Revised Bid Page 6/26/19

Bid Page for Water Treatment PART A ‐ MONTHLY AND QUARTERLY ADDITIONAL MAINTENANCE Quarterly Additional Maintenance to be performed at same Monthly Maintenance YEAR 1 time as Monthly Maintenance ABCDEFGHI Quarterly Additional Maintenance Price ‐ this item is for work NOT Est. Quantity of covered under the "Monthly Quarterly Additional Total Cost for Quarterly Est. Quantity of Monthly Maintenance Total Cost for Monthly Maintenance Price" (i.e. this Item is Total Extended Cost Item No. Site Address Maintenance Visits (to Additional Maintenance Monthly Visits Price Maintenance (C x D) an additional fee to the monthly (Add column E and H) be done same time as (F x G) maintenance rate in Column D, and monthly visit) only applies when the Quarterly visit is performed) 1902 W. 19th St. 1 Abe Stark Rink Brooklyn, NY 11214 10 3 1234 5th Ave. 2 North New York, NY 10029 62 125‐40 Roosevelt Ave. 3 FMCP Aquatic Center Flushing, NY 11368 12 4 181 East End Ave. 4 Gracie Mansion New York, NY 10028 12 4 171 East Drive 5 Lakeside Rink Brooklyn, NY 11225 12 4 East Drive & W. 110th St. 6 Lasker Rink/Pool , New York, NY 10026 62 776 Lorimer St. 7 McCarren Pool and Playhouse Brooklyn, NY 11225 62 52‐01 Grand Central Parkway 8 Queens Museum of Art FMCP Queens, NY 11368 62 65 St. Transverse 9 Central Park New York, NY 10065 62 625 Father Capodanno Blvd. 10 Ocean Breeze Athletic Center Staten Island, NY 10301 12 4 SI WWII Memorial 1321 Victory Blvd. 11 Ice Rink Staten Island, NY 10301 62 2530 Jerome Avenue 12 St. James Rec Center Bronx, NY 10468 3 0$ 500.00 $ ‐ 450 St. Ann's Avenue Bronx, NY 13 St. Mary's Rec Center 10455 6 0$ 500.00 $ ‐ 117‐02 Roosevelt Ave. 14 Olmsted Center Corona, NY 11368 6 20 Bronx Shore Road 15 Five Boro Complex , NY 10035 6 3808 Victory Boulevard 16 Greenbelt Native Plant Center Staten Island, NY 10314 6 Chelsea 430 W 25th St. 17 Recreation New York, NY 10001 4

PART A TOTAL (Total Maintenance #1‐17) PART B ‐ Chemicals,Time & Materials Total Price (Quantity * Unit Item No. Est. Quantity Item Description Unit Unit Price Price) Site Specific Legionella Testing 18 (Stand‐Alone Test) 6 Per Test Labor Rate for Installation and 19 Repair 12 (Straight Time) Per Hour Labor Rate for Installation and 20 Repair 6 (Overtime) Per Hour

21 Oxidizing cooling tower biocide 97 5‐gallon pail

22 Non‐oxidizing cooling tower biocide 49 5‐gallon pail Corrosion inhibitor for cooling 23 tower 29 5‐gallon pail

24 Steam boiler treatment chemical 6 5‐gallon pail

25 HW boiler treatment chemical 10 5‐gallon pail

26 Chilled water treatment chemical 2 5‐gallon pail

27 Brine system treatment chemical 6 5‐gallon pail

28 Other Materials & Equipment Lump Sum$ 5,000.00 Profit and Overhead on Materials 29a (not to exceed 20%) Percentage Multiply percentage of item #28 by 29b #29a and enter amount at right

PART B TOTAL (ITEMS #18‐29b)

YEAR 1 TOTAL (PART A + PART B)

VENDOR NAME ______

VENDOR TAX ID: ______Revised Bid Page 6/26/19

Bid Page for Water Treatment PART A ‐ MONTHLY AND QUARTERLY ADDITIONAL MAINTENANCE Quarterly Additional Maintenance to be performed at same Monthly Maintenance YEAR 2 time as Monthly Maintenance ABCDEFGHI Quarterly Additional Maintenance Price ‐ this item is for work NOT Est. Quantity of covered under the "Monthly Quarterly Additional Total Cost for Quarterly Est. Quantity of Monthly Maintenance Total Cost for Monthly Maintenance Price" (i.e. this Item is Total Extended Cost Item No. Site Address Maintenance Visits (to Additional Maintenance Monthly Visits Price Maintenance (C x D) an additional fee to the monthly (Add column E and H) be done same time as (F x G) maintenance rate in Column D, and monthly visit) only applies when the Quarterly visit is performed) 1902 W. 19th St. 1 Abe Stark Rink Brooklyn, NY 11214 10 3 1234 5th Ave. 2 Arsenal North New York, NY 10029 62 125‐40 Roosevelt Ave. 3 FMCP Aquatic Center Flushing, NY 11368 12 4 181 East End Ave. 4 Gracie Mansion New York, NY 10028 12 4 171 East Drive 5 Lakeside Rink Brooklyn, NY 11225 12 4 East Drive & W. 110th St. 6 Lasker Rink/Pool Central Park, New York, NY 10026 62 776 Lorimer St. 7 McCarren Pool and Playhouse Brooklyn, NY 11225 62 52‐01 Grand Central Parkway 8 Queens Museum of Art FMCP Queens, NY 11368 62 65 St. Transverse 9 Wollman Rink Central Park New York, NY 10065 62 625 Father Capodanno Blvd. 10 Ocean Breeze Athletic Center Staten Island, NY 10301 12 4 SI WWII Memorial 1321 Victory Blvd. 11 Ice Rink Staten Island, NY 10301 62 2530 Jerome Avenue 12 St. James Rec Center Bronx, NY 10468 3 0$ 500.00 $ ‐ 450 St. Ann's Avenue Bronx, NY 13 St. Mary's Rec Center 10455 6 0$ 500.00 $ ‐ 117‐02 Roosevelt Ave. 14 Olmsted Center Corona, NY 11368 6 20 Bronx Shore Road 15 Five Boro Complex Manhattan, NY 10035 6 3808 Victory Boulevard 16 Greenbelt Native Plant Center Staten Island, NY 10314 6 Chelsea 430 W 25th St. 17 Recreation New York, NY 10001 4

PART A TOTAL (Total Maintenance #1‐17) PART B ‐ Chemicals,Time & Materials

Total Price (Quantity * Item No. Est. Quantity Item Description Unit Unit Price Unit Price) Site Specific Legionella Testing (Stand‐Alone 18 6 Test) Per Test Labor Rate for Installation and Repair 19 12 (Straight Time) Per Hour Labor Rate for Installation and Repair 20 6 (Overtime) Per Hour

21 Oxidizing cooling tower biocide 97 5‐gallon pail

22 Non‐oxidizing cooling tower biocide 49 5‐gallon pail

23 Corrosion inhibitor for cooling tower 29 5‐gallon pail

24 Steam boiler treatment chemical 6 5‐gallon pail

25 HW boiler treatment chemical 10 5‐gallon pail

26 Chilled water treatment chemical 2 5‐gallon pail

27 Brine system treatment chemical 6 5‐gallon pail

28 Other Materials & Equipment Lump Sum$ 5,000.00 Profit and Overhead on Materials 29a (not to exceed 20%) Percentage Multiply percentage of item #28 by #29a and 29b enter amount at right

PART B TOTAL (ITEMS #18‐29b)

YEAR 2 TOTAL (PART A + PART B)

GRAND TOTAL (Year 1 and 2)

VENDOR NAME ______

VENDOR TAX ID: ______