Chirgaon Road (SH-42) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Total Page:16

File Type:pdf, Size:1020Kb

Chirgaon Road (SH-42) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF UTTAR PRADESH Public Works Department Public Disclosure Authorized Uttar Pradesh Core Road Network Development Program Part – A: Project Preparation DETAILED PROJECT REPORT Volume - IX: Resettlement Action Plan Garautha – Chirgaon Road (SH-42) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized July 2015 India Consulting engineers pvt. ltd. Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Volume-IX: Resettlement Action Plan Garautha – Chirgaon Road (SH-42) Volume-IX : Resettlement Action Plan Document Name (Detailed Project Report) Document Number EIRH1UP020/DPR/SH-42/GC/002/IX Uttar Pradesh Core Road Network Development Program Project Name Part – A: Project Preparation including Detailed Engineering Design and Contract Documentation Project Number EIRH1UP020 Document Authentication Name Designation Prepared by Dr. Sudesh Kaul Social Development Specialist Reviewed by Rajeev Kumar Gupta Deputy Team Leader Approved by Rajeev Kumar Gupta Deputy Team Leader History of Revisions Version Date Description of Change(s) Rev. 0 02/12/2014 First Submission Rev. 1 12/12/2014 Second Submission Rev. 2 27/12/2014 Compliances to WB comments Rev. 3 08/07/2015 Compliances to Review Consultant Comments Page i| Rev: R3 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Volume-IX: Resettlement Action Plan Garautha – Chirgaon Road (SH-42) TABLE OF CONTENTS Chapter Description Page 0 EXECUTIVE SUMMARY ................................................................................................ 0-1 0.1 Introduction......................................................................................................................... 0-1 0.2 Objective of the Study .......................................................................................................... 0-2 0.3 Scope of the Study ............................................................................................................... 0-2 0.4 Methodology ........................................................................................................................ 0-2 0.5 Right of Way and Corridor of Impact ..................................................................................... 0-3 0.6 Rehabilitation Issues ............................................................................................................ 0-4 0.7 Land Use along the Project Road .......................................................................................... 0-4 0.8 Social Impact Assessment .................................................................................................... 0-4 0.9 Corridor of Impact ............................................................................................................... 0-6 0.10 Cut off Date ......................................................................................................................... 0-9 0.11 Analysis of Census and Baseline Socio-economic Data .......................................................... 0-10 0.12 Literacy Level .................................................................................................................... 0-13 0.13 Resource Base of the Affected Families ............................................................................... 0-13 0.14 Usual Activity ..................................................................................................................... 0-14 0.15 Occupational Pattern .......................................................................................................... 0-14 0.16 Average Annual HH Income and Expenditure ....................................................................... 0-15 0.17 Project Specific Resettlement & Rehabilitation (R & R) Policy, 2014 ....................................... 0-15 0.18 Analysis of Alternatives ....................................................................................................... 0-19 0.19 Widening Options ............................................................................................................... 0-19 0.20 Timing of Resettlement ...................................................................................................... 0-20 0.21 Institutional Arrangement ................................................................................................... 0-21 0.22 Integrated Grievance Redressal Mechanism ......................................................................... 0-21 0.23 Implementation Arrangements and Schedule ....................................................................... 0-22 0.24 Budget .............................................................................................................................. 0-22 1 INTRODUCTION .......................................................................................................... 1-1 1.1 Project Background .............................................................................................................. 1-1 1.2 Start and End Points ............................................................................................................ 1-3 1.3 Salient Features ................................................................................................................... 1-4 1.4 Project Description ............................................................................................................... 1-5 1.5 Social Impact Assessment .................................................................................................... 1-8 1.6 Structure of Report ............................................................................................................ 1-12 2 STUDY METHODOLOGY ............................................................................................... 2-1 2.1 Introduction......................................................................................................................... 2-1 2.2 Social Assessment Process .................................................................................................... 2-1 2.3 Consultations ....................................................................................................................... 2-3 Page ii| Rev: R3 Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Volume-IX: Resettlement Action Plan Garautha – Chirgaon Road (SH-42) 2.4 Local Level Consultation ....................................................................................................... 2-3 2.5 Consultation with Government Officials ................................................................................. 2-3 2.6 Collection of Data from Secondary Sources ............................................................................ 2-4 3 MINIMISING NEGATIVE SOCIAL IMPACT .................................................................. 3-1 3.1 Minimizing the Social Impact ................................................................................................ 3-1 3.2 Right of Way and Corridor of Impact ..................................................................................... 3-1 3.3 Design and R&R Co-ordination .............................................................................................. 3-2 3.4 Timing of Resettlement ........................................................................................................ 3-3 3.5 Widening Options ................................................................................................................. 3-3 4 RESETTLEMENT POLICIES AND LEGAL FRAMEWORK ................................................ 4-1 4.1 Key Social Laws and Regulations ........................................................................................... 4-1 4.2 World Bank Safeguard Policies .............................................................................................. 4-2 4.3 Comparative Analysis of World Bank OP 4.12 on Involuntary Resettlement and RFCTLARR Act, 2013 ................................................................................................................................... 4-2 4.4 Process of Land Acquisition and Other Immovable Assets ....................................................... 4-7 4.5 Project Specific R&R Policy ................................................................................................... 4-8 5 PROFILE OF STATE AND PROJECT AFFECTED PERSONS ............................................ 5-1 5.1 Socio-Demographic Profile of the State .................................................................................. 5-1 5.2 Census and Socio-economic Survey Analysis .......................................................................... 5-3 5.3 Objectives of the Census and Socio-economic Surveys ........................................................... 5-3 5.4 Categories of Properties Affected within COI .......................................................................... 5-4 5.5 Analysis of Census and Baseline Socio-economic Data ............................................................ 5-5 6 COMMUNITY PARTICIPATION .................................................................................... 6-1 6.1 Introduction......................................................................................................................... 6-1 6.2 Consultation and Participation Mechanisms ...........................................................................
Recommended publications
  • Jhansi PIP Report 2018.Pdf
    NATIONAL HEALTH MISSION A REPORT ON MONITORING OF IMPORTANT COMPONENTS OF NHM PROGRAMME IMPLEMENTATION IN JHANSI DISTRICT, UTTAR PRADESH DR. GAGANDEEP KAUR Mr. RAHUL KUMAR POPULATION RESEARCH CENTRE INSTITUTE OF ECONOMIC GROWTH, UNIVERSITY OF DELHI ENCLAVE, NORTH CAMPUS, DELHI 110007 OCTOBER, 2018 NHM Jhansi PIP 2017-18: Uttar Pradesh PRC, IEG Delhi Contents List of Tables 3 List of Figures 4 List of Abbreviations 6 Executive Summary 7 Strengths 8 Weaknesses 9 1: Introduction 10– 16 1.1: Methodology 11 1.2: Demographic Profile 12 1.3: Health Profile 13 2: Human Resources & Health Infrastructures 16 – 21 2.1: Human Resources 17 2.2: Health Infrastructure 19 3: Maternal Health 20 – 26 3.1: Overview 20 3.2: Janani Suraksha Yojna (JSY) 23 3.3: Janani Sishu Suraksha Karyakram (JSSK) 24 3.4: Maternal Death Review 25 4: Child Health 26 – 32 4.1: Neonatal Health 27 4.2: Immunization 28 4.3: Rashtriya Bal Suraksha Karyakram (RBSK) 29 4.4 Rashtriya Kishor Swasthya Karyakram (RKSK) 30 5: Family Planning 31-32 6: Quality Management in Health Care Services 32-34 1 AUGUST, 2018 NHM Jhansi PIP 2017-18: Uttar Pradesh PRC, IEG Delhi Contents 6.1: Health Care Waste Management 33 7: Information Education & Communication 34 8: Community Process 35 9: Ayurveda, Yoga and Naturopathy, Unani Siddha and Homeopathy (AYUSH) 36 10: Disease Control Programme 36-39 10.1: Communicable Diseases 37 10.2: Non Communicable Diseases 38 11: Health Management Information System 40 12: Budget Utilization 41 13: Facility wise Observations 42-51 13.1: District Women Hospital
    [Show full text]
  • IEE: India: SH-45: Mihona-Lahar-Daboh-Bhander-Chirgaon Project Road, Madhya Pradesh State Roads Project
    Environmental Assessment Report Initial Environmental Examination for SH-45: Mihona–Lahar–Daboh–Bhander–Chirgaon Project Road Project Number: 43063 November 2010 IND: Madhya Pradesh State Roads Project III Prepared by Government of Madhya Pradesh for the Asian Development Bank (ADB). The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Table of Contents Executive Summary …………………………………………………………………………vii 1. INTRODUCTION 1 1.1. Project Background/Rationale .......................................................................... 1 1.2. Project Preparatory Technical Assistance (PPTA) and Environmental Assessment ................................................................................................................. 2 1.3. Purpose of the Study ....................................................................................... 2 1.4. Extent of IEE .................................................................................................... 3 1.5. IEE Content ..................................................................................................... 3 1.6. Team Composition and Acknowledgements .................................................... 3 1.7. Methodology .................................................................................................... 3 1.7.1. Information/ data Sources ...........................................................................
    [Show full text]
  • List of Class Wise Ulbs of Uttar Pradesh
    List of Class wise ULBs of Uttar Pradesh Classification Nos. Name of Town I Class 50 Moradabad, Meerut, Ghazia bad, Aligarh, Agra, Bareilly , Lucknow , Kanpur , Jhansi, Allahabad , (100,000 & above Population) Gorakhpur & Varanasi (all Nagar Nigam) Saharanpur, Muzaffarnagar, Sambhal, Chandausi, Rampur, Amroha, Hapur, Modinagar, Loni, Bulandshahr , Hathras, Mathura, Firozabad, Etah, Badaun, Pilibhit, Shahjahanpur, Lakhimpur, Sitapur, Hardoi , Unnao, Raebareli, Farrukkhabad, Etawah, Orai, Lalitpur, Banda, Fatehpur, Faizabad, Sultanpur, Bahraich, Gonda, Basti , Deoria, Maunath Bhanjan, Ballia, Jaunpur & Mirzapur (all Nagar Palika Parishad) II Class 56 Deoband, Gangoh, Shamli, Kairana, Khatauli, Kiratpur, Chandpur, Najibabad, Bijnor, Nagina, Sherkot, (50,000 - 99,999 Population) Hasanpur, Mawana, Baraut, Muradnagar, Pilkhuwa, Dadri, Sikandrabad, Jahangirabad, Khurja, Vrindavan, Sikohabad,Tundla, Kasganj, Mainpuri, Sahaswan, Ujhani, Beheri, Faridpur, Bisalpur, Tilhar, Gola Gokarannath, Laharpur, Shahabad, Gangaghat, Kannauj, Chhibramau, Auraiya, Konch, Jalaun, Mauranipur, Rath, Mahoba, Pratapgarh, Nawabganj, Tanda, Nanpara, Balrampur, Mubarakpur, Azamgarh, Ghazipur, Mughalsarai & Bhadohi (all Nagar Palika Parishad) Obra, Renukoot & Pipri (all Nagar Panchayat) III Class 167 Nakur, Kandhla, Afzalgarh, Seohara, Dhampur, Nehtaur, Noorpur, Thakurdwara, Bilari, Bahjoi, Tanda, Bilaspur, (20,000 - 49,999 Population) Suar, Milak, Bachhraon, Dhanaura, Sardhana, Bagpat, Garmukteshwer, Anupshahar, Gulathi, Siana, Dibai, Shikarpur, Atrauli, Khair, Sikandra
    [Show full text]
  • Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Volume – IX: Resettlement Action Plan Hamirpur – Rath Road (SH-42)
    Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Volume – IX: Resettlement Action Plan Hamirpur – Rath Road (SH-42) 0 EXECUTIVE SUMMARY 0.1 Introduction The State has a road network of 299,604 km, out of which 174,451 km is under Uttar Pradesh Public Works Department (PWD). The roads under PWD comprise 7,550 km of National Highways (NHs), 7,530 km of State Highways (SHs), 5,761 km of Major District Roads (MDRs), 3,254 km of Other District Roads (ODRs) and 138,702 km of Village Roads (VRs). Only about 60% of SHs are two-lane (7 m). In the entire state 62% of MDRs and 83% of ODRs have widths less than 7 m. With a view to improve the transport network system, UP PWD has identified 24,095 km of Core Road Network (CRN) for the development. The Core road development works will consist of raising the formation level, widening to a full two lanes from the existing single and intermediate lane widths, and/or pavement rehabilitation/strengthening. Road sections with high volumes of non-motorized traffic will be widened to 10m with 1.5m full paved shoulders. Road stretches crossing urban areas may also require upgrading to a four lane cross section, and/or provision for drains, sidewalks and parking where required. In some cases, new alignments (by-passes and/or re-alignments may also be required. In view of the above, UP core road network development project (UPCRNDP) has been designed. The UPCRNDP will have three Components: Upgrading/reconstruction/widening as well as rehabilitation of selected roads from the Core Road Network (CRN) including construction of a new Sharda Bridge at Pachpheri Ghat in Lakhimpur district.
    [Show full text]
  • B H I N D D a T I a J a L a U N Jhansi Lalitpur
    77°30'0"E 77°40'0"E 77°50'0"E 78°0'0"E 78°10'0"E 78°20'0"E 78°30'0"E 78°40'0"E 78°50'0"E 79°0'0"E 79°10'0"E 79°20'0"E 79°30'0"E 79°40'0"E 79°50'0"E 80°0'0"E 80°10'0"E 80°20'0"E 80°30'0"E ¤£2A GEOGRAPHICAL AREA JHANSI (EXCEPT AREA ALREADY AUTHORIZED), ¤£2 CA-10 N ! N BHIND, JALAUN, LALITPUR AND DATIA " ATER " 0 0 ' Chomho 719 ' 0 ¤£ 0 4 4 DISTRICTS ° ° 6 Sukand ! (! Phuphkalan 6 2 ! Para ± 2 Jawasa ! CA-11 Seoda ! ! KEY MAP BÁhind ! Kachogara GORMI (! ! (! Á! !. Bhind Kanavar Manhad ! Akoda Gormi Á! ! N Endori ( N " ! ! Umri " 0 Á 0 ' ! ' 0 Babedi ! 0 3 Sherpur Á! (! ! 3 ° ! Mehgaon Nunahata ° 6 Goara CA-09 6 2 Á! ! ! 2 Bilaw BHIND Á! ! (! GohadB H I N D Á Jagammanpur CA-12 ! CA-13 MEHGAON U T TA R P R A D E S H N CA-08 Kuthond ! N " Rampura " Malanpur (! ! 0 Gaheli (! Umri 0 ' GOHAD ! Roan ! ' 0 ( 0 Amayan RON Machhand 2 ! 2 ° ! CA-04 Ajitapur ° 6 ! 6 2 Sirsakalar 2 Mihona (! MADHOGARH ! Mau Rahawali (! ! ( Ubari Madhogarh ! Gopalpura Saravan CA-07 ! ! CA-03 MIHONA ! M A D H Y A N (! N " Bangra JALAUN " 0 0 P R A D E S H ' Lahar ' 0 Seondha 70 0 1 ¤£ 1 ° (! Khaksis ! ° 6 Aswar (! 6 2 ! !. Jalaun 2 Musmirya (!!Kalpi Area Excluded Nadigaon ! Á (Part Jhansi District) CA-14 CA-06 (! CA-01 ! SEONDHA LAHAR KALPÁI ¤£91 CA-05 J A L A U N Á!! Aata N Alampur (! N " KONCH ! Akbarpur " 0 ! 0 ' Tharet (! ! Babina ' 0 0 ° (!! (! ° 6 Daboh ÁKonch !Orai ! (! Kadaura 6 2 45 Á 2 ¤£ Margaya ! Parsan Total Geographical Area (Sq Km) 21,888 Á ! Lohagarh CA-02 ! No.
    [Show full text]
  • CP Vol VIII EIA
    GOVERNMENT OF UTTAR PRADESH Public Works Department Uttar Pradesh Core Road Network Development Program Part – A: Project Preparation DETAILED PROJECT REPORT Volume - VIII: Environmental Impact Assessment Report and Environmental Management Plan Garautha – Chirgaon Road (SH-42) July 2015 India Consulting engineers pvt. ltd. Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Volume-VIII: EIA and EMP Report Garautha – Chirgaon Road (SH-42) Volume-VIII : Environmental Impact Assessment Report (EIA) and Document Name Environmental Management Plan (EMP) (Detailed Project Report) Document Number EIRH1UP020/DPR/SH-42/GC/002/VIII Uttar Pradesh Core Road Network Development Program Project Name Part – A: Project Preparation including Detailed Engineering Design and Contract Documentation Project Number EIRH1UP020 Document Authentication Name Designation Prepared by Dr. S.S. Deepak Environmental Specialist Reviewed by Sudhendra Kumar Karanam Sr. General Manager (Roads & Highways) Rajeev Kumar Gupta Deputy Team Leader Avadesh Singh Technical Head Approved by Rick Camise Team Leader History of Revisions Version Date Description of Change(s) Rev. 0 02/11/2014 First Submission Rev. 1 13/12/2014 Compliances to Comments Rev. 2 14/01/2015 Compliances to Comments Rev. 3 16/07/2015 Revision after discussion with Independent Consultant Page i| Rev: R3 , Uttar Pradesh Core Road Network Development Program DETAILED PROJECT REPORT Volume-VIII: EIA and EMP Report Garautha – Chirgaon Road (SH-42) TABLE OF CONTENTS Chapter Description
    [Show full text]
  • List of Common Service Centres Established in Uttar Pradesh
    LIST OF COMMON SERVICE CENTRES ESTABLISHED IN UTTAR PRADESH S.No. VLE Name Contact Number Village Block District SCA 1 Aram singh 9458468112 Fathehabad Fathehabad Agra Vayam Tech. 2 Shiv Shankar Sharma 9528570704 Pentikhera Fathehabad Agra Vayam Tech. 3 Rajesh Singh 9058541589 Bhikanpur (Sarangpur) Fatehabad Agra Vayam Tech. 4 Ravindra Kumar Sharma 9758227711 Jarari (Rasoolpur) Fatehabad Agra Vayam Tech. 5 Satendra 9759965038 Bijoli Bah Agra Vayam Tech. 6 Mahesh Kumar 9412414296 Bara Khurd Akrabad Aligarh Vayam Tech. 7 Mohit Kumar Sharma 9410692572 Pali Mukimpur Bijoli Aligarh Vayam Tech. 8 Rakesh Kumur 9917177296 Pilkhunu Bijoli Aligarh Vayam Tech. 9 Vijay Pal Singh 9410256553 Quarsi Lodha Aligarh Vayam Tech. 10 Prasann Kumar 9759979754 Jirauli Dhoomsingh Atruli Aligarh Vayam Tech. 11 Rajkumar 9758978036 Kaliyanpur Rani Atruli Aligarh Vayam Tech. 12 Ravisankar 8006529997 Nagar Atruli Aligarh Vayam Tech. 13 Ajitendra Vijay 9917273495 Mahamudpur Jamalpur Dhanipur Aligarh Vayam Tech. 14 Divya Sharma 7830346821 Bankner Khair Aligarh Vayam Tech. 15 Ajay Pal Singh 9012148987 Kandli Iglas Aligarh Vayam Tech. 16 Puneet Agrawal 8410104219 Chota Jawan Jawan Aligarh Vayam Tech. 17 Upendra Singh 9568154697 Nagla Lochan Bijoli Aligarh Vayam Tech. 18 VIKAS 9719632620 CHAK VEERUMPUR JEWAR G.B.Nagar Vayam Tech. 19 MUSARRAT ALI 9015072930 JARCHA DADRI G.B.Nagar Vayam Tech. 20 SATYA BHAN SINGH 9818498799 KHATANA DADRI G.B.Nagar Vayam Tech. 21 SATYVIR SINGH 8979997811 NAGLA NAINSUKH DADRI G.B.Nagar Vayam Tech. 22 VIKRAM SINGH 9015758386 AKILPUR JAGER DADRI G.B.Nagar Vayam Tech. 23 Pushpendra Kumar 9412845804 Mohmadpur Jadon Dankaur G.B.Nagar Vayam Tech. 24 Sandeep Tyagi 9810206799 Chhaprola Bisrakh G.B.Nagar Vayam Tech.
    [Show full text]
  • Integrated Area Devdopment Plan for District Jhansi
    Integrated Area Devdopment Plan for District Jhansi N IE PA D C D00348 AREA PLANNING DIVISION STATE PLANNING INSTITUTE UTTAR PRADESH SEPTEMBER, 1980 \> Sub. Nationsl Systems KaHonal Institute of Edncatioiiat Planning pr. i ministration 17-B,SriAurt.; M .NewDelhi-110016 Date...... Ihe fifth Jive Year PlaA had recommended the formulation 3f location ^scifLc integrated area developnait-pl^ for each dLs- trlct in the countiy. Ihe present stacfy, **Integrated ^Area Develop- ment Plan f»r QLstilct JhansL** i s "ttie first attempt made in this State. The studfer under-taken by the State Planning Institute sati'^fies some of the main criteria laid dovn by the Planning Commission, Govem4ent of India* Ihou^ the integrated area deve­ lopment plan h;as been prepared for the district Jhgglai it s implica­ tions are much vdder and, the methodology adopted i s replicable in other distilcts of the State with seme modifications, Ihe-present stac^ i s , thus, an im port^t step in the foimulation of the integrated area p l^s , Ihe stu<%- provides necessary locational guid^nes for establi^ng various institu- tions ^ d facilities in specific areas of the district end suggests impl on citation of in t ^ _ sectoral programmes in an integrated manner. In fact, area planning has beoi recognised as an indLsensible tech­ nique for comprdiensive development of ?si area based on integration of functional ^ d spatial factors vhich msy furtLier ensure proper linkages in the inter-sectoral pmgr^Emes to derive an optimum benefit for -fche inhabitants of tiie area on -ttieir impl an station. Ihe methodology pursued in the study i s bound to improve in the subsequent exercises vhich be under-taken in other district of the State.
    [Show full text]
  • 1 Village Kathera, Block Akrabad, Sasni to Nanau Road , Tehsil Koil
    Format for Advertisement in Website Notice for appointment of Regular / Rural Retail Outlet Dealerships Bharat Petroleum Corporation Limited (BPCL) proposes to appoint Retail Outlet dealers in Uttar Pradesh, as per following details: Fixed Fee / Security Estimated monthly Type of Minimum Dimension (in M.)/Area of Mode of Minimum Bid Sl. No Name of location Revenue District Type of RO Category Finance to be arranged by the applicant Deposit (Rs. Sales Potential # Site* the site (in Sq. M.). * Selection amount (Rs. In In Lakhs) Lakhs) 1 2 3 4 5 6 7 8 9a 9b 10 11 12 SC, SC CC-1, SC PH ST, ST CC-1, ST PH OBC, OBC CC- CC / DC / Estimated fund Estimated working Draw of Regular / 1, OBC PH CFS required for MS+HSD in Kls Frontage Depth Area capital requirement Lots / Rural development of for operation of RO Bidding infrastructure at RO OPEN, OPEN CC- 1, OPEN CC- 2,OPEN-PH Village Kathera, Block Akrabad, Sasni to Nanau Road , Draw of 1 Tehsil Koil, Dist Aligarh ALIGARH RURAL 90 SC CFS 30 30 900 0 0 Lots 0 2 Village Dhansia, Block Jewar, Tehsil Jewar,On Jewar to GAUTAM BUDH Draw of 2 Khurja Road, dist GB Nagar NAGAR RURAL 160 SC CFS 30 30 900 0 0 Lots 0 2 Village Dewarpur Pargana & Distt. Auraiya Bidhuna Auraiya Draw of 3 Road Block BHAGYANAGAR AURAIYA RURAL 150 SC CFS 30 30 900 0 0 Lots 0 2 Village Kudarkot on Kudarkot Ruruganj Road, Block Draw of 4 AIRWAKATRA AURAIYA RURAL 100 SC CFS 30 30 900 0 0 Lots 0 2 Draw of 5 Village Behta Block Saurikh on Saurikh to Vishun Garh Road KANNAUJ RURAL 100 SC CFS 30 30 900 0 0 Lots 0 2 Draw of 6 Village Nadau,
    [Show full text]
  • S. No. Tahsil Block Name of Village (All Villages As Per Census) Census
    Scheme: DDUGJY-RE 12th plan District : Jhansi Discom : Dakshinanchal Vidyut Vitran Nigam Ltd., PIA : Dakshinanchal Vidyut Vitran Nigam Ltd., Turnkey Contractor: M/s Chaudhary Constructions Co., Etawah Date- As on 15.06.2017 Date of Name of Village census completion/ S. Tahsil Block (all villages as per code Name of habitation Expected No. census) (2011) date of completion 1 2 3 4 5 6 7 1 Jhansi Babina Badanpur 04568600 Badanpur 25.07.2016 2 Jhansi Babina Basai 04568700 BASAI 15.06.2017 3 Jhansi Babina Khaira 4568800 KHAIRA 20.05.2017 4 Jhansi Babina Baidora 04568900 BAIDAURA 25.07.2016 5 Jhansi Babina Baidora 04568900 TOONKA 25.07.2016 6 Jhansi Babina Murari 04569000 MURARI 29.08.2016 7 Jhansi Babina Chamaraua 04569100 BANDA 25.07.2016 8 Jhansi Babina Chamaraua 04569100 CHAMARAUA 25.07.2016 9 Jhansi Babina Chamaraua 04569100 KOTI 23.05.17 10 Jhansi Babina Gurha 04569300 GURHA 03.12.2016 11 Jhansi Babina Dogri 04569400 DONGRI July'17 12 Jhansi Babina Dogri 04569400 KALARYA 29.08.2016 13 Jhansi Babina Kichalwara Bujurg 04569500 KICHALWARA BUJURG 05.10.2016 14 Jhansi Babina Kichalwara Bujurg 04569500 TOONKA 29.08.2016 15 Jhansi Babina Sarvad 04569600 BHADRA 03.12.2016 16 Jhansi Babina Sarvad 04569600 SARVAD Oct'17 17 Jhansi Babina Parasai 04569700 PARASAI 25.07.2016 18 Jhansi Babina Bachhauni 04569800 BACHHAUNI 24.10.2016 19 Jhansi Babina Bachhauni 04569800 CHATTPUR 25.07.2016 20 Jhansi Babina Rajapur 04569900 RAJAPUR 30.04.2016 21 Jhansi Babina Dagarwaha 04570000 DAGARWAHA 24.10.2016 22 Jhansi Babina Dagarwaha 04570000 GANESH GARH 29.08.2016
    [Show full text]
  • District Census Handbook, 23-Jhansi, Uttar Pradesh
    _.___ . _ ... ~..... ~.... _~ __ ---:.v ____ .. _.__. __ ~ ________ DISTRICT CENSUS HANDBOOK 1951 JHANSI DISTRICT -------------- FOREWORD Several States, including Uttar Pradesh, have been publishing village statistics by districts at each census. In 1941 they were published in U. P. under the title "District Census Statistics" with a separate volume for each district. In the 1951 census, when the tabulation has been more elaborate than ever in view of the require .... ments of the country, the district .. wise volume has been expanded into a "District Census Handbook", which now contains the District Census Tables (furnishing data with break .. up for census tracts within the district), the District Index of Non .. agricultural Occupations, agricultural statistics from 1901.102 to 195°"51 and other miscellaneous statistics in addition to the usual village population statistics. The village population statistics also are given in an elaborate form giving the division of the population among eight livelihood classes and other details. 2. It may be added here that a separate set of district .. wise volumes giving only population figures of rural areas by villages and of urban areas by wards and mohallas and entitled "District Population Statistics" has already been published. This separate series was necessitated by the urgent requirements of the U. P. Government for elections to local bodies. 3. The number of District Census Handbooks printed so far is fou~teen. Special arrangements for speeding up the printing have now been made and it is hoped thafthe remaining Handbooks will be pri.nted before the end of 1955. RAJESHW ARI PRASAD. I.A.S., R.AMPtnt: Supef'intendent, Census Operations, February 28, 1955.
    [Show full text]
  • Pradhan Mantri Awas Yojana (PMAY-U)
    Pradhan Mantri Awas Yojana (PMAY-U) Proposal for 20 projects with 18598 EWS Houses under Vertical-3 AHP Proposal for 282 projects with 102047 validated Beneficiaries under Vertical 4 – BLC (N) Presented to 29th CSMC Dated 27-12-2017 State Urban Development Agency (SUDA), Government of Uttar Pradesh PROGRESS OF PMAY (U) Indicators Current Status (No.) . Cities Approved 653 Nos . Total Application Received after De duplication 27,34,293 . Total Physical Validation completed in ULB’s 539 ULBs . Total no of Applications physically Validated 17,70,594 . Demand Survey Completed . 465 ULBs . SECC 2011 data linkage 28% average . Cases accepted/rejected (including deduplication) 5,89,736/4,09,497 (7,71,361 entry is in process) . Whether HFAPoA Submitted 69 cities . Whether AIP Submitted No . Whether HFAPoA & AIP entered in MIS Under Progress . SLTC/CLTC staffs approved vs. placed SLTC/CLTC staff will be placed by next month. Target of DUs in 2017-18 5,00,000 Dus . State Budgetary Provision for PMAY (U) in 2017-18 3000 Cr. STATUS OF MANDATORY CONDITIONS Mandatory conditions Current Status .Dispensing the need for separate Non Agricultural (NA) Permission Complied .Prepare/amend their Master Plans earmarking land for Under Progress Affordable Housing .Single-window, time bound clearance for layout approval and Complied building permissions .Adopt the approach of deemed building permission and layout Complied approval on the basis of pre-approved lay outs and building plans. .Amend or legislate existing rent laws on the lines of the Model Under Progress Tenancy Act. .Additional Floor Area Ratio (FAR)/Floor Space Index (FSI)/ Provision for Transferable Development Rights (TDR) and relaxed density norms.
    [Show full text]