A6359 Findynate Estate

Total Page:16

File Type:pdf, Size:1020Kb

Load more

Craignarin House & COACH HOUSE KIRKCALDY, FIFE STUNNING GEORGIAN HOUSE AND COACH HOUSE WITH IMMACULATE ACCOMMODATION AND ENCLOSED GROUNDS Distances Kirkcaldy Railway Station 1.5 miles Edinburgh 30 miles (All Distances Approximate) Savills Edinburgh Wemyss House 8 Wemyss Place Edinburgh EH3 6HD 0131 247 3738 [email protected] savills.co.uk Craignairn House & COACH HOUSE RAVENSCRAIG STREET, KIRKCALDY, FIFE, KY1 2AL Immaculate and fully upgraded accommodation B Listed Georgian house dating back to 1830 Separate coach house with 4 bedrooms, 3 bathrooms and WC Views over the Firth of Forth towards Edinburgh and the Pentland Hills Excellent commuting links into Edinburgh via rail and road Enclosed grounds and extensive garaging Main Accommodation Kitchen / breakfast room, dining room, drawing room, conservatory, study, utility room. Principal bedroom with en suite shower and dressing room. 3 further double bedrooms, bathroom and shower room. Coach House Kitchen, sitting room, utility room, 4 bedrooms (2 en suite), bathroom. EPC = D About 0.5 acres in all Situation Craignairn House sits in a prominent setting at the top of Ravenscraig Street, in a quiet residential area of Kirkcaldy. The street leads down to Ravenscraig Park with the Firth of Forth coastline beyond. The elevated setting provides the house with exceptional south facing views. Kirkcaldy is a coastal town on the south Fife coastline, which provides all essential facilities including supermarkets, shops, schools, professional services and a hospital. The Fife Coastal Path is an attractive walk which links Kirkcaldy to Kinghorn and Aberdour. There are golf courses at Kinghorn, Aberdour, Kirkcaldy and Burntisland with a further selection of links courses along the Fife coast. St Andrews, the “Home of Golf”, is 23 miles to the north. Craignairn House is in a great situation for access to local amenities but it also offers fantastic commuting links into Edinburgh. The Forth Road Bridge is 20 miles away, with Edinburgh Airport and the city centre only 30 miles and 24 miles respectively. Kirkcaldy railway station is only 1.5 miles away, and is on the main east coast line which provides services to Edinburgh, Dundee, Aberdeen, and south to London. The Caledonian Sleeper offers a direct service between London and Kirkcaldy. Description Craignairn House is a spectacular example of classic late Georgian architecture. The accommodation in both the houses has been meticulously upgraded in recent years, and offers outstanding living space throughout, with a wealth of traditional character retained. The coach house to the rear has also been extensively renovated by the current owners. Craignairn House is Category B Listed, and dates back to 1830 when it was built by the Earl of Rosslyn for his son. It is a classic two storey house of Georgian design, flanked by two single storey pavilions. The house sits at the top of Ravenscraig Street with superb southerly views over the Firth of Forth, towards Edinburgh and the Pentland Hills beyond. It was formerly known as Ravenscraig House, and became the Sinclairtown Bank until 1927. Stone steps to the front of the house lead up to the front door with its pillared entrance. Ground Floor Vestibule and Entrance Hall: Tiled flooring and cupboard with fuse box. Stunning decorative cornicing in both areas, with ceiling rose in entrance hall. Glazed door separating the two. Drawing Room: South facing room of classic Georgian proportions. Marble open fireplace with slate hearth. Decorative cornicing with ceiling rose. Bespoke Axminster carpet. Doors into conservatory and study. Dining Room: South facing room with decorative cornice and ceiling rose. Open fireplace with marble inset and decorative wooden mantel. Bespoke Axminster carpet. Study: Approached from drawing room via double doors, but connects through to entrance hall. North facing window overlooking courtyard. Decorative cornice with ceiling rose. Conservatory: Used as a family room with generous dining area. South and west facing windows overlooking garden. Doors opening onto the raised terrace. Fitted cupboards. Combination of underfloor heating and radiators. Mounted wall lights and roof beams. High pitched double glazed glass ceiling with 3M tint and UV protection film and fitted blinds. Kitchen / Breakfast Room: South facing aspect over front garden. Handmade cherrywood units and surfaces by Crannog. Integrated appliances including AGA with gas hob and electric oven / grill, Bosch American style fridge freezer, Neff dishwasher and Panasonic microwave. External door to the east side. Radiators and under floor heating. Bathroom: Jacuzzi bath and separate steam shower. WC and wash hand basin. Fully tiled. North facing frosted window. Radiator and under floor heating. Utility Room: Plumbed for tumble dryer and washing machine. Boiler. Store cupboard. Door from rear hall leading out to the north courtyard. First Floor Stairs to Landing: A central staircase from the entrance hall up to the first floor landing. Ornate iron balustrades. Large window providing an abundance of natural light. Solid wood flooring and decorative cornicing on landing. Principal Bedroom Suite: Spacious and well-proportioned room with south and west views towards Firth of Forth. Decorative plasterwork and ornate cornice. Fireplace with wooden surround and granite hearth. En suite shower room and dressing room: Shower, WC, wash hand basin and under floor heating. Walk in dressing room. 3 Further Double Bedrooms: One south facing with views of Firth, two north facing. Two with fitted wardrobes. Shower Room: Shower cubicle, wash hand basin, WC and under floor heating. First Floor Boiler Room Bathroom Study 4.11 x 3.94 13'6'' x 12'11'' Terrace/ Courtyard 10.06 x 2.46 Conservatory 8.61 x 4.11 33' x 8'1'' Kitchen/ (approximate) 28'3'' x 13'6'' Breakfast Room 7.09 x 3.58 23'3'' x 11'9'' Sitting Room Dining 5.64 x 4.62 Room 18'6'' x 15'2'' 5.64 x 4.62 18'6'' x 15'2'' Vestibule Ground Floor Double Double Bedroom 4 Bedroom 3 4.11 x 3.94 4.11 x 3.94 13'6'' x 12'11'' 13'6'' x 12'11'' Shower Room Main House Principal Bedroom Dressing 5.64 x 4.27 Room Double 18'6'' x 14' Bedroom 2 320.60 sq.m - 3,451 sq.ft 4.27 x 4.11 14' x 13'6'' Ensuite Shower Room First Floor The Coach House The coach house at Craignairn has been extensively renovated by the current owners. It offers exceptional overflow living space, or alternatively business potential as either office space or a short-term rental property, subject to the necessary permissions and consents. The accommodation is entered via an arched front door. The sitting room has double doors leading outside to the front, and an electric fireplace. The kitchen has fitted units, a Smeg oven, gas hob, integrated fridge and dishwasher. The adjacent utility room is plumbed for a washing machine, houses the Worcester high flow combi boiler and an under counter freezer. There is a separate WC. It has a door leading out to the side of the coach house, where there is an enclosed south and west facing patio area for outdoor entertaining with access to the generous storage rooms which were once stables. The first floor has four bedrooms. One of them has a dressing room, along with an en suite shower room. Another of the bedrooms has an en suite shower room and an infrared sauna. There are two further double bedrooms and a bathroom with separate shower cubicle. Utility 3.12 x 2.36 10'3'' x 7'9'' Kitchen 5.44 x 2.79 17'10'' x 9'2'' Pit WC Garage 1 Garage 2 Courtyard 4.93 x 3.10 5.41 x 4.29 Garage 3 7.77 x 5.66 16'2'' x 10'2'' 17'9'' x 14'1'' 5.41 x 3.99 25'6'' x 18'7'' 17'9'' x 13'1'' (approximate) Store 3.35 x 2.29 11' x 7'6'' Hall Sitting Room 6.15 x 3.35 Store 20'2'' x 11' 3.15 x 2.92 10'4'' x 9'7'' Ground Floor Dressing Room 4.67 x 2.74 15'4'' x 9' Ensuite Sauna Shower Room Double Bedroom 3 Ensuite 4.27 x 2.92 Shower Double Double 14' x 9'7'' Room Bedroom 2 Bedroom 4 Bathroom Void 3.84 x 2.97 3.84 x 3.43 12'7'' x 9'9'' 12'7'' x 11''3 The Coach House Double Bedroom 1 252.04 sq.m - 2,713 sq.ft 4.32 x 3.35 14'2'' x 11' First Floor G THE COACH HOUSE Grounds & Outbuildings A stone pillared entrance with electric gates leads into the property, direct from Ravenscraig Street. Next to this, there is a separate pedestrian gate with intercom with electric controlled access. An attractive cobbled drive, flanked by traditional feature street lamps, leads round to the rear of the house where there are further electric wrought iron gates. There are three separate garages with remote controlled doors, and one of which has a working pit. There is ample parking for further cars in the courtyard in front. There is a back door into the house from the courtyard, however cobbled paths lead around both sides of the house to the front door. The grounds extend to about 0.5 acres, and are walled along the north, east and west boundaries, with fencing along the south boundary. The principal garden is to the front / south of the property. It is largely laid to lawn and surrounded by young shrubs and trees. To the east of the house is a decorative tiled patio area with pergola. There is a raised terrace outside the conservatory, offering a lovely area for evening entertaining. To the side of the entrance gates is a useful enclosed bin storage area with power points.
Recommended publications
  • Firth of Forth Bridges

    Firth of Forth Bridges

    Historic Bridge Foundation Facebook Archives Focus Bridges: Firth of Forth Bridges September 2017 The Firth of Forth in Scotland is a unique location— perhaps one of the only locations in the world where three centuries of large-scale bridge design and construction can be seen side by side. Here, three parallel bridges cross the Firth of Forth: the 1890 Forth Rail Bridge, the 1964 Forth Road Bridge, and the 2017 Queensferry Crossing. The Forth Rail Bridge is a steel cantilever through truss, and one of a small number of bridges in the world to be designated a UNESCO World Heritage Site, which was awarded in 2015. The UNESCO World Heritage designation not only recognizes the bridge’s "outstanding universal value" but also confirms its protection and preservation as a heritage structure. Among the most famous bridges in the world, the Forth Rail Bridge was the longest cantilever truss bridge in the world when it was completed in 1890. The 1917 Quebec Bridge in Canada is the only bridge to have surpassed its span among cantilever truss bridges. Sir John Fowler and Sir Benjamin Baker designed the Forth Rail Bridge and construction began in 1882. It is unique for its use of massive tubular members and is also one of the first large-scale uses of steel in bridges rather than wrought iron. It remains in use by trains today, and was fully blasted and repainted for the first time starting in 2002. The bridge's overall length is 8,093 feet and the main spans are 1,700 feet each.
  • The History of Dunedin Income Growth Investment Trust

    The History of Dunedin Income Growth Investment Trust

    The History of Dunedin Income Growth Investment Trust PLC The first investment trust launched in Scotland, 1873 – 2018 Dunedin Income Growth Trust Investment Income Dunedin Foreword 1873 – 2018 This booklet, written for us by John Newlands, It is a particular pleasure for me, as Chairman of DIGIT describes the history of Dunedin Income Growth and as former employee of Robert Fleming & Co to be Investment Trust PLC, from its formation in Dundee able to write a foreword to this history. It was Robert in February 1873 through to the present day. Fleming’s vision that established the trust. The history Launched as The Scottish American Investment Trust, of the trust and its role in making professional “DIGIT”, as the Company is often known, was the first investment accessible is as relevant today as it investment trust formed in Scotland and has been was in the 1870s when the original prospectus was operating continuously for the last 145 years. published. I hope you will find this story of Scottish enterprise, endeavour and vision, and of investment Notwithstanding the Company’s long life, and the way over the past 145 years interesting and informative. in which it has evolved over the decades, the same The Board of DIGIT today are delighted that the ethos of investing in a diversified portfolio of high trust’s history has been told as we approach the quality income-producing securities has prevailed 150th anniversary of the trust’s formation. since the first day. Today, while DIGIT invests predominantly in UK listed companies, we, its board and managers, maintain a keen global perspective, given that a significant proportion of the Company’s revenues are generated from outside of the UK and that many of the companies in which we invest have very little exposure to the domestic economy.
  • Forth Replacement Crossing Community Forum Minutes

    Forth Replacement Crossing Community Forum Minutes

    Page 1 of 16 Forth Replacement Crossing Community Forum Minutes Meeting Location: FRC Contact & Education Centre, South Queensferry Meeting Date/Time: 29 November 2017 – 7 pm Participants: Transport Scotland – Employer’s Delivery Team Lawrence Shackman - FRC Project Manager Raymond Kirk – FRC Policy, Governance and Stakeholder Liaison, Outreach and Education Forth Crossing Bridge Constructors Katrina Bruce - FCBC Community Liaison Brian Walker – FCBC (part) Amey Chris Waite – Media and Communications Manager City of Edinburgh Council Dave Sinclair Community Representatives Wayne Morris - Inverkeithing Community Council Lin Collis - North Queensferry Community Council Grant Sangster - QDCC Bert Scott - Cramond & Barnton Community Council Doug Tait – BRIGS Les Chapman - BRIGS Peter Fitzgerald - BRIGS Page 2 of 16 David Buchanan – Kirkliston Community Council Doug Ross - Cramond & Barnton Community Council Tim Beasley - Newton Community Council Apologies Alan Shirley - Head of Policy, Governance and Stakeholder Liaison Keith Giblett – QDCC Bill King – Rosyth Community Council Action 1 Welcome and introductions 1.1 - Meeting Chaired by LS. LS welcomed all to the Community Forum and reminded everyone of the Health and Safety arrangements: Toilets are located on the ground floor in reception area. No smoking policy in and around the entrance to the building. No fire alarms planned for this evening. If the fire alarm sounds, make your way to the nearest exit and congregate at the muster point in the car park (red phone box). LS also stated that this would be the final Community Forum in its current guise and following the Queensferry Crossing opening as a motorway at the end of January 2018, the responsibility for community engagement would transfer to the Forth Bridges Operating Company – FBOC.
  • Forth Road Bridge Suspended Span Under Deck Access (SSUDA) Improvements – Phase 6 NGR 312541, 679746 (Centre Point)

    Forth Road Bridge Suspended Span Under Deck Access (SSUDA) Improvements – Phase 6 NGR 312541, 679746 (Centre Point)

    Transport Scotland EC DIRECTIVE 97/11 (as amended) ROADS (SCOTLAND) ACT 1984 (as amended) RECORD OF DETERMINATION Name of Project: Location: Forth Road Bridge Forth Road Bridge Suspended Span Under Deck Access (SSUDA) Improvements – Phase 6 NGR 312541, 679746 (centre point) DESCRIPTION OF PROJECT BEAR Scotland (BEAR) has been commissioned by Transport Scotland to undertake Suspended Span Under Deck Access (SSUDA) improvement works on the Forth Road Bridge (FRB). The bridge spans the Firth of Forth between South Queensferry and North Queensferry (Appendix A, Figure 1 and Figure 2). The FRB SSUDA system was designed and installed in 1981 and travels the full 1821 m length of the bridge. It is used for inspection of the suspended span and for carrying out minor remedial works such as painting, replacing bolted connections and maintenance of the deck half joints. The FRB SSUDA system is comprised of walkways made of steel angle and channel sections connected through plated, bolted or welded connections. The walkway mesh is supported on longitudinally spanning angle sections with a maximum span of 3.86 m centres between the walkway hangers. The walkway hangers are mainly standard to each line; however, several bespoke hangers exist to avoid collision with the bridge structure or public utilities. The two walkways below the pedestrian footpaths / cycleways are designated as the ‘A-Lines’. The walkways below each carriageway are the ‘C-Lines’, and the ‘D-Line’ is below the central reservation. The longitudinal stiffening truss, or ‘top chord’ is designated as the ‘B-Line’, from which are suspended temporary ‘B-Line hangers’.
  • LMRC ‘Re-Tweeted’ the St

    LMRC ‘Re-Tweeted’ the St

    Campaign The Levenmouth Rail Campaign Update 37 Newsletter January “ More Than Just a Railway ! ” 2018 Happy New Year, Everyone - Enjoy 2018! “More Than Just a Railway!” ———————————–—————————————————————— New Slogan … and Plenty of New Campaign Strategies “A F I R S T - C L A S S P r e se n t a t i o n f r o m @Playfair15 tonight - lots of well—evidenced analysis and useful recommendations! ….. .... … .. ” — That was how the Above: The Playfair Consulting LMRC ‘re-tweeted’ the St. Group brief LMRC members at their meeting on Tuesday, 28th. November. Andrews-based Playfair Consulting Group for their impressive display at the TheDundee-Levenmouthfinal meeting of 2017 at Fife College, on Methil- Dundee, and its famous haven Road, Buckhaven. Tay railway bridge. The LMRC, and the Connection IImage:: Wiikiidata.. ‘News’ editor Alistair Ayn- scough, thank all of them LAST MONTH The LevenMouth Rail for all that sterling work! Campaign met up with their new He has already adopted the new LMRC campaign ‘mentors’, Playfair Consulting Group, and also Dundee Council ’s transport slogan ‘More Than Just a officials, for an important get together, to Railway’ for these news- discuss just how the Levenmouth rail link letters’ main title-banners. might benefit Dundee in future, and not connection could reduce Dundee’s likely The meeting, on Tues- day, 28th. November, was just Levenmouth. Gregor Hamilton, Head benefits but, by calling at a ‘minor’ plat- to set out new campaign of the Council ’s Planning and Economic form at one or other of the stations
  • Scotland's Key Transport Infrastructure Projects

    Scotland's Key Transport Infrastructure Projects

    Scotland’s key transport infrastructure projects Prepared by Audit Scotland June 2013 Auditor General for Scotland The Auditor General’s role is to: • appoint auditors to Scotland’s central government and NHS bodies • examine how public bodies spend public money • help them to manage their finances to the highest standards • check whether they achieve value for money. The Auditor General is independent and reports to the Scottish Parliament on the performance of: • directorates of the Scottish Government • government agencies, eg the Scottish Prison Service, Historic Scotland • NHS bodies • further education colleges • Scottish Water • NDPBs and others, eg Scottish Police Authority, Scottish Fire and Rescue Service. You can find out more about the work of the Auditor General on our website: www.audit-scotland.gov.uk/about/ags Audit Scotland is a statutory body set up in April 2000 under the Public Finance and Accountability (Scotland) Act 2000. We help the Auditor General for Scotland and the Accounts Commission check that organisations spending public money use it properly, efficiently and effectively. Scotland’s key transport infrastructure projects | 3 Contents Summary 4 Key messages 7 Part 1. Overview of projects and progress to date 12 Part 2. Investment decision-making and management 21 Part 3. Financial management and public reporting 32 Endnotes 43 Appendix 1. Audit methodology 44 Appendix 2. Advantages and disadvantages of different financing methods 45 Exhibit data When viewing this report online, you can access background data by clicking on the graph icon. The data file will open in a new window. 4 | Summary Key facts £1,462 Forth million £745 Replacement million Crossing Oct Mar 2016 2018 Aberdeen Western Borders Peripheral Route/ Railway Balmedie-Tipperty Combined estimated 30-year budget £353 commitment for million the five projects1 Sept £588 £7.5 billion 2015 million Apr 2017 Edinburgh- M8 Glasgow bundle Improvement £650 Programme million Mar 2019 – phase 1 Current estimated building cost Current forecast completion date Note: 1.
  • Ferrymuir Gait, South Queensferry, Edinburgh EH30 9SF Ferrymuir Gait, South Queensferry

    Ferrymuir Gait, South Queensferry, Edinburgh EH30 9SF Ferrymuir Gait, South Queensferry

    FOR SALE PRIME EDINBURGH RESIDENTIAL DEVELOPMENT SITE • Planning Permission in Principle (PPP) for up to 125 residential units • Approx. 4.1 hectares (10.1 acres) • Net Developable Area approx. 3.5 hectares (8.6 acres) • Located within the boundary of The City of Edinburgh ©Aerial Photography Solutions 2014 Approximate area for illustrative purposes only On Behalf of Corus Hotels www.ferrymuirgait.com Ferrymuir Gait, South Queensferry, Edinburgh EH30 9SF Ferrymuir Gait, South Queensferry Proposed Site Layout - all details are approximate The site at Ferrymuir Gait, formerly occupied by the Forth Bridges Hotel, is a prime development site overlooking the Firth of Forth approximately 10 miles from Edinburgh. Extending to approximately 4.1 Ha (10.1 acres), the site occupies a prominent elevated position overlooking the Firth of Forth with excellent access links to Edinburgh and beyond. Planning Permission in Principle (PPP) was granted on 8th October 2015 for up to 125 units, including 25% Affordable Housing, with access from the Varney Estate, to the east of the site. The PPP consent applies to the roads, access, open space and unit numbers but leaves the layout as illustrative and subject to subsequent Approval of Matters Specified in Conditions (AMC) application. SITE DESCRIPTION: • The site is situated in the town of South Queensferry, approx. 1 mile from the station at Dalmeny with regular trains to both Edinburgh (approx. a 20 minute journey) and connections to the north. • The site extends to approx. 4.1 hectares (10.1 acres). Formerly occupied by the Forth Bridges Hotel, the site is now cleared and vacant.
  • Congestion Charging

    Congestion Charging

    No.StB dliilI Edinburgh. In C!4! wontrasts Look at www.transportedinburgh.info for Facts Without Spin Congestion Charging - a Community Perspective 20 Reasons Why You Should Vote Against Congestion Charging Despite the hundreds of concerns and objections expressed at the May 2004 Congestion Charging Public Inquiry, the City of Edinburgh Council remains determined to press ahead with a flawed congestion charging scheme. More than twelve community councils and local organisations took part in the public inquiry. Many were extremely concerned about the negative impact of the congestion charging proposals on their communities. Listed below* are 20 reasons why you should vote “NO” in the February 2005 Referendum. 1. Traffic is projected to increase on over 60 Edinburgh streets in communities which lie between the cordons. Rat-running, as drivers try to avoid the cordons, will impact on everyone. Most affected areas are: Leith Walk, Canonmills, lnverleith and the Botanic Gardens, Dalry-Blackhall, Corstorphine, Marchmont, Morningside, Queen’s Drive, Duddingston and the 6701 orbital route. 2. This is congestion-building scheme, not a congestion-busting scheme. 64% of car journeys will be unaffected, as they are made between the proposed two cordons or inside the inner cordon. 3. Neither details nor a timetable for mitigation of the impacts of the congestion charge on streets which will experience more traffic are available. A report has been promised, but this should have been done at an earlier stage. Mitigation is not always possible (for example, along emergency services routes). Where it is possible, it has a knock-on effect on other neighbourhood streets.
  • Arrol House Rosyth Europarc, Viking Way Rosyth, Fife, Ky11 2Uu

    Arrol House Rosyth Europarc, Viking Way Rosyth, Fife, Ky11 2Uu

    TO LET/ FOR SALE WWW.ARROL-HOUSE.CO.UK ARROL HOUSE ROSYTH EUROPARC, VIKING WAY ROSYTH, FIFE, KY11 2UU Newly Refurbished Open Plan Grade A Office Accommodation Located adjacent to Babcock International, Lloyds Banking Group and Sainsbury’s Bank From 465 - 1,992 sq m (5,000 to 21,446 sq ft) Immediate entry available EPC “B” Classification ARROL HOUSE 02 ROSYTH LOCATION LOCATED ON THE NORTHERN SHORE OF THE FIRTH OF FORTH, ROSYTH EUROPARC OCCUPIES A GATEWAY POSITION WITHIN SCOTLAND’S CENTRAL BELT AND FIFE’S EVOLVING BRIDGEHEAD AREA. A variety of Scotland’s diverse engineering, production, finance and technology companies are situated within South West Fife, taking advantage of the diverse working population and excellent proximity to Scotland’s key office and industrial districts. Rosyth Europarc is particularly well LLOYDS BANK established for its’ easy access to the Scottish motorway networks with direct access to the M90 motorway leading SAINSBURY’S BANK directly to the arterial A9, M8 and M9 motorways. Edinburgh Airport and Edinburgh City Centre are respectively 20 and 25 minutes by road via the Forth Road Bridge and the Forth Replacement Crossing project is currently underway with completion scheduled for June 2017. The new ARROL HOUSE Queensferry Crossing will be of great benefit to Fife and will prompt further development of the Bridgehead area. The location also benefits from a range of public transport amenities including both Inverkeithing and Rosyth railway stations which provide trains to Edinburgh, Glasgow, Aberdeen and Dundee via the national rail network. Inverkeithing railway station provides a direct link to London via the East Coast Main Line.
  • Fife Waterfront Network Proposal

    Fife Waterfront Network Proposal

    FIFE WATERFRONT NETWORK Fife Waterfront Network Proposal Prepared by: James Bell 25 June 2020 Proposal number: 123-4567 FIFE WATERFRONT NETWORK EXECUTIVE SUMMARY Objective To redefine Inverkeithing as a transport hub for walkers and cyclists and promote a sustainable active travel economy, recognising Inverkeithing’s unique location as a gateway from the Forth Road Bridge into and from the Fife Coastal Path, routes 1 and 76 of the National Cycle Network and noting the path’s close proximity to Ferrytoll bus station and Inverkeithing train station. To create sustainable regeneration and bring distinction and investment to Inverkeithing, enhancing its waterfront and access to the Fife Coastal Path for everyone. It will offer potential downstream benefits to Dalgety Bay, Aberdour and beyond. Rationale Over the course of 120 years three iconic bridges have been constructed over the Firth of Forth at the equivalent cost of billions of pounds. In combination with the rich natural splendour of the area and fascinating history, Inverkeithing and towns along the Fife Coastal Path are in a position to capitalise from sustainable tourism growth and self-discovery. The Forth Rail Bridge is an iconic World Heritage Site. The construction of the Queensferry Crossing has eased traffic on the Forth Road Bridge, further enhancing the experience of crossing it on foot or bike on dedicated lanes - but the benefit of this monumental investment has not been fully realised. This is because on exiting the Forth Road Bridge at Inverkeithing the cycle lane immediately degenerates and becomes unfit for purpose. Instead of Inverkeithing being a hub, linking visitors using the Forth Road Bridge and the Fife Coastal Path, the substandard nature of the connection deters visitors from onward exploration into Inverkeithing and beyond, achieving exactly the opposite to what it should.
  • Grand Tour of Britain & Ireland

    Grand Tour of Britain & Ireland

    GRAND TOUR OF BRITAIN & IRELAND 18 Day London to London May 12th - May 30th 2023 ITINERARY Day 1 ARRIVE IN LONDON, ENGLAND Day 2 LONDON (B) Day 3 LONDON–STONEHENGE – WIDECOMBE – PLYMOUTH (B) (D) Day 4 PLYMOUTH–GLASTONBURY–BATH–CARDIFF, WALES (B) Day 5 CARDIFF–TENBY–TRAMORE, IRELAND (B) Day 6 TRAMORE–BLARNEY–KILLARNEY (B) Day 7 KILLARNEY. RING OF KERRY EXCURSION (B) Day 8 KILLARNEY–DINGLE PENINSULA–ADARE–LIMERICK (B) Day 9 LIMERICK–CLIFFS OF MOHER–GALWAY–DUBLIN (B) Day 10 DUBLIN (B) Day 11 DUBLIN–CAERNARVON, WALES–LIVERPOOL, ENGLAND (B) Day 12 LIVERPOOL–LAKE DISTRICT–GRETNA GREEN, SCOTLAND – GLASGOW (B) (D) Day 13 GLASGOW–FORT WILLIAM–INVERNESS–CULLODEN MOOR–HIGHLANDS (B) (D) Day 14 HIGHLANDS–PITLOCHRY–ST. ANDREWS–EDINBURGH (B) Day 15 EDINBURGH (B) Day 16 EDINBURGH–JEDBURGH–YORK, ENGLAND–LEEDS (B) (D) Da7 17 LEEDS–STRATFORD-UPON-AVON–LONDON (B) Day 18 LONDON - Your vacation ends with breakfast this morning. (B) ACCOMMODATIONS Hotels subject to change INCLUDED FEATURES LONDON Novotel London West (F) R/T Motor Coach Shermans Dale to Airport PLYMOUTH Jury Inn (F) Round Trip Airfare CARDIFF Mercure (F) 18 Day Escorted Tour TRAMORE Majestic (ST) 17 Nights Hotel KILLARNEY Killarney Court (F) All Gov’t Taxes & Fees LIMERICK Limerick City Hotel (ST) 18 Full English breakfasts DUBLIN Bonnington (F) 5 three-course dinners with choice of menus LIVERPOOL Holiday Inn Liverpool City Centre (F) Pre Trip Meet & Greet GLASGOW Leoardo Inn West End (F) HIGHLANDS Carrbridge (F) Per person EDINBURGH Novotel Edinburgh Park (F) $4,799* double occupancy LEEDS Holiday Inn (F) LONDON Kensington Close (ST) or Novotel London West (F) JC Smith Travel 5263 Spring Rd *ALL PRICING AND INCLUDED FEATURES ARE BASED ON A MINIMUM OF Shermans Dale 20 PASSENGERS.
  • Access-Statement.Pdf

    Access-Statement.Pdf

    Table of Contents General Information About Us Wheelchair Users Prams Entrance and Pre-Arrival Getting Here By Rail By Bus By Car By Taxi By Bicycle Car Park and Lift Entrance Main Entrance Dynamic Earth Amphitheatre: Earth’s Core and Outside Picnic Area Ticket Desk Cloakroom Tour, Education, and Corporate Entrance to Tour Exhibitions and Access along the Tour Education Classrooms Corporate Events Other Amenities Food Chain Café Public Toilets Natural Selection Gift Shop Ocean Commotion Soft Play Additional Information Assistance Dogs Signage Staff Training First Aid Public Wi-Fi Contact Information Building Diagrams General Information About Us: Our Dynamic Earth is a Five Star Visitor Attraction located in the heart of Edinburgh. Our Dynamic Earth is fully accessible for wheelchair users and prams. We also have additional amenities for those with special access needs including transcripts and audio guides. Our tour experience invites you to take a journey through time to witness the story of planet Earth. Through a series of interactive exhibits, state of the art technology, and a 4D encounter. You will feel the heat of a bubbling volcano, face the chill of polar ice, and fly across the globe before crash landing in a tropical rainforest. Hours of Operation: April through October open everyday from 10:00 – 17:30 (last admission 16:00). July and August open from 10:00 – 18:00 (last admission 16:30). November through March open Wednesday to Sunday (closed Monday and Tuesday) 10:00 – 17:30 (last admission 16:00). Please check our website prior to your visit. Wheelchair Users: The Dynamic Earth tour is fully accessible for wheelchair users.