfront Transit Network Update – Summer 2020 Agenda 1. Project Overview 1. Context 2. Background 3. Timeline 2. Portal Selection Study - Summary of findings 3. Network Phasing Study – Upcoming work 4. EA Addenda/TPAP – Upcoming work 5. Preliminary Design and Engineering – Upcoming work Waterfront Transit Network Update – Summer 2020 Context Distillery Loop Union Station Waterfront Transit Network Update – Summer 2020 Background • In April 2019 , City Council endorsed the streetcar loop expansion at Union Station as the preferred option for the Union Queens Quay Link, and directed staff to commence the preliminary design and engineering phase of the extension of light rail transit to the East Bayfront beginning in 2020. • The first part of this work includes feasibility studies to assess: • An alternative portal location for the LRT along Queens Quay between Bay Street and Yonge Street, which may provide overall cost and public realm benefits • Consideration of phasing option(s) that may expedite the east-west streetcar service on Queens Quay to the East Bayfront Waterfront Transit Network Update – Summer 2020 Timeline Last time we met We are here TTC East Preliminary Transit Preliminary Bayfront Design – EBF Waterfront Union Station Project Design and Transit Portal + Transit – Queens Assessment Engineering Class EA Tunnel Reset Quay Link Process Structures Study (TPAP) (PDE) 2010 2011 2018 2019 2020 2020-2021 2020-2021 Study area from Preliminary Council Council approved Refine two Identify phase 1 Complete the Complete PDE Bay to Cherry design and cost directed streetcar loop implementation TPAP process (30% design) three St.
    [Show full text]
  • 130 Queens Quay E 1,915 SF for Sale: Office
    Click Here for Virtual Tour! 130 Queens Quay E 1,915 SF For Sale: Office Here is where your business will grow. lennard.com 130 Queens Quay E 1,915 SF Office space located in the Waterfront Communities-The Island neighborhood in Toronto Suite Availability 819 Immediate Available Space Listing Agents 1,915 SF (approximately) Dillon Stanway Sales Representative Sale Price 416.649.5904 $2,290,000 [email protected] Condo Fees William J. Dempsey** $1,042.29 / month Partner Taxes 416.649.5940 $21,915.10 (2020) [email protected] **Broker Benefits • One of the best located and finished units in the East Tower • Top floor in east tower below the amenities. • Bright corner unit with great Views – 2 sides with full windows. • South and east facing – end of hall privacy. • Access to common amenity space with 2 high tech board rooms, lounge, large outdoor terrace & BBQ area over looking lake. • 24 hrs concierge • Bike locker room and shower room. • Secure heated storage locker available. Move In condition • Finished drop ceiling and premium carpet for sound attenuation • LED lighting throughout • 3 heat/cool zones with separate thermostats. • 5 private offices with glass side lights • 2 larger rooms with view • Separate kitchen with full fridge and dishwasher • Dividing half wall in open space • Extensively pre-wired for data and voip runs from server cupboard lennard.com 130 Queens Quay E lennard.com 130 Queens Quay E Building amenities Main Lobby Bike Storage Private Shower Facilities 130 Queens Quay E Common areas Private Meeting Rooms Rooftop
    [Show full text]