F. No.: 4-852/2010-RO (NZ) Dated: 24.01.2017

~;8-J

fa1t~lCI1 (w) , ~IRUT~ .:> q ""l~ Cl '{ 0 I, qa:r 3iR \Ji (>l Cli ""l qf{ Cl ~ 0"1 ,Fbll (>l ""l .:> ~ q<:1~C1'{ol ~ ~ ~ Us, 3i<>l'tdi\Ji, ~ ~ - ~ ~ooo~

~ : Construction of Proposed Group Housing Project 'Vistas' at Sector- 70 in revenue land of Village Badshahpur, Tehsil & District- , by M/s Unitech Ltd. - site inspection regarding.

~* :Letter No. SEIAA/HR/2010/416 dated 11.06.2010.

3q'{)CfCi ~ ;8- 3<>-ilffilCi qf{""l)\JiO"1I cnr faiftlRUT ~ :<~ ~ : 3lmm fcl'fCiCi ~ "Cf3f ~ 0ITU ~ Cf){" ~ ChliiClI61 ~ ~ ~ c=rm c- ' , f;q.:> 61 ;8­ c;n<:IT "\JiTCiT 6 fctl s:il\il CfC': CflT fai qf{ <:1) \Ji 0"11 3fRl Chi f{ <:11 ~ ~ '8 ~ <:1) dI ~ 0"1'ti" fcl:i

-. -:-..,,:::o....;,==>o~~__ 1. Project Type Co'r1s'truction Project (Group Housing)' , 2. Name o{th'e ProTe-ct Group Housing project "Vistas", Sector-70, Gurgaon,_Haryan'!. by M/s Unitech Ltd. 3. Clearance letter (s)/ O.M No. & dates SEIAA/HR/2010/416, Dated 11.06.2010 -- 4. I Location a) District (s) Gurgaon b) State (s) Haryana c) Latitudes/Longitudes 28°23'56" N / 7r1'8" E 5. Address for correspondence a) Address of Concerned Project Chief M/s Unitech Limited Engineer (with Pin Code/ Tel No'; Unitech House, South City-I, Telex/Fax NO./E-mail address) Gurgaon - 122 007 Haryana Tel: 0124-4125 200 Fax: 0124-2383332 b) Address of Executive Project Same as above Engineer/Manager (with Pin Code/ Tel No'; Telex/Fax No'/E-mai!.address) 6. Saiient features a) of the project The project involves the construction of group housing project "Vistas" at Sector -70 in revenue land of Village Badshahpur, Gurgaon. b) of the environmental management Total estimated quantity of sewage will be 402 I plans KLD, which will be treated by a STP of 500 KLD capacity. 7. Break-up of the project area Total plot area is 1,07,221.29 m L and total built 2 up area will be 2,11,534.928 m • 8. Break-up of project affected population NA

9. Financial details: a) Project cost as originally planned and Not submitted by PA subsequent revised estimates and the year of price reference b) Al.locations made for environmental Not submitted by PA management plans with item wise and year wise break up c) Benefit cost ratio/internal rate of Not submitted by PA return and the year of assessment d) Whether (c) includes the cost of Not submitted by PA environmental management as shown in b) above e) Actual expenditure incurred on the 12539.92 Lakhs (2014) project so far f) Actual expenditure incurred on the 156.13 Lakhs (2014) environmental management plans so far

Unitech: Vistas Ltd. 1 PART -II & III DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Clearance O.M. No.: SEIAA/HR/2010/416 dated 10.06.2010

The project was monitored on 25.05.2016 along with other projects in the area. Lack of cooperation WClS noticed from the PA as no one present at the site during tile visit despite being informed in advance. It was found thClt the construction work was on hold (Photos 1-2). Security personal informed that due to the dispute (water issue) between Haryana Urbvn Development Authority (HUDA) and PA, the project was on hold. The main gate was locked by the HUDA and project site was not accessible. However, review of progress, documents submitted and the compliance shows the following: 1. It was observed during the visit thvt 70% construction wvs completed. 2. PA did not submit the copy of Consent to Establish under Air & Water Acts from HSPCB till date. 3. Details of quantity of removed soil & its utilizvtion/disposal were not submitted. 4. Fly ash materials were not used at the site in the existing structures as observed during the visit (Photo No.2). This is in contravention to the fly ash notification 1999 amended in 2003. 5. PA has not submitted NOC from the Forest department as per condition (iv) of general conditions of the EC.

6. NOC (for the height clearance) from the Air Port Authority of India has been expired on 05.05.2015. Fresh NOC has not been submitted till date. 7. PA had assured vide letters dated 27.05.2015 and 20.11.2015 that six-monthly compliance report and monitoring data will be submitted to RO Chandigarh once the construction work is recommenced at site. In light of above mentioned non-compliances and lack of sincerity shown by PA, status of the remaining conditions of construction phase could not be verified.

Photos 1 & 2: Showing site and status of project.

~.\~{\otnj "" 1\'\'''' Joint~irector (5)

Unitech: Vistas Ltd. 3