APAC and Maritime STATEMENT OF QUALIFICATIONS Cardno is a professional infrastructure and environmental services company, with expertise in the development and improvement of physical and social infrastructure for communities around the world.

Cardno can offer a highly multidisciplinary team in its Ports and Maritime division. We have a long history of working on full range of services required for delivery and asset management of maritime and berths throughout Australia and the Pacific. We service multiple markets from small marina plan for developers right through to large scale design and construction projects for Ports. Our staff have worked on some of Australia’s largest Oil & Gas Projects. Our maritime team comprises skills that are required in the scoping, master planning, concept, detailed, delivery and maintenance phases of infrastructure projects. These specialist skills include use of industry specific tools and software including Full Bridge Navigation Simulation, analysis (e.g. “Optimoor”), cathodic protection design programs, wave and modelling programs and fender design tools developed in-house. Cardno can also offer complementary skills required for port projects such as in-house geotechnics, survey, diving, marine environmental, metocean and coastal processes studies. The Cardno staff has completed facility and operational planning for numerous international and domestic ports and is dedicated to the development of environmentally sustainable projects. Cardno has directed and land reclamation studies, prepared environmental documents and permits, and completed port and terminal master plans, equipment studies, operational analyses, design, and procurement.

Cardno’s Commitment to Zero Harm Safety is a core value at Cardno and our Zero Harm safety program fosters an environment of clear accountability, shared responsibility, risk awareness and effective communication. Our program underpins all operations and is responsive to the needs of our clients. We are focussed on continually improving our safety culture and the management systems that reinforce our commitment to zero harm. Cardno operates an occupational health and safety management system that has been certified to AS4801 and OHSAS18001. APAC OFFICE LOCATIONS CARDNO LOCATIONS Recent Project Examples

DRY AND LIQUID BULK PORTS

South Upgrade, VIC MCF Berth Upgrade, VIC Cardno was engaged by the Port Cardno was engaged by Port of of Melbourne to undertake major Melbourne to upgrade an existing upgrades and remediation to 7No. of cement berth to accommodate its major bulk wharves. The primary larger vessels. The project includes objective of this project was to dredging, sheetpile retaining walls rehabilitate South Wharf Berths 27-29 and new cone fenders. Cardno and the sheet pile wall from 24-31 undertook optioneering, geotechnical in order to maintain the berths in a investigations and maritime functional and serviceable condition. infrastructure design.

Half Tide Tug Harbour Johor Port VTS, Malaysia WSCAM Assessment, QLD Johor Port Berhad (Malaysia) The facility is an aging but important required a vessel traffic management asset that provides critical support system, including the Port limits to berthing operations at Hay Point. and areas adjacent to Cardno undertook an advanced condition Singapore. The scope included assessment, load rating, diving and preparation of a full business physical testing in accordance with the requirements specification including Wharf Structures Condition Assessment integration with other primary systems, preparation and Manual (WSCAM). management of tendering and full project management

Fiji Port Development, FIJI Ichthys LNG Project, NT The 5 Year Strategic Plan (2018- Cardno lead the environmental 2022) is a cornerstone of the monitoring team of over 100 overall alignment of the Port to an specialist personnel assessing the increasing dynamic and competitive environmental impact of dredging business environment. Through the operations on the Darwin marine Strategic Plan, the Port will meet key environment as part of the $38b. challenges and leverage opportunities Ichthys LNG Development for INPEX. to achieve its goals. The Plan addresses the regulatory, physical, Results from extensive field programs were analysed under operational, economic, financial, environmental, and recreational exacting timeframes to measure environmental responses to requirements of the company. It forms the basis for strategic policy dredging and piling activities and to initiate reactive management for effective resource utilization and efficient service delivery. actions. Cardno’s in-house equipment was used for the project. CONTAINER AND GENERAL PORTS

Port Botany Development, NSW Short Rd Tug Facility, D&C, VIC Sydney Ports Corporation (now NSW Cardno were engaged as part of a Ports) proposed to increase container D&C contract to design two 60m berth space at Port Botany to meet long . Works included mooring expanding trade. Cardno assisted in analysis, and design of all structural, undertaking a range of water resources fendering and mooring systems. and coastal engineering investigations As well as design of services for for the EIS. the facility.

NSW Regional Ports Strategy, Fender Rating Study, NSW NSW Cardno were engaged by Patricks to The NSW Department of Primary assess the current capacity of fender Industries required a plan to at Brotherson for larger vessels. guide investment and operations Cardno reviewed the fender capacity of 25 regional ports and coastal against three international standards infrastructure over the medium term. and informed Patricks of the current The strategy focus is on promoting load limitations under a range of regional economic growth, and managing and mitigating risks operating conditions. to the community that are associated with ports operations. The strategy is to be used to facilitate investor confidence, and Nauru Port Development provide a framework for maintaining access to, and sustainable Project, Nauru use of, natural resources in the sea and the related coastal zone. Cardno has been engaged by ADB It included detailed analyses of existing conditions and service to develop a new port for the island standards, environment and heritage, economics, service delivery nation of Nauru. Cardno are currently and risk management, and port operations. undertaking detailed design to construct a quay wall for berthing Fremantle Current Monitoring, WA together with an access causeway, demolishing and safe removal Cardno were engaged by the Fremantle of existing and reconstructing new buildings for harbour master’s Port Authority to profile currents office, staff amenities, gatehouse and a plant workshop, paving throughout its inner harbour. The the container storage area with heavy-duty industrial pavement, data was used to inform shipping and a fully secured fence. Cardno have undertaken hydrodynamic movements at the facility. Data was analysis including wave and climate assessment, ship bridge collected during field campaigns, using simulation to determine appropriate berthing configurations, and a vessel-mounted Acoustic Doppler will conduct physical investigations and detailed design. Current Profiler (ADCP). Project Examples

PASSENGER AND WATER FRONT CRUISE TERMINALS DEVELOPMENTS

Shute Harbour Redevelopment Footscray Wharf Whitsundays Regional Council engaged The Footscray Wharf and Promenade Cardno to undertake a feasibility study into Project is a $12M investment by the underutilized maritime infrastructure at Maribyrnong City Council to revitalise a Shute Harbour. The study included a variety 500 m long section of the Maribyrnong of services and resulted in a proposed $20M River. Cardno’s commission includes redevelopment of the harbour. geotechnical investigations, approvals, civil design, maritime design and design of all associated services. The concept design Cruise Terminal Operability Study was developed in consultation with the Council architect. The The project includes a detailed Optimoor design will incorporate floating infrastructure and fixed timber operability study to assess the feasibility wharf infrastructure. of an exposed cruise terminal. The project remains confidential but if shown to be Port Macquarie Wharf feasible it will involve a major new berthing Cardno was engaged for the detailed facility and become of Australia’s most design of 4 new maritime structures (mainly prominent cruise terminal facilities. timber) at Port Macquarie Boat Harbour. The structures were proposed by Port Macquarie Car Carrier Berth Hastings Council as a part of the ‘Master Cardno was engaged by a government agency Plan’ for the Boat Harbour. A new wharf is to accommodate to assess the merits of a new car carrier ferry fishing and passive recreational activities and be consistent service. The project included a review the with the Port Macquarie Hastings Council Master Plan for the upgrade requirements of existing berthing Boat Harbour. Carndo undertook survey, diving works, condition structures and needs to wave attenuation and assessment and detailed design. DDA compliance requirements. The project remains confidential.

Eden Safe Harbour Project The NSW Government has provided $10 million for the Eden Safe Harbour project, which will provide a safer harbour for local and visiting vessels and improve the protection of existing maritime infrastructure within Snug Cove, Eden. Cardno was engaged by Waterways Construction to prepare a tender design a $6M wave screen Cardno undertook all wave and structural assessments. The tender was successful. What We Do

Cardno supports its clients by providing the following services

Ports and Maritime Coastal Processes, Environment and Sustainability Data Acquisition and Structures >> Strategic and Master Plans >> Environmental impact assessments >> Feasibility Studies >> Coastal, ocean and estuarine processes >> Project development and planning >> Detailed Design assessment and design criteria approvals >> Mooring Analysis (Optimoor) >> Concept detailed design of coastal >> Stakeholder mapping, engagement, >> Facility, Terminal and Building Design protection facilities and consultation >> Pavement Design >> Environmental monitoring of waves, >> Long Term Dredge Spoil >> Condition assessment & load ratings winds, water levels, currents, water Management Plans >> Value Engineering temperature, and water quality either >> Dredge Material Re-use Strategies >> Independent Review Services on campaign basis or through to fully >> Environmental compliance monitoring >> Construction Phase services / integrated, real time, web linked data and reporting; third party audits Superintendency acquisition, analysis, distribution and >> Environmental remediation and >> Economic and Financial Forecasting display systems hazardous waste management >> Tariff Studies >> Numerical modelling of water quality >> Environmental licensing, permitting, >> Terminal Operational Analysis & and ecological processes and training Logistics >> Numerical modelling of waves, winds, >> Property acquisition due diligence >> Capital and Operating Cost Estimates water levels, currents, dispersion and >> Voluntary remediation / brownfield >> Asset Management Systems sediment transport in coastal, ocean redevelopment >> Long-term maintenance plans and estuarine environments >> Natural resource management >> Public-private Partnership Strategies >> Coastal Structures >> Natural resource economics and >> Due Diligence and Privatization >> Sand Bypass System human health toxicology and data Concession Support for Financing management Geotechnical >> Transaction Advisory >> Community engagement plan, >> Cost estimating >> Investigations including land tenure and >> Dredging and land reclamation >> Detailed Design compensation >> Vessel Traffic Management Systems >> Finite Element Analysis >> Social impact assessments >> Information Systems >> Pavements >> Socio-economic baseline >> Green Port Policy & Civil Services Implementation Plans >> Port roads >> Green House Gas inventory programs >> Rail >> Sustainable Design and Construction >> Transport Studies Guidelines >> HVAC systems >> Climate change trend analysis, >> Electrical systems simulations, impact analysis, >> Plumbing systems planning and monitoring >> Water/wastewater systems >> Climate resilience and vulnerability assessment Key Offices

Global Head Office Sydney Office Melbourne Office

Level 11, 515 St Paul’s Terrace Level 9 - The Forum Level 4, 501 Swanston Street Fortitude Valley 203 Pacific Highway, St Leonards Melbourne Queensland 4006 Australia New South Wales 2065 Australia Victoria 3000 Australia

P +61 7 3100 2132 P +61 2 9024 7065 P +61 3 9937 0705 E [email protected] About Cardno Cardno is a professional infrastructure and environmental services company, with expertise in the development and improvement of physical and social infrastructure for communities around the world. Cardno’s team includes leading professionals who plan, design, manage and deliver sustainable projects and community programs. Cardno is an international company listed on the Australian Securities Exchange (ASX: CDD).

Global Head Office Follow us on www.linkedin.com/company/cardno Level 11, North Tower, Green Square 515 St Paul’s Terrace, Fortitude Valley Follow us on QLD 4006 Australia www.twitter.com/cardno Locked Bag 4006 Fortitude Valley QLD 4006 Join us on www.facebook.com/CardnoGlobal Phone + 617 3369 9822 Fax + 617 3369 9722 Watch us on [email protected] www.cardno.com/youtube www.cardno.com